402-91-EL-LIS-00003 Rev B - Signed
402-91-EL-LIS-00003 Rev B - Signed
402-91-EL-LIS-00003 Rev B - Signed
PROJECT – OFFSHORE
Topsides and Pipelines: Engineering, Procurement, Construction,
Installation and Commissioning (EPCI)
COMPANY AGREEMENT No.: LTC/C/NFE/4665/19 CONTRACTOR Project No.: D7264
Discipline : Electrical
Document Class : 1
McDermott www.mcdermott.com
McDermott Middle East Inc.
NORTH FIELD EXPANSION (NFXP) PROJECT - OFFSHORE
TOPSIDES AND PIPELINES - EPCI
ELECTRICAL TIE-IN LIST - NFE PIPELINES AND
CABLES - ONSHORE FACILITIES INTERFACE
REVISION HISTORY
HOLDS LIST
CONTENTS
1. PROJECT OVERVIEW ......................................................................................................... 4
2. DEFINITIONS AND ABBREVIATIONS ................................................................................. 6
2.1 Definitions ..................................................................................................................... 6
2.2 Abbreviations ................................................................................................................ 6
3. PURPOSE ............................................................................................................................ 8
4. REFERENCE ........................................................................................................................ 9
5. APPENDIX .......................................................................................................................... 10
1. PROJECT OVERVIEW
The North Field Expansion Project (NFXP) comprises of two (2) development phases,
North Field East (NFE) and North Field South (NFS) to significantly increase the State of
Qatar LNG Production capacity from 77 MTPA to 110 MTPA and from 110 MTPA to 126
MTPA respectively.
The NFE development shall add new offshore wells and infrastructure including wellhead
platforms (WHPs), pipelines and onshore facilities to boost LNG production for export. The
NFE development shall add eighty (80) wells on eight (8) nos. fifteen (15) slot offshore
platforms located approximately 50 – 90 km from Ras Laffan with a water depth variation
of 20 to 57 meters in the North Field.
NFE subsea pipelines shall be installed to transfer a dry Full Well Stream (FWS) rate of
6.36 BSCFD (Stream Day Basis, “dry” excluding water but including condensate) to the
onshore facilities. The onshore facilities, including a Beach Valve Station (BVS) shall be
located at Ras Laffan. The Pipeline network shall consist of four (4) 38” trunklines and four
(4) 28” intrafield pipelines.
The NFE development scope includes provision for up to two (2) Sensor Tower Platform
(STPM-9 & STPM-10) as part of the National Security Shield (NSS) project, subject to
COMPANY’s decision.
trunkline via two (2) intrafield pipelines, to balance and complement the production to the
LNG trains, as required.
2.1 Definitions
2.2 Abbreviations
3. PURPOSE
This document provides list of the electrical Power tie-in of NFXP project between
Offshore Contractor (OFC) and Onshore Contractor (EPC1)
(1) 33kV HV Subsea cable tie-in for Offshore network power feed at SS-6103 at Inlet
facility train 8 & 9 within the Qatargas Onshore plant area.
(2) 6.6kV HV Onshore cable tie-in for Onshore BVS power feed at SS-6001
Administration Area substation within the Qatargas Onshore plant area.
(3) Refer onshore telecom systems interface schedule (402-52-TC-LIS-00003) for FO
cable tie-ins to facilitate protection and control signals interchange
• subsea cable Transition Joint Bay at Beach Valve Station area and SS-6103 at
Inlet facility train 8 & 9 within the Qatargas Onshore plant area.
• 400V LV SWGR at Beach Valve Station Interface Control Building and SS-6001
Administration Area substation within the Qatargas Onshore
(4) Refer Doc. No. 101-91-EL-LIS-00002 for ELICS tie-ins to facilitate ELICS I/O signals
interchange
(5) This document shall be referred in conjunction with Onshore Tie-In interface document
no. 60-00-EL-DWG-00022
4. REFERENCE
Ref.No Document no Document Description
1. NFE-ON-00-PE-005 ONSHORE-OFFSHORE INTERFACE BASIS OF
DESIGN
2. 402‐91‐EL‐DWG‐ INTERCONNECTION DRAWING - 6.6 KV AND 33
00002 KV SYSTEM CABLES - BEACH VALVE STATION
3. 402-52-TC-LIS-00003 ONSHORE TELECOM SYSTEMS INTERFACE
SCHEDULE
4. 101-91-EL-LIS-00002 ELICS TIE-IN LIST-COMMON / GENERAL NFE
OFFSHORE
5. 60-00-EL-DWG-00022 TIE-IN INTERFACE DESIGN SCOPE OF WORK
5. APPENDIX
APPENDIX-1 NFE ELECTRICAL TIE-IN LIST
APPENDIX-2 NFS ELECTRICAL TIE-IN LIST
SSJB‐XXX‐FR1/FY1/FB1‐ Feeder no (TBA)
SSJB‐XXX Transition junction box‐1 SB‐XXX 33kV Switchgear at
G1 TBA & terminal no
at Beach Valve station NMCB SS‐XXX substation
FR2/FY2/FB2 (TBA)
SSJB‐XXX‐ FR1/FY1/FB1‐ Feeder no (TBA)
SSJB‐XXX Transition junction box‐2 SB‐XXX 33kV Switchgear at
G1 TBA & terminal no
at Beach Valve station NMCB SS‐XXX substation
FR2/FY2/FB2 (TBA)