LEGENDS:-

765 kV SWITCHYARD 765 kV SWITCHYARD 765 kV SWITCHYARD 400 kV SWITCHYARD 400 kV SWITCHYARD 765 kV SWITCHYARD 765 kV SWITCHYARD 765 kV SWITCHYARD TG TURBINE GENERATOR
765 kV 400 kV
DIESEL
DG
GENERATOR
INT TRANSF. (#0A) INT TRANSF. (#0B)

2-WINDING TRANSFORMER
(WITH OLTC)

2-WINDING TRANSFORMER
33 kV SWITCHYARD BOARD (WITH OCTC)

BUS DUCT

CABLE CONNECTION
GENERATOR TRANSFORMER (GT#1) GENERATOR TRANSFORMER (GT#2) GENERATOR TRANSFORMER (GT#3) 132 kV OH TRANSMISSION GENERATOR TRANSFORMER (GT#4) GENERATOR TRANSFORMER (GT#5)
GENERATOR TRANSFORMER (GT#6)
3 X 1 PH 270 MVA, 800 22KV, OFAF OR ODAF

COLONY SUPPLY
10BAT01 3
20BAT01 30BAT01 40BAT01 50BAT01 60BAT01
10BAT02 20BAT02 30BAT02 50BAT02 60BAT02 ON LOAD SWITCH-FUSE UNIT (DRAW OUT)
40BAT02
(TYP) 100 MVA, 132/34.5 kV
10BAT03 20BAT03 30BAT03 40BAT03 50BAT03 60BAT03
Ynd11, Z=

13500A IP BUS DUCT (DELTA RUN) ON LOAD SWITCH-FUSE UNIT (NON DRAW OUT)

23000A IP BUS DUCT (MAIN RUN)


10BAA02 10BAA03 20BAA02 20BAA03 30BAA02 30BAA03 40BAA02 40BAA03 50BAA02 50BAA03 60BAA02 60BAA03
FUSED CONTACTOR (DRAW OUT)

10BAA01
23000A IP BUS DUCT 20BAA01 30BAA01 40BAA01 60BAA01
50BAA01
ON LOAD SWITCH UNIT (DRAW OUT)

M M M M M M
10BAC01 20BAC01 40BAC01 50BAC01 60BAC01 ON LOAD SWITCH UNIT (NON DRAW OUT)
30BAC01
22 kV GCB#1 GCB#2 GCB#4 GCB#5 GCB#6
GCB#3
23000A, 22KV, 160KA
3PH, 50Hz.

OB SUB STATION#2
OB SUB STATION#1
CHP AT MINING END
OB SUB STATION#2
OB SUB STATION#1
CHP AT MINING END
(TYP)
40BBT01 40BBT02 50BBT01 50BBT02 60BBT01 60BBT02

1400A IP BUS DUCT(TAP-OFF)


ON LOAD SWITCH UNIT ( DRAW OUT)

1400A IP BUS DUCT(TAP-OFF)


UNIT TRANSF. UNIT TRANSF. UNIT TRANSF. UNIT TRANSF. UNIT TRANSF. UNIT TRANSF.
10BBT01 10BBT02 20BBT01 20BBT02 6.3MVA, 33/11.5 kV
30BBT01 30BBT02 (UT#4A) (UT#4B) (UT#5A) (UT#5B) (UT#6A) (UT#6B)
UNIT TRANSF. (UT#1A) UNIT TRANSF. UNIT TRANSF. UNIT TRANSF. Dyn1, Z=7.15+/-10%
10MKA01 UNIT TRANSF. UNIT TRANSF. 00BBT05 OFTC,+/-5% @ 2.5 40BBY01
40/50 MVA, 22/11.5 KV, ONAN/ONAF, (UT#1B) (UT#2A) 20MKA01 (UT#2B) 00BBT06 40BBY02 50MKA01 60BBY02
Dyn1, Z = 10%(+0%/-10%) (UT#3A) 30MKA01 (UT#3B) 33 kV OH TRANSMISSION 50BBY02
GEN#1 GEN#2 GEN#4 50BBY01 GEN#5 60BBY01 GEN#6
10BBY01 660MW, 22KV TG GEN#3 12.5 MVA, 33/11.5 kV 00BBT02 TG
(TYP) TG ~ 00BBT01 TG 40MKA01 TG 60MKA01 CIRCUIT BREAKER (DRAW OUT)
300A ~ 10BBY02 20BBY01 20BBY02 TG 30BBY02 Dyn1, Z=7.0% (+0 ,-10%) ~ ~ ~
10 SECS. 3PH, 50Hz, P.F=0.85 ~ RES AUX TRANSF. (RAT#1) RES AUX TRANSF. (RAT#2)
(TYP) 30BBY01 00BBA07
22.13 Ohm 33/11.5 kV 33/11.5 kV
(TYP) 40/50 MVA(ONAN/ONAF), Dyn1 11 kV OVERLAND CONV 40/50 MVA(ONAN/ONAF), Dyn1
Z= 9% (+0% & -10%) SWGR(MINING END) Z= 9% (+0% & -10%)
00BBT03 00BBT04
NEUTRAL GROUNDING TRANSF.

