Foundation Plan: F-2 F-2 F-1 F-2 F-2 200 RAFT 200 RAFT
Foundation Plan: F-2 F-2 F-1 F-2 F-2 200 RAFT 200 RAFT
Foundation Plan: F-2 F-2 F-1 F-2 F-2 200 RAFT 200 RAFT
2 3 5 6 7 8 9
1650
1350 1350 1350 1350
1650
1350
1350
A A
F-2 F-2 F-2 F-2
F-1
200 RAFT 200 RAFT
1350
1350
#4@300CC
TOP MESH
4700
4700
#4@300CC
BOTTOM MESH
1500
B B
1650
1650
1650
F-1 F-3 F-1
F-1 1650
1650
100
1650
1650
F-1
F-1
4850
4850
200 RAFT 200 RAFT
1650
1650
1650
1500
1650
F-1
C C
A A
F-1 F-4 F-1
4300
4300
1350 1650
2800
1650
1650
1350
1350
D D
1650
F-2
F-1 F-1
1700
1700
3000
E E
1650
1 3 4 5 6 7 8 10
FOUNDATION PLAN
NOTES:
1. EXCAVATE TO FIRM GROUND & COMPACT BEFORE PCC.
2. PROVIDE TERMITE PROOFING.
3. ALL CONC MACHINE MIX. STEEL NOTE:
4. CONCRETE MIXING TIME AFTER ADDING WATER MIN 1.5 MINUTES. 1- FOUND, COLS, BEAMS, SLAB GRADE - 60
5. USE DEFORMED STEEL GRADE-60. 2- STIRRUPS, TIES, W. TANKS GRADE- 60
6. ALL RCC 1:2:4 WELL MIX, VIB CONCRETE NOTE:
7. USE STEEL / PLY FROM WORK. 1- ALL RCC COLUMNS CONCRETE 4000 PSI
8. ALL WORK TO BE CHECKED BY CIVIL /STRUCTURE ENGINEER 2- ALL OTHER RCC FOOTING, BEAMS, SLAB & WALLS 3000 PSI
FOR SAFE & STABLE CONSTRUCTION. 3- THIS IS RCC FRAME STRUCTURE BUILDING PARTITION WALLS ON FLOOR
9. LAYOUT TO BE DONE FROM ARCHITECTURAL DRAWINGS. SHALL BE 12" HOLLOW BLOCK, 8" HOLLOW BLOCK OR 4" BRICK WALLS
10. COVERS: 4- GET STEEL & SHUTRING CHEAKED BEFORE CONCRETE
FOUNDATION = 25mm 5- GET CONCRETE SAMPLES 6"x12" CYCLENDER TESTED
SLAB = 18mm 6 Nos AT FOUNDATIONS, ALL COLUMN LEVELS AND ALL SLAB LEVELS,
3 Nos AT 7 DAYS & 3 Nos AT 28 DAYS
COLUMNS = 25mm 6- MINIMUM OF 300 WELL GRADED GRAVEL/SAND BLEND
BEAMS = 25mm CUSHION (COMPACTED TO 95 % MAXIMUM DRY DENSITY)
REVISION
13. SUBMERGE BRICKS IN WATER TANK 24 HOURS BEFORE USE. NO DATE
10 M -14.
A &ALL
B CM TO BE MACHINE MIXED. 01 25-01-2020
PROJECT NO: DATE: DESIGN BY: PROJECT: OWNER: TITLE: CONSULTANT: STATUS:
17-04-2018
DRAWING NO: SCALE:
DRAWN BY: RESIDENCIAL BUILDING, 2nd Floor, Plot # 14-D West, Feroz Centre,
Fazul-Ul-Haq Road,Blue area, Islamabad.
Fax: 92-51-2273389 CONSTRUCTION DRAWING
AS SHOWN CHECKE BY:
EIGHTEEN E-mail: [email protected]
Web: www.meinhardtgroup.com