0% found this document useful (0 votes)
58 views2 pages

MGS & Wip

This one-line diagram shows the electrical system for a location including transformers, switchgears, cables, and loads. Transformer 2 steps down power from 100 MVA to 1000 kVA. Switchgear GL-13 receives 6600 VAC power and distributes it through Bus1 at 6.6 kV. Switchgear GL-24 steps power down further to 400 VAC distributed through Buses 2 and 11. Various motor control centers, variable speed drives, lighting panels, and other equipment are connected and receive power through the switchgears.

Uploaded by

Roni Hadyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views2 pages

MGS & Wip

This one-line diagram shows the electrical system for a location including transformers, switchgears, cables, and loads. Transformer 2 steps down power from 100 MVA to 1000 kVA. Switchgear GL-13 receives 6600 VAC power and distributes it through Bus1 at 6.6 kV. Switchgear GL-24 steps power down further to 400 VAC distributed through Buses 2 and 11. Various motor control centers, variable speed drives, lighting panels, and other equipment are connected and receive power through the switchgears.

Uploaded by

Roni Hadyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

One-Line Diagram - OLV1 (Load Flow Analysis)

FROM PANEL A2 SPU


100 MVAsc TRANSFORMER 2
1000 kVA

Cable1
Cable 3 x 2 x (1 x 70)
1-3/C 120
LOCATION : MGS & WIP

MV SWITCHGEAR GL-13
Bus1
6.6 kV 6600 VAC, 3 Ph, 50 Hz, 3P

0 A
0 A MCCB-1 3P 1250A6
0 A LBS2 630A LBS2 630A2 0.4 kV
LBS1 630A 0 A
Bus18
Open
MCCB-33
MCCB-27 MCCB-31 MCCB-29
400 A
400 A 200 A 200 A
Cable (3 x 1 x 185)
Cable32
spare
0 MVA 1-3/C 240 Cable26 Cable28

1-3/C 240 1-4/C 25


TRANSFORMER GL24 Cable (3 x 1 x 70)
2000 kVA VSD POMPA 01 Cable30
183 kW
1-4/C 25
VSD POMPA 02 O H crane
183 kW 10 kVA

Cable3 (4 x 1 x 400) lighting panel 2


6 kVA

Cable3 (4 x 1 x 400)5
Cable3 (8 x 1 x 300)
LOCATION : MGS & WIP

LV SWITCHGEAR GL-24
MCCB-1 3P 800A LV SWITCHGEAR GL-24
PANEL LV POMPA INJEKSI LV SWITCHGEAR GL-24 0 A
Bus2 400 VAC, 3 Ph, 50 Hz, 3P + N
MCCB-3 3P 800A
0.4 kV MCCB-1 3P 800 A 0.4 kV 0 A
0 A Bus11
0.4 kV

MCCB-15 MCCB-17 MCCB-21 MCCB-20


400 A 400 A MCCB-44 MCCB-2
400 A 400 A MCCB-5 MCCB-7 MCCB-23
630 A 400 A MCCB-25
250 A 100 A 630 A 630 A

Cable18 Cable24
Cable6 Cable10 Cable12
1-3/C 240 1-3/C 240
1-4/C 240 1-4/C 240 1-4/C 35 1-4/C 10
Spare 1 Spare 3
Cable3 0 MVA 0 MVA

VSD POMPA INJEKSI VSD POMPA INJEKSI5


150 kW lighting panel MGS
150 kW Cable23 30 kVA pompa-HSSE
Cable20 15 HP
1-3/C 240 1-3/C 240
MCCB-3 3P 800A2
0.4 kV 0 A
PANEL LV 4
VSD POMPA INJEKSI6 MCCB-37 MCCB-39 MCCB-41
VSD POMPA INJEKSI2 MCCB-42
150 kW 150 kW 400 A 250 A
MCCB-35 400 A 250 A 250 A

PANEL pump house

Spare 7 Spare 9
0.4 kV 0 MVA Spare 11 Spare 12
0 MVA
page 1 21:32:45 Jun 23, 2022 Project File: MGS & WIP
One-Line Diagram - OLV1 (Load Flow Analysis)
0.4 kV 0 MVA Spare 11 Spare 12
120 kVA 0 MVA 0 MVA 0 MVA
NUTSHELL FILTER PNL 120KW
MCCB-46 MCCB-49 MCCB-50 MCCB-52 MCCB-55
160 A MCCB-54 MCCB-56 MCCB-58
160 A 160 A 160 A 125 A
MCCB-48 100 A 160 A 160 A 125 A

Cable34
Cable36 Cable37 Cable38
Spare 13 1-4/C 25
Spare 16 Spare 17 1-4/C 16 1-4/C 16 1-4/C 16
0 MVA 0 MVA Spare 19
0 MVA 0 MVA
Spare 15
0 MVA

55 kW pompa 30 kw S-D vsd pompa 37 kw


22 kW 30 kW 37 kW
pompa 55 kw S-D pompa 22 kw S-D

page 2 21:32:45 Jun 23, 2022 Project File: MGS & WIP

You might also like