10BAY01 00BBA06

3000A SP BUS DUCT

3000A SP BUS DUCT


22/0.24KV, DRAWOUT
1PH, AN 20BAY01 40BAY01 50BAY01 60BAY01
30BAY01 40BBZ01 50BBZ01 60BBZ01
(TYP)
10BBZ01 20BBZ01

3000A SP BUS DUCT


3000A SP BUS DUCT
10BBZ02 20BBZ02 30BBZ01 30BBZ02 40BBZ02 50BBZ02 60BBZ02 GROUNDING RESISTOR

01BBZ03 01BBZ02 02BBZ05 02BBZ06


01BBZ06 01BBZ05 02BBZ02 02BBZ03
M MOTOR

200 kVA, 11/0.433KV


10BBA01 10BBA03 20BBA01 20BBA02 20BBA03 30BBA01 30BBA02 30BBA03 40BBA01 40BBA02 40BBA03 50BBA01 50BBA02 50BBA03 60BBA01 60BBA02 60BBA03

2000A
2000A
2000A
3000A
2000A
2000A
2000A
2000A
2000A
2000A

2000A
2000A
2000A
2000A
2000A
2000A
2000A
2000A
2000A
2000A

3000A
3000A
3000A
3000A

2000A
2000A
2000A
3000A
10BBA02

3000A
2000A

3150A
3000A
3000A
3000A
2000A

3150A
11kV, 2000A UNIT SWGR#1UA 11kV, 2000A 11kV, 2000A 11kV, 3000A 11kV, 2000A 11kV, 2000A 11kV, 3000A 00BBZ01 11kV, 2000A 11kV, 2000A 11kV, 3000A 11kV, 2000A 11kV, 2000A 11kV, 3000A 11kV, 2000A 11kV, 2000A 11kV, 3000A
11kV, 2000A UNIT SWGR#1UB 11kV, 3000A UNIT SWGR#1UC UNIT SWGR#2UA UNIT SWGR#2UB UNIT SWGR#2UC UNIT SWGR#3UA UNIT SWGR#3UB UNIT SWGR#3UC 00BBZ02 LINK

2000A
UNIT SWGR#4UA UNIT SWGR#4UB UNIT SWGR#4UC UNIT SWGR#5UA UNIT SWGR#5UB UNIT SWGR#5UC UNIT SWGR#6UA UNIT SWGR#6UB UNIT SWGR#6UC

11 kV
00BFA09

2500A
2500A
BATTERY CHARGER

1250A
2500A
2500A
2500A

01BBZ09

1250A
1250A
1250A

1250A
1250A
1250A
1250A
1250A

1250A
1250A

1250A
1250A
1250A

1250A
1250A
2500A

1250A
2000A
1250A
1250A

2000A
1250A

1250A
01BBZ07 01BBZ10 2000A SP BUS DUCT 2000A SP BUS DUCT
2000A SP BUS DUCT

010BBZ08
2000A SP BUS DUCT
2000A SP BUS DUCT 2000A SP BUS DUCT BATTERY

2000A SP BUS DUCT


SPARE GT
2000A SP BUS DUCT

FOR DETAILS FOR DETAILS FOR DETAILS


SEE TABLE-1 SEE TABLE-1 SEE TABLE-1

2500A
2500A

2500A
2500A
2500A

FROM 11kV STATION SWGR 1SA


2500A
2500A

FROM 11kV STATION SWGR 6SA


2500A
2500A

01BBA01 01BBA02 01BBA03

2500A
02BBA01 02BBA02 02BBA03 LT (415V) FUSE
11kV, 2500A STN SWGR#1SA 11kV, 2500A STN SWGR#2SA 2500A 00BBZ03 11kV, 2500A STN SWGR#4SA 2500A 11kV, 2500A STN SWGR#6SA
11kV, 2500A STN SWGR#3SA 11kV, 2500A STN SWGR#5SA

