Example Renovations Boq

This document is a bill of quantities for an example renovation project that provides estimated costs for materials and labor. It lists items under preliminary costs, erosion control, site survey, building design, color consulting, energy efficiency reports, engineering, and supervision. The totals are provided for each section, with an overall total not given. The document notes that pricing does not include GST and that allowance should be made for potential cost increases over time.

Uploaded by

Kein Kep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
551 views37 pages

Example Renovations Boq

This document is a bill of quantities for an example renovation project that provides estimated costs for materials and labor. It lists items under preliminary costs, erosion control, site survey, building design, color consulting, energy efficiency reports, engineering, and supervision. The totals are provided for each section, with an overall total not given. The document notes that pricing does not include GST and that allowance should be made for potential cost increases over time.

Uploaded by

Kein Kep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

Page 1 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

1 PRELIMINARIES

Item Description Quantity Units Rate Amount Lvl Ld


noguaran NOTE: This bill of quantities is NOT Guaranteed. 1 Off $0.00 $0.00 27 1
It is an estimated list of priced materials and
labour.
The materials and labour have been costed using the methods that we would employ if we were to do this
construction work.
The prices are based on the pricing, turnover and buying power that has provided to us by the builder and may
vary depending on the builders actual turnover and buying power.
In all cases the onus is on the client to check that they would employ the same methods, therefore calculating
the same quantities, and that they are able to purchase the materials and labour for the stated rates.
If you are unsure then please contact us immediately to clarify any issues or to have the project repriced at the
appropriate level of pricing. We are able to provide a number of different price levels to suit varying builders
buying capacity.
Pricing shown does NOT include GST, which must be added by the builder.
Supervision, Margin & Markup, where shown, are nominal and must be checked by the builder.
We have NOT allowed for cost increases that may come about through inflation or supply demands. The
builder must estimate the time delay between pricing a project and beginning the works, many suppliers will not
hold pricing for an extended period and you must make an allowance for this.
Total 1 PRELIMINARIES $0.00

1.3 SILT CONTAINMENT \ EROSION CNTRL

Item Description Quantity Units Rate Amount Lvl Ld


04051 Sediment containment fence (lineal mtr rate - min 12 LIN M $15.00 $180.00 27 1
20 mtrs)
6455 Silt prevention hay bales - supply & place 5 Off $25.00 $125.00 27 1

Total 1.3 SILT CONTAINMENT \ EROSION CNTRL $305.00

2 CONTOUR & SITE SURVEY

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 2 CONTOUR & SITE SURVEY $0.00

3 BUILDING DESIGN \ DRAFTING

Item Description Quantity Units Rate Amount Lvl Ld


01221 Drafting of double storey houses including site 220.14 m2 $15.00 $3,302.10 27 1
plans (less cost of sketch plans)
.

Total 3 BUILDING DESIGN \ DRAFTING $3,302.10

3.1 COLOUR CONSULTANT

Item Description Quantity Units Rate Amount Lvl Ld


colours Preparation of Colour Selection, including client 1 Off $600.00 $600.00 27 1
consultation

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 2 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

3.1 COLOUR CONSULTANT

Item Description Quantity Units Rate Amount Lvl Ld

Note:

1.0 Where possible it is preferred for clients to stay with the builders standard range.If you are unsure if
something is standard, then please phone for confirmation.
2.0 Owners Contact Number:
3.0 Contract Type -
4.0 Clients Name -
Total 3.1 COLOUR CONSULTANT $600.00

3.3 ENERGY EFFICIENCY REPORTS

Item Description Quantity Units Rate Amount Lvl Ld


03866 Energy Efficiency Certificate for all highset houses 1 Off $200.00 $200.00 27 1

Total 3.3 ENERGY EFFICIENCY REPORTS $200.00

4 ENGINEER

Item Description Quantity Units Rate Amount Lvl Ld


0141 Engineer's Soil testing & footing and slab design 1 Off $600.00 $600.00 27 1
Note:

1.0 Registered Plan No.


2.0 House Design -
3.0 Slab Design Type -
4.0 External Concrete -
5.0 Contract Type -
6.0 Where conventional slabs are used, if possible, please keep internal slab beams below 200mm deep
7.0 Compaction tests available ? -
01410 Engineer's masonary articulation design 1 Off $25.00 $25.00 27 1
Note:

1.0 Masonary articulation to be nominated on slab plan, or other suitable plan.


2.0 Bricks being used -
3.0 Width of bricks -
0142 Footing Inspection 1 Off $150.00 $150.00 27 1
0143 Slab Inspection 1 Off $150.00 $150.00 27 1
01443 Engineers subfloor design for steel posts & 1 Off $300.00 $300.00 27 1
bracing
Total 4 ENGINEER $1,225.00

4.5 SUPERVISION AND SITE INSPECTIONS

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1
for site foreman etc - refer summary sheet for overheads costs

Total 4.5 SUPERVISION AND SITE INSPECTIONS $0.00

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 3 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

5 CONTRACTORS INSURANCE

Item Description Quantity Units Rate Amount Lvl Ld


01611 Contractors Insurance for building during 490000 /1000 $4.50 $2,205.00 27 1
construction
Total 5 CONTRACTORS INSURANCE $2,205.00

6 Q.B.S.A INSURANCE

Item Description Quantity Units Rate Amount Lvl Ld


01781 QBSA INSURANCE PREMIUM 0.79% OF 490000 /1000 $8.20 $4,018.00 27 1
CONTRACT VALUE MINIMUM $156.4 MAXIMUM
PAYBLE $ 2835.25 PER DWELLING ($400'000
contact)
Total 6 Q.B.S.A INSURANCE $4,018.00

6.5 Q-LEAVE

Item Description Quantity Units Rate Amount Lvl Ld


0163 COMBINED PLSL & WPHS FEES PAYABLE AT 490000 /1000 $4.78 $2,342.20 27 1
THE POST OFFICES PRIOR TO BA FOR JOBS
OVER $80'000
Total 6.5 Q-LEAVE $2,342.20

7 CERTIFICATION & COUNCIL FEES

Item Description Quantity Units Rate Amount Lvl Ld


01975 Certification Application & Building Approvals - 1 Off $400.00 $400.00 27 1
Double Storey
0198 Certification Application & Building Approvals on 1 Off $220.00 $220.00 27 1
site Inspections (frame & final)
Frame Inspection Date -
0199-log Local Government Lodgement & Archive fee - 1 Off $109.00 $109.00 27 1
Local City Council
0200-log-1 Plumbing application fee, Local City Council 1 Off $187.00 $187.00 27 1
0200-log-3 Plumbing Design & approval Local City Council 1 Off $250.00 $250.00 27 1
0201-tank Plumbing Inspection - Water Tanks 1 Off $102.00 $102.00 27 1
02021-log Local City Council Information Package (Bi-Map 1 Off $57.00 $57.00 27 1
Search, City Plan Search & Drainage Plan)
0227 Additional plumbing fixtures 10 Off $60.00 $600.00 27 1

Total 7 CERTIFICATION & COUNCIL FEES $1,925.00

8 TOILET HIRE

Item Description Quantity Units Rate Amount Lvl Ld


0395 Fresh Flush Toilet Hire 12 weeks 1 Off $800.00 $800.00 27 1
0401 Chemical Toilet - extra hire after 12 weeks 8 weekly $45.00 $360.00 27 1
04015 Toilet hire damage waiver 1 Off $45.00 $45.00 27 1

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 4 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

8 TOILET HIRE

Item Description Quantity Units Rate Amount Lvl Ld

Total 8 TOILET HIRE $1,205.00

8.1 TREE LOPPING

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 8.1 TREE LOPPING $0.00

8.3 TEMPORARY POWER POLE

Item Description Quantity Units Rate Amount Lvl Ld


0396 Note: Assuming extisting power and water can be 1 Off $1.00 $1.00 27 1
used whilst alterations are underway
Total 8.3 TEMPORARY POWER POLE $1.00

8.4 HIRE

Item Description Quantity Units Rate Amount Lvl Ld


0398-plan6 6.0 mtr aluminium plank 10 days $15.00 $150.00 27 1
0398-tres5 4.8 mtr aluminium trestle 10 days $25.00 $250.00 27 1
04055 Temporary Balustrade Hire 3 LIN M $25.00 $75.00 27 1
includes extra for stair void
04205 Props & Tarps allowance - larger jobs 1 Off $800.00 $800.00 27 1
2629 Miscellaneous hire allowance - Confirm 1 Off $500.00 $500.00 27 1
requirements & advise if an order is to be raised
from the office
Total 8.4 HIRE $1,775.00

8.7 SITE BINS / MINI SKIPS

Item Description Quantity Units Rate Amount Lvl Ld


0707 6 M3 SKIP 10 Off $400.00 $4,000.00 27 1

Total 8.7 SITE BINS / MINI SKIPS $4,000.00

10 RETAINING WALLS

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 10 RETAINING WALLS $0.00

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 5 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

11 SURVEYOR HOUSE SET OUT

Item Description Quantity Units Rate Amount Lvl Ld


0571 PS Amount to cover Identification Survey 1 Off $800.00 $800.00 27 1

Total 11 SURVEYOR HOUSE SET OUT $800.00

12 DEMOLITION

Item Description Quantity Units Rate Amount Lvl Ld


0414 Concrete Saw Hire 2 days $200.00 $400.00 27 1
057301 PULL UP EXISTING PAVING & STACK ON SITE 16 hour $39.60 $633.60 27 1
057302 Breakup Existing Paving - Large Areas - to 100 m2 53.25 m2 $50.00 $2,662.50 27 1
## check how easy the existing concrete is going to come up ???? ##
05731 Breakup Existing Masonary Walls 20.04 m2 $65.00 $1,302.60 27 1
0575 Site Establishment 40 hour $45.00 $1,800.00 27 1
0577 CARPENTER TO REMOVE WALL FRAME & 20 hour $45.00 $900.00 27 1
PROP
0578 CARPENTER TO REMOVE WINDOWS & 8 hour $45.00 $360.00 27 1
DOORS
0579 CARPENTER TO REMOVE SOFFIT SHEETS 20 hour $45.00 $900.00 27 1
0580 CARPENTER TO REMOVE FASCIA & GUTTER 10 hour $45.00 $450.00 27 1
0581 CARPENTER TO REMOVE ROOF COVERINGS 40 hour $45.00 $1,800.00 27 1
0582 Carpenter - Remove any part of existing roof 40 hour $45.00 $1,800.00 27 1
structure and make ready for new roof
0583 CARPENTER TO REMOVE INTERNAL WALL 30 hour $45.00 $1,350.00 27 1
CLADDING AND DOORS
0584 CARPENTER TO REMOVE FIXTURES & 10 hour $45.00 $450.00 27 1
FITTINGS
0585 CARPENTER TO REMOVE FLOOR COVERINGS 6 hour $45.00 $270.00 27 1
05851 BREAK UP FLOOR TILES 14 hour $45.00 $630.00 27 1
05852 BREAK UP WALL TILES 8 hour $45.00 $360.00 27 1
0587 MISCELLANEOUS ALLOWANCE FOR 80 hour $45.00 $3,600.00 27 1
CARPENTER AT DEMO STAGE
0590 Plumber - Labour to remove or disconnect 8 hour $50.00 $400.00 27 1
0591 Electrician - Labour to disconnect / Reconnect & 8 hour $50.00 $400.00 27 1
make safe
0598 EXTRA ALLOWANCE TO WALK REFUSE TO 60 hour $45.00 $2,700.00 27 1
BIN. BY CARPENTER
0696 10m3 Tipper Truck 3.0 hrs @ $85/hr and $300 Tip 4 Off $600.00 $2,400.00 27 1
Fee
1941 JACK HAMMER HIRE ALLOWANCE 3 days $125.00 $375.00 27 1

