2021 NPM CENTRAL PROGRAM OVERVIEW - Rev1
2021 NPM CENTRAL PROGRAM OVERVIEW - Rev1
• Best Azimuth Detection base on User • IBC Driveless Optimization Kecamatan with
SE Improvement Good RSRP & CQI
demarcation
New features and Volte Tool Consistency Signaling & Planning Optimization by MR
Capacity optimization • LAC, RAC, TAC Island Audit & Dimensioning - NMS KPI
Management
• Spectral Efficiency Optimization • PCI Retune - Spectrum Efficiency
Project Quality Control Tool PMT & CMT • L1800 Spectrum Optimization - Network NPS (+14)
(RAN Project) • RB 100% Capacity maximization Project Monitoring - Benchmarking
Tool SON • Resource Balancing • Maintain and Improve Unlock, ATP/PAC,
Rank
• QoS Audit and Alignment QAC
Tool Geo • Acceptance Digitalization
Note: Achievement
Tools and Automation
Integrate RF Database with • SON Optimization NPS Target still on review
NIMS • Geo Tools • NPS Cities proactive monitoring and discussion
• PMT/CMT
Capacity Optimization • Integrate RF Database with NIMS New Technology
• Dashboard & Alerting • New Feature and strategy
Signaling Optimization • Volte, Nb IoT, etc
• Auto Alert payload degradation
VIP Improvement • XLC & Iconic IBC Monitoring
• Audit and Consistency management
CEM NPS TNPS
New Technology
2021 Optimization Program – What need to be update?
DRIVETES & DRIVELESS OPTIMIZATION & HYGIENE
Action Expected Result
Action Expected Result
Physical Tuning
Drivetest ▲ % SINR >= 5 dB • Overlap
Baseline
• Overshoot
Payload Increase
Progress
▲ % RSRP >= -100 dBm • Undershoot SE Improve
Badspot
Register
Hygiene PRB Flat Reduce
▲ % MR RSRP >= -105 dBm • Sleeping Cell LTC Improve
Badspot • High RSSI
Closing ▲ % MR CQI >= 7 • High VSWR
• Low NAV (Flicker)
• Low Rank2
• Partial Cross Feeder
• Cross Feeder
• Unbalance
Priority
1. NPS CITY
2. FOCUS CITY
NPS City
3. NATIONAL
CITY FOCUS OPTIMIZATION REGION Kabupaten
REGION Count of Kabupaten CENTRAL KOTA BANDUNG
CENTRAL KOTA SEMARANG
CENTRAL 69
CENTRAL KOTA YOGYAKARTA
CITY DRIVELESS OPTIMIZATION CENTRAL KOTA TEGAL
CENTRAL KOTA TASIKMALAYA
REGION Count of Kabupaten CENTRAL KAB. CIREBON
CENTRAL 86 CENTRAL KOTA BANJARMASIN
CENTRAL KOTA PALANGKARAYA
2021 Optimization Program Optim & Hygine SOW
Optimization SOW
Values Total SOW OPEN CLOSED Remark
#CellName 17439 13946 18475 Number Unique Cell with all below issue
Low SE 11034 8860 9261 BH DL Spectral Efficiency in a week < 1.25
SE <1 5183 3626 3903 P1 : 0 - 1
SE 1 - <1.25 5851 5234 5358 P2 : 1 - 1.25
Avail <95 1699 1110 3117 WD Availibilitty in a week <95%
Flicker >=3hour 141 141 669 P1 : Flicker >=3 Hours for hourly availibility <95% in a week
Flicker 1 - 2 hour 790 741 1309 P2 : Flicker 1 -2 Hours for hourly availibility <95% in a week
RTWP > -105 34 45 278 Daily minimum UL Interference >-105 in a week
RB Flat <98 3308 419 1600 Flatness RB >18 hours ratio and Max RB < 98 in a week (No Transport Congestion)
VSWR > 1.4 447 327 554 NEEDquery
Based on VSWR UPDATE LATEST SOW-OPEN-CLOSED
Port Unbalance 1311 373 4404 Gap UL RSSI or GAP UL SINR > 6db
Sleeping Cell 0 5 3 Weekly average for daily availibilty >95% and 0 attempt
Cross Feeder 159 745 63 Based on query by OMStar
Intra Sector Unbalance 4306 3724 2415 Gap between BH DL RB Utilization >30% in a co- located sector
RANK2 < 20 2242 1471 621 Weekly average for daily busy hour user rank2 (include rank4 if any)< 20%, followed by all above hygine issue
Coverage distance > 1st tier site distance and 90% TA distribution > 1st tier site distance and QPSK ratio >35% and BH DL PRB
Over shoot 1005 265 711
>75%
Under shoot 926 1968 777 Coverage distance < 50% TA distribution and RSRP <-105
Overlap 8762 7698 6915 BH Low DL SE and QPSK > 30%
Sharring Traffic 60 84 161 Cell with DL PRB Utilization > 75% with surrounding site low payload category
Optimization
What’s new in 2021? Spectral Efficiency Improvement
QPSK Based Overlap Category
The spectral efficiency is simply the number of bits transmitted over a frequency
bandwidth in a specific time and is measured in bits/s/Hz.
Far
𝐷𝐿_𝑃𝑎𝑦𝑙𝑜𝑎𝑑 𝑏𝑖𝑡 /3600𝑠𝑒𝑐𝑜𝑛𝑑 Yes
𝐷𝐿 𝑆𝑝𝑒𝑐𝑡𝑟𝑢𝑚 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 = QPSK Dist >1st
𝑈𝑠𝑒𝑑 𝑅𝑒𝑠𝑜𝑢𝑟𝑐𝑒 𝐵𝑙𝑜𝑐𝑘 𝐵𝑎𝑛𝑑𝑤𝑖𝑑𝑡ℎ (𝐻𝑧) Tier Distance
No
So any root causes that make Low DL Cell Throughput will direct impact to low SE :
1. Transport congestion will choke capability to get higher cell throughput even in Near
Yes
good radio condition with high MCS index 1st Tier Distance QPSK Dist < half
Calculation of TA
2. Bad radio condition, the most basic and common factor that controls the spectral Distribution
efficiency and throughput is the radio quality. If the quality network is bad, then No
that puts a limit on the throughput gain that it can achieve. A higher quality will
result in a higher CQI value and consequently, a higher MCS index (more QPSK
efficient). Distribution
Plotting
Transport
High Payload Yes MCS Mapping & • Based on location of Overlap can be divided to :
>10x Scheduling
Congestion • Nearby cell : CEU distributed nearer than average TA distribution
BH_Target Optimization
• Far : CEU distributed after 1st tier site
Hygiene No
• Middle : CEU distributed within TA distribution but still in between 1st tier site
Check
1. Near site overlap
Non L1800 L1800 Yes 2. Mid site overlap
Layering Check
Overlapped 3. Far site overlap
4. End cell overlap
RAN Task Achievement NATIONAL
Good SINR Achievement (%) Good RSRP Achievement (%) DT Badspot Progress %
% Ach % Ach % Ach
Region Target BS W10 Delta Achv Region Target BS W10 Delta Achv Region Target W9 W10 Delta Achv
W10 W10 W10
West 80 65.6% 82.0% 16.4% 20.44% 82.0% West 90 82.6% 89.5% 7.0% 7.75% 89.5% West 388 129 144 15 3.9% 37.1%
76.5% Central
East
80
80
67.1%
65.6%
69.9%
78.2%
2.8% 3.48%
12.6% 15.76%
69.9%
78.2%
88.5% Central
East
90
90
83.4%
86.5%
82.0%
93.3%
-1.4%
6.8%
-1.57%
7.52%
82.0%
93.3%
31.8% Central
East
2426
283
434
92
781
111
347
19
14.3%
6.7%
32.2%
39.2%