SPARE TRAFO FEEDER


SPARE TRAFO FEEDER
SPARE TRAFO FEEDER
FROM 11kV STATION FROM 11kV STATION

SPARE MOTOR FEEDER

SPARE MOTOR FEEDER


SPARE MOTOR FEEDER
3150A
3150A
3150A
3150A
3150A
3150A
3150A

3150A

1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
00BBA01 00BBA04 SWGR 5SA

1250A
1250A
00BBA02 00BBA03
1250A
1250A

SWGR 6SA
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A

1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A

1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A

1250A

1250A
1250A
11kV, 3000A, 11kV, 3000A, 11kV, 3000A, 11kV, 3000A, 00BBA05

TO 11/.433 UNIT TRANSFORMER


TO 11/.433 UNIT TRANSFORMER
FROM 11kV STATION FROM 11kV STATION

TO 11/.433 ESP TRANSFORMER


TO 11/.433 ESP TRANSFORMER
RES SWGR#0RA RES SWGR#0RB RES SWGR#0RC RES SWGR#0RD 11KV, 1250A OLC PLANT END SWGR FROM 11kV STATION SWGR 4SA
FROM 11kV STATION SWGR 3SA SWGR 1SA SWGR 2SA
8.0 MVA,ONAN
11/3.45KV

TO 11/.433 STANDBY ESP TRANSFORMER

TO 11/.433 STANDBY CT TRANSFORMER


15 MVA,ONAN

3150A
3150A
3150A
3150A
02BCT06

1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
1250A
02BCT05

1250A
1250A

1250A
1250A
11/3.45KV 8.0 MVA,ONAN 02BBZ04
10BCT01 10BCT02 11/3.45KV 01BBZ01 01BBZ04 02BBZ01
8MVA,ONAN
11/3.45KV

8 MVA,ONAN 02BCT01 02BCT02


8 MVA,ONAN
11/3.45KV

10BCY01 01BCT05 01BCT06


01BCT01 11/3.45KV
R 300A R 10BCY02 01BCT02 02BCY05

SPARE LINE FEEDER


10 SECS.
SPARE LINE FEEDER
SPARE LINE FEEDER

SPARE TRAFO FEEDER


SPARE TRAFO FEEDER

SPARE TRAFO FEEDER


SPARE TRAFO FEEDER

SPARE LINE FEEDER


SPARE TRAFO FEEDER
6.64 Ohm 02BCY01
SPARE TRAFO FEEDER

02BCY06

(TYP) 01BCY05 01BCY06 FOR DETAILS


TO 11/.433 CWPH TRAFO

01BCY01 SEE TABLE-5

TO FUEL OIL TRANSFORMER

3000A SPBD
TO 11/3.45 AHP AUX TRAFO
02BCY02
TO 11/3.45 AHP AUX TRAFO

TO 11/3.45 AHP AUX TRAFO

TO 11/3.45 AHP AUX TRAFO


10BCZ02 02BCZ01
TO FUEL OIL TRANSFORMER

SPARE
02BCZ02

TO ASH SILO TRANSFORMER


10BCZ01 01BCZ01 01BCZ02
TO ASH SILO TRANSFORMER

TO WORKSHOP TRANSFORMER

01BCY02
T0 11/3.45 WATER SYS TRAFO
TO WORKSHOP TRANSFORMER

TO 11 kV OLC PLANT END SWGR

T0 11 kV OLC PLANT END SWGR


01BCA01 02BCA01
10BCA01 01BCA02 02BCA02

3150A
3.3KV, 1600A

TO 11/3.45 STATION TRANSFORMER


TO 11/3.45 STATION TRANSFORMER

3150A 3000A SPBD


2000A 2000A SPBD
2000A 2000A SPBD

2000A 2000A SPBD


2000A 2000A SPBD
2000A

3.3KV, 1600A

2000A
2000A
TO 11/.433 STATION TRANSFORMER
2000A

TO 11/.433 STATION TRANSFORMER


TO 11/.433 STATION TRANSFORMER
TO ADMIN BUILDING TRANSFORMER
TO 11/.433 STATION TRANSFORMER
TO 11/.433 STATION TRANSFORMER

