Class Assignment 2
Class Assignment 2
SECTION
Date
Question
1
Assume you have a project with ten activities labeled A-J, as shown in Table 1 below.
Table 1
(a) Derive the forward and backward pass for each of the following task (begin at time = 0).
Draw the network diagram clearly. [20 marks]
2
(b) Enter the EF, LF, slack and determine the critical path in Table 2 below. [20 marks]
Table 2