What is 5s?
5S is a Japanese word meaning Housekeeping.
5S is a basic technique to enhance the workplace
appearance and give a pleasant work environment.
5S is a methodology for organizing, cleaning,
developing, and sustaining a productive work
environment.
What is 5s?
5S is a group activity performing:
3. Seiso Cleaning
4. Seiketsu Standardizing
Requirements to implement 5S
Total Employee Involvement
Management Commitment
Developing Self directed employees
Team based activity
How to Start 5S
How to Start
Take photos of present level (Before Implementing 5S)
(Click here for Example)
Provide 5S photo board for each zone and display all
the before photos. (Click here for Example)
All Employees should be included in 5S Zone
Create 5S Corner – Display 5S Posters, 5S
Organization chart, 5S photo board, 5S improvements
chart etc., in the 5S Corner
Make 5S Organization chart and display it in the 5S
Corner
Implement 1S, 2S & 3S first.
Pyramid Quality Systems 10
5S
1S – SEIRI (Clearing)
QS
P Y R A M I D
SEIRI …
Segregate wanted & unwanted materials in all Zones
Unwanted Items – Examples
Factory : Office : Home :
a. Scrap Machines a. Useless Papers / Files a. Broken Toys
b. Rejected Materials b. Broken Pens b. Old Clothes
c. Expired Goods c. Old Diaries c. Broken Suitcases
d. Broken Tools, Pallets, bins d. Broken Furniture d. Old Packing Cases
e. Old Notices e. Old Notices
f. Waste Materials
Pyramid Quality Systems 11
P
QS
Y R A M I D
5S
SEIRI …
Pyramid Quality Systems 12
P
QS
Y R A M I D
5S
SEIRI …
Item
Pattern Location Area
SEIRI …
REPAIR WASTE (NO VALUE)
RE USE NOT KNOWN
Red Tag USE FULL OTHERS MATERIAL
MOVE TO
STORE MAINTENANCE
DISPOSAL YARD WASTE AREA
SCRAP YARD RED TAG AREA
SEIRI …
c. Same Camera
d. Fixed Position
Register red Tag & record Disposal Plan.
Should not have Sentimental attachments to any items
Do not keep them with a vague idea that they may be
needed one day. Be ruthless about throwing unnecessary
things away.
Pyramid Quality Systems 15
P
QS
Y R A M I D
5S
Example:-
Decide: whether to remove the extension portion of office desk.
Example:-
SEIRI …
In a shop floor, instead of installing a working desk per supervisor, we
can have this shared working desk concept: This will save working
space and encourage direct visit to actual shop floor.
SEIRI …
Pyramid Quality Systems 17
P
QS
Y R A M I D
5S
Benefits
SEIRI …
Easy access to things
Required materials are located easily
Better Working environment
Improved Safety
Cost recovery by periodic disposal, which can be used
for other developmental activities.
Pyramid Quality Systems 18
5S
2S - SEITON (Organizing)
QS
P Y R A M I D
Implementation Steps
SEITON …
etc.,
Design a suitable storage place / parking slots and fix
the place for storing each item depending on the
frequency of usage
Establish a method of storage for each item which is
easy to see, pick and place with X,Y alignment.
Pyramid Quality Systems 19
P
QS
Y R A M I D
5S
Implementation Steps
SEITON …
Furniture / equipments location marks in the floor.
Identify all the machines, equipments, computers &
Accessories, Lights, fans, Switches, cables, Pipe lines,
Storage Cabins, Racks etc.,
Make storage more transparent & with visual controls.
Establish storage procedures & Display instructions.
Pyramid Quality Systems 20
P
QS
Y R A M I D Before Examples After 5S
SEITON …
Cleaning equipments lying at a
corner in the work place
SEITON …
Pyramid Quality Systems 22
P
QS
Y R A M I D
5S
Examples
Factory :
SEITON …
Office : Home :
a. Layout disorganized a. File cabinets a. Cluttered drawers,
unlabelled cupboards, book
b. Cables, Pipes in
cases
disarray b. Cluttered drawers,
shelves, book cases, b. Kitchen things in
c. Tools, bits heaped in
tables disarray
shelves
c. Records and
d. Stores location system
documents not
unclear
arranged well
e. Things lying on the
d. File heaps and
floor
papers all over
SEITON …
Pyramid Quality Systems 24
P
QS
Y R A M I D
5S
SEITON …
Pyramid Quality Systems 25
P
QS
Y R A M I D
5S
Benefits
SEITON …
minimized
Easy to identify when materials are taken out from
their location
Safety in handling etc.,
SEISO …
a. Where to clean - Area
b. What to clean - Item
c. When to clean - Frequency
d. Who has to clean - Responsibility
e. How to clean - Method & Cleaning tool or
Kit.
