Foundation Plan: F-2 F-2 F-1 F-2 F-2 200 RAFT 200 RAFT

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

B

2 3 5 6 7 8 9

3615 2465 1350 2200 1615 3615

1650
1350 1350 1350 1350

1650
1350
1350

A A
F-2 F-2 F-2 F-2
F-1
200 RAFT 200 RAFT

1350
1350
#4@300CC
TOP MESH
4700

4700
#4@300CC
BOTTOM MESH

1650 1650 3600 1650

1500
B B
1650

1650

1650
F-1 F-3 F-1
F-1 1650
1650
100

1650
1650
F-1
F-1
4850

4850
200 RAFT 200 RAFT

1650

1650 3600 1650

1650
1650
1500
1650

F-1
C C
A A
F-1 F-4 F-1
4300

4300
1350 1650
2800
1650
1650
1350
1350

D D
1650

F-2
F-1 F-1
1700

1700
3000

E E
1650

200 RAFT F-6 200 RAFT


1500

3715 2240 225 1350 2200 1615 3715

1 3 4 5 6 7 8 10

FOUNDATION PLAN
NOTES:
1. EXCAVATE TO FIRM GROUND & COMPACT BEFORE PCC.
2. PROVIDE TERMITE PROOFING.
3. ALL CONC MACHINE MIX. STEEL NOTE:
4. CONCRETE MIXING TIME AFTER ADDING WATER MIN 1.5 MINUTES. 1- FOUND, COLS, BEAMS, SLAB GRADE - 60
5. USE DEFORMED STEEL GRADE-60. 2- STIRRUPS, TIES, W. TANKS GRADE- 60
6. ALL RCC 1:2:4 WELL MIX, VIB CONCRETE NOTE:
7. USE STEEL / PLY FROM WORK. 1- ALL RCC COLUMNS CONCRETE 4000 PSI
8. ALL WORK TO BE CHECKED BY CIVIL /STRUCTURE ENGINEER 2- ALL OTHER RCC FOOTING, BEAMS, SLAB & WALLS 3000 PSI
FOR SAFE & STABLE CONSTRUCTION. 3- THIS IS RCC FRAME STRUCTURE BUILDING PARTITION WALLS ON FLOOR
9. LAYOUT TO BE DONE FROM ARCHITECTURAL DRAWINGS. SHALL BE 12" HOLLOW BLOCK, 8" HOLLOW BLOCK OR 4" BRICK WALLS
10. COVERS: 4- GET STEEL & SHUTRING CHEAKED BEFORE CONCRETE
FOUNDATION = 25mm 5- GET CONCRETE SAMPLES 6"x12" CYCLENDER TESTED
SLAB = 18mm 6 Nos AT FOUNDATIONS, ALL COLUMN LEVELS AND ALL SLAB LEVELS,
3 Nos AT 7 DAYS & 3 Nos AT 28 DAYS
COLUMNS = 25mm 6- MINIMUM OF 300 WELL GRADED GRAVEL/SAND BLEND
BEAMS = 25mm CUSHION (COMPACTED TO 95 % MAXIMUM DRY DENSITY)
REVISION
13. SUBMERGE BRICKS IN WATER TANK 24 HOURS BEFORE USE. NO DATE

10 M -14.
A &ALL
B CM TO BE MACHINE MIXED. 01 25-01-2020

PROJECT NO: DATE: DESIGN BY: PROJECT: OWNER: TITLE: CONSULTANT: STATUS:

17-04-2018
DRAWING NO: SCALE:
DRAWN BY: RESIDENCIAL BUILDING, 2nd Floor, Plot # 14-D West, Feroz Centre,
Fazul-Ul-Haq Road,Blue area, Islamabad.
Fax: 92-51-2273389 CONSTRUCTION DRAWING
AS SHOWN CHECKE BY:
EIGHTEEN E-mail: [email protected]
Web: www.meinhardtgroup.com

You might also like