Project Manufacturing Integration Setup
Project Manufacturing Integration Setup
The following diagram illustrates the eAM Project Manufacturing process. First, a
maintenance Work Order is linked to a project or task. If a requisition or purchase order
is created for that Work Order, the commitments for the Work Order's associated
project or task are updated. The Project Cost Collector process (See: Project Cost
Collector, Oracle Cost Management User's Guide ) then passes the costs to the Work
Order's associated project WIP accounting class accounts, rather than the WIP
accounting class associated with the eAM asset or eAM organization.
Resources and Material charge against a Work Order. The Work Order is associated
with a Project. The charges are transferred to the Project expenditures via the Cost
Collector process.
Project Definition
Project Definition
You can inquire on an existing, or copy a new project from a template or existing
project. To create a new project, See: Project Definition (Assigning Project
Parameters), Oracle Project Manufacturing User's Guide. Associate this project number
with a planning group, a cost group, and a default WIP accounting class.
To inquire on an existing project
Find Projects
Projects, Templates
5. Optionally you can view detailed task information by choosing Detail (See:
Viewing Project Details, Oracle Project Manufacturing User's Guide).
Project Parameters
2. Select a valid Project Number.
3. Optionally select a Planning Group.
4. Select a Cost Group.
If the current organization has selected Average as its primary costing method in
the Organization Parameters window, the Cost Group field is required. The list of
values includes the Common Cost Group and the user defined cost groups. The
list of user defined cost groups includes those cost groups with valid accounts
and with Project selected in the Cost Group window (See: Project Cost
Groups, Oracle Cost Management User's Guide). You must assign the project to
its own Cost Group to keep weighted average costing at the project level.
Associate a Maintenance type WIP Accounting Class to this Cost Group. See:
Project Cost Groups, Oracle Cost Management User's Guide.
Related Topics