Total 12 DEMOLITION $25,943.70

13.5 CONCRETE PUMP - FOOTINGS/SLAB

Item Description Quantity Units Rate Amount Lvl Ld


0694-30s Concrete pump, fixed price for first 30m3 (small 2 Off $750.00 $1,500.00 27 1
jobs)
Concrete pump is for - only

Total 13.5 CONCRETE PUMP - FOOTINGS/SLAB $1,500.00

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 6 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

15 FOOTINGS HARDWARE

Item Description Quantity Units Rate Amount Lvl Ld


0036 NOTE: No Engineers design has been received for 1 Off $0.01 $0.01 27 1
this costing. Foundations & Framing & Steel may
cost substantially more!
any sizes shown are nominal only for budgeting purposes. Do not order these materials.
0763 3 BAR F11 200 X 6000 3 Off $43.20 $129.60 27 1
07655 500x200 R6 Ligatures (Bundle of 25) 1 bundle $54.00 $54.00 27 1
07691 Y12 600 x 600 Corner Bars 4 Off $2.73 $10.91 27 1
0772 Y12 800 x 200 mm Slab Tie (one cog total length 10 each $2.61 $26.10 27 1
1000mm)
07720 Starter bar safety caps - Reo sok 12-20mm 100 per 100 $117.00 $117.00 27 1
07722 Y12 1200 x 200 mm Slab Tie ( one cog total 10 each $3.97 $39.69 27 1
length 1400mm)
0787 Y12 R/W VERTICAL BARS 5.1 METRE $3.50 $17.83 27 1
0788 Y12 R/W HORIZONTAL BARS 5.1 METRE $3.50 $17.83 27 1
0813 TMS65 Trench Mesh Chairs ( PK OF 5 ) 20 20 rounding $2.93 $58.59 27 1
08225 Tie Wire - Belt pack coil 1 roll $45.00 $45.00 27 1
0961 Delivery 1 Off $117.00 $117.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
note Please Note: 1 Off $0.00 $0.00 27 1
back patio is colorbond with metal posts bolted to the slab, timber post brackets not required

Total 15 FOOTINGS HARDWARE $633.57

16 FOOTINGS CONCRETE

Item Description Quantity Units Rate Amount Lvl Ld


09641 Concrete - Footings 600 x 350 2 m3 $189.65 $379.29 27 1
0966 Concrete Supply - Piers 1.6 m3 $189.65 $303.44 27 1
(includes steel post footings)
09690 Blinding concrete to footings 00.4 m3 $206.45 $82.58 27 1
(for steel posts)
0987 Core fill retaining walls 00.2 m3 $228.06 $45.61 27 1
09872-load Minimum load charge 1 Off $31.51 $31.51 27 1

Total 16 FOOTINGS CONCRETE $842.43

17 FOOTINGS LABOUR

Item Description Quantity Units Rate Amount Lvl Ld


0990 Concretor - Prepare & place concrete to footings 7.2 m $25.00 $180.00 27 1
(clean out strip footings & place trench mesh
including chairs etc)
0994 Concretor - Place Columns or Piers (each per pier) 8 Off $40.00 $320.00 27 1
to steel posts
09941 Concretor - Labour, hourly rate 30 hour $45.00 $1,350.00 27 1
to excavate footings
0999 Concretor - Extra labour allowance to tie 2 layers 7 per lin mtr $15.00 $105.00 27 1
of mesh (make cage on site)
1021 Concretor - Place core fill 2 m2 $12.00 $24.00 27 1
10255 Concretors labour allowance to "barrow" concrete 1 Off $100.00 $100.00 27 1
10333 Place blinding concrete, level off, setout and 8 Off $35.00 $280.00 27 1
measure correct lengths of steel posts for ordering

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 7 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

17 FOOTINGS LABOUR

Item Description Quantity Units Rate Amount Lvl Ld

Total 17 FOOTINGS LABOUR $2,359.00

20 PLUMBER - DRAINAGE

Item Description Quantity Units Rate Amount Lvl Ld


1073 Drainer - Supply & Lay PVC Sewer line 10 LIN M $34.32 $343.20 27 2
1074 Supply & Lay PVC Stormwater line 45 LIN M $20.46 $920.70 27 2
plmb-10020 Lowset underslab drainage double bathroom 1 Off $3,726.80 $3,726.80 27 1
house kitchen, laundry & seperate toilet to 250m2
- 60 sew & 70 storm - 7D/P
Total 20 PLUMBER - DRAINAGE $4,990.70

20.2 WATER TANKS

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1
for tank or pump - use existing
confirm if an extra concrete pad is required for the water tank
Total 20.2 WATER TANKS $0.00

21 BRICKS FOR BASE

Item Description Quantity Units Rate Amount Lvl Ld


1172 Face Bricks 380 /1000 $600.00 $228.00 27 1
Brick Colour -
1222 DELIVERY 1 Off $85.00 $85.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.

Total 21 BRICKS FOR BASE $313.00

22 BASE HARDWARE

Item Description Quantity Units Rate Amount Lvl Ld


1223 CAVITY TIES (50 per box) 1 Off $6.00 $6.00 27 1

Total 22 BASE HARDWARE $6.00

23 BRICKLAYER BASE

Item Description Quantity Units Rate Amount Lvl Ld


1327 Lay Bricks to Sub-Floor 300 /1000 $1,000.00 $300.00 27 1
Note:
1.0 Beams passing through brickwork must be wrapped in able flex
2.0 Mud is to be cleaned from the footings, this is especially crucial for rendered houses

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 8 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

23 BRICKLAYER BASE

Item Description Quantity Units Rate Amount Lvl Ld


3.0 Mortar Colour -
4.0 Mortar Joint type -
5.0 Blends
(a) Ensure all bricks on site before commensing work
(b) Blenf from 3 packs to ensure more even finish
6.0 bricks with burn marks should not be used as headers or on returns

Rubbish:

1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
Total 23 BRICKLAYER BASE $300.00

27 BEDDING SAND

Item Description Quantity Units Rate Amount Lvl Ld


1668 Underslab Bedding Sand - Delivered (per m3) 3 M3 $50.00 $150.00 27 1
Patio poured with main slab
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
Total 27 BEDDING SAND $150.00

27.5 SEDIMENT GRAVEL

Item Description Quantity Units Rate Amount Lvl Ld


6947 Excavate driveway & supply & install gravel to 1 Off $300.00 $300.00 27 1
council requirements (bobcat / excavator hire)
Total 27.5 SEDIMENT GRAVEL $300.00

28 TERMITE TREATMENT

Item Description Quantity Units Rate Amount Lvl Ld


ps Provisional Sum for Supply and Installation 500 Off $1.00 $500.00 27 1
of termite proofing

Total 28 TERMITE TREATMENT $500.00

29 SLAB HARDWARE

Item Description Quantity Units Rate Amount Lvl Ld


0803 F82 MESH 2 Off $136.80 $273.60 27 1
0814 BAR CHAIRS SOG5065 (PK OF 100) (for 100 per 100 $35.10 $35.10 27 1
conventional slabs)
Patio poured with main slab
0831 POLYTHENE 50Mx4M BLACK 200um 1 roll $142.88 $142.88 27 1
0840 DUCT TAPE 50mm X 30 mtr 1 roll $5.95 $5.95 27 1

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 9 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

29 SLAB HARDWARE

Item Description Quantity Units Rate Amount Lvl Ld


1716 F72 FOR SITE BIN 1 sheet $135.00 $135.00 27 1
1910 DELIVERY 1 Off $100.00 $100.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.

Total 29 SLAB HARDWARE $692.54

30 SLAB CONCRETE

Item Description Quantity Units Rate Amount Lvl Ld


0969 Concrete supply - slab edge beam 00.4 m3 $189.65 $75.86 27 1
0970 Concrete - Main slab 2 m3 $189.65 $379.29 27 1
Patio poured with main slab
09872-load Minimum load charge 1 Off $31.51 $31.51 27 1

Total 30 SLAB CONCRETE $486.66

31 SLAB LABOUR

Item Description Quantity Units Rate Amount Lvl Ld


09941 Concretor - Labour, hourly rate 12 hour $45.00 $540.00 27 1
to prep new slab
1018 Concretor - prepare & place slab over 100m2 6 m2 $15.00 $90.00 27 1
(screed sand bed, vapour barrier, place mesh on
chairs and finishing etc)
Please make allowance for load bearing walls to -
Fall the floor locally 1:80 to 1:100, to wet area floor waste's.
Check floor for steel posts, confirm recess details with supervisor
Ensure setdown placed for garage doors. Check back of garage for rear door !
The soil classification on this site is ""
1025202 Prepare & Place External Concrete to Driveways, 12 m2 $30.00 $360.00 27 1
Patio's & Paths (over 40.0 m2)
Patio poured with main slab
10255 Concretors labour allowance to "barrow" concrete 4 Off $100.00 $400.00 27 1
1038 Concretor - Set Out Allowance 1 Off $500.00 $500.00 27 3

Total 31 SLAB LABOUR $1,890.00

34 STRUCTURAL STEEL

Item Description Quantity Units Rate Amount Lvl Ld


0036 NOTE: No Engineers design has been received for 1 Off $0.01 $0.01 27 1
this costing. Foundations & Framing & Steel may
cost substantially more!
any sizes shown are nominal only for budgeting purposes. Do not order these materials.
2154-4200 100 x 100 x 5.0 Supergal Column 4200 6 Off $281.96 $1,691.76 27 1
top
base
2219 ON-SITE WELDING 4 hour $151.20 $604.80 27 1
2245 250 U BEAM 37.3Kg 10.8 per mtr $139.69 $1,508.67 27 1

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 10 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

34 STRUCTURAL STEEL

Item Description Quantity Units Rate Amount Lvl Ld


2249-plate Extra allowance to fillet weld (100mm on / 200mm 5.4 per mtr $189.00 $1,020.60 27 1
off) a 300x10 plate to a steel beam to support
brickwork above
2261 CUT STEEL BEAMS TO LENGTH 2 Off $65.52 $131.04 27 1
2270 SITE WELDING PER COLUMN 8 Off $75.60 $604.80 27 1
2299 DELIVERY 1 Off $126.00 $126.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.