Jabo 80 64.2% 73.3% 9.1% 11.39% 73.3% Jabo 90 86.5% 91.1% 4.6% 5.10% 91.1% Jabo 776 180 196 16 2.1% 25.3%
Ongoing Baseline data collection Ongoing Baseline data collection Ongoing Baseline data collection
56.8% Central
East
90%
90%
49.5%
49.7%
53.3%
51.6%
3.9%
2.0%
4.3%
2.2%
53.3%
51.6%
69.6% Central
East
80%
80%
64.5%
78.9%
61.1%
76.5%
-3.4%
-2.4%
0.0%
0.0%
61.1%
76.5%
6.3% Central
East
864
548
22
42
23
49
1
7
0.1%
1.3%
2.7%
8.9%
Jabo 90% 69.6% 71.2% 1.6% 1.8% 71.2% Jabo 80% 76.1% 72.7% -3.5% 0.0% 72.7% Jabo 438 11 17 6 1.4% 3.9%
Ongoing Baseline data collection Ongoing Baseline data collection Ongoing Baseline data collection
WEST
RM LAM SS OTR & BKLU RM LAM SS OTR & BKLU
WEST
WEST
RM KEPRI RIDAR RM KEPRI RIDAR RM KEPRI RIDAR
RM JAMBI SUMBAR RM JAMBI SUMBAR RM JAMBI SUMBAR
RM GRT MEDAN RM GRT MEDAN RM GRT MEDAN
RM PDLB SRCL RM PDLB SRCL RM PDLB SRCL
RM KALBAR KALTIM RM KALBAR KALTIM RM KALBAR KALTIM
RM JKB KBTG RM JKB KBTG RM JKB KBTG
RM JAKU JAKT
JABO
RM JAKU JAKT RM JAKU JAKT
JABO
JABO
RM JAKP JAKS RM JAKP JAKS RM JAKP JAKS
RM DEPK KTTS RM DEPK KTTS RM DEPK KTTS
RM BSKB RM BSKB RM BSKB
RM BKS CKRW RM BKS CKRW RM BKS CKRW
RM SULUT RM SULUT RM SULUT
RM SULSEL SULTRA RM SULSEL SULTRA RM SULSEL SULTRA
RM NTT RM NTT RM NTT
RM MTRM LOTIM RM MTRM LOTIM RM MTRM LOTIM
EAST
EAST
EAST
RM MLNG JBR RM MLNG JBR RM MLNG JBR
RM MDRA SBY RM MDRA SBY RM MDRA SBY
RM GRT SDJ MDN RM GRT SDJ MDN RM GRT SDJ MDN
RM GNYR BAL OTR RM GNYR BAL OTR RM GNYR BAL OTR
RM DPS SMBWA RM DPS SMBWA RM DPS SMBWA
RM YGY MGLG WNGRI RM YGY MGLG WNGRI RM YGY MGLG WNGRI
RM KDUS SOLO SMG RM KDUS SOLO SMG RM KDUS SOLO SMG
RM KBMN PWKT TGAL
CENTRAL
CENTRAL
RM KALSEL KALTENG RM KALSEL KALTENG RM KALSEL KALTENG
RM CRBN MJLK TSKM GRUT RM CRBN MJLK TSKM GRUT RM CRBN MJLK TSKM GRUT
RM CNJR PWKR IDRM SBNG RM CNJR PWKR IDRM SBNG RM CNJR PWKR IDRM SBNG
RM BDG 1/2 RM BDG 1/2 RM BDG 1/2
0% 20% 40% 60% 80% 100% 0% 20% 40% 60% 80% 100% 0% 20% 40% 60% 80% 100%
Safe Close Close Partial Open Safe Close Close Partial Open Safe Close Close Partial Open
Flow
EXECUTION by
REGION
Followup to PIC
Related
Result
Weekly average for daily ratio flatness >18 hour and Max RB
below <95% (exclude 85% - 88% and availibility <95%, high High PRB Utilization
payload)
PRB Flat
PRB Flat >80% Sharing traffic
Sample Cases
Background PRB Flat <80%
413CI71E_LTE_TAMBAN
Low Throughput at site BJ4G18_413CI71E_6 - Max of L.ChMeas.PRB.DL.Avail
413CI71E_LTE_TAMBAN sect 3 due
to High PRB BJ4G18_413CI71E_6 - Sum of PRB Utilization %
120.00
Analysis 100.00
Alarm Check and check No
Yes
40.00
• Alarm VSWR and Cell RX Channel
20.00
Interference Noise Power
0.00
Unbalanced
12:00:00 AM
11:00:00 AM
2:00:00 AM
10:00:00 AM
12:00:00 AM
10:00:00 PM
12:00:00 PM
11:00:00 PM
7:00:00 AM
4:00:00 AM
1:00:00 AM
8:00:00 AM
5:00:00 AM
9:00:00 AM
6:00:00 AM
3:00:00 AM
2:00:00 PM
9:00:00 PM
6:00:00 PM
3:00:00 PM
7:00:00 PM
4:00:00 PM
1:00:00 PM
8:00:00 PM
5:00:00 PM
Action Done
FU to FOP Team INCM-20210104- Vswr Issue, Rank2
Create TT INCM and
00016739 issue, Port
Fu to FOP team
5-Mar 6-Mar 7-Mar 8-Mar 9-Mar 10-Mar 11-Mar12-Mar Unbalance
Result
PRB Utilization %
NY Improve, case still open
120 40
4130242E_LTE_HaurGading
Max of PRB Utilization % User DL Throughput (Mbps)
60
Before
200
180
160
2 degree
BJ4G18_4130242E_4
1
Average RSRP : -110.02 dbm 100.0
90.0
80.0
TA Distribution (%)
140 70.0
𝐷𝐿_𝑃𝑎𝑦𝑙𝑜𝑎𝑑 𝑏𝑖𝑡 /3600𝑠𝑒𝑐𝑜𝑛𝑑 100 35 50
2 120 60.0
Throughput Mbps
𝐷𝐿 𝑆𝑝𝑒𝑐𝑡𝑟𝑢𝑚 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 = 30
𝑈𝑠𝑒𝑑 𝑅𝑒𝑠𝑜𝑢𝑟𝑐𝑒 𝐵𝑙𝑜𝑐𝑘 𝐵𝑎𝑛𝑑𝑤𝑖𝑑𝑡ℎ (𝐻𝑧) 100 50.0
PRB Utiliz %
80 40
DL Spectrum
1.5 25 80 40.0
60 20 30 60 30.0
1 15
40 20 40 20.0
Total (SOW) : 10 20 10.0
0.5 20 10
4 Issue at this Sites : 5 0 0.0
210
420
630
840
0
1050
1260
1470
1680
1890
2100
2310
2520
2730
2940
3150
3360
3570
3780
3990
4200
4410
4620
4830
0 0 0 0
1. Low SE (2)
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
8:00:00 AM
4:00:00 PM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
7:00:00 AM
2:00:00 PM
9:00:00 PM
4:00:00 AM
6:00:00 PM
1:00:00 AM
8:00:00 AM
3:00:00 PM
5:00:00 AM
7:00:00 PM
2:00:00 AM
9:00:00 AM
4:00:00 PM
6:00:00 AM
1:00:00 PM
8:00:00 PM
3:00:00 AM
5:00:00 PM
7:00:00 AM
2:00:00 PM
9:00:00 PM
4:00:00 AM
6:00:00 PM
1:00:00 AM
8:00:00 AM
3:00:00 PM
12:00:00 AM
11:00:00 AM
10:00:00 AM
12:00:00 AM
11:00:00 AM
10:00:00 PM
12:00:00 PM
11:00:00 PM
10:00:00 PM
distance (m)
2. Overlap (2)
Action : Height ISD 1st Tier
25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar
1. Physical tunning at 2 March 2021 with action below : 25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar
BJ4G18_4130242E_4
%TA QPSK UpperBeam
BJ4G18_4130242E_4
Az : 70/170/330. => 10/170/240 Main Beam Lower Beam
TA Distribution (%)
KAL-KS-BRB-0283 4130242E_LTE_HaurGading 1800 1 1 1 4.5 40
100
1200 60.0
Drop %
30.0
2.5
to 1.25 97 2
600 10
20.0
10.0
2. Throughput Improve 6.9 mbps from 8.94 to 15.85 96 1.5 400
0 0.0
3. eRab drop Improve 0.77 from 0.96 to 0.19 1 200
210
420
630
840
0
1050
1260
1470
1680
1890
2100
2310
2520
2730
2940
3150
3360
3570
3780
3990
4200
4410
4620
4830
95
0.5 0
4. Payload Improve 5.03GB from 26.17 to 31.20 94 0
distance (m)
8:00:00 AM
8:00:00 AM
8:00:00 AM
8:00:00 AM
8:00:00 AM
8:00:00 AM
8:00:00 AM
8:00:00 AM
8:00:00 AM
8:00:00 AM
4:00:00 PM
4:00:00 PM
4:00:00 PM
4:00:00 PM
4:00:00 PM
4:00:00 PM
4:00:00 PM
4:00:00 PM
4:00:00 PM
4:00:00 PM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
12:00:00 AM
Height ISD 1st Tier
Before After %TA QPSK UpperBeam
4130242E_LTE_HaurGading 1st Tier
25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar Main Beam Lower Beam
4130242E_LTE_HaurGading 4130242E_LTE_HaurGading
BJ4G18_4130242E_6 BJ4G18_4130242E_5 BJ4G18_4130242E_6 BJ4G18_4130242E_5
120.00 200
180
100.00
160
80.00 140
120
60.00 100
80
40.00
60
20.00 40
20
0.00 0
2:00:00 PM
9:00:00 PM
6:00:00 PM
3:00:00 PM
7:00:00 PM
4:00:00 PM
1:00:00 PM
8:00:00 PM
5:00:00 PM
2:00:00 PM
9:00:00 PM
6:00:00 PM
12:00:00 AM
11:00:00 AM
10:00:00 AM
