SOftware Engineering - Ongoing

This document outlines an 8-phase project plan for developing an e-voting system with activities scheduled over 8 months. Phase 1 involves requirement analysis and data gathering. Phase 2 is system design, including modeling and documentation. Phase 3 is program design, documentation, and evaluation. Phase 4 is coding, building the code, database integration, and code review. Phase 5 is unit testing and revisions. Phase 6 is system testing and revisions. Phase 7 is acceptance testing, revisions, and testing. Phase 8 is deployment and ongoing system maintenance and performance monitoring.

Uploaded by

Daniel Mengote
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views5 pages

SOftware Engineering - Ongoing

This document outlines an 8-phase project plan for developing an e-voting system with activities scheduled over 8 months. Phase 1 involves requirement analysis and data gathering. Phase 2 is system design, including modeling and documentation. Phase 3 is program design, documentation, and evaluation. Phase 4 is coding, building the code, database integration, and code review. Phase 5 is unit testing and revisions. Phase 6 is system testing and revisions. Phase 7 is acceptance testing, revisions, and testing. Phase 8 is deployment and ongoing system maintenance and performance monitoring.

Uploaded by

Daniel Mengote
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Chapter II: Modelling the Process and Life Cycle

Voting
Successfully
Authorized
Voted
to voter Checking
Votes
Sign in

Not
authorized Vote
voter Submitted

Vote Casting

Officially
Voted
Chapter III: Planning and Managing the Project

Start
Phase 1
1
Data Gathering
Phase 6 15 Days
Testing 13 2 Data Analysis
8Days 14Days Phase 2
Perform Found revisions 14 3 Modeling System Design
Phase 7 13Days 20Days
Perform Found revisions 15 Documentation and review
4
13Days 5Days Phase 3

Testing 16 5 Formulate Program Design

6Days 30Days
17
Deployment 6 Documentation

Phase 8 12Days 5Days


18
System Maintenance 7 Evaluation
Phase 4
7Days 3Days
8 Building the code

Finish 50Days
9 Database Integretion
10Days
10 Code review
Phase 5
7Days
11 Testing Database
3Days

12 Perform Found revisions

13Days

Chapter III: Planning and Managing the Project


Activity Number Description OCT. NOV. DEC. JAN. FEB. MAR. APR. MAY
Phase 1: Requirement Analysis
1.1 InterView
1.1.1 Data Gathering
1.2 Analysis
Phase 2: System Design
2.1 System Flow designing
2.1.1 Modeling
system design
2.1.2 Documentation
and review
Phase 3: Program Design
3.1 Formulate Program
Design
3.2 Documentation
3.3 Evaluation
Phase 4: Coding
4.1 Building the code
4.2 Database Integretion
4.3 Code review
Phase 5: Unit Testing
5.1 Testing Database
5.2 Perform Found revisions
Phase 6: System Testing
6.1Testing
6.2 Perform Found revisions
Phase 7: Acceptance Testing
7.1 Perform Found revisions
7.2 Testing
7.3 Deployment
Phase 8: Maintenance
8.1 System Maintenance
8.2 Performance
Requirement InterView Data Gathering
analysis

E voting system

System Flow Flowchart


System Design designing developemtn

Modeling
system design

Documentation
and review
E voting system

E voting system
E voting system

E voting system

Coding

Building the
code
Database
Integretion

Unit Testing
Code review
System Testing Testing

Acceptance Perform Found


Testing revisions

Testing

Deployment

Acceptance
Testing

Testing

Maintenance Deployment

System
Maintenance

Performance
Performance