Pyramid Quality Systems 27
P
QS
Y R A M I D
5S
Implementation Steps
SEISO …
Shortest route for collecting waste in different place to
be identified and a route map to be prepared and given
to the person concerned.
Painting schedules to be made to all machines,
equipments and areas.
X
Cleaning Schedule
S.
Cleaning Area Frequency Method Who 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
No.
Concerned
Machines Daily Cotton was te
operator
SEISO …
Windows Once in 2 days Cotton was te Helper
Sign
Benefits
SEISO …
leakages, strain, dirt and defects.
Hygiene and pleasant place keeps the people more
healthy.
Extends machine and equipment life.
The company gets appreciation from the users /
Consumers.
4S – SEIKETSU (Standardizing)
Standardizing all the 5S activities throughout the
organization
Implementation Steps
List out the various activities of 5S.
SEIKETSU …
Follow the guidelines for floor marking through out
the organization.
The Following things to be standardized:
1) Company Colour
2) Switch / Machine / Fan
3) Machine I.D
Pyramid Quality Systems 31
P
QS
Y R A M I D
SEIKETSU …
9) Pipe Line I.D / Colour 22) Danger/Voltage labels
10) Warning Signals 23) Do’s/Do not
11) Instrument I.D 24) Electric / Telephone
12) Computer Cable I.D 25) Direction boards
13) Letter Colour 26) Letter Size
14) Checklist Format 27) Audit Format
15) Equipment Details 28) Dept. File I.D
16) Street Sign board
Pyramid Quality Systems 32
P
QS
Y R A M I D
Examples 5S
SEIKETSU …
Pyramid Quality Systems 33
P
QS
Y R A M I D
Colour Coding 5S
S.
Area Colour Type Size
No.
Roads, Corridor, Aisle and Work
1 Yellow Solid 10 cm
areas
2 Dividing Lines of Dept/Section Yellow Solid 10 cm
3 Traffic Flow Lines Yellow Arrows 5 cm
SEIKETSU …
4 Work in progress areas Yellow Solid 5 cm
5 Door openings / Exit & Entrance Yellow Broken 5 cm
6 Steps - Front face Yellow & Black Stripes 5 cm
Moving Trolleys, cranes - Front & Rear
7 Yellow & Black Stripes 7.5 cm
Face
5 cm leaving 10
Work Bench, Table, Racks, Stands,
8 Yellow Corner lines mm gap to
Dustbins
length of the leg.
Parking slot for vehicles, Forklift,
9 Sky Blue & White Stripes 5 cm
Trolleys & all mobile equipments.
Control Panels, Fire hose,
10 Extinguishers, Emergency exits and Red & White Stripes 5 cm
all hazardous areas
Implementation Steps 5S
Painting to the floor
Different colours to be used for floor depending
upon the function.
Light Colours in the relaxing areas.
SEIKETSU …
Maintenance of 1S,2S & 3S.
Pictorial Instructions should be provided regarding
5S, Safety, DOs & Don'ts etc.,
Plants & Flower Pots to be provided in the
reception, entrance, relaxing places etc.,
Direction boards to be provided wherever
applicable.
Pyramid Quality Systems 35
P
QS
Y R A M I D
5S
SEIKETSU …
Pyramid Quality Systems 36
P
QS
Y R A M I D
5S
SEIKETSU …
Pyramid Quality Systems 37
P
QS
Y R A M I D
5S
SEIKETSU …
Pyramid Quality Systems 38
P
QS
Y R A M I D
5S
Benefits
SEIKETSU …
areas, equipments and do the activities without
asking others
Saves time in locating the areas and equipments
Better visual control for all the activity
Any Non conformance in following the system can
be easily identified.
