Sessional Test Format - ODD - Semester

1. The document is a sessional test for the subject Quantity Estimation & Construction from G.L. Bajaj Institute of Technology & Management. It contains questions to assess students' understanding of key course outcomes related to measurement units, rate analysis, project scheduling, and cost estimation. 2. The test has 50 marks divided into 3 sections - Section A contains 5 short answer questions worth 2 marks each, Section B has 4 long answer questions worth 5 marks each, and Section C has 2 numerical questions worth 10 marks each. 3. The document lists the course outcomes for the subject, which include understanding measurement units, contracts, quantity takeoff, cost estimation, and choosing cost

Uploaded by

Ankit Soni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views4 pages

Sessional Test Format - ODD - Semester

1. The document is a sessional test for the subject Quantity Estimation & Construction from G.L. Bajaj Institute of Technology & Management. It contains questions to assess students' understanding of key course outcomes related to measurement units, rate analysis, project scheduling, and cost estimation. 2. The test has 50 marks divided into 3 sections - Section A contains 5 short answer questions worth 2 marks each, Section B has 4 long answer questions worth 5 marks each, and Section C has 2 numerical questions worth 10 marks each. 3. The document lists the course outcomes for the subject, which include understanding measurement units, contracts, quantity takeoff, cost estimation, and choosing cost

Uploaded by

Ankit Soni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

ROLL NO.

G.L. BAJAJ INSTITUTE OF TECHNOLOGY & MANAGEMENT


GREATER NOIDA
B. TECH (Vth Semester) - (Civil Engineering Department)
SESSIONAL TEST (ODD SEM 2021-22)
Quantity Estimation & Construction (KCE503)
Faculty Name: Ankit Soni
Duration: 02:00 Hrs ` Max. Marks: 50
Note: (i) Short answer type theoretical questions may be attempted in 150-200 words. The answers must be
precise. However, this rule is not applicable for numerical.
(ii) Long answer type theoretical questions may be attempted in 250-300 words. The answers must be
precise. However, this rule is not applicable for numerical.
(iii) Mention Question number/section correctly.
(iv) Numerical will be evaluated based on approach and step marking will be followed.

Course Outcomes:
Following are the course outcomes of the subject:
CO Code Course Outcome (CO) Bloom's Level
KCE503. Understand the importance of units of measurement and preliminary estimate for L2-Understanding
1 administrative approval of projects.
KCE503. L2-Understanding
Understand the contracts and tender documents in construction projects.
2
KCE503. Analyze and assess the quantity of materials required for civil engineering works as per
L4-Analyzing
3 specifications.
KCE503. Evaluate and estimate the cost of expenditure and prepare a detailed rate analysis
L6-Evaluating
4 report.
KCE503.
Analyze and choose cost effective approach for civil engineering projects. L4-Analyzing
5

Section: A

1. Attempt all question: (5 x 2 = 10)

Q. No. Questions Marks CO BL


a) Find the no of cement bags in 30m of room volume.
3
2 KCE-503.1 L1
b) List the measuring units of shuttering, DPC, Earthwork and mosaic flooring. 2 KCE503.1 L1
c) What is Fulkerson’s rule in Network diagram? 2 KCE503.3 L1
d) What is the significance of Critical, Subcritical and supercritical activities? 2 KCE503.3 L1
e) What is the importance of Critical Path? 2 KCE503.3 L1

Section: B

2. Attempt any four of the following: (4 x 5 =


20)
Q. No. Questions Marks CO BL
a) What do you understand by Schedule of rates (SOR). Write down rates of 5 KCE503.1 L2
concrete, shuttering, Earthwork as per SOR.
b) Identify approximate charges for G+6 RCC residential building consisting of 5 KCE503.1 L2
four flats per floor and each flat has carpet area of 80m 2. Assume area occupied
by walls and columns are of 8% of built up area and area of circulation is 25%
of built up area. Assume cost of construction of superstructure is 10000/m 2.
Assume suitable percentage for electrical, plumbing services and contingencies
charges.
c) Specify the rate analysis for 15mm thick plastering for 1:4 cement mortar 5 KCE503.1 L1
including scaffolding.
d) Compare PERT and CPM method of Project Management. 5 KCE503.3 L4
e) Interpret the total float of given activities in the network shown below 5 KCE503.3 L3

Activity Preceded by Duration


A - 4
B A 2
C (TERMINAL) D 5
D E 2
E A 6
F B 1
G B 2
H(TERMINAL) E, G 4
I(TERMINAL) F 6
f) Why CPM method is used for repetitive types of Project & PERT is for non- 5 KCE503.3 L2
repetitive type projects?

Section: C

3. Attempt any one question (10 x 1 = 10)

Q. No. Questions Marks CO BL


a) Analyse the rate of materials and labours for a cement concrete 10 KCE503.1 L4
1:1.5:3-1 cu m. Take-100 cu m. The rate of particulars is given below.
CA Rs.1800 per cu m
FA Rs.1500 per cu m
CEMENT Rs.7000 per cu m
MISTRI Rs.450 per day
MASON Rs.400 per day
BELDAR Rs.270 per day
BHISHTI Rs.200 per day
COOLIE Rs.200 per day
T&P Rs.1450 L.S.

b) Calculate 10 KCE503.3 L4
i) The expected completion time
ii) Variance for the following project &
iii) The Critical Path
Activity A B C D E F G H
Predecessors - - A B A C,D C,D,E F
T0 (In days) 1 1 3 3 1 3 2 4
Tm (In days) 4 5 5 4 3 5 9 4
Tp (In days) 7 9 7 5 9 8 11 4

4. Attempt any one question


Q. No. Marks CO BL

a) Prepare a detailed estimate of part of a wall of a building from the given plan 10 KCE503.1 L4
and section and general specifications
General Specifications:
(i) Foundation concrete is RCC.
(ii) Foundation and plinth shall be of 1 st class brickwork in lime
mortar.
(iii) Damp Proof Course- 2.5 mm c.c. 1:1.5:3 with water proofing
.compound.
(iv) Superstructure- 1st class brick work in cement mortar.
Consider column is located at ends having size of 230*300 mm 2 and
footing is 2m x 3m.

b) The following information is available about the various activities of networks. 10 KCE503.3 L4
Activit Normal Normal Cost Crash Crash
y duration (INR) Duration Cost
(weeks) (weeks) (INR)
1-2 6 5000 4 9000
2-3 8 10000 5 16000
1-3 12 5000 6 11000

Project overhead cost is 2500/ week, Contrast direct cost vs time relationship.
Checked By
(Head of Department)