12:00:00 AM
11:00:00 AM
10:00:00 PM
12:00:00 PM
11:00:00 PM
7:00:00 AM
4:00:00 AM
1:00:00 AM
8:00:00 AM
5:00:00 AM
2:00:00 AM
9:00:00 AM
6:00:00 AM
3:00:00 AM
7:00:00 AM
4:00:00 AM
2:00:00 PM
9:00:00 PM
6:00:00 PM
3:00:00 PM
7:00:00 PM
4:00:00 PM
1:00:00 PM
8:00:00 PM
5:00:00 PM
2:00:00 PM
9:00:00 PM
6:00:00 PM
12:00:00 AM
11:00:00 AM
10:00:00 AM
12:00:00 AM
11:00:00 AM
10:00:00 PM
12:00:00 PM
11:00:00 PM
7:00:00 AM
4:00:00 AM
1:00:00 AM
8:00:00 AM
5:00:00 AM
2:00:00 AM
9:00:00 AM
6:00:00 AM
3:00:00 AM
7:00:00 AM
4:00:00 AM
26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar
PRB Utilization % User
Private & Confidential
3. Sleeping Cell
Symptom when the cell status is normal(nav > 95%), no alarm impacted and All channel /
resources is are unavailable and 0 attempt/traffic (non user behavior)
*)Troubleshooting procedure: Sleeping Cells 1
1. Check the status of the RNC cells
Cell problem category Run the DSP UCELL command in the RNC LMT and query the execution result. If the cell status is abnormal, it
• the downlink signaled are abnormal or the downlink scramble cannot detected indicates that the Sleeping Cell problem does not occur. If the cell status is normal, proceed to the next step.
• RRC Connect request message is not reported 2. Check whether the cell is barred
• RRC Connect setup complete message is not reported Run the LST UCELLACCESSSTRICT command in the RNC LMT and query the execution result. If the cell is barred, it
• The RB setup complete message is not reported indicates that the Sleeping Cell problem does not occur. If the cell status is normal, proceed to the next step.
3. Check the cell radius
No Traffic every Run the LST LOCELL command in the RNC LMT and query the execution result. If the cell is extremely small, access
time fails in the area beyond the cell radius, which is not a Sleeping Cell problem. If the cell status is normal, proceed to the
next step.
4. Check the alarm shield of the NodeB
Run the LST OBJALMSHLD: QRMD=OBJ command in the NodeB LMT. Check whether the execution result shields from
Inline NAV some important alarms. If the alarm shield is disabled and the alarm is reported, process the alarm emphatically. If
degrade Create TT INCM and
Availability Check the execution result does not shield from any alarm, proceed to the next step.
Fu to FOP team
5. Check the AAL2PATH configuration (the transmission mode is ATM)
Check whether the AAL2PATH configuration on the RNC is consistent with that on the NodeB. If not, the problem is
NAV Safe
not a Sleeping Cell problem and thus you need to modify the AAL2PATH configuration to ensure the consistency
between them. If yes, proceed to the next step.
6. Check the status of the NodeB cells
Alarm Safe Check configuration Run the DSP LOCELL command in the NodeB LMT and query the execution result. If the cell status is abnormal, it
Alam Check indicates that the Sleeping Cell problem does not occur. If the cell status is normal, proceed to the next step.
procedure*
7. Check the VSWR
Run the DSP VSWR command in the NodeB LMT. Query the VSWR of the RRU. If the VSWR is lower than 10
(illegal), it indicates that the RRU is faulty.
Alarm related : Carrier no
- Carrier no traffic
Trial to re-config IPPM Path
traffic/sleeping cell or reset Board Already handle traffic after reset
- VSWR
Yes
2021-03-04
2021-03-07
2021-03-10
2021-02-15
2021-02-16
2021-02-17
2021-02-18
2021-02-19
2021-02-20
2021-02-21
2021-02-22
2021-02-23
2021-02-24
2021-02-25
2021-02-26
2021-02-27
2021-02-28
2021-03-01
2021-03-02
2021-03-03
2021-03-05
2021-03-06
2021-03-08
2021-03-09
2021-03-11
2021-03-12
to FOP team
BD4G18_451MBZ751E_5 BD4G18_451MBZ751E_6
Join TS with
FOP
DT
NOK
Verification
OK
End
JAW-JB-SBR-2006 BD4G18_451D045E_6 LTE_ADI_DARMA_CIREBON 0.91 0.4 0.9 0.4 1.0 Safe Safe Capacity Safe Transport Safe Safe 1 Near Safe Safe Optim Overlap LSE
2021-01-12
2021-01-13
2021-01-14
2021-01-15
2021-01-16
2021-01-17
2021-01-18
2021-01-19
2021-01-20
2021-01-21
2021-01-22
2021-01-23
2021-01-24
2021-01-25
2021-01-26
2021-01-27
2021-01-28
2021-01-29
2021-01-30
2021-01-31
2021-02-01
2021-02-02
2021-02-03
2021-02-04
2021-02-05
2021-02-06
2021-02-07
2021-02-08
2021-02-09
2021-02-10
3. DL Spectrum Efficiency is improved 22.53%, 0.89 to 1.09
5. QPSK Ratio (%) is reduced -19.48%, 57.44% to 46.25%
6. DL SE source and surrounding site Improved
60 120 60
1
50 100 50
0.8
40 80 40
bits/s/hz
Payload
User
0.6
%
30 60 30
0.4
20 40 20
0.2
10 20 10
0 0 0 0
2021-01-12
2021-01-13
2021-01-14
2021-01-15
2021-01-16
2021-01-17
2021-01-18
2021-01-19
2021-01-20
2021-01-21
2021-01-22
2021-01-23
2021-01-24
2021-01-25
2021-01-26
2021-01-27
2021-01-28
2021-01-29
2021-01-30
2021-01-31
2021-02-01
2021-02-02
2021-02-03
2021-02-04
2021-02-05
2021-02-06
2021-02-07
2021-02-08
2021-02-09
2021-02-10
2021-01-12
2021-01-13
2021-01-14
2021-01-15
2021-01-16
2021-01-17
2021-01-18
2021-01-19
2021-01-20
2021-01-21
2021-01-22
2021-01-23
2021-01-24
2021-01-25
2021-01-26
2021-01-27
2021-01-28
2021-01-29
2021-01-30
2021-01-31
2021-02-01
2021-02-02
2021-02-03
2021-02-04
2021-02-05
2021-02-06
2021-02-07
2021-02-08
2021-02-09
2021-02-10
Overlap | Low Spectral Efficiency and QPSK ratio > 30% by Parameter
Background
300
Payload 4G(GB) DL Throughput
9 70
QPSK Ratio(%) Spectrum_Efficiency
2
2
› 4G payload (GB) is
› Found Low Spectral Efficiency and improved by +65.9%
QPSK ratio > 30% 8 1.8
250
60 › 4G DL user throughput
1.6
Analysis 7 is improved by +75.4%
50 1.4
200 6 › DL Spectral Efficiency is
› Missing parameter virtual 4T4R 1.2
5 40 improved by +255.5%
BPS/HZ
switch ON at site which have RRU
MBPS
GB
150 1
%
5502 or RRU 5904 (1Ru), it should 4 30 › 4G QPSK ratio is
0.8
be swicth OFF decreased by -53.6%
100 3
20 0.6
Benefit 2
0.4
50
10
› Improving DL user throughput 1 0.2
› Improving modulation
0 0 0 0
› Increased Spectrum Efficiency
› Increase CQI
› Increase Payload
› Decrease Service Drop
