Process: Can making Process owner: J. K. Project ID: P1918 Project title:
1 Cuppimng Weight Output 10.1 10.4 10.25 5% Stable 1.34 SPC charts 20 products / hour QC 50 products / hour Input
3 Forming Diameter Output 22.5 22.6 22.55 5% Stable 1.21 SPC charts 20 products / hour QC 50 products / hour
5 " Shape Output - - - - - - Inspection Visual inspection QC Visual inspect all products Visual cont
Conduct periodic audits to
6 Supervisors verify staff trained in visual Audits
inspection
Mistake proofing in
7 Trimming Height Output 40.28 40.66 40.47 - - - Poka Yoke place
Not required Poka Yoke
8 Inspection
9 Sampling
10 SOP
11 5S
12 Prevetive M
13 Training pla
14 Process red