The document provides spring constants for single piles and pile groups of varying sizes. For a single pile, the horizontal spring constant is 0.18 T/mm and vertical spring constant is 4.167 T/mm. For a group of 2 piles, the horizontal, vertical, and rotational spring constants are provided. The spring constants scale based on the number of piles and their configuration. Formulas are given to calculate the spring constants for pile groups of up to 5 piles.

Uploaded by

adihind
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views12 pages

Support Spring Calculations-11.10.17 For Cooling Tower Area

The document provides spring constants for single piles and pile groups of varying sizes. For a single pile, the horizontal spring constant is 0.18 T/mm and vertical spring constant is 4.167 T/mm. For a group of 2 piles, the horizontal, vertical, and rotational spring constants are provided. The spring constants scale based on the number of piles and their configuration. Formulas are given to calculate the spring constants for pile groups of up to 5 piles.

Uploaded by

adihind
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

For Single Pile

Lateral Capacity of pile = 7.2 KN (for Static case and allowable deflection = 5 mm)

Therefore,
Horizontal spring value = 1.25 x0.72/5 = 0.18 T/mm
i.e. KFx = KFz = 0.18 T/mm

Whereas,
Vertical Pile capacity = 1.25 X 51 = 63.75 T (For 12 mm Vertical Settlment)
Vertical spring value = 63.75 / 12 = 5.3125 T/mm

For Group of 2 Piles -

1.5

Rotation of pilecap -
F

=1

=1
F
0.75 0.75

1.5

Vertical spring constant KFY = 5.3125 x 2 = 10.625 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 2 = 0.36 T/mm

Rotational Spring Constant KMx = 0 T-m /degree

KMz = 5.3125 x 1.5 = 104.31 T-m /degree


tan-1(1/750)

KMy = 0.18 x 2 x 0.750 = 3.534 T-m /degree


tan-1(1/750)
For Group of 3 Piles -

5
1.

1.3
1.5

Rotation of pilecap -
F

=1

=1
F
0.65 0.65

1.3

Vertical spring constant KFY = 5.3125 x 3 = 15.9375 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 3 = 0.54 T/mm

Rotational Spring Constant KMx = 5.3125 x 0.866 + 5.3125 x ( 1/866) x 433 x 0.433 x 2 = 104.3 T-m /degree
tan-1(1/866)

KMz = 5.3125 x 1.5 = 104.3 T-m /degree


tan-1(1/750)

KMy = 0.18 x 3 x 0.866 = 7.07 T-m /degree


tan-1(1/866)
For Group of 4 Piles -

1.5
1.5

Rotation of pilecap @ X-X axis or @ Z-Z axis

=1

=1
F
0.75 0.75

1.5

Vertical spring constant KFY = 5.3125 x 4 = 21.25 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 4 = 0.72 T/mm

Rotational Spring Constant KMx, KMz = 5.3125 x 2 x 1.5 = 208.62 T-m /degree
tan-1(1/750)

KMy = 0.18 x 4 x 1.060 = 14.12 T-m /degree


tan-1(1/1060)
For Group of 5 Piles -

X
1.5

2.121
2.121

Rotation of pilecap @ X-X axis or @ Z-Z axis

=1

=1
F
1.0605 1.0605

2.121

Vertical spring constant KFY = 5.3125 x 5 = 26.5625 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 5 = 0.9 T/mm

Rotational Spring Constant KMx, KMz = 5.3125 x 2 x 2.121 = 417.12 T-m /degree
tan-1(2/2121)

KMy = 0.18 x 4 x 1.5 = 28.27 T-m /degree


tan-1(1/1500)
For Single Pile

Lateral Capacity of pile = 7.2 KN (for Static case and allowable deflection = 5 mm)

Therefore,
Horizontal spring value = 1.25 x0.72/5 = 0.18 T/mm
i.e. KFx = KFz = 0.18 T/mm

Whereas,
Vertical Pile capacity = 1.25 X 40 = 50 T (For 12 mm Vertical Settlment)
Vertical spring value = 50 / 12 = 4.167 T/mm

For Group of 2 Piles -

1.5

Rotation of pilecap -
F

=1

=1
F
0.75 0.75

1.5

Vertical spring constant KFY = 4.167 x 2 = 8.334 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 2 = 0.36 T/mm

Rotational Spring Constant KMx = 0 T-m /degree

KMz = 4.167 x 1.5 = 81.82 T-m /degree


tan-1(1/750)

KMy = 0.18 x 2 x 0.750 = 3.534 T-m /degree


tan-1(1/750)
For Group of 3 Piles -

5
1.