CQI DL IBLER_Rate(%) Service Drop Rate SSSR_(%) S1 Signaling SR(%)
Action Parameter 12 14 100.1 0.09 › DL Average CQI is
Disable 4T4R Switch 100.0 0.08
improved by +33.3%
MOD 13.5
CELLALGOSWITCH:LOCALCELLID=16,EMI
10
100.0
0.07
› 4G DL iBLER rate is
MOSWITCH=Virtual4T4RSwitch-0; 13 decreased by -5.1%
99.9
8 0.06
Execution › SSSR is maintained by
ACCESSIBILITY
99.9
12.5 0.05
+0.05%
INDEX
%
2021. 12
99.8
0.04
› S1 Signaling SR is
4
11.5 99.7
0.03 maintained by 0.04%
Recommendation 99.7
0.02 › Service Drop Rate is
2
• Continue monitoring
11
99.6 0.01 decreased by -44.1%
0 10.5 99.6 0.00
Rank 2
2
451BA81E_LTE_Bangodua 50 Analysis
40
30
Action 20
10 Check Cell
Troubleshoot by FOP Team Clearance wrong configuration serial 0 MIMO
Transmision
number of MRFU and CPRI 2T/2R & 4T/4R
SISO/SIMO/MIMO
OK
OK
End
Before After
Action Done
Re Config BASEBANDEQMID
(detail next slide)
Result
DL User Throughput improved +146.51% from
7.08 Mbps to 17.46 Mbps
Before After
MML Command NE Name Local cell ID Sector equipment ID SCRIPT
Baseband equipment ID Baseband equipment ID
LST EUCELLSECTOREQM 251MC0525_SRIM 16 24 7 6 MOD EUCELLSECTOREQM:LOCALCELLID=16,SECTOREQMID=24,BASEBANDEQMID=6;
LST EUCELLSECTOREQM 251MC0525_SRIM 17 25 7 6 MOD EUCELLSECTOREQM:LOCALCELLID=17,SECTOREQMID=25,BASEBANDEQMID=6;
LST EUCELLSECTOREQM 251MC0525_SRIM 18 26 7 6 MOD EUCELLSECTOREQM:LOCALCELLID=18,SECTOREQMID=26,BASEBANDEQMID=6;
LST EUCELLSECTOREQM 251MC0525_SRIM 21 54 7 7
LST EUCELLSECTOREQM 251MC0525_SRIM 22 55 7 7
LST EUCELLSECTOREQM 251MC0525_SRIM 23 56 7 7
LST EUCELLSECTOREQM 251MC0525_SRIM 31 64 6 7 MOD EUCELLSECTOREQM:LOCALCELLID=31,SECTOREQMID=64,BASEBANDEQMID=7;
LST EUCELLSECTOREQM 251MC0525_SRIM 32 65 6 7 MOD EUCELLSECTOREQM:LOCALCELLID=32,SECTOREQMID=65,BASEBANDEQMID=7;
LST EUCELLSECTOREQM 251MC0525_SRIM 33 66 6 7 MOD EUCELLSECTOREQM:LOCALCELLID=33,SECTOREQMID=66,BASEBANDEQMID=7;
After
MML Command NE Name BASEBANDEQMID BASEBANDEQMTYPE Before BASEBANDEQMBOARD SCRIPT
BASEBANDEQMBOARD
LST BASEBANDEQMID 251MC0525_SRIM 7 2 (CN,SRN,SN):(0,0,1) (CN,SRN,SN):(0,0,1)
LST BASEBANDEQMID 251MC0525_SRIM 6 2 (CN,SRN,SN):(0,0,4),(0,0,2) (CN,SRN,SN):(0,0,2) MOD BASEBANDEQM:BASEBANDEQMID=6,BASEBANDEQMTYPE=ULDL,OPMODE=DELETE,SN=4;
LST BASEBANDEQMID 251MC0525_SRIM 1 1 (CN,SRN,SN):(0,0,2) (CN,SRN,SN):(0,0,2)
LST BASEBANDEQMID 251MC0525_SRIM 1 0 (CN,SRN,SN):(0,0,2) (CN,SRN,SN):(0,0,2)
LST BASEBANDEQMID 251MC0525_SRIM 0 1 (CN,SRN,SN):(0,0,3),(0,0,0),(0,0,5) (CN,SRN,SN):(0,0,3),(0,0,0),(0,0,5)
LST BASEBANDEQMID 251MC0525_SRIM 0 0 (CN,SRN,SN):(0,0,5),(0,0,3),(0,0,0) (CN,SRN,SN):(0,0,5),(0,0,3),(0,0,0)
Rank 2
2
• DL SE bits/s/hz Increase Analysis
4514472E_LTE_BLOK_PASIR_HAYAM
• TA (m) Increase
• DL QPSK (%) Reduce
Action
Check Cell MIMO
Physical tuning on March 9th, 2021 by some action below : Transmision
2T/2R & 4T/4R
SISO/SIMO/MIMO
• Change MT Sector 1 from 4 to 2, with AH 42m and RET 30
• Change MT Sector 3 from 4 to 2, with AH 42m and RET 30
SISO 1T/1R
RANK2 Rate(%) DL QPSK Ratio(%) Rank2 <20% / Day Improper tilt
SIMO 1T/2R
3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_4 3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_4
3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_6 3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_6
3000
80
2500 70 Close/
60 Hardware Issue Request Permit
2000 Jutify
50
1500 40
30
1000
20
500 10
0
0 Create TT & FU to Physical Tuning
2021-02-24
2021-03-05
2021-03-14
2021-02-23
2021-02-25
2021-02-26
2021-02-27
2021-02-28
2021-03-01
2021-03-02
2021-03-03
2021-03-04
2021-03-06
2021-03-07
2021-03-08
2021-03-09
2021-03-10
2021-03-11
2021-03-12
2021-03-13
2021-03-15
2021-02-23
2021-02-24
2021-02-25
2021-02-26
2021-02-27
2021-02-28
2021-03-01
2021-03-02
2021-03-03
2021-03-04
2021-03-05
2021-03-06
2021-03-07
2021-03-08
2021-03-09
2021-03-10
2021-03-11
2021-03-12
2021-03-13
2021-03-14
2021-03-15
FOP team
DL SE bits/s/hz TA (m)
Rank2 >20% / Day
NOK
3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_4
TS by FOP Team
3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_4
3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_6 3514472G_3G_BLOK_PASIR_HAYAM - BD4G18_4514472E_6
1.7
1.5
3000
2500
OK
1.3 2000
1.1 1500 NOK Rank2 >20% / Day End
0.9 1000
0.7 500
0.5 0
OK
2021-02-23
2021-02-24
2021-02-25
2021-02-26
2021-02-27
2021-02-28
2021-03-01
2021-03-02
2021-03-03
2021-03-04
2021-03-05
2021-03-06
2021-03-07
2021-03-08
2021-03-09
2021-03-10
2021-03-11
2021-03-12
2021-03-13
2021-03-14
2021-03-15
2021-02-23
2021-02-24
2021-02-25
2021-02-26
2021-02-27
2021-02-28
2021-03-01
2021-03-02
2021-03-03
2021-03-04
2021-03-05
2021-03-06
2021-03-07
2021-03-08
2021-03-09
2021-03-10
2021-03-11
2021-03-12
2021-03-13
2021-03-14
2021-03-15
End
2 0 0 1 0 0 0 0 1 2 0 0
Overlap on sector-3 of site JAW-JB-SBR-2976 / 2976
4511522E_LTE_Suci_Mundu / BD4G18_4511522E_6
TA W07 BD4G18_4511522E_6 TA W09 BD4G18_4511522E_6
Average RSRP : -96.79 dbm Average RSRP : -99.86 dbm
35 100.0
Action Done 40 100.0
TA Distribution (%)
TA Distribution (%)
30 6 degree 4 degree
80.0 80.0
30
Parameter tuning by some action below : 25
60.0 60.0
20
20
15 40.0 40.0
1. Change Ret From 40 to 20 on February 19th 10 10
2. Change Ret From 40 to 30 on March 4th 20.0 20.0
5
0 0.0
0 0.0
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1250
1000
1050
1100
1150
1200
1300
1350
0
50
1040
1000
1080
1120
1160
1200
1240
1280
1320
1360
0
520
40
80
120
160
200
240
280
320
360
400
440
480
560
600
640
680
720
760
800
840
880
920
960
distance (m) distance (m)
BEFORE
Height ISD 1st Tier %TA Height ISD 1st Tier %TA
QPSK UpperBeam Main Beam Lower Beam QPSK UpperBeam Main Beam Lower Beam
80 1.2 8.2 25
70
1 2 1 2
8 20
1
60 7.8
0.8 15
Rank2
50
CQI
7.6
Bits/s/hz
40 0.6 10
%
7.4
30
0.4 7.2 5
20
AFTER 0.2 7 0
10
0 0
Payload (GB) User Connected PRB Usage Rate (%)Vs User Thp (Mbps)
120 50 18 60
1 2 45 16 1 2 50
100 40 14
12 40
80 35
10
Mbps
30 30
%
Payload
User
60 25
6 20
20 4
40 15 10
2
20 10 0 0
5
0 0
