Inspection Details
Client INEOS Report No. BIS-DK-UT 1150
Project CS-2040534 Location NINI A
Contract No. TBC PO/Request No. 4501070489
Test Date 27.04.2022 Workpack No. RBI 2020
Part Description UT inspection on C081-IP2022-NA-2
Drawing No. Line No.
C081-DONG-L-XM-T00-20-0071-01/02/03 6"-PT-20-0071-FC11-0-T00
P & ID Drawing No. C081-DONG-P-XC-1300-01 Rev 16.5 Location / System Level 1
Material Type Carbon Steel Material Thickness 21.95mm
External Coating Painted Surface Temperature Ambient
Equipment, Technique & Application Method
Procedure No. SAL-INP-NDT-PRO-059: UT Thickness Measurement Ver No. 5
Technique No. T/EN/UT/01A - Spot Check Thickness Measurement Ver No. 5
Technique Std BS EN ISO 16809 Acceptance Criteria as per Client
Temp. Correction N/A Test Mode(s) N/A
Test Restrictions N/A
Manufacturer Model SAL ID Couplant
Flaw Detector Equipment
Olympus Epoch M600 20083 UCA 2
Calibration Block Type SAL ID
5-25mm Carbon Steel Stepwedge 20/21/01
Calibration Block Type
Reference Block Type SAL ID
Control Checks
✘ Visual Angle Index ✘ Sig/Noise Ratio ✘ Vertical Linearity ✘ Pulsed Duration
By marking the equipment/probe check boxes you are confirming the checks have been carried out in accordance
with the applicable procedure appendix and that the results are satisfactory for all equipment and probes used.
Inspection Summary
Scope - Brief Summary of task
UT inspection was carried out on the 6"-PT-20-0071-FC11-0-T00
UNCONTROLLED IF PRINTED
Bilfinger UK Ltd, 4 Greenhole Place, Bridge of Don, Aberdeen, AB23 8EU | Tel: +44 1224 246100
UNCONTROLLED IF PRINTED
UT Results Table
Client INEOS Report No. BIS-DK-UT 1150
Min Reading Location
Examination Point / Test Surface Nominal Fresh Thickness Min WT
EWL cat. TWL cat. X Y Comments
Feature ID Geometry Condition WT (mm) (mm) (mm) Datum
(mm) (mm)
BE01 B F 21.95 D D 20.5 18.8 Extrados
BE01 B F 21.95 D B 21.1 19.3 Intrados
BE01 B F 21.95 D B 21.1 19.7 At 3 o/c location
BE01 B F 21.95 C B 22.3 21.7 At 9 o/c location
ST06 P F 21.95 19.3 19.3 19.3 18.6 7 o/c
Key to Acronyms
B = Bend P = Pipe Straight EXC = External Corrosion LAM = Laminations R = Restriction due to….
C = Cap R = Reducer IP = Internal Pitting NT = No Test Due to…
S = Tank Shell V = Vessel IC = Internal Corrosion
F = Flange T = Tee MII = Minor Isolated Inclusions
Surface Condition
G = GOOD F = FAIR P = POOR VP = VERY POOR
As or close to original Condition ≥90% Minor deterioration - approximately 75-90% Deterioration resulting in approximately 50- Significant deterioration resulting in <50% test
Coverage achievable test coverage achievable 75% test coverage achievable coverage achievable
UNCONTROLLED IF PRINTED
Bilfinger UK Ltd, 4 Greenhole Place, Bridge of Don, Aberdeen, AB23 8EU | Tel: +44 1224 246100
UNCONTROLLED IF PRINTED
Photograph Page
Client INEOS Report No. BIS-DK-UT 1150
Photo 5 - Photo 6 -
UNCONTROLLED IF PRINTED
Bilfinger UK Ltd, 4 Greenhole Place, Bridge of Don, Aberdeen, AB23 8EU | Tel: +44 1224 246100
UNCONTROLLED IF PRINTED