Total 34 STRUCTURAL STEEL $5,687.69

34.9 FLOOR MATERIALS - LOWER FLOOR

Item Description Quantity Units Rate Amount Lvl Ld


0036 NOTE: No Engineers design has been received for 1 Off $0.01 $0.01 27 1
this costing. Foundations & Framing & Steel may
cost substantially more!
any sizes shown are nominal only for budgeting purposes. Do not order these materials.
2319 HYSPAN 240 X 45 - LVL 20.1 m $26.29 $528.35 27 1
231906 HYSPAN 240 X 45 - LVL - H3 12 m $26.29 $315.43 27 1
2613 AQUA-BAR FLOORING 3600 X 900 X 19 2 sheet $48.54 $97.09 27 1
MULITPURPOSE YELLOW TONGUE
Total 34.9 FLOOR MATERIALS - LOWER FLOOR $940.88

35 STICK FRAME LOWER FLOOR

Item Description Quantity Units Rate Amount Lvl Ld


0036 NOTE: No Engineers design has been received for 1 Off $0.01 $0.01 27 1
this costing. Foundations & Framing & Steel may
cost substantially more!
any sizes shown are nominal only for budgeting purposes. Do not order these materials.
2501 NAIL PLATE 100 X 50 F14 HWD 10.8 m $5.27 $56.93 27 1
2536 DELIVERY 1 Off $150.00 $150.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
7861 90 X 35 PINE(MGP12) 263.7 m $2.65 $698.81 27 1
Bottom Plates 1.0/15
Bulkheads 1.0/20
Nogging 2.0/15
Ribbon Plates 1.0/15
Studs 45/3.3
Temporary Bracing 20/1.0
Top Plates 1.0/15
7862 90 X 45 PINE(MGP12) 45 m $4.18 $188.14 27 1

Total 35 STICK FRAME LOWER FLOOR $1,093.89

35.1 FLOOR MATERIALS - UPPER FLOOR

Item Description Quantity Units Rate Amount Lvl Ld

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 11 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

35.1 FLOOR MATERIALS - UPPER FLOOR

Item Description Quantity Units Rate Amount Lvl Ld


0036 NOTE: No Engineers design has been received for 1 Off $0.01 $0.01 27 1
this costing. Foundations & Framing & Steel may
cost substantially more!
any sizes shown are nominal only for budgeting purposes. Do not order these materials.
2319 HYSPAN 240 X 45 - LVL 396 m $26.29 $10,409.22 27 1
bearers 16/5.4
blocking to external walls 1.0/10
blocking to internal walls 1.0/10
floor joists 1/280.0
void trimmers 4/2.4
2536 DELIVERY 1 Off $150.00 $150.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
2613 AQUA-BAR FLOORING 3600 X 900 X 19 24 sheet $48.54 $1,165.03 27 1
MULITPURPOSE YELLOW TONGUE
2614 AQUA-BAR FLOORING 3600 X 900 X 19mm 6 sheet $87.54 $525.23 27 1
WET AREA YELLOW TONGUE
26301 HJ240 - LF189 JOIST HANGER 180 Off $4.46 $802.24 27 1
joist hanger to suit -

Total 35.1 FLOOR MATERIALS - UPPER FLOOR $13,051.73

35.2 STICK FRAME UPPER FLOOR

Item Description Quantity Units Rate Amount Lvl Ld


0036 NOTE: No Engineers design has been received for 1 Off $0.01 $0.01 27 1
this costing. Foundations & Framing & Steel may
cost substantially more!
any sizes shown are nominal only for budgeting purposes. Do not order these materials.
2382 LINTEL 1200 LENGTHS 1 Off $38.54 $38.54 27 1
2384 LINTEL 1800 LENGTHS 1 Off $57.73 $57.73 27 1
2386 LINTEL 2400 LENGTHS 1 Off $105.41 $105.41 27 1
23861 LINTEL 2700 LENGTHS 2 Off $234.15 $468.31 27 1
2406 Tasbeam 300x65 18C Appearance B 3.3 per lin mtr $88.26 $291.27 27 1
Bulkhead Beams 1.0/3.3
2536 DELIVERY 1 Off $150.00 $150.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
2546 Ply Brace 2440x900 - F14 4mm STRUCTURAL 4 sheet $16.00 $64.00 27 1
BRACING PLYWOOD
7861 90 X 35 PINE(MGP12) 997.2 m $2.65 $2,642.58 27 1
external studs 150/2.4
plates and nogging 5/50.0
temp brace 1/30.0

Internal Bottom Plates 1.0/35


Internal Nogging 1.0/35
Internal Studs 105/2.4
Internal Top Plates 1.0/35
Total 35.2 STICK FRAME UPPER FLOOR $3,817.85

35.3 T & G FLOORING \ CLADDING

Item Description Quantity Units Rate Amount Lvl Ld

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 12 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

35.3 T & G FLOORING \ CLADDING

Item Description Quantity Units Rate Amount Lvl Ld


63172-3000 Polished floor - provisional Sum 100 m2 $200.00 $20,000.00 27 1

Total 35.3 T & G FLOORING \ CLADDING $20,000.00

36 FRAME HARDWARE

Item Description Quantity Units Rate Amount Lvl Ld


2551 50 x 50 x 3.0 mm WASHERS TO SUIT 12mm DIA. 10 each $0.26 $2.60 27 1
BOLT
25530 BATTEN SCREWS 14 x 75 20 each $0.22 $4.40 27 1
extra allowed for transfer blocks
2554 NAIL 1 KG BOX GAL CLOUTS 30 x 2.8 mm 00.5 Kg. $8.80 $4.40 27 1
2556 HOOP IRON 20Mx30mmx1.0mm 4 roll $20.00 $80.00 27 1
2561 65mm Concrete Nails (box quantity 100) 1 packet $9.10 $9.10 27 1
2562 ZP COACH SCREW 3/8 X 2 8 Off $0.20 $1.60 27 1
2576 SN4C NAIL PLATES 40 each $0.35 $14.00 27 1
2586 BOLT/NUT/WASHER GAL CUPHEAD 100 x 12 16 Off $0.98 $15.68 27 1
mm
2600 BOLT/NUT/WASHER CUPHEAD ? 75 x 12 mm 12 Off $0.92 $11.04 27 1
26105 Senco Framing Nails - 3000 per box 1 Kg. $30.00 $30.00 27 8
26107 Coil Nails (for fixing ply bracing) 1 Kg. $45.00 $45.00 27 8
2617 CSR FLOORMATE ADHESIVE 300ml 15 Off $4.68 $70.16 27 1
2625 18 MM MARINE GRADE PLYWOOD 2400 X 4 sheet $115.10 $460.40 27 1
1200
BOX GUTTER
2737 DELIVERY 1 Off $30.00 $30.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
3651 Tyvek wall Barrier Insulation - flamestop fire 3 Off $162.45 $487.35 27 1
retardant 1350 x 60 m roll
3654 Foil Fasteners (for builders paper) - pack of 500 1500 /500 $17.50 $52.50 27 1

Total 36 FRAME HARDWARE $1,318.23

37 PRE-FAB ROOF TRUSSES

Item Description Quantity Units Rate Amount Lvl Ld


2783 Roof Trusses - Quotes Required 110.7 m2 $50.00 $5,535.00 27 1
2786 SITE MEASURE 1 Off $66.00 $66.00 27 1
note Please Note: 1 Off $0.00 $0.00 27 1
Exoposed truss tails - check truss material is suitable - H3 topchords ?

Total 37 PRE-FAB ROOF TRUSSES $5,601.00

37.1 PITCHED ROOFS

Item Description Quantity Units Rate Amount Lvl Ld


2319 HYSPAN 240 X 45 - LVL 30 m $26.29 $788.58 27 1
2534 CEILING BATTENS 50 x 38 60 m $1.30 $77.82 27 1

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 13 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

Total 37.1 PITCHED ROOFS $866.40

37.5 COLORBOND ROOFED PATIO'S

Item Description Quantity Units Rate Amount Lvl Ld


84904 Provisional Allowance for Vergola - confirm 21 m2 $600.00 $12,600.00 27 1
requirements
Total 37.5 COLORBOND ROOFED PATIO'S $12,600.00

38 CARPENTRY FRAME

Item Description Quantity Units Rate Amount Lvl Ld


0039 CAUTION IS CRANE HIRE REQUIRED 1 Off $0.01 $0.01 27 1
0897 Carpentry - Extra allowance over standard rate for 13 m2 $15.00 $195.00 27 1
pitched roofs
1034 Carpentry - Extra to place steel posts 8 Off $25.00 $200.00 27 1
278902 Carpentry - Extra allowance for 3.0 mtr walls 123.91 m2 $8.00 $991.28 27 1
278903 Carpentry - additional allowance over and above 123.91 m2 $6.00 $743.46 27 1
3.0 mtr wall allowance where walls are over 3.0
mtrs high
2790 Carpentry - Lower level of two storey home, 123.91 m2 $30.00 $3,717.30 27 1
includes full frame, bearers,flooring, joists, gun
nails - frame inspection
279000 Carpentry - Upper level of a two storey home, 96.23 m2 $34.00 $3,271.82 27 1
includes full frame, truss erection, bath, gun nails -
frame inspection
2807 Carpentry - Fix ceiling battens 32.7 m $1.98 $64.75 27 1
28072 Carpentry - Frameup / battens for dropped celings 16.5 m $1.00 $16.50 27 2
28080 Carpentry - Miscellaneous allowance for difficult 40 hour $45.00 $1,800.00 27 1
access or complicated works
MISCELLANEOUS ALLOWANCE
2815 Carpentry - Fix nail plates 10.8 m $5.28 $57.02 27 1
2816 Carpentry - Place Steel Beam 10.8 m $26.40 $285.12 27 1
28162 Carpentry - Fix joist hangers 80.1 m $5.00 $400.50 27 1
28271 Carpentry - Frame up Falls for large box gutter 15 m $79.20 $1,188.00 27 1
and afix plywood base
bath Carpentry - Bath Frame - Check bath colour 1 Off $50.00 $50.00 27 1
before installation
item Provide: 200 Off $1.00 $200.00 27 1
service existing windows

Total 38 CARPENTRY FRAME $13,180.76

39 FASCIA AND GUTTERS

Item Description Quantity Units Rate Amount Lvl Ld


2841 Supply & Install Colorbond Fascia & Gutter 28.5 per mtr $23.00 $655.36 27 1
Colours:

1.0 Fascia Colour -


2.0 Gutter Colour -
3.0 Barge colour -
4.0 Gutter Profile -
5.0 Downpipes -

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 14 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

39 FASCIA AND GUTTERS

Item Description Quantity Units Rate Amount Lvl Ld


2841-cnr Supply & Install Colorbond Fascia & Gutter 4 per mtr $8.82 $35.28 27 1
corners
28442 Additional cost for spikes 30 m $6.00 $180.00 27 1
2846 Highset Allowance for fascia & gutter (includes 1 each $157.50 $157.50 27 1
safety requirements)
28500 Box Gutter - Supply & Install - 600 wide 15 m $200.00 $3,000.00 27 1
3042 Delivery 1 Off $60.00 $60.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.

Total 39 FASCIA AND GUTTERS $4,088.14

39.5 DECK GUARD RAIL

Item Description Quantity Units Rate Amount Lvl Ld


2840 Deck Guard Rail Working Platform for above 3.0 60 per mtr $33.00 $1,980.00 27 1
mtrs
Total 39.5 DECK GUARD RAIL $1,980.00

40 CRANE HIRE

Item Description Quantity Units Rate Amount Lvl Ld


0701 CRANE HIRE 8 Off $210.00 $1,680.00 27 2

Note:

Please advise of extra costs immediately to ensure compliance of invoicing \ payments


Total 40 CRANE HIRE $1,680.00

41 ROOF COVERING

Item Description Quantity Units Rate Amount Lvl Ld


29932 ##### CONFIRM IF SECOND HAND TERRA 0 Message $0.00 $0.00 27 1
COTTA TILES ? #######
30005 Supply & place sarking to suit concrete tile roofs 144 m2 $5.51 $793.80 27 1
30006 Anti-Ponding Board where no overhang on sarked 3.3 m $6.83 $22.52 27 1
roofs
30011 SECOND HAND ROOF TILES M2 ESTIMATE 144 m2 $69.30 $9,979.20 27 1
RATE
300301 Concrete Hips Apex's 3-way, Supply & Install 2 Off $5.25 $10.50 27 1
30031 TERRACOTTA RIDGE TILES ESTIMATE RATE 32.4 m $20.79 $673.60 27 1
3029 Highset allowance for roof sheeting 103.23 m2 $2.10 $216.78 27 1
313406 Per downpipe price - Temporary downpipes to 11 Off $11.00 $121.00 27 3
control run-off from unconnected downpipes
Total 41 ROOF COVERING $11,817.40

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 15 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