Private & Confidential 3511522G9_3G_Suci_Mundu - BD4G18_4511522E_6 - DL PRB Usage Rate(%) 3511522G9_3G_Suci_Mundu - BD4G18_4511522E_6 - DL User Thp (Mbps)
7. PFT
2
Antenna Troubleshooting procedure
Fill OLT PFT for escalate at link below:
Stuck Make PFT evidence report and submit to PIC (sampling on next page)
Monitoring and follow up for status PFT
Electrical Achieve
No 4G
tilt port Follow up PFT and monitoring status
Colo When PFT done check onsite and do tunning as planning
broken Make PPT improvement as result of PFT closing (sampling PPT on next page)
Analysis
Found any design issue
onsite we can input PFT
for propose trouble
shoot or add material
PFT | sample Electrical port broken
Mounting Re-Height
Issue Antenna
No Power
Cable RET
PFT | Design Issue Ampi Baros
2
Issue Solution PIC of
Region Cluster Tower ID Sitename System Sector Longitude Latitude Issue Details Triger by Escalation Date Status Remark PIC of Escalated Close Date
Category Proposal Escalation
Blocking by high houses Re-high Arip
West Java C-BDG2 3512284G Ampi Baros 3G/4G 1,2,3 107.5401111 -6.8905 Low Antenna impact to poor coverage at Complain Antenna from 5/20/2017 Kurnia/Rieza Open RND
RO. Antenna height (26 m) 20m to 35m (Optim)
X4514333E_LTE_KP._CIJELER
X4514333E_LTE_KP._CIJELER
4512174E_LTE_Cibatu 4512174E_LTE_Cibatu
4512130E_LTE_Leuwigoong 4512130E_LTE_Leuwigoong
4514393E_LTE_ADE_IRMA_LIMBANGAN 4514393E_LTE_ADE_IRMA_LIMBANGAN
JAW-JB-GRT-1050
Triggered from VVIP complaint and also that area is potential market.
Proposed insert LTE at site 3514333G9_3G_KP._CIJELER to grab traffic JAW-JB-GRT-1050
600
since no poor LTE coverage at that residential.
On W31 2020, site X4514333E_LTE_KP._CIJELER has On Aired. 500
400
GB
300
200
100
2020-06-20
2020-06-21
2020-06-22
2020-06-23
2020-06-24
2020-06-25
2020-06-26
2020-06-27
2020-06-28
2020-06-29
2020-06-30
2020-07-01
2020-07-02
2020-07-03
2020-07-04
2020-07-05
2020-07-06
2020-07-07
2020-07-08
2020-07-09
2020-07-10
2020-07-11
2020-07-12
2020-07-13
2020-07-14
2020-07-15
2020-07-16
2020-07-17
2020-07-18
2020-07-19
2020-07-20
2020-07-21
2020-07-22
2020-07-23
2020-07-24
2020-07-25
2020-07-26
2020-07-27
2020-07-28
2020-07-29
2020-07-30
2020-07-31
2020-08-01
2020-08-02
2020-08-03
2020-08-04
2020-08-05
2020-08-06
2020-08-07
2020-08-08
2020-08-09
2020-08-10
2020-08-11
2020-08-12
2020-08-13
2020-08-14
2020-08-15
2020-08-16
2020-08-17
2020-08-18
Private & Confidential
8. SCR DT City
2
Propose Physical &
route parameter when DT baseline done, collect data & analyze by genex assistant/probe
baseline optim For SINR badspot we can see pollution cell list from measurement information on genex
assistant
No Register badspot SINR/RSRP & action needed at offline tracker for easy monitoring
Request
approval Retest DT
SOM After optim No Request permit based on site list from analyzing result
Make priority optim from easiest badspot to hardest
yes Follow up to cluster owner / FOP when we found any optimization issue
DT
Baseline Checking
& Compile Follow up by email to cluster owner, then cluster owner ask FOP/BO RAN to handle it
retest result
yes
Analysis
Log Baseline
Badspot
closed
Request
permit
Closing
OLT KPI
DriveTest +
Static
Before After
Action done
Action done
Before After
MR Residential Area
No
No
No
VSWR Check
Port Unbalance
Transport Check
Availability Check
Yes
Yes
No
Yes
Yes
Yes
RF Issue
Low Rank2 Ratio
Escalation to FOP
Escalation to TRM
Escalation to FOP
Escalation to FOP
Escalation to FOP
Yes
10. Port Unbalanced
RF Optimization
Port
<30 %
Result
SE > 1.5
Indicates
Improved
Low Rank2
10
12
10
15
0
2
4
6
8
0
5
-75
-85
-90
-100
-80
-95
11/1/2020 11/1/2020
11/1/2020
11/4/2020 11/4/2020
11/4/2020
11/7/2020 11/7/2020
11/7/2020
11/10/2020 11/10/2020
11/10/2020
11/13/2020 11/13/2020
11/13/2020
11/16/2020 11/16/2020
11/16/2020
11/19/2020 11/19/2020
11/22/2020 11/19/2020
11/22/2020
11/25/2020 11/22/2020
11/25/2020
11/28/2020 11/25/2020 11/28/2020
12/1/2020 11/28/2020 12/1/2020
12/4/2020 12/1/2020 12/4/2020
12/7/2020 12/4/2020 12/7/2020
12/10/2020 12/7/2020 12/10/2020
12/13/2020 12/10/2020 12/13/2020
12/16/2020 12/13/2020 12/16/2020
12/19/2020 12/16/2020 12/19/2020
12/22/2020 12/19/2020 12/22/2020
12/25/2020 12/22/2020 12/25/2020
12/28/2020 12/25/2020 12/28/2020
12/31/2020 12/28/2020 12/31/2020
1/3/2021 12/31/2020 1/3/2021
1/6/2021 1/3/2021 1/6/2021
1/9/2021 1/6/2021 1/9/2021
1/12/2021 1/9/2021 1/12/2021
1/15/2021 1/12/2021 1/15/2021
1/18/2021 1/15/2021 1/18/2021
1/21/2021 1/18/2021 1/21/2021
1/24/2021 1/21/2021 1/24/2021
1/27/2021 1/24/2021 1/27/2021
1/30/2021 1/27/2021 1/30/2021
2/2/2021 1/30/2021 2/2/2021
2/5/2021 2/5/2021
2/2/2021
2/8/2021 2/8/2021
Gap >6dBm
2/5/2021
2/11/2021 2/11/2021
2/8/2021
2/14/2021 2/14/2021
2/11/2021
2/17/2021 2/17/2021
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of Average CQI
2/14/2021
2/20/2021 2/20/2021
2/17/2021
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of GAP UL RSSI
2/23/2021 2/23/2021
2/20/2021
2/26/2021 2/26/2021
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of RANK2 Rate(%)
2/23/2021
3/1/2021 3/1/2021
2/26/2021
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of DL Spectrum Efficiency
3/4/2021 3/4/2021
3/7/2021 3/1/2021
3/7/2021
3/10/2021 3/4/2021
3/10/2021
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of L.CellSectorEQUIP.UL.IN.Avg.Ant0(dBm)
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of L.CellSectorEQUIP.UL.IN.Avg.Ant1(dBm)
3/13/2021 3/7/2021
3/13/2021
3/10/2021
0
1
2
0
3/13/2021
10
20
30
40
50
0.5
1.5
Sample Case Port Unbalanced
Background L.CellSectorEQUIP.UL.IN.Avg.Ant0(dBm) vs RANK2 Rate(%) vs GAP UL RSSI
L.CellSectorEQUIP.UL.IN.Avg.Ant1(dBm)
› Found Low Rank2 Rate <30% at cell 16 50
-100 45
BD4G18_4511455E_5 site 14
4511455E_LTE_NAGRI_KIDUL. 40
12
35
-95
Analysist 10 30
› After check found Port Unbalance
Gap >6dBm 8 25
-90 20
between UL RSSI Ant0 vs UL RSSI 6
Ant1. 15
4
10
-85
Action 2 5
0 0
› Escalated to FOP Team for TS.