TO ADMIN BUILDING TRANSFORMER


3.3KV, 3000A UNIT SWGR#1UAA STATION SWGR#1 3.3KV, 2000A AHP SWGR#1 FROM 11kV STATION SWGR 3SA FROM 11kV STATION SWGR 4SA 3.3KV, 2000A AHP SWGR#2 STATION SWGR#2
TO 11/3.45 WATER SYS TRANSFORMER

ROAD ILLUMINATION
2000A

SPARE TRAFO FEEDER


3150A 2000A

2 NOS TRANSFORMER
2 NOS TRANSFORMER

FEEDERS FOR LONG


BELT CONVEYOR DRIVE
FEEDERS FOR LONG
BELT CONVEYOR DRIVE

TO STACKER RECLAIMER #2
3.3 kV TO STACKER RECLAIMER #2
8.0 MVA,ONAN

PLANT ILLUMINATION FEEDER


PLANT ILLUMINATION FEEDER

1250A
1250A

1250A
1250A
1250A

1250A
1250A
1250A
11/3.45KV

OLC AUX TRANSFORMER FEEDER


5 MVA,ONAN
11/3.45KV

OLC AUX TRANSFORMER FEEDER

01BCT04
5 MVA,ONAN
11/3.45KV

01BCT03 00BCT01 00BCT02 FROM 3.3kV WATER SYSTEM SWGR FROM 3.3kV WATER SYSTEM SWGR 02BCT03 02BCT04

5 MVA,ONAN
11/3.45KV
5 MVA,ONAN
11/3.45KV
FOR DETAILS 01BCY03 01BCY04 00BCY01 00BCY02 02BCY03 02BCY04
SEE TABLE-2 FOR DETAILS
SPARE MOTOR FEEDER SPARE MOTOR FEEDER SPARE FOR DETAILS SPARE SPARE FOR DETAILS SPARE SPARE SEE TABLE-5 SPARE SPARE SPARE
SEE TABLE-4 SEE TABLE-5 FOR DETAILS
FROM 11kV UNIT SWGR 1UC 00BCZ01 SEE TABLE-4 02BCZ04
01BCZ03 01BCZ04 01BCA04 00BCZ02 02BCZ03
02BCA04

OIL FILLED, ONAN


10BFT11 01BCA03 00BCA01

1250A
10BFT12 02BCA03
1250A

1250A
1250A
1250A
1250A

10BFT10 3.3KV, 1600A


00BCA02

OIL FILLED, ONAN


OIL FILLED, ONAN
OIL FILLED, ONAN

OIL FILLED, ONAN OIL FILLED, ONAN 3.3KV, 1600A CHP SWGR#1 01BFT06 WATER SYSTEM SWGR 3.3 kV AWR SWGR 3.3KV, 1600A CHP SWGR#2
01BFT05 02BFT05 02BFT06
2000A 1250A 2000A 1250A 2000A
10BFZ12
10BFZ10 2500A NSPBD 10BFZ11

2500A NSPBD
2500A NSPBD
3000A NSPBD
3000A NSPBD

3000A NSPBD
3000A NSPBD

SPARE
FOR DETAILS

2500A
2500A
2500A
2500A
SEE TABLE-5
SPARE SPARE SPARE SPARE FOR DETAILS
00BFT16 SPARE FOR DETAILS SPARE SPARE SPARE
FOR DETAILS 00BFT11 SPARE
FOR DETAILS SEE TABLE-5 00BFT12 00BFT15 200 kVA, 3.3/0.433KV SEE TABLE-5 FOR DETAILS
SEE TABLE-5 00BFT09 1.6MVA, 11/0.433KV
415V, 2500A CT PMCC#1A 415V, 2500A CT PMCC#1B SEE TABLE-3 OIL FILLED, ONAN 00BFT10 SEE TABLE-3
10BFA09 02BFZ03 02BFZ04

OIL FILLED, ONAN


OIL FILLED, ONAN

OIL FILLED, ONAN


OIL FILLED, ONAN

10BFA08 00BFZ11 NOTES:-

TO 3.3 kV AWR SWGR


00BFZ12

TO 3.3 kV AWR SWGR


SPARE TRFO FEEDER
01BFT01 01BFT02 01BFZ03 01BFZ04 02BFT01 02BFT02
FROM 11kV UNIT SWGR 1UB FROM 11kV UNIT SWGR 1UC FROM 11kV UNIT SWGR 1UC FROM 11kV UNIT SWGR 1UC 00BFZ09
OIL FILLED, ONAN 00BFZ15 00BFZ16 00BFZ10
01BFZ07 01BFZ08 02BFZ07 02BFZ08
1. RATING AND QUANTITY OF EQUIPMENT AND THEIR
2500A NSPBD
2500A NSPBD

CONNECTION SHOWN IN THIS DRAWING ARE INDICATIVE.

3200A
3200A
3200A
3200A

00BFA07

2500A

1600A
1600A

1600A
01BFA02
1600A

OIL FILLED, ONAN

1600A NSPBD
01BFA01 00BFA01

1600A NSPBD
00BFA08 THE SLD SCHEME/RATING WILL GET REVISED ON
1600A NSPBD

02BFA02 02BFA01
1600A NSPBD

415V ASH WATER

2500A
25000A
2500A

10BFT01 OIL FILLED, ONAN 10BFT02 10BFT05 10BFT03 10BFT04 415V, 1600A CHP PMCC#1 415V, 2500A FIRE WATER PMCC RECOVERY PMCC COAL SILO PMCC 415V, 1000A CHP PMCC#2
OIL FILLED, ONAN
FINALIZATION OF LOAD DATA.
1600A 3200A 2500A 2500A 3200A 1250A
CHP CHP AWR AWR
CHP CHP 2. SYSTEM PARAMETERS AND VARITIONS ARE AS UNDER :
BATTERY BATTERY BATTERY BATTERY BATTERY BATTERY
3000A NSPBD CHARGER#1A CHARGER#1B CHARGER#A CHARGER#B

1250A
1250A

CHARGER#1A CHARGER#1B a. 765KV (800KV TO 728KV), 3PH, 3 WIRE, 50 HZ,


10BFZ01 10BFZ02 10BFZ05 01BTL01 100% (FLOAT 100% (FLOAT
01BTL02 100% (FLOAT
100% (FLOAT

10BFZ03
10BFZ04
CUM BOOST CUM BOOST 00BTL03 02BTL01 CUM BOOST CUM BOOST 02BTL02
00BTL04

3000A NSPBD
3000A NSPBD

3000A NSPBD
3000A NSPBD

3000A NSPBD
CHARGER) CHARGER) CHARGER) CHARGER)
00BFT03 OIL FILLED, ONAN
00BFT04
01BHA05 FROM 11kV OLC PLANT END SWGR

4000A
4000A
4000A
3200A

4000A
4000A
4000A
4000A
44KA FOR 1 SEC. NON EFFIECTIVELY EARTHED.

4000A
4000A
00BFZ03 00BFZ04
00BFT17 02BHA05 40KA/26.2kA FOR 1 SEC. NON EFFIECTIVELY EARTHED.
00BFT18

3000A NSPBD

3000A NSPBD
220V CHP AREA DCDB#1 220V CHP AREA DCDB#2
10BFA03 10BFA04 10BFA05 10BFA07 01BUA01 00BFA02 00BUA01 DRY TYPE, AN 02BUA01
10BFA06

32000A

32000A

T0 CHP COMMON PMCC


T0 CHP COMMON PMCC

415 V, 3200A DM PMCC


50KA FOR 1 SEC. EFFIECTIVELY EARTHED.
01BHA06 3200A 02BHA06 e. 220 V DC (+10% TO -15%), 2 WIRE 25KA.
FROM 11kV STATION SWGR 1SA FROM 11kV STATION SWGR 6SA
UNEARTHED.
FROM 11kV STATION SWGR 2SA FROM 11kV STATION SWGR 3SA 00BFA10 f. MAIN PLANT EMERGENCY SYSTEM WILL BE 3 WIRE,
800A
800A

FROM 11kV UNIT SWGR 1UB FROM 11kV UNIT SWGR 1UA OLC PLANT END PMCC FROM 11kV STATION SWGR 5SA FROM 11kV STATION SWGR 5SA
STN SR TRAFO
STN SR TRAFO #1A #1B UNGROUNDED TYPE AND DG NEUTRAL WILL BE
00BHA01 STN SR TRAFO#2A STN SR TRAFO#2B
10BHA08 01BFT07 800A
10BFT06 10BFT07 10BFT08 10BFT09 02BFT07 02BFT08 GROUNDED THROUGH PT.
01BFT08 00BFT01 OIL FILLED, ONAN 00BFT02
DRY TYPE, AN OIL FILLED, ONAN
UNIT SR TRAFO #1B UNIT SR TRAFO #1D UNIT SR TRAFO#1A UNIT SR TRAFO #1C
DRY TYPE, AN 3. SWITCHGEAR/PMC/MCC/ACDB WITH TWO
02BFT03 02BFT04
DRY TYPE, AN WATER SYSTEM FROM 415V STATION PMCC-1A FROM 415V STATION PMCC-2A
WATER SYSTEM INCOMERS AND ONE BUS-COUPLER
BATTERY BATTERY
CHARGER#A CHARGER#B 00BFZ01 00BFZ02

4000A NSPBD
10BFZ06 10BFZ07 10BFZ08 DRY TYPE, AN 10BFZ09 01BFZ01 02BFZ01

4000A NSPBD
01BFZ02 02BFZ02 WILL BE PROVIDED WITH 2-OUT-OF-3 INTERLOCK.
4000A NSPBD
4000A NSPBD

00BTL02

4000A NSPBD
00BTL01
3000A NSPBD
3000A NSPBD

4000A NSPBD

4000A NSPBD
4000A NSPBD
4. SWITCH DISCONNECTOR FUSE/ISOLATOR WILL BE PROVIDED AT
415V FEEDER FOR RATING UPTO & INCLUDING 500A.
3200A
3200A
4000A
4000A

4000A
01BFA03

4000A
00BHA06 02BFA03 02BFA04
1000A

1000A

00BFA06
415V, 4000A STATION PMCC-1A 415V, 1600A SERVICE BUILDING MCC 415V, 4000A STATION PMCC-2A 415V, 1000A CWPH PMCC#2 FEEDER RATING OF 630A SHALL HAVE ACB.

4000A 4000A 1000A 5. ONE DEISEL GENERATOR PROVIDED PER UNIT IS CONNECTED TO
10BFA02 10BFA01 00BUA02 THE RESPECTIVE UNIT EMERGENCY BOARD. ONE STANDBY DG
OIL FILLED, ONAN FROM 11kV STATION SWGR 1SA FROM 11kV STATION SWGR 4SA
SET IS PROVIDED BETWEEN THE THREE UNITS (PER BLOCK) TO
01BFT03 01BFT04 CATER FOR EMERGENCY REQUIREMENT OF ONE UNIT AT A
00BFT13 OIL FILLED, ONAN 00BFT14 TIME(PER BLOCK)
00BHA02 FROM 415V CHP PMCC#1 FROM 415V CHP PMCC#2 6. POWER DISTRIBUTION ARRANGEMENT FOR THE UNIT SYSTEM
00BFZ13 00BFZ14
IS SHOWN FOR UNIT#1 ONLY. SIMILAR ARRANGEMENT WILL
ALSO BE FOLLOWED FOR UNIT#2, 3, 4, 5 & 6.

1000A
01BFA04
1600A

1000A
1600A

415V, 1000A CWPH PMCC#1 7. CHANGEOVER FACILITY :


1600A NSPBD

1600A NSPBD

00BFA05

TO POWERHOUSE ACDB#1
TO POWERHOUSE ACDB#1
TO POWERHOUSE ACDB#4
TO POWERHOUSE ACDB#4

TO POWERHOUSE ACDB#3
TO POWERHOUSE ACDB#2
TO POWERHOUSE ACDB#2
TO POWERHOUSE ACDB#3
TO POWERHOUSE ACDB#6
TO POWERHOUSE ACDB#5
TO POWERHOUSE ACDB#5
TO POWERHOUSE ACDB#6