42 WATERPROOFING

Item Description Quantity Units Rate Amount Lvl Ld


30429 Seal & Waterproof bathtub 1 Off $225.00 $225.00 27 1
Rubbish:

1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
30455 WATERPROOFING - URETHANE SEALING WET 17.66 m2 $60.00 $1,059.60 27 1
AREA FLOORS AND BALCONIES
30535 FIBREGLASS SHWR. TRAYS 1800 X 1000 W/- 1 Off $360.00 $360.00 27 1
FLOOR WASTE - INC. SUPPLY & INSTALL HOB
3054 SHWR, BATHS, CORNER & WALLS TO ROSE 1 Off $200.00 $200.00 27 1
HEIGHT 700 X 1000
3057 Waterproof Skirtings / Perimeter of wet areas 13.2 m $12.00 $158.40 27 2

Total 42 WATERPROOFING $2,003.00

43 BATHS & SPA BATHS

Item Description Quantity Units Rate Amount Lvl Ld


27371 DELIVERY 1 Off $30.00 $30.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
568601-17 Bath - pressed steel, Dura, Shark or Apollo - 1675 1 Off $226.00 $226.00 27 1
mm, white
Total 43 BATHS & SPA BATHS $256.00

44 PLUMBER'S ROUGH IN

Item Description Quantity Units Rate Amount Lvl Ld


3127
Plumber - Dishwasher Provisions 1 Off $59.40 $59.40 27 1
31272
Plumber - Tap for Ice making fridge provisions 1 Off $350.00 $350.00 27 1
31292
Plumber - Second Vanity in double vanity unit 1 Off $125.40 $125.40 27 1
31342
Plumber - Highset downpipes - PVC 6 Off $85.80 $514.80 27 1
DOWNPIPES
plmb-10120 Lowset rough in double bathroom house kitchen, 1 Off $1,883.37 $1,883.37 27 1
laundry & seperate toilet to 250m2
Notes:

1.0 Tapware is
2.0 Vanities are by
3.0 Vanity height
4.0 Whilst temperature safety valves are to be fitted to bathrooms & ensuites etc. Normal temperature hot water
is to be provided to the kitchen tap.

Rubbish:

1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
Total 44 PLUMBER'S ROUGH IN $2,932.97

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 16 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

45 ELECTRICIAN

Item Description Quantity Units Rate Amount Lvl Ld


3166 Install light point & batten holder 20 Off $65.00 $1,300.00 27 1
Light switch colour -
3167 Single power point 1 Off $65.00 $65.00 27 1
3168 Double power point 20 Off $65.00 $1,300.00 27 1
Power point colour -
3169 Two way light switch 2 Off $65.00 $130.00 27 1
3170 TV point (with minimum 3.0 mtrs of cable to suit 3 Off $55.00 $165.00 27 1
digital TV)
3172 Wire & install oven & hotplates - including safety 1 Off $350.00 $350.00 27 1
switch
3173 Microwave point & switch 1 Off $65.00 $65.00 27 1
3180 Dishwasher Point (10amp) 1 Off $85.00 $85.00 27 1
31801 15 amp point 1 Off $95.00 $95.00 27 1
(ice maker fridge or similiar)
3181 Rangehood Installation & Power point (standard 1 Off $95.00 $95.00 27 1
reticulating unit)
3181-dgl Labour allowance for installation of rangehood 2 Off $52.80 $105.60 27 1
ducting
to
3181-dla Ducting grill 1 Off $52.80 $52.80 27 1
3181-edc 3.0 mtr lengths of extenda-duct 2 Off $52.80 $105.60 27 1
3184 Wire & Install Ceiling Fan with Metal Blades 5 Off $81.40 $407.00 27 1
3193 Light fitting installation allowance 20 Off $15.00 $300.00 27 1

NOTE: Ensure that you have a copy of the light fitting selection \ order
If the electrical plan does not match the order & colour selection
Then please advise urgently
3195 EXTRA CIRCUIT LIGHTS 20max PER CIRCUIT 2 Off $80.00 $160.00 27 1
3196 EXTRA CIRCUIT POWER 30max PER CIRCUIT 2 Off $80.00 $160.00 27 1
3198 Telephone pre-wire per phone point (in addition to 2 Off $65.00 $130.00 27 1
initial first free pre-wire)
32087 PS to Upgrade fuse box if required 1 Off $600.00 $600.00 27 1
3209 Supply & Install Smoke Alarm, hard wired to 2 Off $135.00 $270.00 27 1
current standards.
3210 Weatherproof Double GPO 1 Off $105.00 $105.00 27 1
32145 Underground power to small water tank next to 1 Off $198.00 $198.00 27 1
house
3216 Electrician - Hourly Rate 20 hour $65.00 $1,300.00 27 1
miscelaneous
3217402 Install IXL Tastic 3 in 1 exhaust fan 2 Off $78.10 $156.20 27 1

Total 45 ELECTRICIAN $7,700.20

45.1 GAS CONNECTION

Item Description Quantity Units Rate Amount Lvl Ld


31239 Gas Fitter - 20mm CU Tube (Supply & Install) 20.1 m $33.40 $671.40 27 1
31240 BBQ HOT PLATE FIT OFF (GAS FITTER) 1 Off $84.46 $84.46 27 1
31244 Gas Fitter - Autochange regulators 1 Off $220.00 $220.00 27 1
31247 Gas Fitter - Plinths 2-off 2 Off $100.00 $200.00 27 1
31248 Gas fitter travelling & administration charges 1 Off $100.00 $100.00 27 1

Total 45.1 GAS CONNECTION $1,275.86

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 17 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

46 ALUMINIUM WINDOWS

Item Description Quantity Units Rate Amount Lvl Ld


3241 S0921 1 Off $203.40 $203.40 27 1
3243 S0927 XOX 2 Off $275.80 $551.60 27 1
3249 S1015 2 Off $169.69 $339.37 27 1
3273 S1527 1 Off $363.58 $363.58 27 1
3274 S1530 1 Off $436.92 $436.92 27 1
3285 S2109 PATIO UNIT XO/OO (handings 1 Off $252.12 $252.12 27 1
are as per plan)
3414 Special windows 5.76 m2 $396.00 $2,280.96 27 1
(includes external windows)
67424 BI-FOLD DOOR 2700 1 Off $3,572.38 $3,572.38 27 1
6750 Sliding window locks 7 Off $8.00 $56.00 27 1
67523 Aluminium window supply 1 Off $1.05 $1.05 27 1
Window frame colour -
Window reveals -
General glass -
Wet area glass -
Wind Speed -

Please check builders order list against plans provided (plans must be current signed construction plans)
The onus is on the window supply company to supply windows as shown on the plans provided
and to check that pricing is correct before accepting our order.
If in doubt contact the office for confirmation.
67524 Louvers 9.63 m2 $660.00 $6,355.80 27 1
deliv-win DELIVERY 4.5 % of order $28,826.37 $1,297.19 0 1
Contract Type -

Total 46 ALUMINIUM WINDOWS $15,710.37

47 EXTERNAL DOOR LOCKS

Item Description Quantity Units Rate Amount Lvl Ld


366500 Entrance door knob - prime cost 1 Off $150.00 $150.00 27 1
36921 EXTERNAL GATE HARDWARE PRIME COST 1 Off $100.00 $100.00 27 1
369210 French Door hardware (handles locks etc) 2 Off $100.00 $200.00 27 1

Total 47 EXTERNAL DOOR LOCKS $450.00

48 EXTERNAL DOORS & JAMBS

Item Description Quantity Units Rate Amount Lvl Ld


3519 Delivery 1 Off $33.00 $33.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
4334 Entrance Door - Prime Cost 1 Off $800.00 $800.00 0 1

hand
ps Provisional Sum for Supply and Installation 1 Off $350.00 $350.00 0 1
reglaze hi-light

Total 48 EXTERNAL DOORS & JAMBS $1,183.00

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 18 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

48.1 FIRST SITE CLEAN

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 48.1 FIRST SITE CLEAN $0.00

49 LOCK UP HARDWARE & SOFFIT SHEETS

Item Description Quantity Units Rate Amount Lvl Ld


1227 VISCOARSE 300x30M 2 roll $18.00 $36.00 27 1
2533 SOFFIT BATTEN 50x38 RPB 105.6 per mtr $1.26 $132.60 27 1
2737 DELIVERY 1 Off $30.00 $30.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
35465 External stops for shadowclad - "L" shaped corner 24 m $4.16 $99.79 27 1
mould with rounded corner - LOSP H3 for external
use
354653 Internal stops for shadowclad - 65 x 31 - H3 pine 8.1 m $4.16 $33.68 27 1
(ex 75x38)
35534 Scyon Matrix 8mm - 2.39 x 0.59 or 1.19 x 1.19 or 88.67 m2 $21.00 $1,862.07 27 1
1.79 x 0.89 (expressed joints system)
3656 75MM GALVANISED WINDOW FLASHING 1800 11 Off $6.00 $66.00 27 1
3677 FC SOFFIT 4.5 2400 x 600 12 Off $10.00 $120.00 27 1
3682 P.V.C.JOINT MOULD 4.5 HM4 WHITE 2.4 10 Off $1.10 $11.00 27 1
3684 NAIL 1Kg BOX H/FLEX 25x2.0 1 KG NAILS $9.70 $9.70 27 5
3720 DELIVERY 1 Off $30.00 $30.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.
448510 31x19 STOPS FJ 43.2 per mtr $1.30 $56.16 27 1
50601 6.0mm JAMES HARDIE CERAMIC TILE 17.82 m2 $12.50 $222.75 27 1
UNDERLAY (1.8x0.9 SHT) 1.62 M2 PER SHEET
50602 Ribbed tile board nails - 2 KG box 1 Off $50.00 $50.00 27 1

Total 49 LOCK UP HARDWARE & SOFFIT SHEETS $2,759.75

50 CARPENTER LOCK & SOFFITS

Item Description Quantity Units Rate Amount Lvl Ld


08940 Carpentry - soffits, small external ceilings, gable 220.14 m2 $20.00 $4,402.80 27 1
sheeting & gable trims - per m2 of house
including installation of gable cladding & treatments
Rubbish:
1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
3.0 If holes are made in the soffit sheeting for external lights keep them clear of the screen door swing.
09031 Carpentry - Install Builders Paper 187.2 m2 $2.00 $374.40 27 1
28080 Carpentry - Miscellaneous allowance for difficult 40 hour $45.00 $1,800.00 27 1
access or complicated works
MISCELLANEOUS ALLOWANCE
37231 Carpentry - Install Timber Windows and Doors, fit -1 Off $25.00 -$25.00 27 1
furniture
372310 Carpentry - Install Bi-Fold doors, fit door furniture 1 Off $330.00 $330.00 27 1

Total 50 CARPENTER LOCK & SOFFITS $6,882.20

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 19 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

51 CARPENTER CLADDING

Item Description Quantity Units Rate Amount Lvl Ld


3721 Carpentry - Fix External Sheeting and dress 77.1 m2 $20.00 $1,542.00 27 1
flashings
(double labour where expressed joints used)
3734 Carpentry - Fix stops to external cladding 40.2 m $5.00 $201.00 27 1

Total 51 CARPENTER CLADDING $1,743.00

52 SCAFFOLDING

Item Description Quantity Units Rate Amount Lvl Ld


3764 Provisional Sum - Supply & Erection of Scaffold - 1 130 m2 $50.00 $6,500.00 27 1
month hire
Total 52 SCAFFOLDING $6,500.00

52.5 EDGE PROTECTION PLATFORM

Item Description Quantity Units Rate Amount Lvl Ld


3768 Edge Protection Rail where working height is 60 LIN M $15.00 $900.00 27 1
above 3.0 mtrs (metal & concrete)
Total 52.5 EDGE PROTECTION PLATFORM $900.00

54 BRICKS

Item Description Quantity Units Rate Amount Lvl Ld


1172 Face Bricks 4845 /1000 $600.00 $2,907.00 27 1
Brick Colour -

Total 54 BRICKS $2,907.00

55 BRICK HARDWARE

Item Description Quantity Units Rate Amount Lvl Ld


1223 CAVITY TIES (50 per box) 1 Off $6.00 $6.00 27 1
1225 BRICK VENEER STUBBY TIE WITH NAILS (PKT 2 Off $11.55 $23.10 27 1
150)
1226 NAILS 1Kg BOX GALV CLOUTS 30x2.8 00.5 Kg. $10.50 $5.25 27 1
1227 VISCOARSE 300x30M 2 roll $18.00 $36.00 27 1
1235 HOOP IRON 30Mx30mmx1.2mm 1 roll $21.00 $21.00 27 1
1260 GALINTEL ANGLE 2700x100x100 2 Off $54.78 $109.56 27 1
1265 GALINTEL ANGLE 3000x150x100 4 Off $76.89 $307.56 27 1
1269 30 M ROLL X 300 MM ALCOR STANDARD 1 roll $120.12 $120.12 27 1
3956 DELIVERY 1 Off $30.00 $30.00 27 1
Note: Materials not to be placed on road, footpath or within 2.0 mtrs of the house.