1/4/2021
1/8/2021
2/1/2021
2/5/2021
2/9/2021
3/1/2021
3/5/2021
3/9/2021
11/13/2020
11/17/2020
11/21/2020
11/25/2020
11/29/2020
12/11/2020
12/15/2020
12/19/2020
12/23/2020
12/27/2020
12/31/2020
12/7/2020
1/12/2021
1/16/2021
1/20/2021
1/24/2021
1/28/2021
2/13/2021
2/17/2021
2/21/2021
2/25/2021
3/13/2021
11/1/2020
11/5/2020
11/9/2020
12/3/2020
12/27/2020
11/13/2020
11/17/2020
11/21/2020
11/25/2020
11/29/2020
12/11/2020
12/15/2020
12/19/2020
12/23/2020
12/31/2020
1/12/2021
11/1/2020
11/5/2020
11/9/2020
12/3/2020
12/7/2020
1/16/2021
1/20/2021
1/24/2021
1/28/2021
2/13/2021
2/17/2021
2/21/2021
2/25/2021
3/13/2021
-80
1/4/2021
1/8/2021
2/1/2021
2/5/2021
2/9/2021
3/1/2021
3/5/2021
3/9/2021
Benefit
-75
› Improving Rank2 Ratio
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of GAP UL RSSI
› Improving DL Spectrum Efficiency 3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of L.CellSectorEQUIP.UL.IN.Avg.Ant1(dBm)
› Improving Average CQI 3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of L.CellSectorEQUIP.UL.IN.Avg.Ant0(dBm) 3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of RANK2 Rate(%)
› Increase Payload
DL Spectrum Efficiency vs Average CQI Total Payload vs Connected User
Result (Feb, 19 – Mar, 1 2021 vs Mar,
12 1.8 120 45
3-13 2021)
1.6 40
10 100
› 4G Payload is improve 22.24%. 1.4 35
› 4G Rank2 Rate is improve 49.69%. 8 1.2 80 30
› 4G DL Spectral Efficiency is improve 1 25
34.08%. 6 60
0.8 20
› 4G Average CQI is improve 10.95%. 4 0.6 40 15
0.4 10
2 20
0.2 5
0 0 0 0
2/14/2021
3/11/2021
1/10/2021
1/15/2021
1/20/2021
1/25/2021
1/30/2021
2/19/2021
2/24/2021
11/1/2020
11/6/2020
12/1/2020
12/6/2020
11/16/2020
11/11/2020
11/21/2020
11/26/2020
12/11/2020
12/16/2020
12/21/2020
12/26/2020
12/31/2020
1/5/2021
2/4/2021
2/9/2021
3/1/2021
3/6/2021
1/25/2021
1/10/2021
1/15/2021
1/20/2021
1/30/2021
2/14/2021
2/19/2021
2/24/2021
3/11/2021
11/1/2020
11/6/2020
12/1/2020
12/6/2020
11/11/2020
11/16/2020
11/21/2020
11/26/2020
12/11/2020
12/16/2020
12/21/2020
12/26/2020
12/31/2020
1/5/2021
2/4/2021
2/9/2021
3/1/2021
3/6/2021
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of Average CQI 3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Sum of Payload 4G Total (GB)
3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of DL Spectrum Efficiency 3511455G_3G_Nagri_Kidul - BD4G18_4511455E_5 - Average of L.Traffic.User.Avg
• Availability degrade 80
7 100
80
• Payload degrade 6
NUMBER
80
• Detected specific CPRI alarm
GB
60 5 60
%
%
4 60
40 40
3 40
Low Availability 2
20 20 20
1
0 0 0 0
Check specific CPRI alarm
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
2021-02-27 2021-02-28 2021-03-01 2021-03-04 2021-03-05 2021-03-06 2021-02-27 2021-02-28 2021-03-01 2021-03-04 2021-03-05 2021-03-06
30 60 0.25 120
Is CPRI rate
Yes 25 50 0.2 100
negotiation Renegotiate CPRI rate
20 40 80
error? 0.15
SSSR%
SDR %
INDEX
MBPS
15 30 60
alarm Yes 0.1
No clear? 10 20 40
No 5 10 0.05 20
Reset RF unite remotely
0 0 0 0
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
alarm Yes
2021-02-27 2021-02-28 2021-03-01 2021-03-04 2021-03-05 2021-03-06 2021-02-27 2021-02-28 2021-03-01 2021-03-04 2021-03-05 2021-03-06
clear?
No Alarm
TS on site by FOP • Cabinet No.=0, Subrack No.=93, Slot No.=0, Port No.=Port 0(West), Board Type=MRRU,
Port Type=NULL, Specific Problem=CPRI Interface Reception Error
• Alarm clearance at 04 march 2021
alarm Yes
End • Continue monitoring
clear?
No
Contact Huawei expert
NUMBER
40
• Payload degrade
GB
60 25 300
%
• Detected BBU Board Maintenance Link Failure alarm 20 30
40 200
15 20
10
20 10 100
5
0 0 0 0
Flicker Availability
00:00
07:00
14:00
21:00
04:00
11:00
18:00
01:00
08:00
15:00
22:00
05:00
12:00
19:00
02:00
09:00
16:00
23:00
06:00
13:00
20:00
03:00
10:00
17:00
00:00
07:00
14:00
21:00
04:00
11:00
18:00
01:00
08:00
15:00
22:00
05:00
12:00
19:00
02:00
09:00
16:00
23:00
06:00
13:00
20:00
03:00
10:00
17:00
2021-02- 2021-02- 2021-03- 2021-03- 2021-03- 2021-03- 2021-03- 2021-02- 2021-02- 2021-03- 2021-03- 2021-03- 2021-03- 2021-03-
BBU Board Maintenance Link Failure alarm 27 28 01 04 05 06 07 27 28 01 04 05 06 07
SSSR%
SDR %
INDEX
25
MBPS
clear? 60 0.06
20
10
No 15 40 0.04
10 5
TS on site by FOP 5
20 0.02
0 0 0 0
00:00
07:00
14:00
21:00
04:00
11:00
18:00
01:00
08:00
15:00
22:00
05:00
12:00
19:00
02:00
09:00
16:00
23:00
06:00
13:00
20:00
03:00
10:00
17:00
00:00
07:00
14:00
21:00
04:00
11:00
18:00
01:00
08:00
15:00
22:00
05:00
12:00
19:00
02:00
09:00
16:00
23:00
06:00
13:00
20:00
03:00
10:00
17:00
alarm End
clear? 2021-02- 2021-02- 2021-03- 2021-03- 2021-03- 2021-03- 2021-03- 2021-02- 2021-02- 2021-03- 2021-03- 2021-03- 2021-03- 2021-03-
27 28 01 04 05 06 07 27 28 01 04 05 06 07
No
Alarm
Contact Huawei expert
• Cabinet No.=0, Subrack No.=0, Slot No.=1, Board Type=UBRI, alarm BBU Board
Maintenance Link Failure
• Alarm clearance at 23 February 2021
• Continue monitoring
NUMBER
• Detected Batt low voltage alarm
GB
96 50 60 800
%
95 40 600
40
94 30
400
93 20
20
200
Flicker Availability 92 10
91 0 0 0
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
Check Batt low voltage alarm
2021-02-21 2021-02-22 2021-02-23 2021-02-24 2021-02-25 2021-02-26 2021-02-21 2021-02-22 2021-02-23 2021-02-24 2021-02-25 2021-02-26
SSSR%
10
SDR%
INDEX
MBPS
30 60 0.15
No 8
6 20 40 0.1
TS on site by FOP 4
10 20 0.05
2
0 0 0 0
alarm End
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
00:00
06:00
12:00
18:00
clear?