Implementation Steps
SHITSUKE …
5S Chairman & Zone leaders should monitor all the
5S activities continuously
Create work discipline with the help of employees
working in the particular area and to suit the
requirement.
SHITSUKE …
Award for best suggestions every month.
5S Audit checklist to be prepared for all zones &
displayed in the respective zones.
5S Champion should do Audit periodically as per
the checklist & Suggestions to be given for
improvement.
SHITSUKE …
action.
If you are recruiting anybody, he/she undergo 5S
Training first and then he/she should enter his/her
regular work.
Idea Suggested :
SHITSUKE …
Benefits :
Estimated Cost :
Signature of Employee
Reviewed by :
Status : Approved / Not Approved
Reward : Recommended / Not Recommended
Signature of Reviewed person
Implementated date & details :
Benefits achieved :
SHITSUKE …
5. Rare using Items are arranged in back.
6. Frequently using items are arranged as easy as to use.
1. Dirt free Lights, Walls, Tables, Chairs, Computers, Glasses, files etc.,
SEISO 2. Cleaning of Floor
3. Clear responsibilities assigned to all persons
1. Adequate light, Ventilation, Safety items are Provided
SEIKETSO 2. No Leakage of Electricity and Water
3. Maintenance of 1S, 2S, 3S.
1. Punctuality
SHITSUKE 2. Make Procedures a habit
3. No wastage of work time in private Conversation
Total
Scale/ Marks Selection Criteria
1 Awareness totally absent
Poor ( Concern )
2 Partial Awareness
3 No Control on disposition. No Procedure available Not Satisfactory
4 Procedure available not followed ( Must Improve )
5 There is a Scope for Improvement
Satisfactory
6 To be sustained
7 Just meets the requirements Good
8 Can improve further ( Keep it up further )
Month : Week :
1. Disposal of unwanted Tools, Materials, Burrs, Clothes etc
2. Disposal of Broken tools and Broken machine parts
SEIRI
3. Disposal of Scraps
4. Disposal of Unwanted wires, expired items.
1. Arrangement of Cutting tools in a separate area and identification
2. Arrangement of Raw Materials in a specified area and identification
3. Arrangement of Maintenance tools in a easy handling area
4. Arrangement of Finished and work in process products in the specified area
and Identification with tags
SEITON 5. Rare using Items are arranged in back.
6. Frequently using items are arranged as easy as to use.
7. Arrangement of Measuring Equipments
SHITSUKE …
8. Arrangement of Safety items and clothes
9. Arrangement of Machine Parts
10. Cables, Pipes in disarray
1. Dirt free Lights, Walls, Tables, Chairs, Glasses, files etc.,
2. Cleaning of Floor
SEISO 3. Clear responsibilities assigned to all persons
4. Cleaning of Machines
5. Cleaning of Measuring Equipments, Tools, Jobs, Safety items.
1. Adequate light, Ventilation, Safety items are Provided
2. No Leakage of Electricity and Water
3. Maintenance of 1S, 2S, 3S.
SEIKETSO
4. Location of Materials, Jobs, Tools in the Identified area
5. Handling of Hazardous Chemicals
6. Toilets not disinfected
1. Punctuality
2. Make Procedures a habit
SHITSUKE
3. No wastage of work time in private Conversation
4. Team Work
Total
Scale/ Marks Selection Criteria
1 Awareness totally absent
Poor ( Concern )
2 Partial Awareness
3 No Control on disposition. No Procedure available Not Satisfactory
4 Procedure available not followed ( Must Improve )
5 There is a Scope for Improvement
Satisfactory
6 To be sustained
7 Just meets the requirements Good
8 Can improve further ( Keep it up further )
SHITSUKE …
All the peoples are motivated to continue the 5S
Journey.
Recognized individual/Zone/Zone leaders by
displaying the photos, results in the 5S corner make
them more involved.
Develops Teamwork
5S CLIPPINGS
5S Champion
5S
5S Photo
Board
5S Posters &
Company
PQCDMS Profile
Board
5S Photo Board
Before After 5S
Benefits :
Searching & handling time reduced from 35 sec to 10 sec (25 sec saved) due to Spares Rack &