CAREER OBJECTIVE:

A Piping Engineer with working experience in Engineering, Procurement, Construction and Installation
companies in the Oil & Gas Industries. Working as Piping Engineer with competence in Topside design &
Modeling, with emphasis on (Onshore and Offshore) Topside facilities; design of crude oil production
platform, and good knowledge of various engineering deliverables and activities such as Equipment
Layout Drawings, Piping General Arrangement, Mechanical and Material Handlings of Equipment and
valves, MTOs, Data sheets, Piping Isometric drawings and Support Layout development including as-built
drawings.
Familiar with Design codes and standards as well as recommended specification by various Oil and gas
companies.
Ability to use Software for Engineering design Projects.
Specialties: General safety awareness on Off-shore and On-shore Oil & gas facilities.
Carry out Preliminary & basic engineering studies/in-house design.
Read / interpret facility engineering drawings / designs / make necessary modifications &
recommendations
Proficient in the following software
➢ Autodesk NAVISWORKS.
➢ PDMS
➢ AVEVA E3D
➢ AUTOCAD
➢ CADWORX SOFTWARES PLANT
➢ CAESAR II
➢ PV ELITE
Resume

EXPERIENCE:
1. POSITION : PIPING ENGINEER
COMPANY: RADIATT INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : NIGERIAN GAS COMPANY
PROJECT : ENGINEERING, PROCUREMENT & CONSTRUCTION OF NEW EGBIN
METERING STATION
Responsibilities:
• Preparation of Piping Design Philosophy
• Preparation of Piping Material Class Specification
• Preparation of Specification for Pipe Support
• Preparation of Specification for Specialty Items
• Preparation of Specifications for Valves
• Preparation of Specifications for Flanges, Fittings, Gaskets, Bolts, Studs, Nuts, Washers
• Preparation of Piping Wall Thickness Calculation Report
• Preparation of Piping Manual Valve Datasheet
• Preparation of Piping Bulk MTO
• Preparation of Pipe Support MTO
• Preparation of Manual Valve MTO
• Preparation of Pipe Support List

2. POSITION : PIPING ENGINEER


COMPANY: RADIATT INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : NIGERIAN GAS COMPANY
PROJECT : FEED FOR FRADRO GAS & POWER LIMITED's 24" X 85 KM
OGAN/AGBOR TO ASABA/ONITSHA BRIDGE GAS PIPELINE PROJECT
Responsibilities:

• Preparation of Piping Overall Plot Plan -Launcher station


• Preparation of Piping General Arrangement - Pig Launcher
• Drafting of Piping Isometric Drawing - Pig Launcher
• Drafting of Piping Supports drawing
• Preparation of Specification for Piping Materials
• Preparation of Piping Bulk MTO
Resume

3. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : CHEVRON NIGERIA LIMITED
PROJECT : NMA FACILITIES INFORMATION MANAGEMENT PROJECT
(EWAN PRODUCTION PLATFORM & RISER PLATFORM)
Responsibilities:
• Back drafting of piping plan - production platform above main deck north east
• Back drafting of piping plan - production platform above main deck centre north
• Back drafting of piping plan - production platform above main deck north west
• Back drafting of piping plan - production platform above main deck south east
• Back drafting of piping plan - production platform above main deck centre south
• Back drafting of piping plan - production platform above main deck south west
• Preparation of Specialty item list

4. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED
CLIENT : MOBIL PRODUCING NIGERIA UNLIMITED
PROJECT : JV FW PIPING REPLACEMENT PROJECT
Responsibilities:
• Preparation of Piping MTO
• Preparation of Valve List
• Preparation of Tie-in list
• Preparation of Specialty Item List
• Preparation of Piping Support Location Plan.
• Preparation of Piping Material Specification
Resume

5. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : MOBIL PRODUCING NIGERIA UNLIMITED
PROJECT : JV SKIM PILE UPGRADE PROJECT
Responsibilities:
• Preparation of Piping MTO
• Preparation of Valve List
• Preparation of Tie-in list
• Preparation of Specialty Item List
• Preparation of Piping Material Specification

6. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : WEST AFRICAN GAS PIPELINE COMPANY
PROJECT : WAGPCO LBCS COMPRESSOR PROJECT
Responsibilities:
• Preparation of Piping material take off
• Preparation of Pipe Support Location Plan
• Preparation of Valve List
• Preparation of Tie-in List
• Preparation of Piping Material Specifications
• Preparation of Specialty Item List
• Preparation of Critical Line List

7. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : NIGERIAN PETROLEUM DEVELOPMENT COMPANY
PROJECT : EPIC OF 2 PORTABLE GAS SCRUBBERS FOR FPSO MYSTRAS IN