1.3
1.5

Rotation of pilecap -
F

=1

=1
F
0.65 0.65

1.3

Vertical spring constant KFY = 4.167 x 3 = 12.501 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 3 = 0.54 T/mm

Rotational Spring Constant KMx = 4.167 x 0.866 + 4.167 x ( 1/866) x 433 x 0.433 x 2 = 81.81 T-m /degree
tan-1(1/866)

KMz = 4.167 x 1.5 = 81.81 T-m /degree


tan-1(1/750)

KMy = 0.18 x 3 x 0.866 = 7.07 T-m /degree


tan-1(1/866)
For Group of 4 Piles -

1.5
1.5

Rotation of pilecap @ X-X axis or @ Z-Z axis

=1

=1
F
0.75 0.75

1.5

Vertical spring constant KFY = 4.167 x 4 = 16.668 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 4 = 0.72 T/mm

Rotational Spring Constant KMx, KMz = 4.167 x 2 x 1.5 = 163.64 T-m /degree
tan-1(1/750)

KMy = 0.18 x 4 x 1.060 = 14.12 T-m /degree


tan-1(1/1060)
For Group of 5 Piles -

X
1.5

2.121
2.121

Rotation of pilecap @ X-X axis or @ Z-Z axis

=1

=1
F
1.0605 1.0605

2.121

Vertical spring constant KFY = 4.167 x 5 = 20.835 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 5 = 0.9 T/mm

Rotational Spring Constant KMx, KMz = 4.167 x 2 x 2.121 = 327.18 T-m /degree
tan-1(2/2121)

KMy = 0.18 x 4 x 1.5 = 28.27 T-m /degree


tan-1(1/1500)
For Single Pile

Lateral Capacity of pile = 7.2 KN (for Static case and allowable deflection = 5 mm)

Therefore,
Horizontal spring value = 1.25 x0.72/5 = 0.18 T/mm
i.e. KFx = KFz = 0.18 T/mm

Whereas,
Vertical Pile capacity = 1.25 X 20 = 25 T (For 12 mm Vertical Settlment)
Vertical spring value = 25 / 12 = 2.08 T/mm

For Group of 2 Piles -

1.5

Rotation of pilecap -
F

=1

=1
F
0.75 0.75

1.5

Vertical spring constant KFY = 2.08 x 2 = 4.16 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 2 = 0.36 T/mm

Rotational Spring Constant KMx = 0 T-m /degree

KMz = 2.08 x 1.5 = 40.84 T-m /degree


tan-1(1/750)

KMy = 0.18 x 2 x 0.750 = 3.534 T-m /degree


tan-1(1/750)
For Group of 3 Piles -

5
1.

1.3
1.5

Rotation of pilecap -
F

=1

=1
F
0.65 0.65

1.3

Vertical spring constant KFY = 2.08 x 3 = 6.24 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 3 = 0.54 T/mm

Rotational Spring Constant KMx = 2.08 x 0.866 + 2.08 x ( 1/866) x 433 x 0.433 x 2 = 40.84 T-m /degree
tan-1(1/866)

KMz = 2.08 x 1.5 = 40.84 T-m /degree


tan-1(1/750)

KMy = 0.18 x 3 x 0.866 = 7.07 T-m /degree


tan-1(1/866)
For Group of 4 Piles -

1.5
1.5

Rotation of pilecap @ X-X axis or @ Z-Z axis

=1

=1
F
0.75 0.75

1.5

Vertical spring constant KFY = 2.08 x 4 = 8.32 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 4 = 0.72 T/mm

Rotational Spring Constant KMx, KMz = 2.08 x 2 x 1.5 = 81.68 T-m /degree
tan-1(1/750)

KMy = 0.18 x 4 x 1.060 = 14.12 T-m /degree


tan-1(1/1060)
For Group of 5 Piles -

X
1.5

2.121
2.121

Rotation of pilecap @ X-X axis or @ Z-Z axis

=1

=1
F
1.0605 1.0605

2.121

Vertical spring constant KFY = 2.08 x 5 = 10.4 T/mm

Horizontal spring Constant KFx, KFz = 0.18 x 5 = 0.9 T/mm

Rotational Spring Constant KMx, KMz = 2.08 x 2 x 2.121 = 163.31 T-m /degree
tan-1(2/2121)

KMy = 0.18 x 4 x 1.5 = 28.27 T-m /degree