0% found this document useful (0 votes)
27 views35 pages

Cls 7

This lecture discusses different approaches for software project management including waterfall, prototyping, iterative, incremental and agile models. It covers factors to consider like project characteristics, requirements certainty, and complexity when choosing an appropriate process model for development.

Uploaded by

ml assignment
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views35 pages

Cls 7

This lecture discusses different approaches for software project management including waterfall, prototyping, iterative, incremental and agile models. It covers factors to consider like project characteristics, requirements certainty, and complexity when choosing an appropriate process model for development.

Uploaded by

ml assignment
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 35

Software Project Management

Durga Prasad Mohapatra


Professor
CSE Deptt.
NIT Rourkela
Selection of an appropriate project
approach
Outline of lecture
 Building versus buying software
 Taking account of the characteristics of the project
 Process models
◦ Waterfall model
◦ Prototyping model
◦ Iterative model
◦ Incremental model
◦ Agile models
‘Step Wise’ - an overview
Selection of project approaches
 This lecture concerned with choosing the right approach to
build a particular project: variously called technical planning,
project analysis, methods engineering and methods
tailoring.
 Relevant to Step 3, of the previous figure.
 In-house: often the methods to be used dictated by
organizational standards
 Suppliers: need for tailoring as different customers have
different needs
Selection of project approaches
 Different types of projects need different types of
approach.
 If you are working in one particular environment which
specializes in one type of software, then the approach is
likely not to change much from one project to another.
 Where you work for different clients in different
organizations developing a variety of applications, then
the approach for each project may need to be tailored.
Build or buy?

In-house
Outsource?
development?

either

Build Buy
Build or buy?
• In-house development almost always involves developing
new code.
• If it is decided to use a specialist organization to
implement system, the supplier could either build a
‘bespoke’ system (created specially for one customer) for
you, or could install a pre-existing application.
• There are hybrids of these options, e.g. to build in-house
but use temporary contract staff, or Customised Off-the-
Shelf (COTS) where a basic existing core system is
modified for your particular requirements.
Some advantages of off-the-shelf (OTS) software
 Cheaper as supplier can spread development costs over a
large number of customers
 Software already exists
◦ Can be trialled by potential customer
◦ No delay while software being developed
 Where there have been existing users, bugs are likely to
have been found and eradicated
Some possible disadvantages of off-the-shelf
 Customer will have same application as everyone else: no
competitive advantage, but competitive advantage may
come from the way application is used
 Customer may need to change the way they work in order
to fit in with OTS application
 Customer does not own the code and cannot change it
 Danger of over-reliance on a single supplier
 One concern is what happens if the supplier goes out of
business. Customer might not then be able to maintain the
system: hence the use of ‘escrow’ services where a 3rd
party retains a copy of the code.
General approach
 Look at risks and uncertainties e.g.
◦ are requirement well understood?
◦ are technologies to be used well understood?
 Look at the type of application being built e.g.
◦ information system? embedded system?
◦ criticality? differences between target and development
environments?
 Clients’ own requirements
◦ need to use a particular method
General approach
Control systems:
 A real-time system will need to be implemented using an
appropriate methodology. Real-time systems that employ
concurrent processing may have to use techniques such as
Petri nets.
General approach
Information systems:
 An information system will need a methodology, such as
Information Engineering, that matches that type of
environment.
 Team members would therefore know exactly what is
expected.
General approach
Availability of users:
 Where the software is for the general market rather than
application and user specific, then a methodology which
assumes that identifiable users exist who can be quizzed
about their needs would have to be thought about with
caution.
 Some business systems development methods assume an
existing clerical system which can be analysed to yield the
logical features of a new, computer-based, system.
 In these cases a marketing specialist may act as a surrogate
user.
General approach
Specialized techniques:
 For example, expert system shells and logic-based
programming languages have been invented to expedite the
development of knowledge-based systems.
 Similarly, a number of specialized techniques and standard
components are available to assist in the development of
graphics-based systems.
General approach
Hardware environment :
 The environment in which the system is to operate could
put constraints on the way it is to be implemented.
 The need for a fast response time or restricted computer
memory might mean that only low-level programming
languages can be used.
General approach
Safety-critical systems:
 Where safety and reliability are essential, this might justify
the additional expense of a formal specification using a
notation such as OCL.
 Extremely critical systems could justify the cost of having
independent teams develop parallel systems with the same
functionality.
 The operational systems can then run concurrently with
continuous cross-checking. This is known as n-version
programming.
General approach
Imprecise requirements:
 Uncertainties or a novel hardware/software platform mean
that a prototyping approach should be considered.
 If the environment in which the system is to be
implemented is a rapidly changing one, then serious
consideration would need to be given to incremental delivery.
 If the users have uncertain objectives in connection with the
project, then a soft systems approach might be desirable.
Processes versus Process Models
 Starting from the inception stage:
◦ A product undergoes a series of transformations
through a few identifiable stages
◦ Until it is fully developed and released to the customer.
◦ This forms its life cycle or development process.
 Life cycle model (also called a process model):
◦ A graphical or textual representation of the life cycle.
Structure versus speed of delivery
Structured approach
 Structured methods consists of sets of steps and rules
which, when applied, generate system products such as use
case diagrams.
 Each of these products is carefully defined.
 Such methods are more time consuming and expensive than
more intuitive approaches.
 The pay-off, it is hoped, is a less error prone and more
maintainable final system.
Structure versus speed of delivery
Structured approach (cont…)
 This balance of costs and benefits is more likely to be
justified on a large project involving many developers and
users.
 Because of the additional efforts needed and their greater
applicability to large and complex projects, these are often
called heavyweight methods.
Structure versus speed of delivery
Structured approach
 Also called ‘heavyweight’ approaches
 Step-by-step methods where each step and intermediate
product is carefully defined
 Emphasis on getting quality right first time
 Example: use of UML and USDP
 Future vision: Model-Driven Architecture (MDA). UML
supplemented with Object Constraint Language, press the
button and application code generated from the UML/OCL
model
Structure versus speed of delivery
Agile methods
 Emphasis on speed of delivery rather than documentation
 RAD (Rapid application development): Emphasized use of
quickly developed prototypes
 JAD (Joint application development): Requirements are
identified and agreed in intensive workshops with users
Choice of process models
 Based on the nature / characteristics of the project,
choose an appropriate process model for developing
the project. Some of the possible process models are:
 Waterfall model (also known as ‘one-shot’, or
‘once-through’ model)
 Prototyping model
 Incremental model
 RAD model
 Agile models
What is Agile Software Development?
 Agile: Easily moved, light, nimble, active software processes