OML 119
Responsibilities:
• Preparation of Material Take Off
• Preparation of Preparation of Valve List
• Specialty Item List
• Preparation of Tie-in List
• Preparation of Valve List
• Preparation of Piping Support Location Plan.
• Drafting of piping Isometrics
Resume

8. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA
PROJECT : SHELL FYNAG FLOWLINE CLUSTER1
Responsibilities:
• Preparation of Critical line list
• Preparation of Material Take Off
• Preparation of Pipe Support MTO
• Preparation of Specialty Item List
• Preparation of Tie-in List
• Preparation of Valve List
• Back drafting of Piping General Arrangement
• Drafting of piping Isometrics

9. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : CHEVRON NIGERIA LIMITED
PROJECT : NMA FACILITIES INFORMATION MANAGEMENT PROJECT (FIM)

(MALU PRODUCTION PLATFORM)


Responsibilities:
• Preparation of Specialty item list
• Back drafting of Equipment Layout Production Platform Main Deck Level Above T.O.S El +17374
• Back drafting of Equipment Layout Production Platform Cellar Deck Level Above T.O.S El +10972
and Below
• Back drafting of Equipment Layout -Utility Platform
• Back drafting Piping General Arrangement Plan Main Deck - North Central T.O.S El 17374
• Back drafting Piping General Arrangement Plan Main Deck - South Central
• Back drafting Piping General Arrangement Plan Underside Cellar Deck North Central
• Back drafting Piping Isometrics
Resume

10. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : GHANA NATIONAL GAS COMPANY
PROJECT : KARPOWERSHIP GAS PIPELINE FEED PROJECT

Responsibilities:
• Preparation of Pipe Support Location Plan
• Preparation of Key Plan
• Preparation of Piping Material and Valve Specification
• 3-D Modeling (Piping and Equipment) with PDMS Software
• Extracting Equipment Layout from 3D model Using PDMS Software.
• Back Drafting and Annotating of extracted Equipment Layout Drawings.
• Back Drafting and Annotating of extracted General Arrangement Drawings.
• Preparation of Critical Line List
• Preparation of Tie-in List
• Preparation of Valve List

11. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : MOBIL PRODUCING NIGERIA UNLIMITED
PROJECT : YOHO YB GASLIFT PROJECT
Responsibilities:
• Piping Isometrics Drawings
• Preparation of Pipe support MTO
• Preparation of Tie-in List
• Preparation of Specialty Item List
• Preparation of Pipe Support MTO
• Preparation of Valve List
Resume

12. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
PROJECTS:
CLIENT : PLATFORM PETROLEUM LIMITED
PROJECT : PPL EGBAOMA FEED & DETAIL DEVELOPMENT PROJECT
Responsibilities:
• Preparation of Critical Line List
• Equipment modeling with PDMS Software
• Pipe routing with PDMS Software
• Preparation of Tie-in List
• Preparation of Specialty Item List
• Preparation of Piping Material Specifications
• Preparation of Piping Material Take Off (MTO)
• Preparation of Valve List

13. POSITION : PIPING ENGINEER


COMPANY: INTERNATIONAL ENERGY SERVICES LIMITED.
PROJECTS:
CLIENT : NIGERIAN GAS PROCESSING AND TRANSPORTATION COMPANY
LTD. (NGPTC)
PROJECT : FEED FOR THE REHABILITATION OF SAPELE METERING STATION

Responsibilities:
• Equipment modeling with PDMS Software
• Pipe routing with PDMS Software
• Preparation of Tie-in List
• Preparation of Critical Line List
• Preparation of Specialty Item List
• Preparation of Piping Material Specifications
• Preparation of Piping Material Take Off (MTO)
• Preparation of Valve List
• Piping General Arrangement- Demolition Drawing.
Resume

14. POSITION : PIPING ENGINEER


COMPANY : INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : CHEVRON NIGERIA LIMITED
PROJECT : OKAN &AT 1 $ 2 FACILITY INFORMATION MANAGEMENT
Responsibilities:
• Piping General Arrangement- Demolition drawing.
• Back Drafting and Annotating of extracted General Arrangement Drawings.
• Back Drafting and Annotating of extracted General Arrangement Elevation Drawings.
• Back Drafting and Annotating of extracted Equipment Layout Drawings.
• Back Drafting and Annotating of extracted Isometrics Drawings.

15. POSITION : TRAINEE PIPING ENGINEER


COMPANY : INTERNATIONAL ENERGY SERVICES LIMITED.
CLIENT : WEST AFRICAN GAS PIPELINE COMPANY
PROJECT : P&ID VERIFICATION AND UPDATE (TAKORADI REGULATING AND
METERING STATION)
Responsibilities:
• Preparation of Valve list

• Preparation of specialty item

REFREE: