Bill No. 1 Preliminaries: Pages 1.1 - 1.7
Bill No. 1 Preliminaries: Pages 1.1 - 1.7
1
PRELIMINARIES
GENERAL MATTERS
2.3 Furnishing the Engineer's Site Office including all furniture and basic
office equipment
2.4 Plant
Provide for all plant necessary for the proper execution of the works
comprising:-
Provide for all necessary watching and lighting and take general
security measures to safeguard the works, materials and plant,
including sub-contractor's property, against damage and theft.
Provide all necessary measures for the safety of the public for the
duration of the contract.
Provide for maintaining all public and private roads and footpaths
adjacent to or upon the site. The contractor shall be held responsible
for making good at his own expense any damage thereto including that
caused by sub-contractors or the transport of suppliers and shall pay all
costs and charges in connection therewith.
CARRIED TO COLLECTION
1.1
Item Description
The contractor shall within twenty-eight days from the date for
possession of the site, submit to the Engineer for his approval and
information and in a form approved by him, three copies of a
programme in which is set forth the sequence of all operations and the
time limits which the contractor proposes that each operation shall be
commenced and completed. The agreed programme may be varied
with the consent of the Engineer but the responsibility for completion
within the time stated shall remain with the contractor
The contractor shall confine all goods, materials and plant, within the
boundaries of the site and only in positions approved by the Engineer
Personnel
2.9 Expatriate personnel recruited for the project shall be subject to the
current Laws of Malawi. Bidders attention drawn to the Customs
Regulation relating to first entry previleges.
The contractor shall allow in his bid for the time and costs involved in
carrying out the above procedures and making the necessary
applications.
CARRIED TO COLLECTION
1.3
Item Description
Temporary Roads
2.9 Provide and maintain all necessary temporary roads, gangways tracks,
hardstandings, crossings and the like required for the proper execution
of the works.
Temporary Screens
2.10 Provide, erect and maintain such temporary screens and the like as
may be specifically required.
2.11 The contractor shall provide, erect and maintain all necessary
temporary fencing, hoardings fans with a minimum height of 5 meters,
planked footways, guard rails, gantries and the like for the proper
execution of the works and for the protection of the general public and
the occupants of adjacent premises and for meeting to requirements of
any relevant national or local regulations. The contractor shall allow for
altering, shifting and adapting any item of the foregoing as and when it
may be necessary and also for providing suitable to ensure its
effectiveness at all times during the execution of the works.
General Scaffolding
2.12 Provide and erect all scaffolding including all stages trestles, planks,
guard rails, barrow runs and the like required for the execution of the
works and maintain, alter and adapt as necessary and remove when no
longer required.
The contractor shall provide clean, fresh water, free from chemical or
organic impurities or other deleterious matter, for use on the works, pay
all charges in connection therewith, provide all temporary storage,
plumbing services, connections and the like and clear away and make
good upon completion of the works. Bidders should ascertain for
themselves that the site has adequate water services to enable the
construction of and allow for any additional costs that might be incurred.
General
2.15 Works which are required to be carried out by a local authority or public
undertaking are dealt with separately
2.16 The contractor shall provide, erect and maintain all necessary
temporary casing, masking and screening to partly finished work
engaged by the Employer and shall also provide all necessary
temporary roofs, tarpaulins, screens, planking and general protection
necessary to protect the works from damage by frost and inclement
weather and provide all temporary gutters, pipes, surface water drains
and the like for conveyance of rainwater and clear away when no longer
required
2.17 The contractor shall be responsible for the adequate drying out of the
works and for maintaining them at a suitable temperature and humidity
until handed over.
2.18 Clean the works internally and externally upon completion to the
satisfaction of the Engineer
CARRIED TO COLLECTION
1.5
Item Description
Demobilisation
COLLECTION
PAGE 1.1
PAGE 1.2
PAGE 1.3
PAGE 1.4
PAGE 1.5
PAGE 1.6
TOTAL PRELIMINARIES AND GENERAL ITEMS CARRIED TO
GRAND SUMMARY
1.7
Amount (MK)
-
Amount (MK)
-
Amount (MK)
-
Amount (MK)
-
Amount (MK)
-
Amount (MK)
500,000.00
1,000,000.00
1,500,000.00
Amount (MK)
1,500,000.00
1,500,000.00
TB ISOLATION WARD
GENERAL
Allow for supplying and erecting all additional necessary shoring, needling,
strutting, etc that may be required to ensure stability of the buildings with suitable
and substantial timber and other necessary materials and taking down and
A removing when directed Item
Temporary Screens
Allow for supplying and erecting any additional temporary tarpaulins, dust or
weatherproof screens and barriers that may be necessary throughout the progress
B of the works, and taking down and removing when directed. Item
Allow for watering the works from time to time as necessary to prevent any
C nuisance from dust Item
Measuring Note
Generally all items to be removed are fixed to brickwork/concrete and rates shall
include for making good to surrounding finishes whether specifically mentioned or
not.
CARRIED TO COLLECTION K
3.1
DEMOLITIONS
Collection 117,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
Page -
3.1 -
3.2 117,000.00
3.2
Refer SMM paragraph F19(a). It has been been assumed that strip footings,
bases, beds and the like within the ground will be poured against natural ground. If
formwork is required to such surfaces, the contractor must include for the same in
his excavations/concrete rates
EXCAVATIONS
A Excavate trench from reduced level for strip footing 0 to 1500mm deep. M3 176 1,000.00 175,500.00
-
B Pit from reduced level for isolated piers, not exceeding 1500mm deep M3 1 1,500.00 1,500.00
-
C Selected earth filling, deposited, spread and compacted 150mm layers around
foundations M3 93 2,500.00 231,500.00
-
Rock excavation -
-
D Extra over all types of excavation for excavating in rock
M3 9 15,000.00 135,000.00
Disposal -
-
E Surplus excuvated material from excavations, transported a distance average 100
linear metres from excavations, deposit, spread and level as directed M3 84 2,500.00 209,750.00
-
Hardcore filling to pass a 50mm ring all ways -
-
F 150mm thick (consolidated) filling well compacted and rolled M2 213 1,000.00 213,000.00
-
Sand blinding -
-
G 50mm Bed of sand on hardcore, rolled to receive damp proof membrane M2 213 1,000.00 213,000.00
-
Damp proof membrane -
-
H 125 microns(500 gauge) Polythene damp proof membrane with welted joints,
lapped 150mm at all joints and laid on blinded hardcore M2 213 700.00 149,100.00
-
Ant treatment -
-
I Saturate surface of hardcore and top of brick walls with approved ant repellant M2 330 1,000.00 330,000.00
-
generally -
TB-ISOLATION WARD
TB ISOLATION WARD
SUNDRIES
CONCRETE WORK
TB-ISOLATION WARD
TB ISOLATION WARD
PLASTERWORK
PAINTWORK -
-
Prepare and apply two coats of black bituminous paint on: -
-
D Rendered walls M2 116 4,500.00 519,750.00
-
E Ditto for 200 x 400mm piers M 3 4,500.00 13,500.00
-
F Ditto for 400 x 400mm columns M 4 1,800.00 7,200.00
-
CARRIED TO COLLECTION
780,650.00
COLLECTION Page
No
3.3 2,148,350.00
3.4 18,300,500.00
3.5 780,650.00
TB-ISOLATION WARD
TB ISOLATION WARD
"CHROMADEK" CLADDING
A 0.55mm (26 gauge) "Chromadek" IBR profile prefinished steel cladding, laid with
one flute side laps and 300mm minimum end laps, fixed to timber purlins with and
including 75mm long drive screws (purlins generally at 1050mm centres) and side
laps with 6 x 25mm sheet bolts at 600mm centres. All fixings to be complete with
bitumen and flat galvanised steel washers. M2 271 25,000.00 6,775,000.00
-
Flashing shall be 0.55mm (26 Gauge) "Chromadek" steel sheet, bent to required
shape, fixed as required and shall include all labours, nails, clips, welges and laps
and joints in the running length -
-
B Ridge flashing, 450mm girth, once bent, dressed to ribs of roofing and fixed to
timber M 58 4,500.00 261,000.00
-
C Hip flashing ditto M 22 4,500.00 99,000.00
-
D Serrated ridge closer piece, fixed to timber M 116 4,500.00 522,000.00
-
E Valley gutter, 450mm girth once bent and fixed to timber M 23 4,500.00 103,500.00
-
CARPENTRY -
-
Framing -
-
Treated sawn softwood -
-
F 150 x 50mm rafter M 242 2,000.00 484,000.00
-
G 150 x 50mm tie beam M 184 2,000.00 368,000.00
-
H 75 x 50mm purlins M 297 2,000.00 594,000.00
-
I 100 x 75mm wall plate M 73 2,000.00 146,000.00
-
J 100 x 50mm struts M 295 2,000.00 590,000.00
Metal work -
-
K 1200 x 50 x 1.63mm (16 gauge) galvanised hoop No 32 20,000.00 640,000.00
iron wall plate anchor one end split, bent and built into -
brickwork, twice holed and spiked to rafters. -
-
-
TB-ISOLATION WARD
TB ISOLATION WARD
COLLECTION Page
No
3.6 10,582,500.00
3.7 2,342,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
CONCRETE WORK
EXTERNAL WALLS
-
Precast hollow cement and sand blocks in -
cement mortar (1:4 filled solid with concrete -
(Grade 15/40) -
-
E 200 mm Thick walls M2 291 25,000.00 7,280,000.00
-
Ditto 200 x 400 attached piers M 12 10,000.00
INTERNAL WALLS -
-
Precast hollow cement and sand blocks in -
cement mortar (1:4 filled solid with concrete -
(Grade 15/40) -
-
I 200 mm Thick walls M2 333 25,000.00 8,320,000.00
-
-
-
-
-
-
-
-
-
TB-ISOLATION WARD
TB ISOLATION WARD
WINDOW CILL
A
1200 x 250 x 65mm thick block tiled window cill, splay rebated once grooved and
exposed chamfered, finished fair on all exposed surfaces and built into blockwork No. 23 35,000.00 805,000.00
-
B
600 x 250 x 65mm thick block tiled window cill, splay rebated once grooved and
exposed chamfered, finished fair on all exposed surfaces and built into blockwork No. 4 20,000.00 80,000.00
-
Doors -
-
Hardwood Doors -
-
Supply and fix hardwood doors, finished with clear vanish -
-
C Size 1800 x 2100mm high Glazed hard wood double door. No 1 100,000.00 100,000.00
-
D Size 1468mm x 2100mm high glazed hardwood double door No 2 100,000.00 200,000.00
-
E Size 1000mm x 2100mm high hardwood moulded door with 600 x 1566 side
window No 2 100,000.00 200,000.00
Flush pannel doors shall be 45mm finished thickness, faced both sides with
internal quality plywood finish lipping on sides -
-
F 1000 x 2100mm High Solid core flush panel door No 4 80,000.00 320,000.00
-
G 900 x 2100mm High semi Solid core flush panel door No 10 80,000.00 800,000.00
-
-
-
-
-
-
-
-
-
TB-ISOLATION WARD
TB ISOLATION WARD
Window Frames
I White pvc curtain rod bar and accessories or equal and approved M 27 1,500.00 40,500.00
COLLECTION Page
No
3.9 3,227,000.00
3.10 3,015,500.00
TB-ISOLATION WARD
TB ISOLATION WARD
Supply and fix the following ironmongery: Locks and furniture where applicable are
to be equal to those manufactured by "ASSA Abloy" and approved by the Architect
Doors
TB-ISOLATION WARD
TB ISOLATION WARD
INTERNAL
Plasterwork
15mm Rendering (1:4) cement and sand, finished with a final coat of lime putty,
steel trowelled
Prepare and apply two coats of styrene acrylic emulsion clear sealer -
-
F rendered walls M2 291 4,500.00 1,310,400.00
-
-
TB-ISOLATION WARD
TB ISOLATION WARD
SCREED
300 x 300 x 6mm non-slip porcelain tiles, adhesive fixed and pointed with grout to 20,000.00
D rendered walls subject to architect's samples approval M2 27 540,000.00
-
E 10 x 100mm high porcelain tile skirting M 14 4,000.00 56,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TB-ISOLATION WARD
TB ISOLATION WARD
INTERNAL
CARPENTRY
Framing
TB-ISOLATION WARD
TB ISOLATION WARD
PROVISIONAL SUM
A Allow the Provisional Sum of K2,000,000.00 (Two Million Kwacha) for fittings and
furnishings which cannot be entirely fore-seen, defined or detailed 2,000,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
Sanitary fittings; Supply and fix sanitary ware approved by the Architect
A WC suite, comprising white grazed Vaal washdown "S" trap pan, 9 litre low level
Vaal cistern, complete with ball valve and flush pipe and plastic seat and cover.
Fix to concrete slab and block/concrete wall. No 5 150,000.00 750,000.00
-
B White glazed Vaal lavatory basin, 560 x 405mm, complete with integral overflow,
32mm diameter chromium plated anti-theft waste outlet, set basin on and including
pair of concealed hanger brackets fixed to block/ concrete wall No 5 100,000.00 500,000.00
-
D
Stainless steel sink size 1200 x 550 mm with single 'bowl single drainer to BS 1244
complete with integral overflows, 40 mm diameter chromium plated waste outlet
with plugs and chromium plated chain and fix in position to sink unit and block wall No 1 200,000.00 200,000.00
-
E 150 x 150mm white glazed vitreous china recessed toilet roll holder, set in and
including 50mm deep recess in brick/ concrete wall No 5 10,000.00 50,000.00
-
Sundries -
-
F 600 x 450mm glazed mirror with filed beveled edges No 5 50,000.00 250,000.00
-
G 600mm Long x 20mm Diameter chromium plated towel rail No 5 15,000.00 75,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
A 20mm Medium quality galvanised mild steel pipe to BS 1387 with screwed joints in
running length and standard pipe clips fixed to concrete/blockwall, include for all
bends, tees, fittings etc as required. M 5 1,500.00 7,500.00
-
B Joint of 20mm galvanised pipe to cistern. No 2 10,000.00 20,000.00
-
Connector pipes -
-
C 12mm Diameter copper connector 300mm girth, bent as required, including joint to
union of fitting and galvanised mild steel pipe with gunmetal connector. No 5 10,000.00 50,000.00
-
12mm Diameter copper connector 450mm girth, bent as required, including joint to
D union of fitting and galvanised mild steel pipe with gunmetal connector. No 5 10,000.00 50,000.00
Testing -
-
E Allow to test the foregoing sanitary fittings and overflow pipes as sp[ecified to the
satisfaction of the Architect Item -
-
127,500.00
CARRIED TO COLLECTION
COLLECTION Page
No
3.16 2,510,000.00
3.17 127,500.00
TB-ISOLATION WARD
TB ISOLATION WARD
This section has been measured from fittings up to gully or first manhole
Waste Installation
Fittingss to walls, slabs, etc shall be with standard pipe clips, plugged and screwed
Waste Installation
TB-ISOLATION WARD
TB ISOLATION WARD
Sanitary Installation
TB-ISOLATION WARD
TB ISOLATION WARD
Testing
A Include for testing of the whole of the Waste and Sanitary Installation to the
satisfaction of the Architect/Supervising Officer
B Make hole through block wall for small pipe and make good No 13 2,000.00 26,000.00
-
C Ditto for large pipe and make good No 5 5,000.00 25,000.00
-
D Form sleeve in concrete slab for small diameter pipe and make (include for
covering the sleeve/opening) M 4 2,000.00 8,000.00
-
E Trench excavation for large diameter pipe M 35 3,000.00 105,000.00
-
-
164,000.00
CARRIED TO COLLECTION
COLLECTION Page
No
3.18 354,000.00
3.19 1,457,500.00
3.20 164,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
Reticulation to fittings
4 No WC (s)
3 No WHB (s)
1No Urinal
1 No Sink
All pipes shall be medium quality galvanised mild steel to BS with joints as
described, fixed with and including the relevant pipe supports
Rates for pipework 20mm diameter and under shall include for all bends, tees,
fittings, etc as required
Rates for all bends, tees, valves, fittings, etc shall include for the corresponding
TB-ISOLATION WARD
TB ISOLATION WARD
Sundries
A 40mm Diameter brass screw down gate valve to B.S. 1010 with capstan head and
joint pipe No 1 10,000.00 10,000.00
Testing
C Include testing of the whole of cold and hot water installations in sections during
construction and on completion, by approved means, including re - testing until
perfect to the satisfaction of the Architect/Supervising Officer Item
D Make hole through blockwall and include for making good No 36 3,000.00 108,000.00
-
E Excavate trench, 300mm wide for large pipe M 61 1,500.00 91,500.00
-
199,500.00
CARRIED TO COLLECTION
COLLECTION Page
No
3.21 903,500.00
3.22 199,500.00
TB-ISOLATION WARD
TB ISOLATION WARD
Reticulation to fittings
All pipes shall be medium quality galvanised mild steel to BS with joints as
described, fixed with and including the relevant pipe supports
Rates for pipework 20mm diameter and under shall include for all bends, tees,
fittings, etc as required
Rates for all bends, tees, valves, fittings, etc shall include for the corresponding
Sundries
Testing
H Include testing of the whole of cold and hot water installations in sections during
construction and on completion, by approved means, including re - testing until
perfect to the satisfaction of the Architect/Supervising Officer -
-
Builder's Work In Connection -
-
I Make hole through blockwall and include for making good No 6 2,000.00 12,000.00
1,103,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
Item HOT AND COLD WATER SERVICES COLLECTION PAGE Unit Qty Rate K t
PAGE
TB-ISOLATION WARD
TB ISOLATION WARD
Pipe work
All pipe works and fittings for fire fighting are measured under cold water
services
Equipment
A Fire hose reels; Chubb; 19mm diameter x 35m long non-kinkable hose
6mm fixing bolts swiveling pulley with slide and housing short lenghth
of tube and 25mm non return valve fixing to backgrounds requiring
pluggings No 1 1,000,000.00 1,000,000.00
B Fire extinguisher; Angus; hand operated 9kg dry chemical powder, fixing
brackets to background requiring plugging No 1 500,000.00 500,000.00
-
C 4.5kg carbon dioxide; fixing brackets to backgrounds requiring
plugging No 1 200,000.00 200,000.00
SUNDRIES
E Allow for testing the foregoing fire fighting services, including pipe work
to twice the working pressure Item
1,700,000.00
FIRE FIGHTING TO SUMMARY K
3.25
TB-ISOLATION WARD
TB ISOLATION WARD
EARTHING
TB-ISOLATION WARD
TB ISOLATION WARD
LIGHTING CIRCUITS
A 1 Ceiling lighting point controlled by 1 gang 1 way switch (Ward 1, Bathroom 1, 6,000.00
Ward 2, Bathroom 2, Recreation Area, Kitchenette) No 6 36,000.00
B 1 Ceiling lighting point controlled by 1 gang 1 way switch (Ward 3, Bathroom 3, 6,000.00
Ward 4, Bathroom 4, Recreation Area) No 5 30,000.00
C 2 Ceiling lighting points controlled by 1 gang 1 way switch (Nursing Station, Toilet 6,000.00
Lobby) No 2 12,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
A 5 Ceiling lighting points controlled by 2 gang 1 way switch (Corridor, Waiting Area, 6,000.00
Khonde) No 1 6,000.00
B 9 Wall mounted lighting points controlled by 1 gang 1 way switch (Security Lights) 6,000.00
No 1 6,000.00
POWER CIRCUITS
C Radial Circuit to13A Twin socket switch (Ward 1, Ward 2) No 4 6,000.00 24,000.00
D Radial Circuit to 20A Double pole switch box controlling ceiling fan (Ward 1, Ward 6,000.00
2) No 2 12,000.00
E Radial Circuit to13A Twin socket switch (Nursing Station, Ward 3) No 4 6,000.00 24,000.00
F Radial Circuit to 20A Double pole switch box controlling ceiling fan (Nursing 6,000.00
station, Ward 3) No 2 12,000.00
H Radial Circuit to13A Twin socket switch (Corridor, Waiting Area, Ward 4) No 6 10,000.00 60,000.00
I Radial Circuit to 20A Double pole switch box controlling ceiling fan (Waiting Area, 6,000.00
Ward 4) No 2 12,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
LIGHT FITTINGS
B Led 2x24w 1200 x100 light fitting or equally approved No 8 20,000.00 160,000.00
E 2x1w 12V Outdoor Wall Mounted Led Lamp, Aluminium Body with Acrylic Lens as 20,000.00
Radiant Beam T LS369 Or Equally Approved. No 9 180,000.00
SWITCHES
POWER OUTLETS
H Supply and Install 13A Twin rectangular pin switched socket Outlet No 15 6,000.00 90,000.00
J Switch box with Neon Indicator controlling ceiling fan No 6 6,000.00 36,000.00
COMMUNICATION ACCESSORIES
EQUIPMENT
TB-ISOLATION WARD
TB ISOLATION WARD
A Allow the provisional sum of ONE Million for ESCOM connections to the
Isolation Ward (MK 1,000,000.00) Item 1,000,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
EQUIPMENT
C Five zone analogue addressable fire alarm panel as Gent or equal approved No 1 500,000.00 500,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
SUMMARY K T
Page
No.
3.26 610,000.00
3.27 78,000.00
3.28 286,000.00
3.29 2,792,000.00
3.30 1,000,000.00
3.31 2,792,000.00
TB-ISOLATION WARD
TB ISOLATION WARD
SUMMARY K T
A DEMOLITIONS 3.2
TB-ISOLATION WARD
TB-ISOLATION WARD
-
-
-
Channel/Box Drains
A
675mm Girth blockwork Channel drain, rendered (15mm
thick 1;4 cement and sand) on sides, laid to falls on
50mm thick concrete slab and include 50mm thick sand
bed, include for excavations and disporsal of surplus spoil
as required m 68 15,000.00 1,020,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
CONCRETE WORK
TRENCH EXCAVATIONS
25N/MM2/20MM AGGREGATE -
-
I Plain insitu concrete 150 mm Thick in bed m2 9 30,000.00 270,000.00
-
J Ditto, in benching average 200mm thick with steep slopes
to channels and branches in bottom of manhole finished
with 15mm cement, lime and sand (1:1:6) rendering,
trowelled smooth m2 9 40,000.00 360,000.00
-
-
SAWN FORMWORK
CARRIED TO COLLECTION K -
SUNDRIES
CARRIED TO COLLECTION K -
SOAKWAY PIT
CARRIED TO COLLECTION K -
BLOCKWORK
CARRIED TO COLLECTION K -
SUNDRIES
-
CARRIED TO COLLECTION
COLLECTION Page
No
4.4 912,000.00
4.5 3,655,500.00
4.6 -
4.7 -
4.8 -
4.9 -
4.10 -
SUMMARY
Item EXTERNAL WORKS K t
Page
No
PROVISIONAL SUMS
Induction Training
Firefighting training
COVID19 awareness
training
COLLECTION
Page No.
6.1 6,100,000.00
6.2 5,200,000.00
6.3 1,400,000.00
Page
No.
SUB-TOTAL K 130,806,394.00
K 150,427,353.10
MAIN SUMMARY