 How agility achieved?

◦ Fitting the process to the project

◦ Avoidance of things that waste time

 Emphasis on speed of delivery rather than documentation

25
Important Themes of Agile Methods
 Incremental approach:
◦ At a time, only one increment is planned, developed,
and then deployed at the customer site.
 Emphasizes face-to-face communication over written
documents.
 An agile project usually includes a customer
representative in the team.
 Agile development projects usually deploy pair
programming.(one will write the code, the other one
will review the code, then the roles will be swapped).
Agile Models / Methodologies
 XP
 Scrum
 Unified process
 Crystal
 DSDM
 Lean

27
combinations of approaches
installation
one-shot incremental evolutionary
one-shot yes yes no
incremental yes yes no
evolutionary yes yes yes

• one-shot or incremental installation - any


construction approach possible
• evolutionary installation implies evolutionary
construction
‘Rules of thumb’ about approaches to be
used
IF uncertainty is high
THEN use evolutionary approach
IF complexity is high but uncertainty is not
THEN use incremental approach
IF uncertainty and complexity both are low
THEN use one-shot model
IF schedule is tight
THEN use evolutionary or incremental model
Comparison of Different Life Cycle
Models
 Iterative waterfall model
◦ most widely used model.
◦ But, suitable only for well-understood problems.
 Prototype model
o is suitable for projects which are not well understood in
the following aspects:
 user requirements
 technical aspects
30
Comparison of Different Life Cycle
Models cont …
 Evolutionary model is suitable for large problems:
◦ can be decomposed into a set of modules that can be
incrementally implemented,
◦ incremental delivery of the system is acceptable to the
customer.
 Spiral model:
◦ suitable for development of technically challenging
software products that are subject to several kinds of
risks.

31
Comparison of Different Life Cycle
 Agile model:
Models cont …
◦ to help projects to adapt to change requests
◦ In the agile model, the requirements are decomposed into many
small incremental parts that can be developed over one to four
weeks each.

32
Summary
• We have discussed Building versus buying a software.
• We have discussed some characteristics of the projects such
as control systems, information systems, availability of users,
specialized techniques, hardware environment, safety-critical
systems, imprecise requirements.
• We have mentioned different Process models.
References :
1. B. Hughes, M. Cotterell, R. Mall, Software Project Management, Sixth
Edition, McGraw Hill Education (India) Pvt. Ltd., 2018.
2. R. Mall, Fundamentals of Software Engineering, Fifth Edition, PHI
Learning Pvt. Ltd., 2018.
Thank you