1000A 00BHA07 CW CHLORINATION MCC#2


TO SERVICE BUILDING MCC

TO SERVICE BUILDING MCC


415V, 1600A ADM BLDG PMCC 415V, 1250A CHP COMMON MCC A. 11 kV UNIT BUSES WILL HAVE MANUAL LIVE CHANGEOVER WITH
10BHA01 02BHA03
CPU REGEN MCC#UNIT-1 CPU REGEN MCC#UNIT-6 CHECK SYNCHRONISING AS WELL AS MANUAL DEAD BUS CLOSE
1600A
01BHA04 FROM 11kV STATION SWGR 3SA FROM 11kV STATION SWGR 6SA 02BHA04
FROM 11kV STATION SWGR 2SA NO FAST TRANSFER IS ENVISAGED IN THIS SCHEME.
FROM 11kV STATION SWGR 5SA B. 11 kV RAT BUSES WILL HAVE MANUAL DEAD BUS CHANGEOVER.
FROM 11kV STATION SWGR 3SA FROM 11kV STATION SWGR 4SA
C. 11 KV /3.3 kV SWGR WITH 2 INCOMER & 1 BUSCOUPLER WILL
10BHA05 01BFT10 00XKA01 02BFT09
01XKA01 01BFT09 00BFT05 2.0 MVA, 11/0.433KV 02BFT10 02XKA01 HAVE MANUAL LIVE CHANGEOVER WITH CHECK SYNCHRONISING
STN SERVICE TRAFO 00BFT06 00BFT07 OIL FILLED, ONAN DIESEL GEN. FOR CCR STN SR TRAFO #2C
DRY TYPE, AN
STN SERVICE TRAFO 00BFT08 STN SR TRAFO#2D
#1D OIL FILLED, ONAN 415V, 3 PH, 3 W, 50HZ.250 kVA AS WELL AS MANUAL DEAD BUS CLOSE. BUS-COUPLER WILL HAVE
#1C
10XKA01 10BHA06 CW CHLORINATION MCC#1 DRY TYPE, AN AUTO CHANGEOVER ON DEAD BUS.
01BHA03

3000A NSPBD
3000A NSPBD
3000A NSPBD
3000A NSPBD

01BFZ06 D. 415V SWITCHGEAR WITH 2 INCOMER & 1 BUSCOUPLER WILL


1600A NSPBD

02BFZ05
1600A NSPBD

10BHA02 00BFZ05 00BFZ06


00BFZ08
3000A NSPBD
3000A NSPBD

00BFZ07
01BFZ05 02BFZ06 HAVE MANUAL LIVE CHANGEOVER WITH CHECK SYNCHRONISING
AS WELL AS MANUAL DEAD BUS CLOSE. BUS-COUPLER WILL HAVE
10BHA03 00BFA03 00BFA04
1600A

3200A
3200A

AUTO CHANGEOVER ON DEAD BUS. ESP PMCC IS PROVIDED WITH


1600A

01BFA05
3200A
3200A

02BFA05
3200A
3200A

415V, 3200A
415V STATION PMCC-1B 415V, 1600A WORKSHOP PMCC FUEL OIL PMCC 415V STATION PMCC-2B BUS CHANGEOVER ONLY.
10BHA04 01BFA06 3200A 02BFA06 E. 415 V EMERGENCY BOARDS ARE NORMALLY FED FROM
3200A 1600A 3200A
10BHA07 RESPECTIVE UNIT PMCCs. iN THE EVENT OF FAILURE OF NORMAL
POWER SUPPLY MAIN AND STANDBY DG WILL AUTOSTART
SIMULTANEOUSLY. UPON ATTAINING NORMAL VOLTAGE AND
00BJA01
00BHA05 02BHA02 FREQUENCY, MAIN DG INCOMERS WILL BE CLOSED ON AUTO TO
CANTEEN ACDB STORE MCC AC MCC#2
01BHA02 THE EMERGENCY BOARD.
AC MCC#1
00BHA03
ETP MCC
CPU REGEN MCC# UNIT-2,3 00BHA04 CPU REGEN MCC# UNIT-4,5
TO CCR MCC#1