Total 55 BRICK HARDWARE $658.59

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 20 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

56 BRICKLAYER

Item Description Quantity Units Rate Amount Lvl Ld


1326 Bricklayer - Sills to doors and windows 00.9 m $20.00 $18.00 27 1
13301 Free Standing Piers, Per Meter, Including Core 2 per mtr $46.20 $92.40 27 1
Filling.
1334 Bricklayer - Lay bricks to first floor 4750 /1000 $1,200.00 $5,700.00 27 1
13402 Note: Bricks above windows 15.6 mtrs $20.00 $312.00 27 1
refer plans, unless advised otherwise
3965 Check Termite Proofing & Brick Base 1 Off $0.00 $0.00 27 1
Requirements !
Total 56 BRICKLAYER $6,122.40

56.5 MASONRY ARTICULATION

Item Description Quantity Units Rate Amount Lvl Ld


3059 Supply & placement masonary articulation, 10 per mtr $10.56 $105.60 27 1
including backing rod & mastic etc (expansion
joints)
Mortar Colour -
All Masonary walls require full height articulation at locations marked on the engineers plans.
Articulation shall be in accordance with the Cement & Concrete Association note TN61
please ensure that the correct materials are used & the correct brick tie procedure is followed.

Mortar Colour -
All Masonary walls require full height articulation at locations marked on the engineers plans.
Articulation shall be in accordance with the Cement & Concrete Association note TN61
please ensure that the correct materials are used & the correct brick tie procedure is followed.
Total 56.5 MASONRY ARTICULATION $105.60

58 INSULATION - WALL BATTS

Item Description Quantity Units Rate Amount Lvl Ld


40963 Supply & Install R1.5 Wall Batts (fiberglass) 90 m2 $7.13 $641.52 27 1
(window area deleted) - (external walls)
Total 58 INSULATION - WALL BATTS $641.52

59 WALL & CEILING LININGS

Item Description Quantity Units Rate Amount Lvl Ld


1300 Hi-Set Allowance 1 Off $500.00 $500.00 27 1
13070 Stair Allowance & Void Scaffold Allowance 1 Off $600.00 $600.00 27 1
13075 Extra allowance to return to site and sheet up 1 Off $400.00 $400.00 27 5
walls built under stairs
13080 Extra for raked ceiling under stairs 1 Off $200.00 $200.00 27 5
13090 Extra allowance to return to site to sheet external 1 Off $400.00 $400.00 27 5
ceilings when scaffold installed
41023-hi 2 Storey - Supply, Fix & finish Plasterboard 96.23 m2 $15.00 $1,443.45 27 1
Ceilings to 2.4m high (superceil) - (net area for
supply & install)

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 21 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

59 WALL & CEILING LININGS

Item Description Quantity Units Rate Amount Lvl Ld


1.0 Truss Centers - mm
2.0 Insulation to ceiling -
3.0 Insulation to walls -
4.0 Bulkheads above overhead cupboards -
5.0 prepaint amd post handover patching included in pricing.
410255 Supply & Fix 3.0 high ceilings (net area for supply 123.91 m2 $15.00 $1,858.65 27 1
& fix)
Note:
1.0 Truss Centers - mm
2.0 Insulation to ceiling -
3.0 Insulation to walls -
4.0 Where insulation is required to walls & ceilings confirm installation is complete prior to installing gyprock
5.0 Set joints are to be sanded within the confines of the joint
6.0 Bulkheads above overhead cupboards -
Rubbish:
1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
41040-hi 2 Storey - 10mm plasterboard (walls) - to 2400mm 30.24 m2 $15.00 $453.60 27 1
high - (net area for supply & install)
4104-27-hi 2 Storey - 10mm plasterboard (walls) - to 2700mm 155.52 m2 $10.50 $1,632.96 27 1
high - (net area for supply & install)
4106 Bulkheads under soffitts 3.3 m $13.20 $43.56 27 1
41071 Note: Backblock Gyprock to AS 2589 & all 206.93 m2 $0.00 $0.00 27 1
revisions
4109 90mm Cornice to 2400mm high 119.4 m $6.00 $716.40 27 1
41092 90mm CORNICE 3.0 mtrs & OVER 27 m $6.00 $162.00 27 1
4110 Extra cost for "Area of VILLABOARD OR 65.34 m2 $12.00 $784.08 27 1
aquacheck", for wet area's .
to bathroom
to ensuite
4111 External Angles & labour to plasterboard corners - 7 Off $15.00 $105.00 27 1
2.4
41110 External Angles & labour to plasterboard corners - 4 Off $15.00 $60.00 27 1
2.7
4112 Plasterboard Ceiling - Raked Rafters 13.65 m2 $30.00 $409.50 27 1
4212 Patch & Repair Existing Ceilings, Prepare Ready 42.5 m2 $5.00 $212.50 27 1
For Paint
ps Provisional Sum for Supply and Installation 1200 Off $1.00 $1,200.00 1 1
extra for fancy cornice if required

Total 59 WALL & CEILING LININGS $11,181.70

62 FINISHING HDWRE & INT DOOR KNOBS

Item Description Quantity Units Rate Amount Lvl Ld


42731 SPECIAL DOOR STOP 1 Off $13.20 $13.20 27 1
42733 Wall mates Metal butterfly toggles 12 Off $0.95 $11.40 27 1
4280 DS1 Catches 3 Off $0.55 $1.65 27 1
4281 Door Stop Cushion 75 mm 9 Off $1.12 $10.10 27 1
4282 18mm Chrome Plated Rod (2.0/2.5/3.0/4.0/5.0) 6.3 mtrs $5.02 $31.60 27 1
per L/M
6.3/1.0
4283 18mm Chrome End Pillars (pairs) 7 pair $3.02 $21.14 27 1
4284 18mm Chrome Centre Pillars 7 Off $1.80 $12.60 27 1

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 22 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

62 FINISHING HDWRE & INT DOOR KNOBS

Item Description Quantity Units Rate Amount Lvl Ld


4286 No More Gaps 1 Off $6.00 $6.00 27 1
42963 Privacy set PC amount including latches 7 Off $60.00 $420.00 27 1
with latch
42964 Half passage set - PC amount - (dont supply 3 Off $20.00 $60.00 27 1
dummy knob, prefer half passage)
4352 Medium Grade Sandpaper 80 Grit per lineal meter 1 Off $2.00 $2.00 27 1
43532 Aquadhere 250ml 1 Off $12.61 $12.61 27 1
4470 Delivery 1 Off $25.00 $25.00 27 5
467495 Push catch 1 Off $5.00 $5.00 27 1
for roof access door
467496 Felt door seal 1 Off $12.00 $12.00 27 1
for roof access door
5765-3000 Heirloom Genisis collection Double towel rail 2 Off $140.76 $281.52 27 1
5765-3010 Heirloom Genisis collection Toilet roll holder 2 Off $93.84 $187.68 27 1
5765-3021 Heirloom Genisis collection Soap Holder 2 Off $130.00 $260.00 27 1

Total 62 FINISHING HDWRE & INT DOOR KNOBS $1,373.49

63 FINISHING TIMBER & INTERNAL DOOR

Item Description Quantity Units Rate Amount Lvl Ld


3519-hing Provide stainless steel external door hinges 3 Off $33.00 $99.00 27 1
4319 Special Internal Doors 8 Off $300.00 $2,400.00 27 1
43241 2040x520 REDICOTE FLUSH DOOR HINGED 1 Off $42.25 $42.25 27 1
ONLY.
Right hand 1 -off
433310 IMPRESSIONS INT. DOOR 2040 x 420 HINGED 2 Off $62.37 $124.74 27 1
ONLY
Right hand 1 -off Left hand 1 -off
4350 WHITE MELAMINE 16mm 3600x600 5 Off $48.31 $241.56 27 1
4483 WINDOW ARCHITRAVES FJ 41x12 , NDOM, 124.2 per mtr $3.50 $434.70 27 1
PINE - 5.4 M LENGTHS
MOULDINGS -
4485 30x12 STOPS FJ 10.4 L\M $0.80 $8.32 27 1
(extra stops ordered for head of 920 wide doors)
44850 30x12 STOPS (31x12) 15.6 L\M $0.92 $14.41 27 1
DAR
4486 41x12 ARCHITRAVE FJ PINE (5.2m) 176.8 L\M $2.85 $503.88 27 1
MOULDINGS -
4487 68x12 SKIRTING FJ PINE (5.4m) 113.4 per mtr $3.50 $396.90 27 1
MOULDINGS -
MOULDINGS -

MOULDINGS -
44870 SKIRTING AS PER SPEC 140.1 m $12.00 $1,681.20 0 1
MOULDINGS -
4489 42x19 FJ PINE DAR (5.2m) 52 L\M $2.06 $107.08 27 1

1/5.2
inc manhole frame
4490 68x19 FJ PINE DAR (5.2m) 26 L\M $3.41 $88.55 27 1
1/5.2
4491 DAR 93x19 FJ PINE JAMBS (5.2m) 46.8 L\M $3.50 $163.71 27 1

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 23 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

63 FINISHING TIMBER & INTERNAL DOOR

Item Description Quantity Units Rate Amount Lvl Ld


(extra material ordered for heads of 920 wide doors)
4497 QUADP Q1 12x12 PINE - 5.2 M LENGHTS 15.6 L\M $1.08 $16.89 27 1
4570 DOOR JAMB SETS 92x19 SINGLE DOORS 6 Off $30.49 $182.95 27 1
HINGED ONLY LOOSE STOPS PFJ1
Hinges to match internal door knob backplate colour
Note: Doors supplied with holes are to suit -
If you are unable to supply doors with the appropriate hole size
then please supply doors that can be drilled on site
4572 DOOR JAMB SET 92x19 DOUBLE SET HINGED 1 Off $44.00 $44.00 27 1
ONLY LOOSE STOPS PFJD1
4674 DELIVERY 1 Off $39.60 $39.60 27 1
46749 Provide Loose hinges, extra end panel, unhinged 1 Off $33.00 $33.00 27 1
jamb and door with no hole for roof access door to
be cut down on site.
Cut down door is a
51791 QUICKSLIDER FLUSH DOORS 3 DOOR UNIT 1 Off $270.86 $270.86 27 1
2040 x 820/770/720/620/520 x 35
517911 QUICKSLIDER FLUSH DOORS 4 DOOR UNIT 1 Off $356.40 $356.40 27 1
2040 x 820/770/720/620/520 x 35
51801 QUICKSLIDER FINGER GRIPS 3 PER DOOR 3 1 Off $37.13 $37.13 27 1
DOOR UNIT
51802 QUICKSLIDER FINGER GRIPS 4 PER DOOR 4 1 Off $49.50 $49.50 27 1
DOOR UNIT
Total 63 FINISHING TIMBER & INTERNAL DOOR $7,336.63