No 2021-02-21 2021-02-22 2021-02-23 2021-02-24 2021-02-25 2021-02-26 2021-02-21 2021-02-22 2021-02-23 2021-02-24 2021-02-25 2021-02-26
Traffic unbalance
Check capacity & capability cell surrounding Improve network quality and improve optimization efficiency
User Analysis
No Capable to Optimization and
Evaluation and Monitoring
Improvement
sharing?
Yes Resource
Solution
frequency Performance
Problem Area Recognition capacity VIP assurance
Check replanning
optimization
improvement
Parameter Layering
Data Support
Traffic Yes
End MR Trace Coord PM CM FM MME Map EP
Balance?
No
Justification
Action
GGB
Background
action below :
to 7.1 Mbps
116% to -115%
BD4G18_4511522E_6
17th
Vs
Change Azimuth from 240 to 310
24th
6.8
7.2
7.4
7.6
7.8
8.2
8.4
8.6
7
8
0
10
20
30
40
50
60
100.5
100
98.5
99.5
98
99
2021-01-28 2021-01-28
2021-01-28
2021-01-29 2021-01-29
2021-01-29
2021-01-30 2021-01-30
2021-01-30
2021-01-31 2021-01-31
2021-01-31
2021-02-01
2021-02-01 2021-02-01
2021-02-02
2021-02-02 2021-02-02
2021-02-03
2021-02-03 2021-02-03
2021-02-04
2021-02-04 2021-02-04
2021-02-05
2021-02-05 2021-02-05
2021-02-06
2021-02-06 2021-02-06
2021-02-07 2021-02-07
2021-02-07
2021-02-08 2021-02-08
2021-02-09
2021-02-08
2021-02-09
Service Drop Rate (%)
2021-02-10 2021-02-09
2021-02-10
Average of CQI
2021-02-10
DL PRB Usage Rate(%)
2021-02-11 2021-02-11
2021-02-12 2021-02-12 2021-02-11
2021-02-13 2021-02-13 2021-02-12
2021-02-14 2021-02-14 2021-02-13
SSSR(%)
0.1
10
15
20
25
0.02
0.04
0.06
0.08
0.12
2021-02-26
% %
0
4
6
8
2
12
14
16
10
18
Ta (m) % Payload
0
10
20
30
40
60
70
80
50
100
120
0
20
40
60
80
200
400
600
800
0
1000
1200
1400
2021-01-28
2021-01-28 2021-01-28
2021-01-29 2021-01-29
2021-01-29
2021-01-30 2021-01-30
2021-01-30
2021-01-31 2021-01-31
2021-01-31
2021-02-01 2021-02-01
2021-02-01
2021-02-02 2021-02-02
2021-02-02
2021-02-03 2021-02-03
2021-02-03
2021-02-04 2021-02-04 2021-02-04
2021-02-05 2021-02-05 2021-02-05
2021-02-06 2021-02-06 2021-02-06
2021-02-07 2021-02-07 2021-02-07
2021-02-08 2021-02-08 2021-02-08
Avg TA (m)
2021-02-11 2021-02-11
DL QPSK Ratio(%)
2021-02-11
2021-02-12 2021-02-12 2021-02-12
2021-02-13 2021-02-13 2021-02-13
2021-02-14 2021-02-14 2021-02-14
2021-02-15 2021-02-15 2021-02-15
2021-02-16
2021-02-16 2021-02-16
2021-02-17
2021-02-17 2021-02-17
User Connected
2021-02-18
DL SE bits/s/hz
2021-02-18 2021-02-18
2021-02-19
L.UL.Interference.Avg(dBm)
2021-02-19 2021-02-19
2021-02-20
2021-02-20 2021-02-20
2021-02-21
2021-02-21 2021-02-21
2021-02-22
2021-02-22 2021-02-22
2021-02-23
2021-02-23 2021-02-23
2021-02-24
2021-02-25 2021-02-24 2021-02-24
2021-02-26 2021-02-25 2021-02-25
2021-02-26 2021-02-26
-118
-117
-116
-115
-114
0
1
0
5
-117.5
-116.5
-115.5
-114.5
0.2
0.4
0.6
0.8
1.2
10
15
20
25
30
40
45
35
0
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2021-01-28 2021-01-28
2021-01-29 2021-01-29
2021-01-30 2021-01-30
2021-01-31 2021-01-31
2021-02-01 2021-02-01
2021-02-02 2021-02-02
2021-02-03 2021-02-03
2021-02-04 2021-02-04
2021-02-05 2021-02-05
2021-02-06 2021-02-06
2021-02-07 2021-02-07
2021-02-08 2021-02-08
2021-02-09 2021-02-09
2021-02-10 2021-02-10
2021-02-11 2021-02-11
2021-02-12 2021-02-12
Rank2 (%)
2021-02-13 2021-02-13
2021-02-14 2021-02-14
2021-02-15 2021-02-15
3511522G9_3G_Suci_Mundu - BD4G18_4511522E_6
2021-02-16
3511522G9_3G_Suci_Mundu - BD4G18_4511522E_6
2021-02-16
DL SE bits/s/hz Source & Surrounding
3511522G9_3G_Suci_Mundu - BD4G21_4511522E21_3
3511522G9_3G_Suci_Mundu - BD4G21_4511522E21_3
2021-02-17 2021-02-17
2021-02-18 2021-02-18
2021-02-19 2021-02-19
3510653G_DUKUH_DUWUR_PEGAMBIRAN_3G - BD4G18_4510653E_6
2021-02-20 2021-02-20
3510653G_DUKUH_DUWUR_PEGAMBIRAN_3G - BD4G18_4510653E_6
2021-02-21 2021-02-21
2021-02-22 2021-02-22
2021-02-23 2021-02-23
2021-02-24 2021-02-24
2021-02-25 2021-02-25
2021-02-26 2021-02-26
0
10
20
30
40
50
60
70
80
0
20
40
60
80
100
120
140
2021-01-28 2021-01-28
2021-01-29 2021-01-29
2021-01-30 2021-01-30
2021-01-31 2021-01-31
2021-02-01 2021-02-01
Improvement Sharing Traffic (2/2)
2021-02-02 2021-02-02
2021-02-03 2021-02-03
2021-02-04 2021-02-04
2021-02-05 2021-02-05
2021-02-06 2021-02-06
2021-02-07 2021-02-07
2021-02-08 2021-02-08
2021-02-09 2021-02-09
2021-02-10 2021-02-10
2021-02-11 2021-02-11
2021-02-12 2021-02-12
2021-02-13 2021-02-13
2021-02-14 2021-02-14
2021-02-15 2021-02-15
3511522G9_3G_Suci_Mundu - BD4G18_4511522E_6
3511522G9_3G_Suci_Mundu - BD4G18_4511522E_6
3511522G9_3G_Suci_Mundu - BD4G21_4511522E21_3
2021-02-16 2021-02-16
3511522G9_3G_Suci_Mundu - BD4G21_4511522E21_3
User Connected Source & Surrounding
2021-02-17 2021-02-17
2021-02-18 2021-02-18
2021-02-19 2021-02-19
3510653G_DUKUH_DUWUR_PEGAMBIRAN_3G - BD4G18_4510653E_6
2021-02-20 2021-02-20
3510653G_DUKUH_DUWUR_PEGAMBIRAN_3G - BD4G18_4510653E_6
2021-02-21 2021-02-21
2021-02-22 2021-02-22
2021-02-23 2021-02-23
2021-02-24 2021-02-24
2021-02-25 2021-02-25
2021-02-26 2021-02-26
-
-
-
-
Maintained
executed sites :
sharing traffic
sharing payload
Surrounding Maintain
DL Spectrum Efficiency
Surrounding Site, Traffic and
KPI Performance Source and
80 25000
S1 Failure Number
No Ping Issue 20000
S1 Sig SR(%)
60
15000
40
10000
20 5000
0 0
Port Unbalance
Sharring Traffic
Cross Feeder
RTWP > -105
Under shoot
Low Spectral Efficiency for Cells
RANK2 < 20
VSWR > 1.4
Over shoot
RB Flat <98