STP MCC
TO CCR MCC#2

01BHA07 02BHA07
10BMA01
FROM DG FOR CCR FROM DG FOR CCR

FROM 415V STATION PMCC-1A

BLOCK#1 CCR MCC#1 00BUA01 COMMON SYSTEM CCR MCC#2 BLOCK#2


10BJA01
TURBINE VALVE ACDB POWER DISTRIBUTION 01BHA01 POWER DISTRIBUTION 02BHA01 POWER DISTRIBUTION

10BJA02
10BJA03 BOILER VALVE ACDB
POWERHOUSE ACDB#1

TABLE-5 : 3.3 kV DRIVES


KEY SINGLE LINE DIAGRAM
10BLA01 SWGR RATING (kW) FOR IN-PLANT POWER DISTRIBUTION SYSTEM
DRIVE AHP-1 AHP-2 SLURRY-1 SLURRY-2 AWR WATER SYS

RW PUMP 350 - - - - - 2(W)+1(S)

10BTL01 10BTL02 355 6(W)+3(S) 6(W)+3(S) - - -


TRANSPORT COMP -

ASH SLURRY PUMP 250 - - 6(W)+6(S) 6(W)+6(S) - -

RECOVERY WATER PUMP 220 - - - - 2(W)+1(S)

CW MAKE-UP PUMP 415 - - - - - 2(W)+1(S)


10BTA01 10BUA01 10BTA02
TABLE-4 : 3.3 kV DRIVES BOOSTER PUMP FOR ASH -
150 - - - - 1(W)+1(S)
HANDLING
SWGR STN. STN.
UNIT SYSTEM #1 DRIVE RATING (kW) SWGR.-1 SWGR.-2 BAHP WATER PUMP 250 3(W)+1(S) 3(W)+1(S) - - - -
POWER DISTRIBUTION 450 2(W) -
TABLE-2 : 3.3 kV DRIVES CONVEYOR -6A/6B
MINING WATER PUMP 250 - - - - - 1(W)+1(S)
SWGR RATING (kW) CONVEYOR -7A/7B 250 2(W) -
DRIVE 1UAA 2UAA 3UAA 4UAA 5UAA 6UAA TABLE-3 : CHP/OLC DRIVES FIRE SPRAY PUMP - - - -
210 - 1(W)
SWGR CONVEYOR -9A/9B 2(W) -
FD FAN 1850 2(W) 2(W) 2(W) 2(W) 2(W) 2(W) RATING (kW) 3.3 kV CHP-1 3.3 kV CHP-2 11kV OLC 250
DRIVE
TABLE-1 : 11 kV DRIVES ( MOTOR RATING > 2000 KW ) -
ACW BOOSTER PUMP 230 1(W)+1(S) 1(W)+1(S) 1(W)+1(S) 1(W)+1(S) 1(W)+1(S) 1(W)+1(S) CONVEYOR -4AA/BA 450 2(W) - - CONVEYOR -11A/11B 250 2(W)
SWGR
DEVELOPMENT CONSULTANTS PRIVATE LIMITED
CEP 1250 2(W)+1(S) 2(W)+1(S) 2(W)+1(S) 2(W)+1(S) 2(W)+1(S) 2(W)+1(S) CONVEYOR -4AB/BB 450 2(W) - - CONVEYOR -16A/16B 450 - 2(W)
DRIVE RATING (kW) 1UA 1UB 1UC 2UA 2UB 2UC 3UA 3UB 3UC 4UA 4UB 4UC 5UA 5UB 5UC 6UA 6UB 6UC
400 2(W) 2(W) 2(W) 2(W) 2(W) 2(W) 450 - 2(W) - CONVEYOR -17A/17B 250 - 2(W)
MDBFP 18000 - - 1(S) - - 1(S) - - 1(S) - - 1(S) - - 1(S) - - 1(S) DMCW-TG & SG CONVEYOR -14AA/BA

ID FAN 4950 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - MILLS 950 6(W)+1(S) 6(W)+1(S) 6(W)+1(S) 6(W)+1(S) 6(W)+1(S) 6(W)+1(S) CONVEYOR -14AB/BB 450 - 2(W) - CONVEYOR -19A/19B 250 - 2(W)

CW PUMP 3600 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - BOILR CIRC 800 1(S) 1(S) 1(S) 1(S) 1(S) 1(S) CONVEYOR 1C/1D 550 - - 2(W) CONVEYOR -21A/21B 250 - 2(W)

3300 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 1(W) 1(W) - 630 2(W) 2(W) 2(W) 2(W) 2(W) 2(W) 550 SA/IA COMP 770 3(W)+1(S) 2(W)+1(S)
PA FAN BOOSTER TDBFP CONVEYOR 1F/1E - - 2(W)