64 INTERNAL STAIRS

Item Description Quantity Units Rate Amount Lvl Ld


4678 COVER GRADE PINE MDF TREAD INTERNAL 14 tread $85.80 $1,201.20 27 1
STAIRS SUPPLIED & INSTALLED
QUOTE #
4682 BALUSTRADE PINE STYLE 1 TO 6 & 8 4.2 m $133.32 $559.94 27 1
4684 HANDRAIL ONLY PINE INC 1.5 BRACKETS PER 5.1 m $41.58 $212.06 27 1
MTR
4686 NEWEL POSTS PINE 1 Off $81.84 $81.84 27 1
4688 1/2 NEWEL POSTS PINE 1 Off $40.92 $40.92 27 1
4692 WINDERS - COVERGRADE 4 Off $200.00 $800.00 27 1

Total 64 INTERNAL STAIRS $2,895.96

65 CABINETMAKER

Item Description Quantity Units Rate Amount Lvl Ld


4697 Provide 600mm wide Kitchen base cupboards, 7.8 per mtr $481.57 $3,756.26 27 1
white lined to builders standard specification
Contract Type -

Colours:
Kitchen Benchtops -
Kitchen Cupboards & Doors -
Kitchen Kickboards -
Kitchen Knobs -

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 24 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

65 CABINETMAKER

Item Description Quantity Units Rate Amount Lvl Ld


Rubbish:

1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
46970 Provide 600mm wide Laundry base cupboards, 2.6 per mtr $481.57 $1,252.09 27 1
white lined to builders standard specification
(similiar to kitchen cupboards
Laundry base cupboards, 600mm wide, white lined with laminate top
Colours:
Laundry Benchtops -
Laundry Cupboards & Doors -
Laundry Kickboards -
Laundry Knobs -
4699 Provide 600mm high overhead cupboards, white 2.5 per mtr $321.05 $802.62 27 1
lined to builders standard specification (2.1 high )
Colours:
Kitchen Overheads -
46995 Provide "Bulkhead" above overhead cupboards - 3.7 per mtr $120.40 $445.48 27 1
to 300mm deep
4702 Provide 300mm wide flat breakfast bar extention of 3.7 per mtr $120.40 $445.48 27 1
kitchen benchtop
47031 Laminated appliance cupboard, linen, broom 00.5 per mtr $802.62 $401.31 27 1
cupboard or pantry to 2.1 high
4706 Laminated vanity units, up to 500 deep with 5.4 per mtr $602.00 $3,250.80 27 1
kickboards
Bathroom 1/2.6
Ensuite 1/2.8
4706-bath Bathroom vanity drawers (per set of drawers) 1 Off $100.00 $100.00 27 1
Bathroom Top -
Bathroom Doors -
Bathroom Kickboard -
Bathroom Knobs -
4706-ens Ensuite vanity drawers (per set of drawers) 2 Off $100.00 $200.00 27 1
Ensuite Top -
Ensuite Doors -
Ensuite Kickboard -
Ensuite Knobs -
471402 Kitchen Sink - Corsica - double bowl with single 1 Off $411.60 $411.60 27 1
drainer
KITCHEN SINK BOWL -
4734 FRIDGE PANELS 2400 1 Off $151.35 $151.35 27 1
563404 Semi Recessed Vanity Basin 3 Off $250.00 $750.00 27 1
Note: Tapware is
Note: Vanities are by
56958 ### EXTRA ALLOWANCE FOR 2 PAK DOORS 4.2 m $264.87 $1,112.44 27 1
TO KITCHEN CUPBOARDS ###
569580 ### EXTRA ALLOWANCE FOR 2 PAK DOORS 3.9 m $529.73 $2,065.95 27 1
TO KITCHEN CUPBOARDS WITH EXPOSED
BACK ###
56959 ### EXTRA ALLOWANCE FOR 2 PAK DOORS 2.7 m $176.58 $476.77 27 1
OVERHEAD CUPBOARDS ###
569591 ### EXTRA ALLOWANCE FOR 2 PAK DOORS 5.7 m $232.76 $1,326.75 27 1
TO VANITIES ###
5700-pan Upgrade pantry to vinyl wrap or 2 Pak 1.2 m $296.98 $356.38 27 1
57681 Clarke 45 litre insert trough with bypass 1 Off $257.40 $257.40 27 1
note Please Note: 1 Off $0.00 $0.00 27 1
# a dishwasher provision is required in this house
ps Provisional Sum for Supply and Installation 500 Off $1.00 $500.00 27 2
handles upgrade

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 25 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

65 CABINETMAKER

Item Description Quantity Units Rate Amount Lvl Ld


ps Provisional Sum for Supply and Installation 1200 Off $1.00 $1,200.00 1 3
soft closers to kitchen
ps Provisional Sum for Supply and Installation 3500 Off $1.00 $3,500.00 27 3
BBQ joinery

Total 65 CABINETMAKER $22,762.69

65.8 SPECIAL SPLASHBACKS

Item Description Quantity Units Rate Amount Lvl Ld


ps Provisional Sum for Supply and Installation 3000 Off $1.00 $3,000.00 1 3
glazed splashback

Total 65.8 SPECIAL SPLASHBACKS $3,000.00

66 SPECIAL BENCH TOPS

Item Description Quantity Units Rate Amount Lvl Ld


47981 Mid Range Granite Tops - Provisional Sum 12.6 m $500.00 $6,300.00 27 1

Total 66 SPECIAL BENCH TOPS $6,300.00

67 CARPENTER FIXOUT

Item Description Quantity Units Rate Amount Lvl Ld


278904 Carpentry Fixout - Labour and finishing gun nails - 303.16 m2 $15.00 $4,547.40 27 1
Mouldings, PB Shelving, Socks n Jocks Nest of
Shelves, Doors, etc.
Note:
1.0 The carpenter is to ensure that no materials left over from the
fix-out are left inside the house. Damaged materials are to be
placed in the rubbish cage provided.
2803001 Carpentry - Place tile underlay . Floors must be 17.66 m2 $9.90 $174.83 27 1
dead level for tiling over ! (read instructions before
laying)
485211 Carpenter - Make frame & hang internal doors & fit 8 Off $105.60 $844.80 27 1
Architectural door furniture
Total 67 CARPENTER FIXOUT $5,567.03

70 SPECIAL WALL APPLICATIONS

Item Description Quantity Units Rate Amount Lvl Ld


ps Provisional Sum for Supply and Installation 1000 Off $1.00 $1,000.00 27 1
patch up existing walls etc where windows infilled

Total 70 SPECIAL WALL APPLICATIONS $1,000.00

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 26 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

70.5 RENDER \ BAG & PAINT

Item Description Quantity Units Rate Amount Lvl Ld


4995 BAGGING ONLY (All surfaces such as quoins & 45 m2 $4.62 $207.90 27 1
sills that are to be left as face brick must be taped
prior to bagging)
1.0 Area to be bagged -
2.0 Finish -
3.0 The V-joint at the termimesh line must be installed
4.0 The termimesh must not be bridged
5.0 If there is any doubt contact termimesh on 3865 4654 or 5476 6688
49965 Paint bagged finish masonry 45 m2 $20.00 $900.00 27 1
(a) Exterior Walls - 2 coats solverline 4290 premium duraguard low sheen acrylic
- recoat time 2 hours, substrate cement render
(b) Area to be painted -
(c) Finish -
Total 70.5 RENDER \ BAG & PAINT $1,107.90

71 CERAMIC TILES

Item Description Quantity Units Rate Amount Lvl Ld


5022 Bathroom Floor Tiles, Supply Only, PC to premier 10.24 m2 $30.00 $307.20 27 1
spec
Length Widt Quantity
0.2 X 0.2 256 OFF Bathroom Main Floor Tiles
5023 Bathroom Wall Tiles, Supply Only, PC to premier 8.16 m2 $30.00 $244.80 27 1
spec
Length Widt Quantity
0.2 X 0.2 204 OFF bathroom skirting tile
bathroom main shower tile
bathroom shower top tile
5029 Laundry Wall Tiles, Supply Only, PC to premier 2.52 m2 $30.00 $75.60 27 1
spec
Length Widt Quantity
0.2 X 0.2 63 OFF laundry tub splashback
5031 Kitchen Wall Tiles, Supply Only, PC to premier 2.28 m2 $30.00 $68.40 27 1
spec
Length Widt Quantity
0.2 X 0.2 57 OFF kitchen splashback tile
kitchen splashback top tile
5033 Ensuite Wall Tiles, Supply Only, PC to premier 11.32 m2 $30.00 $339.60 27 1
spec
Length Widt Quantity
0.2 X 0.2 248 OFF ensuite main shower tile
ensuite shower top tile
0.2 X 0.2 35 OFF ensuite skirting tile
5041 Soap Holders 3 Off $22.00 $66.00 27 1
5072 Delivery 1 Off $40.00 $40.00 27 1
5081 Ensuite Floor Tiles, Supply Only, PC to Premier 8.98 m2 $30.00 $269.40 27 1
Spec.
Length Widt Quantity
0.2 X 0.2 22 OFF Shower Hob
0.3 X 0.3 90 OFF Main Floor Tiles
Total 71 CERAMIC TILES $1,411.00

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 27 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

71.1 CERAMIC TILES (NON WET AREAS)

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 71.1 CERAMIC TILES (NON WET AREAS) $0.00

72 CERAMIC TILER

Item Description Quantity Units Rate Amount Lvl Ld


5042 Tile Angle at wet area doors 4 Off $13.20 $52.80 27 1
50421 Dry floor waste to wet area floors 4 Off $6.60 $26.40 27 1
5091 Fix wall tiles including supply of grout & glue 21.96 m2 $60.00 $1,317.60 27 1
kitchen splashback to 600 high
ensuite splashback & skirting to 200 high
laundry tub surround to 600 high
ensuite shower walls to 2000 high
bathroom splashback & skirting to 200 high
wall grout - bathroom shower walls to 2000 high
50911 fix skirting tiles & hobs - per lineal meter (extra 15.3 m $0.00 $0.00 27 5
above m2 rate)
5092 Fix floor tiles including supply of grout & glue & 18.58 m2 $40.00 $743.20 27 1
preparation
ensuite floor
bathroom floor
ensuite shower hob
50920 Extra allowance for tiler to bed / grout floors to 16.58 m2 $30.00 $497.40 27 1
achieve sufficient fall to ensure that water does not
pond
50920-shw Grout floors to shower's (each shower) 2 Off $20.00 $40.00 27 5
50931 Tilers Labour allowance to apply silicone - Vanity 1 Off $200.00 $200.00 27 1
units, kitchen bench, bath, mirrors etc.
Silicon

1.0 A 3mm gap is to be provided against all skirtings


& any other place that tiles are finished up against
2.0 An expansion joint is to be placed at maximum 9.0 mtr centers
3.0 Flexible silicon sealant is to be used, match grout colour

Fixtures

1.0 Laundry tub bowl colour -

Rubbish:

1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
50932 Tiler to supply silicone 3 Off $12.00 $36.00 27 1