Unbalance
Kabupaten
SM4G18_4531116E_16_M
TowerID
Overlap
Low SE
With Radio Overlap: Near | Hygiene: Safe| Transport:
Safe |Low SE : 1-1.25
KOTA PEKALONGAN JAW-JT-PKL-1323 2 0 0 1 0 2 0 0 0 2 0 0
Action been done:
Week 4 -2021 Week 8 -2021
ReAzimuth from 290 to 350 on 16 Feb 2021
Azimuth : 100/220/290 >> 100/220/290 ~ Avoid Intergap
sect
Result :
Comparison between 9 Feb (BH) and 23 Feb (BH)
Spectral Efficiency Improved 41% from 0.95 bit/s/Hz
to 1.34 bit/s/Hz
Total Payload Increased 47% from 2.9 GB to 4.4 GB
14. Overshooting-Undershooting
160
SM4G18_4525901E_4
Average RSRP : -107.18 dbm
BEFORE
100.0 60
SM4G18_4525901E_4
Average RSRP : -105.87 dbm
3
AFTER
100.0
90.0 90.0
140 50 4 degree
2 degree
80.0 80.0
120
TA Distribution (%)
70.0
TA Distribution (%)
70.0 40
100 60.0 60.0
80 50.0 30 50.0
40.0 40.0
60 20
30.0 30.0
40
20.0 20.0
10
20 10.0 10.0
0 0.0 0 0.0
520
2990
0
130
260
390
650
780
910
1040
1170
1300
1430
1560
1690
1820
1950
2080
2210
2340
2470
2600
2730
2860
3120
3250
3380
3510
3640
3770
3900
4030
330
1210
0
110
220
440
550
660
770
880
990
1100
1320
1430
1540
1650
1760
1870
1980
2090
2200
2310
2420
2530
2640
2750
2860
2970
3080
3190
Background
distance (m) distance (m)
› Samples of overshooting with
Upperbeam distance >= 90. Height ISD 1st Tier %TA Height ISD 1st Tier %TA
4525901E_LTE_PAPANREJO_GUB QPSK UpperBeam Main Beam Lower Beam QPSK UpperBeam Main Beam Lower Beam
UG (SM4G18_4525901E_4)
Vertical Slope Upper Beam 1st Distance TA 90% in
Action Done CellName Height Ant-Type Ant-Size Beam Tilt M-Tilt E-Tilt 1 E-Tilt 2 RET ISD Overshoot TA(km) Status
Beam (%) Distance (KM) Km
• Done physical antenna adjustment SM4G18_4525901 TONGYU_TTB- OVER SHOOT 6.15285774
on 20-Jan-2021 (Elec. 0 to 2) by E_4
51
809016/182017/182017DE-65P
1.3 25 2 2 0 NO 7
!
NULL
2
0 1.71 3.26 BEFORE | W06_2021
EID-RO (Prodef 20OTLO) SM4G18_4525901 TONGYU_TTB-
51 1.3 25 4 2 2 NO 7 5844.02 NULL 6.15285774 0 1.91 4.11 AFTER | W08_2021
E_4 809016/182017/182017DE-65P
Result Total Payload VS DL User Throughput CQI VS QPSK Spectral Efficiency VS TxRank2
Comparison between 14 Jan 2021 (BH)
14 12 10 80 1.6 50
and 28 Jan 2021 (BH)
• Total payload decreased from 10.46 12 10 9 1.4
45
70
GB to 8.16 GB
8 35
60
7.98% from 1.66 Mbps to 9.64 7 1
TxRank2 (%)
30
Mbps 6
CQI
6 6 50 0.8 25
• CQI improved 1.76% from 7.36 4 20
to 9.12 4 5
40
0.6
15
• QPSK reduced 9.1% from 54.41% 2 2 4 0.4
to 45.31% 30
10
3 0.2
• Spectral Efficiency improved 0 0 5
01-Feb
02-Feb
03-Feb
04-Feb
12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
26-Jan
27-Jan
28-Jan
29-Jan
30-Jan
31-Jan
01-Feb
02-Feb
03-Feb
04-Feb
01-Feb
02-Feb
03-Feb
04-Feb
12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
26-Jan
27-Jan
28-Jan
29-Jan
30-Jan
31-Jan
12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
26-Jan
27-Jan
28-Jan
29-Jan
30-Jan
31-Jan
1.48 bit/s/Hz
Jan Feb
• TxRank2 improved 5.2% from
39.55% to 44.75% SM4G18_4525901E_4 - Sum of TotalPayloadGB SM4G18_4525901E_4 - Average of LCqi SM4G18_4525901E_4 - Average of SpectralEff
SM4G18_4525901E_4 - Average of LDLAVGUserThroughputMbps SM4G18_4525901E_4 - Average of LQPSKrate SM4G18_4525901E_4 - Average of LTxRank2RateOnly
Undershoot Issue
Undershoot
Issue
3
Any
Yes
Blocking No
YES No
Clear Hygiene/
PFT Issue Clear? Power Issue
NO Cek Tilting/
Perform Site NO
Audit
Issue clear?
YES
Stop YES
SUMMARY
14/07/2020
15/07/2020
16/07/2020
17/07/2020
18/07/2020
19/07/2020
20/07/2020
21/07/2020
Done adjustment on 20-July-2020
14/07/2020
15/07/2020
16/07/2020
17/07/2020
18/07/2020
19/07/2020
20/07/2020
21/07/2020
14/07/2020
15/07/2020
16/07/2020
17/07/2020
18/07/2020
19/07/2020
20/07/2020
21/07/2020
Result
YG4G21_4533657E21_7 - LTE_SROYO_ROAD YG4G21_4533657E21_8 - LTE_SROYO_ROAD YG4G21_4533657E21_9 - LTE_SROYO_ROAD
Total payload YG4G18_4533657E_6 - 4533657E_LTE_SROYO_ROAD
YG4G18_4533657E_4 - 4533657E_LTE_SROYO_ROAD YG4G18_4533657E_5 - 4533657E_LTE_SROYO_ROAD
4533657E_LTE_SROYO_ROAD
increased 25.55% from 557.91 GB to RSRP Before RSRP After
Timing Advance (#)
700.43 GB
4000
Total payload of Sroyo_Road and 3500
3000
surrounding is maintain 2500
2000
1500
1000
500
0
1405.44
1639.68
1873.92
2108.16
2576.64
2810.88
3045.12
3279.36
234.24
468.48
702.72
936.96
1171.2
2342.4
Total Payload (GB)
3500 531239-5 - BEFORE 531239-5 - AFTER
1015.04
1249.28
1483.52
1717.76
2186.24
2420.48
2654.72
2888.96
78.08
312.32
546.56
3123.2
780.8
1952
14/07/2020
15/07/2020
16/07/2020
17/07/2020
18/07/2020
19/07/2020
20/07/2020
21/07/2020
SOURCE SURROUNDING
16. RTWP Improvement Site 353B476G_3G_CEBONGAN_SLEMAN
3
Root Cause&Analysis: High RTWP
• High RTWP issue
Problem:
• External interference -10 dBm Suspect
Action: No
internal
Impact to
• Retilting antenna surrounding
interference,
item to check,
Scope : 1 site in Central Java cell?
jumper, RRU,
353B476G_3G_CEBONGAN_SL antenna
EMAN
Yes
Result:
• RTWP Decreased Suspect interference from external
source, (repeater or other operator
-10 dBm frequencies)
• PS drop maintain & CS drop Join Troubleshoot
increase 5% with FOP
• HSDPA & HSUPA Throughput Action take to locate the source of
maintain interference:
1. Retilting (downitilt/ uptilt)
• HSDPA & HSUPA Payload 2. Reazimuth
Increased + 16.6 GB 3. Scanning frequency with scanner
Result :
Yes
VSWR normalized Is the Alarm
FINISH
Clearance?
No