CE155P-2 Estimating, BOQ and BOM

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 26

INTRODUCTION TO

ESTIMATING
ENGR. JYZEL CRIS B. FACTOR

ENGR. JYZEL CRIS B. FACTOR


DEFINITION

Basic estimating is the analysis


of the work to be performed,
including the type of quantity of
the work, the type and size of the
equipment to be used during
construction, production rates of
labor and equipment to install
the work and other job site
conditions that are unique to the
project and that can impact time
and cost of construction.

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


PURPOSE

• To apply proper unit cost to these items


to determine the forecast cost required
to complete the project in accordance
with the contract plans and
specifications.

• To determine the quantities of labor,


material and equipment for a given
project and to

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


TYPES OF ESTIMATES

FEASIBILITY STUDY PRELIMINARY DETAILED PROCUREMENT CONSTRUCTION


ENGINEERING ENGINEERING

INITIAL BID
RE - ESTIMATE RE - ESTIMATE
ESTIMATE ESTIMATE

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


TYPES OF ESTIMATES
• Approximate Estimate

• Detailed Estimate

THEORY OF STRUCTURES 2| Engr. Kevin Paolo V. Robles


MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering
PREPARATION OF DETAILED ESTIMATE
1. Thorough review of contract documents
2. Thorough review of bidding and
contract documents
3. Thorough review of drawings and
technical specifications
4. Propose site visits
5. Material Quantity Take Off Preparation
6. Indirect Cost Preparation
7. Risk of Uncertainties is conducted
8. Profit is added to the estimate
MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering
PREPARATION OF DETAILED ESTIMATE
1. Thorough review of contract documents
2. Thorough review of bidding and
contract documents
Factors that can influence the construction
3. Thorough review of drawings and cost :
technical specifications a. Available space for storage of materials
4. Propose site visits b. Control of traffic
c. Security
5. Material Quantity Take Off Preparation d. Existing underground and
aboveground utilities
6. Indirect Cost Preparation e. Zonal description of site
f. Local laws governing the site
7. Risk of Uncertainties is conducted
8. Profit is added to the estimate
MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering
PREPARATION OF DETAILED ESTIMATE
1. Thorough review of contract documents What should we consider in Quantity Take
Off:
2. Thorough review of bidding and
1. Know how the project is to be
contract documents constructed
2. Review the drawings, the material
3. Thorough review of drawings and quantities
3. Basis of costing is the unit costs from
technical specifications
suppliers. Take note of delivery charges
4. Propose site visits and taxes.
4. Calculate the quantity of work done
5. Material Quantity Take Off Preparation considering the available equipment
5. Quantity of Work considering the labor
6. Indirect Cost Preparation and manpower
6. Subcontracting
7. Risk of Uncertainties is conducted 7. Common error of estimate
8. Profit is added to the estimate
MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering
FACTORS AFFECTING THE DECISION TO BID
1. The investment of time and money to prepare an estimate
2. The risk that may occur during construction.
3. Availability of Labor and Equipment
4. Current amount of work
5. Geographic Location
6. Complexity of the project
7. Owner and designer’s reputation
8. Potential of making a profit after the project is completed

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


ROLE OF AN ESTIMATOR
To be an estimator, an individual needs to go a step further. He or she must:

• Be able, to visualize the project


• Have enough construction experience productivity
• Have sufficient knowledge of labor operations and
• Be able to keep a database of information
• Be computer literate
• Be able to meet bid deadlines and still remain calm.
• Have good writing and presentation skills.

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


THE ESTIMATING PROCESS
1. Standardization
2. Kick-off meeting
3. Estimating Work Plan
4. Thorough documentation
5. Well executed estimate review
6. Formulation of estimating team

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


THE ESTIMATING PROCESS
OBTAIN BID
INFORMATION

DECISION TO PARTICIPATE IN THE BID NO END


YES

KICKOFF MEETING AND


CREATION OF ESTIMATING TEAM

DEVELOP ESTIMATE WORK PLAN


UPDATE ESTABLISH
DATABASE PREPARE ESTIMATE STANDARDS
REALITY CHECK
(Based on Internal DOCUMENT ESTIMATE REVISE ESTIMATE
Review) (Based on External
Review)
ESTIMATE REVIEW ESTIMATE LESSONS
FEEDBACK LEARNED
ADJUST YES
ESTIMATE?
NO

PROJECT EXECUTION

PROJECT COMPLETION
THE ESTIMATING PROCESS

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


THE ESTIMATING PROCESS

MAPUA UNIVERSITY – School of Civil, Environmental and Geological Engineering


BILL OF QUANTITIES VS. BILL OF
MATERIALS?
ENGR. JYZEL CRIS B. FACTOR

ENGR. JYZEL CRIS B. FACTOR


BILL OF QUANTITY VS. BILL OF MATERIALS

• BILL OF QUANTITIES
• A Bill of Quantities or BOQ is a document used for tendering in the construction
industry. It contains a list of materials or supplies in which the cost for all parts or rates
for combined materials and labor and their costs are itemized.
• contains a list of material with a combined labor and materials rate or price value.

• BILL OF MATERIALS
• Bill of Materials is a list of each individual material item required in order to complete
the whole project or process.
BILL OF QUANTITIES: DIVISION
• General Condition » Doors & Windows
• Site Works » Finishes
• Concrete » Specialties
• Masonry
» Mechanical & Sanitary
• Metals
» Electrical
• Wood and Plastics
» Construction Plant and Equipment
• Thermal & Moisture Protection
BILL OF MATERIALS SHEET
BILL OF QUANTITY SHEET
BILL OF QUANTITY SHEET
BILL OF QUANTITY SHEET
BILL OF QUANTITY SHEET
BILL OF QUANTITY SHEET
BILL OF QUANTITY SHEET
PROJECT REQUIREMENT
FOR CE155P-2
ENGR. JYZEL CRIS B. FACTOR

ENGR. JYZEL CRIS B. FACTOR


PROJECT REQUIREMENT:

Project (by group) for Module 2

1. Refer to the layout of Two-Storey Residential Unit


2. Estimate the following structural members:
1. Siteworks (Excavation, Disposal, Backfill)
2. Rebar works (total kg of rebar per structural members)
3. Concrete (total volume per floor)
4. Formworks (total area per floor)
5. Finishing (plastering, painting, tilting works, etc.)
3. Prepare a Bill of Quantities and computation of each structure in an excel file.
4. Include the updated price list of the materials.
5. Provide your references.

Criteria:
Written Report (A4 bondpaper) – 50%
Project Presentation (Individual) - 30%
Project Presentation (Report) - 20%