Total 72 CERAMIC TILER $2,913.40

73 SHOWER SCREENS-MIRRORS & S/DOORS

Item Description Quantity Units Rate Amount Lvl Ld


50961 SHOWER SCREEN MODEL 501 1865 x 1200 no 1 Off $242.00 $242.00 27 1
return, site measure

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 28 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

73 SHOWER SCREENS-MIRRORS & S/DOORS

Item Description Quantity Units Rate Amount Lvl Ld


Bathroom -
Ensuite -
Powder -
Second bathroom -
50974 SHOWER SCREEN MODEL 501 1865 x 1800 no 1 Off $314.00 $314.00 27 1
return, site measure
Bathroom -
Ensuite -
Powder -
Second bathroom -
51198 FRAMED MIRRORS, confirm length on site, 900 x 1 Off $220.00 $220.00 27 1
2700
BATHROOM MIRROR FRAME COLOUR
ENSUITE MIRROR FRAME COLOUR
POWDER ROOM MIRROR FRAME COLOUR
SECOND BATHROOM MIRROR FRAME COLOUR
51199 FRAMED MIRRORS, confirm length on site, 900 x 1 Off $300.00 $300.00 27 1
3000
BATHROOM MIRROR FRAME COLOUR
ENSUITE MIRROR FRAME COLOUR
POWDER ROOM MIRROR FRAME COLOUR
SECOND BATHROOM MIRROR FRAME COLOUR
5166 Vinyl sliding doors 2100 x 2700 1 Off $260.00 $260.00 27 1
Frame Colour -
Vinyl Colour -
ps Provisional Sum for Supply and Installation 1500 Off $1.00 $1,500.00 27 1
to upgrade to fancy frameless mirrors

Total 73 SHOWER SCREENS-MIRRORS & S/DOORS $2,836.00

74.5 WARDROBE FIT-OUTS

Item Description Quantity Units Rate Amount Lvl Ld


4725 BED 1 ROBE FIT OUT AS PER QUOTE 1 Off $2,500.00 $2,500.00 0 1
4726 BED 2 FIT BOBE FIT OUT AS PER QUOTE 3 Off $800.00 $2,400.00 0 1
ps Provisional Sum for Supply and Installation 1 Off $2,500.00 $2,500.00 0 1
lounge sk4 special cabinetry

Total 74.5 WARDROBE FIT-OUTS $7,400.00

78 SANITARY WARE

Item Description Quantity Units Rate Amount Lvl Ld


567-10015 Elderings Tradesman 500 - Basin Set including 3 Off $52.95 $158.84 27 1
spout - chrome
567-10035 Elderings Tradesman 500 - Shower Set including 2 Off $52.95 $105.89 27 1
AAA rated rose - chrome
567-10055 Elderings Tradesman 500 - Bath Set including 1 Off $52.95 $52.95 27 1
spout - chrome
567-10075 Elderings Tradesman 500 - Laundry Tub Set - 1 Off $52.95 $52.95 27 1
chrome
567-10092 Elderings Tradesman 500 - Washing Machine Set 1 Off $52.95 $52.95 27 1
including spout - chrome

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 29 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

78 SANITARY WARE

Item Description Quantity Units Rate Amount Lvl Ld


576204 Kitchen tap - Elderings Tradesman 500 mixer, 1 Off $106.26 $106.26 27 1
chrome
5765925 China Toilet Suite - White 2 Off $385.00 $770.00 27 1

Total 78 SANITARY WARE $1,299.82

78.1 SOLAR SYSTEM'S

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 78.1 SOLAR SYSTEM'S $0.00

78.5 PLUMBERS FIT OFF

Item Description Quantity Units Rate Amount Lvl Ld


31271 Install Dishwasher - Ensure vermin proofing is in 1 Off $100.00 $100.00 27 3
place ready for final inspection
32146 Connect water tanks, mains cistern to ext taps, 1 Off $5,000.00 $5,000.00 27 1
toilets, hot water etc, supply rainwater heads, refer
DA documents.
plmb-10220 Lowset fix off double bathroom house kitchen, 1 Off $2,174.85 $2,174.85 27 1
laundry & seperate toilet to 250m2
Rubbish:

1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
Total 78.5 PLUMBERS FIT OFF $7,274.85

80T PAINTERS TOUCH-UPS

Item Description Quantity Units Rate Amount Lvl Ld


5973-3touc Touch-Up & patching works to make paint work 220.14 m2 $2.00 $440.28 27 1
ready for handover (including touchups)
Note:
1.0 Touch-up paint is to be left at the back of the top shelf of the pantry
Only approved solver paint tins are to be used to store touch up paints
The touch up paint tins must have appropriate safety information on them
8.0 Pricing includes minor patching as required to ensure surfaces are suitable for painting
9.0 Pricing includes touch-ups to make paintwork ready for handover
Total 80T PAINTERS TOUCH-UPS $440.28

80 PAINTER

Item Description Quantity Units Rate Amount Lvl Ld


59370-eavs Paint Eaves 17.1 m2 $15.00 $256.50 27 1

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 30 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

80 PAINTER

Item Description Quantity Units Rate Amount Lvl Ld


5967 Paint Timber Windows & Doors 3 Off $60.00 $180.00 27 1
(a) Timber Doors - 1 coat solverline 4388 premium oil based wood primer
- 1 coat solverline 4103 premium oil based undercoat
- 1 coat solverline 4171 premium high gloss enamel
- recoat time 2 hours, substrate timber
59681 Painter - Extra allowance to paint raked ceilings 13 m2 $15.00 $195.00 27 1
and walls (based on floor area)
59720 Paint exposed truss or rafter tails 30 m $15.00 $450.00 27 1
59731 RENOVATIONS - PREPARE & SUPPLY ALL 34 m2 $35.00 $1,190.00 27 1
PAINT & LABOR FOR INTERNAL WORK (2
COLOURS ONLY) INCLUDING 600 MM SOFFITS
Note:
1.0 Do not start work if this order is insufficient funds to cover
sufficiently. Extra's cannot be excepted once work is started
2.0 The front door is grade.
3.0 Contract Type -
4.0 has an agreement with "Solver paint",
Only solver paint is to be used on our projects.
5.0 All paint work is to comply with solver paint specification including,
but not limited to the following. (A full copy is available upon request)
(a) Walls general - 1 coat solvermaster 4330 solvermaster acrylic sealer undercoat
- 2 coats solverline 4165 velvetsheen low sheen acrylic
- recoat time 2 hours, substrate paper faced plasterboard
(b) Ceilings - 2 coats solverline 4636 premium acrylic ceiling white
- recoat time 2 hours, substrate paper faced plasterboard
(c) Mouldings - 2 coats solverline 330 acrylic sealer undercoat
- 1 coat solverline 171 premium high gloss enamel
- recoat time 2 hours, substrate timber
(d) Internal Doors- 2 coats solverline 4330 acrylic sealer undercoat
- 1 coat solverline 4171 premium high gloss enalem
- recoat time 2 hours, substrate pre-primed timber
(e) Soffits - 2 coats solverline 4165 solvermaster low sheen acrylic
- recoat time 2 hours, substrate fibrous cement sheeting
(f) Timber Doors - 1 coat solverline 4388 premium oil based wood primer
- 1 coat solverline 4103 premium oil based undercoat
- 1 coat solverline 4171 premium high gloss enamel
- recoat time 2 hours, substrate timber
(g) PVC Downpipes - 2 coats solverline 4290 premium duraguard low sheen acrylic
- recoat time 2 hours, substrate PVC
(h) Pergola's etc - 2 coats solverline 4290 premium duraguard low sheen acrylic
- recoat time 2 hours, substrate timber
- oil based primer required where there is tannin stain bleeding
(i) Gable Ends - 2 coats solverline 4290 duraguard low sheen acrylic
- recoat time 2 hours, substrate fibrous cement sheeting
6.0 Touch-up paint is to be left at the back of the top shelf of the pantry
Only approved solver paint tins are to be used to store touch up paints
The touch up paint tins must have appropriate safety information on them
7.0 The painter is responsible for acceptance of all surfaces if he paints them
This means that if you paint something it is deemed that you have inspected the
surface that it is suitable for the paint application.
The painter shall be financially responsible if repainting is required.
8.0 Pricing includes minor patching as required to ensure surfaces are suitable for painting
9.0 Pricing includes touch-ups to make paintwork ready for handover
5973-3000 Extra allowance for materials and labour for 3000 123.91 m2 $2.40 $297.38 27 1
high ceilings
Note:
Do not start work if this order is insufficient funds to cover
sufficiently. Extra's cannot be excepted once work is started
The front door is grade.

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 31 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

80 PAINTER

Item Description Quantity Units Rate Amount Lvl Ld


5973-3coat Supply materials & labour for 3 coat system 220.14 m2 $40.00 $8,805.60 27 1
internal painting, including eaves, downpipes,
meter box, trims
59734 Note: - no allowance has been made for 1 m2 $0.00 $0.00 27 1
requirements of lead paint or asbestos - confirm
existing situation
59739 Extra Painters Allowance for 2 storey work 96.23 m2 $5.00 $481.15 27 8
59786 Extra Painters allowance for quicksliding door 7 Off $13.35 $93.45 27 1
system
Includes labour to remove & reinstate doors & tracks
Extra to sand, prepare & finish finger grips
5980 Paint External Cladding (Hardiplank, 77.1 m2 $15.00 $1,156.50 27 1
weatherboards, chamferboards or fiber cement
sheeting)
(a) External Cladding -
- 2 coats solverline 4290 duraguard low sheen acrylic
- recoat time 2 hours, substrate fibrous cement sheeting
(a) External Cladding -
- 2 coats solverline 4290 duraguard low sheen acrylic
- recoat time 2 hours, substrate fibrous cement sheeting
(a) External Cladding -
- 2 coats solverline 4290 duraguard low sheen acrylic
- recoat time 2 hours, substrate fibrous cement sheeting
5981 Paint External Ceilings (paint used must be an 9 m2 $13.20 $118.80 27 1
external use sealer to prevent future problems with
plaster ceilings)
(e) External ceilings - 1 coat solverline 129 oil based wall sealer
- 2 coats solverline 4165 solvermaster low sheen acrylic
- recoat time 2 hours, substrate plasterboard sheeting
599013 Paint or Stain internal handrails 4.2 m $30.00 $126.00 27 1
5990131 Paint or Stain internal handrails - Wall Mounted 5.1 m $6.60 $33.66 27 1

Total 80 PAINTER $13,384.04

81 WHITE GOODS

Item Description Quantity Units Rate Amount Lvl Ld


59921 Oven - PC sum 1 Off $1,555.50 $1,555.50 27 1
5994 Cooktop - PC Sum 1 Off $675.00 $675.00 27 1
59951 Rangehood PC Sum 1 Off $582.12 $582.12 27 1
5996 Dishwasher - PC 1 Off $1,200.00 $1,200.00 27 1

Total 81 WHITE GOODS $4,012.62

82 LIGHT FITTINGS

Item Description Quantity Units Rate Amount Lvl Ld


62530 Lounge, Dining or Rumpus light fittings (Brilliant 3 Off $75.00 $225.00 27 1
ctc 10974-13)
625300-150 Lounge, Dining or Rumpus light fitting - Gimble 2 Off $37.50 $75.00 27 1
DL23 LV downlight - 12 volt - low voltage
62531-200 Kitchen spot light fittings - ORI-OL57191/4 4lt 1 Off $106.25 $106.25 27 1
gu10 spotlight with lamp

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 32 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

82 LIGHT FITTINGS

Item Description Quantity Units Rate Amount Lvl Ld


62532-100 Bedroom Light Fittings (ORI OL 44131CH 40cm 4 Off $68.75 $275.00 27 1
Oyster)
6254 IXL 311 Tastic 2 heat 1 light plus exhaust 2 Off $168.75 $337.50 27 1
6255 Martec Ceiling Fan CMW 123, 48" 3 blade (fan 5 Off $99.00 $495.00 27 1
only no light)
625530 Entry light fittings (nap nl22) 1 Off $23.93 $23.93 27 1
625530-10 Stairwell light fitting - Dropped Pendant 1 Off $87.50 $87.50 27 1
62554 Hallway light fittings (nap nl22 ) 1 Off $22.44 $22.44 27 1
62556 Walk In Robe light fitting (kl 6006) 1 Off $15.00 $15.00 27 1
62558 Laundry light fitting (kl 6006) 1 Off $15.00 $15.00 27 1
6259 Soffit mounted exterior light fittings (ies l5001) 2 Off $20.63 $41.25 27 1
62594 Light Globes 40w Round Pearl 3 Off $1.49 $4.46 27 1
62595 Edison Screw "Lightstar" flourescent Energy 13 Off $8.13 $105.63 27 1
Saving Lamps - CFL -11, 15, 20 watts to suit
fittings placement
Light fittings trim to match internal door furniture where possible -
62597 RO 80 reflector downlight lamp 2 Off $2.50 $5.00 27 1
Light fittings trim to match internal door furniture where possible -
6259-ext External light - nl4215 oval black bunker with grill 3 Off $37.50 $112.50 27 1

Total 82 LIGHT FITTINGS $1,946.45

83 CURTAINS/VENITIAN BLINDS/SHUTTER

Item Description Quantity Units Rate Amount Lvl Ld


ps Provisional Sum for Supply and Installation 6000 Off $1.00 $6,000.00 27 1

Total 83 CURTAINS/VENITIAN BLINDS/SHUTTER $6,000.00

84 TV ANTENNA

Item Description Quantity Units Rate Amount Lvl Ld


3207 TV Antenna UHF \ VHF & Mast connected to one 1 Off $250.00 $250.00 27 1
outlet (3.0 mtrs of cable)
NOTE: Confirm TV points, splitter & amplifier requirements & advise of extra costs so that we can have the
client authorise a variation before we continue with installation

Rubbish:

1.0 The house is to be swept out daily, all rubbish is to be placed in the designated area or cage provided.
2.0 Rubbish areas & cages are intended for construction rubbish, subcontractors are to remove food scraps &
other personal rubbish from the construction site.
32070 Upgrade to larger Antenna 1 Off $68.00 $68.00 27 2
NOTE: Confirm TV points, splitter & amplifier requirements & advise of extra costs so that we can have the
client authorise a variation before we continue with installation
32071 TV POINTS " F" CONNECT SPLITTER 2-4 1 Off $23.76 $23.76 27 3
POINTS
Total 84 TV ANTENNA $341.76

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 33 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

84.1 AIR CONDITIONING

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 84.1 AIR CONDITIONING $0.00

85 FLOOR SANDING & POLISHING

Item Description Quantity Units Rate Amount Lvl Ld


63175 Sand particleboard flooring to level out raised 100.23 m2 $15.00 $1,503.45 27 1
edges etc.
Total 85 FLOOR SANDING & POLISHING $1,503.45

86 BALUSTRADING / METAL FENCING

Item Description Quantity Units Rate Amount Lvl Ld


6745 SPECIAL EXTERNAL GATE PROVISIONAL SUM 1 Off $400.00 $400.00 0 1
72824 PANELLING TO MATCH GATES PROVISIONAL 6.3 m $500.00 $3,150.00 0 1
SUM
STANDARD DESIGN POWDER COATED ALLUMINIUM
MAXIMUM HT 1500 MM
Total 86 BALUSTRADING / METAL FENCING $3,550.00

88 CONCRETOR EXTERNAL

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 6

Total 88 CONCRETOR EXTERNAL $0.00

88.5 EXTERNAL CONCRETE PUMP

Item Description Quantity Units Rate Amount Lvl Ld


note Please Note: 1 Off $0.00 $0.00 27 1
check if concrete pump required for external slabs

Total 88.5 EXTERNAL CONCRETE PUMP $0.00

89.1 CARPENTER FINAL FIX

Item Description Quantity Units Rate Amount Lvl Ld


278907 Carpentry - Final fix 220.14 m2 $8.00 $1,761.12 27 1
Note:
1. All doors are to be checked for level.
2. Privacy adaptors to

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 34 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

Total 89.1 CARPENTER FINAL FIX $1,761.12

89.6 SHUTTERS

Item Description Quantity Units Rate Amount Lvl Ld


341410 Supply & Install Stained / Painted Shutters 20 m2 $600.00 $12,000.00 1 3
Install to -
Colour -
Total 89.6 SHUTTERS $12,000.00

90-1000 HOT WATER SYSTEM

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 90-1000 HOT WATER SYSTEM $0.00

91 PAVERS

Item Description Quantity Units Rate Amount Lvl Ld


6498 SUPPLY & PLACE GRATED DRAIN TO 6m $85.00 $510.00 27 1
DRIVEWAY - LIGHT DUTY
66845 Stone / Travertine - Pavers Provisional Sum 55 m2 $200.00 $11,000.00 27 1
ps Provisional Sum for Supply and Installation 600 Off $1.00 $600.00 1 1
to raise existing terrace - confirm requirements

Total 91 PAVERS $12,110.00

93 FLY SCREENS OR SECURITY SCREENS

Item Description Quantity Units Rate Amount Lvl Ld


68184 Flyscreens - Provisional Sum m2 33 m2 $60.00 $1,980.00 27 1

Total 93 FLY SCREENS OR SECURITY SCREENS $1,980.00

94-1000 INSULATION

Item Description Quantity Units Rate Amount Lvl Ld


409625 Supply & Install R3.5 Ceiling Batts (fiberglass) 220.14 m2 $8.00 $1,761.12 27 1
Note:
1.0 Truss Centers = MM
2.0 Please ensure that wiring from exhaust fans is not
pushed onto the fan when batts installed. The fans
make & loud noise & the wiring is rubbed by the blade.
3.0 Please ensure that downlights are not bumped & they
can be easily dislodged & knocked to an odd angle.
40969 Allowance to string up for floor joists or raked 123.91 m2 $2.00 $247.82 27 1
ceilings
Total 94-1000 INSULATION $2,008.94

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 35 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

94 HOUSE CLEAN

Item Description Quantity Units Rate Amount Lvl Ld


6912 Internal house clean 220.23 m2 $2.50 $550.58 27 1

Total 94 HOUSE CLEAN $550.58

95 FINAL SITE CLEAN

Item Description Quantity Units Rate Amount Lvl Ld


6931 Provisional allowance for site cleanup & tip fee;ss 1 Off $800.00 $800.00 27 1

Total 95 FINAL SITE CLEAN $800.00

96 LANDSCAPING

Item Description Quantity Units Rate Amount Lvl Ld


05562 STRIP DRAIN - SUPPLY ONLY - SD300 x 50 mtrs 1 Off $504.24 $504.24 27 1
ROLL
6062 ALLOWANCE FOR LANDSCAPE RESTITUTION 1 Off $660.00 $660.00 27 1
ON COMPLETION OF WORKS
6956-20 Garden Beds 20 m2 - edging, mulch, soil, labour, 1 Off $1,050.00 $1,050.00 27 1
30 plants (16 x 140mm, 12 x 200mm, 1 x 25 ltr)
Total 96 LANDSCAPING $2,214.24

98 FLOOR COVERINGS

Item Description Quantity Units Rate Amount Lvl Ld


7074 Ps to supply & lay Carpet on rubber underlay, 89 m2 $40.00 $3,560.00 0 1
including door trims

Contract Type -
7074-step Extra labour allowance to lay "Carpet" to stair 17 Off $5.00 $85.00 1 1
treads (extra carpet required to cover face of
treads)
Total 98 FLOOR COVERINGS $3,645.00

100 SPECIAL TIMBER TREATMENTS

Item Description Quantity Units Rate Amount Lvl Ld


34144 Privacy Screens - Provisional Sum to supply & 15 m2 $350.00 $5,250.00 0 1
install
Total 100 SPECIAL TIMBER TREATMENTS $5,250.00

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 36 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

104 CLOTHES HOISTS \ LETTER BOXES

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 104 CLOTHES HOISTS \ LETTER BOXES $0.00

105 ESTIMATING

Item Description Quantity Units Rate Amount Lvl Ld


7436 Renovations 220.14 m2 $3.00 $660.42 27 1

Total 105 ESTIMATING $660.42

106 CONTINGENCY & THEFT

Item Description Quantity Units Rate Amount Lvl Ld


74531 Contingencies & Site Theft Allowance (per m2) 220.14 m2 $3.50 $770.49 27 1

Total 106 CONTINGENCY & THEFT $770.49

110 WINDOW SERVICE

Item Description Quantity Units Rate Amount Lvl Ld


67451 Window Service per item 7 Off $3.00 $21.00 27 1
6746 Window service callout charge 1 Off $100.27 $100.27 27 1
67461 Allowance for angles above windows where gal 15.6 m $11.00 $171.60 27 2
lintels used over large openings
Total 110 WINDOW SERVICE $292.87

115 PLUMBING APPROVAL INSTALL HOT-WS

Item Description Quantity Units Rate Amount Lvl Ld


313415 Return to site to connect to patio downpipes & 1 Off $81.00 $81.00 27 1
yard gully's
plmb-90000 Final Plumbing Approval Certificate 1 Off $266.20 $266.20 27 1
Note:
Payment will not be made unless a council certificate accompanies your invoice.
Invoices received without the correct certificate attached will be returned.
Total 115 PLUMBING APPROVAL INSTALL HOT-WS $347.20

117 MAINTENENCE

Item Description Quantity Units Rate Amount Lvl Ld


7454 Maintenence Allowance - Minor maintenance 1 Off $800.00 $800.00 27 1
works during settling in period

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45


Page 37 of 37

Speedy Estimating Service ph: 0407 763 976


Bill of Quantities

9 September 2010

Job example3 Example Renovation


Example Renovation Priced Bill of Materials and Labour

Total 117 MAINTENENCE $800.00

130 Power usage during construction

Item Description Quantity Units Rate Amount Lvl Ld


no No Allowance 1 Off $0.00 $0.00 27 1

Total 130 Power usage during construction $0.00

160 HANDOVER INSPECTIONS

Item Description Quantity Units Rate Amount Lvl Ld


7580 Hand Over Inspection 1 Off $360.09 $360.09 27 1
Contract Type -
Approximate handover date of is to be confirmed closer to the date.
Please contact the supervisor to arrange a suitable time for inspection.
Please contact the office for the following if you dont have them
1. Plans & Elevations
2. Colour Selection
3. Copy of Contract Specification
4. Copy of post contract variations.

Please send a copy of your report to our office for our files.
7581 Hand Over Clean and tidy up, cost of filler & 220.14 m2 $1.20 $264.23 27 1
cleaning gear etc....
Contract Type -
Approximate handover date of is to be confirmed closer to the date.
Please contact the supervisor to arrange a suitable time for inspection.
Please contact the office for the following if you dont have them
1. Plans & Elevations
2. Colour Selection
3. Copy of Contract Specification
4. Copy of post contract variations.
Please send a copy of your report to our office for our files.
Total 160 HANDOVER INSPECTIONS $624.32

Total example3 Example Renovation $385,920.58

c2004 Databuild pty ltd www.Databuild.com.au 2 - 18 SP1 C:\DBW32ADO\reports\C10dbill.rpt Jeff 16:45