The document provides a summary of static axial pile load tests conducted on 6 cast-in-situ piles for Fame Apparels Limited in June 2022. It includes descriptions of the test piles, equipment used, test procedures, interpretation of test results, and observations. The maximum applied test loads ranged from 225 to 243.75 tons. All piles were loaded until reaching failure conditions, with gross settlements ranging from 25.619 to 27.849 mm and net settlements of 11.724 to 23.76 mm.

Uploaded by

Naim Parvej
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views125 pages

Final Report, Narayanganj

The document provides a summary of static axial pile load tests conducted on 6 cast-in-situ piles for Fame Apparels Limited in June 2022. It includes descriptions of the test piles, equipment used, test procedures, interpretation of test results, and observations. The maximum applied test loads ranged from 225 to 243.75 tons. All piles were loaded until reaching failure conditions, with gross settlements ranging from 25.619 to 27.849 mm and net settlements of 11.724 to 23.76 mm.

Uploaded by

Naim Parvej
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 125

CLIENT:

FAME APPARELS LIMITED (PRINTING UNIT).

REPORT
STATIC AXIAL PILE LOAD TEST ON CAST-IN SITU PILES

WORKS NAME
FAME APPARELS LIMITED (PRINTING UNIT).

NAME OF CONSULTANT:
ORBIT CONSULTANT

TEST PILE ID:


TP-01, 02, 03, 04, 05 & 06

NAME OF CONTRACTOR:
FAME APPARELS LIMITED.

JUNE-2022

LOAD TEST PERFORMEDBY:


M.R FOUNDATION
1st Floor,261/G Haji Moron ali Road,
East Nakhalpara Tejgon Dhaka -1208.
Mob: 01756-337274, 01911-834611
E-mail:[email protected]
CONTENTS

Page No
1.0 Introduction ----------------------- 1

2.0 Objective ----------------------- 1

3.0 Scope of Work ----------------------- 1

4.0 Physical Description of Test Pile


& Equipment ---------------------- 2

5.0 Interpretation of Test Result ---------------------- 2

6.0 Observation ---------------------- 3

7.0 Information on site, pile, loading equipment etc - - - - - - - - - - 4

INDEX FOR APPENDICES

A1 Load Test Curves

Data Plots

Calibration Chart

Pressure Calculation & Sequence

Static Pile Load Test Records (Field Data Computer Sheet)

Field Data Records

Pile Load Test Kentledge

M.R FOUNDATION
1.0 INTRODUCTION

This report presents the test results of monotonic Static Axial Pile Load tests on Cast-in Situ test Pile for
the site Fame Apparels Limited ( Printing Unit). The Client of the project is Fame Apparels
Limited. Contractor is Fame Apparels Limited. Pile load testing work was awarded to “M.R
FOUNDATION”. This test was carried out with a view to confirm the carrying capacity of single pile
under monotonic static load and to know the settlement behavior of this pile under test. This test was
carried out between 18th to 30th June, 2022.

2.0 OBJECTIVE
Pile load test have been carried out to achieve following objectives-

 To determine the settlement under working load

 To confirm the adequacy of design bearing capacity

 As proof of acceptability

 Determine allowable bearing capacity

Maintained load tests were performed to accomplish the objectives

3.0 SCOPE OF WORK

 Scope of work were set as follows -

 Materials and instruments required for the test

 Placement of loading platform

 Placement of sand bag on platform

 Installation of reference beam

 Finishing of pile top for the test of hydraulic jack, Installation of pile collar, placement of jack,
dial gauge & taking strain gauge reading etc.

 Ensure safety provisions

Recording of time, load & settlement data during loading and unloading.

Submission of report that will include following-

 Preparation of related graph

 Analysis of recorded data

 Interpretation of results

Page-1
M.R FOUNDATION
4.0 PHYSICAL DESCRIPTION OF TEST PILE AND EQUIPMENT

Physical description of test pile and equipment use are provided in Table-1 & Table-2 bellow

Table-1
Physical description of test pile

Date of Pile Date of pile length of


Test pile no Size of Pile Applied load
Casting Testing Pile
TP-01 20-04-2022 18-06-2022 100ft 500mm 240.00 Ton
TP-02 23-04-2022 22-06-2022 100ft 500mm 243.75 Ton
TP-03 27-04-2022 14-06-2022 100ft 500mm 236.25 Ton
TP-04 05-05-2022 20-06-2022 100ft 500mm 225.00 Ton
TP-05 20-05-2022 26-06-2022 100ft 500mm 225.00 Ton
TP-06 22-05-2022 29-06-2022 100ft 500mm 230.25 Ton

Table-2
Description of Equipment used
Pressure gauge Dial gauge
Test pile no Ram Dia
Range Calibration Date Regression equation Sensitivity Range
TP-1,2,3,4,5&6 28.00 cm 0-1000Bar 29-05-2022 Y= 1.0067x-8.5106 0.01 mm 0-50mm

5.0 INTERPRETATION OF TEST RESULT

The load-Settlement–time curves and load-Settlement curve for the test pile is shown respectively. A
number of arbitrary or empirical methods are used to serve as criteria for determining the allowable
and ultimate load Carrying Capacity from pile load test. Some are based on maximum permissible
gross or net Settlement as measured at the pile butt while the others are based on the performance of
the pile during the progress of testing (Chellis, 1961; Whitaker, 1976; Poulos and Davis, 1980; Fuller,
1983). Most commonly practiced criteria used for evaluating the ultimate and allowable load Carrying
Capacity of pile in Bangladesh are given below.

I. A very useful method of computer the ultimate failure load has been reported by Davisson (1973).
This method is based on offset method that defines the failure load. The elastic shortening of the
pile, considered as point bearing, free standing column is computed and plotted on the load –
settlement curve, with the elastic shortening line passing through the origin. The slope of the
elastic shortening line is 20º. An offset line is drawn parallel to the elastic line the offset is usually
0.15 inch plus a quake factor is usually taken as 0.1D inch, where D is the diagonal section of pile
in foot. The intersection of the offset line with the gross load –Settlement Curve determines the
arbitrary Ultimate Failure load.
II. Terzaghi (1942) Reported that the Ultimate load Capacity of a pile may be considered as that load
which causes a Settlement equal to 10% of the pile diagonal section. However, this criterion is
limited to a case where no definite failure point or trend is indicated by the load-Settlement curve
(Singh, 1990). This criterion has been incorporated in BS 8004: 1986 where recommends that the
Ultimate Capacity of pile should be that which causes the pile to settlement a depth of 10% of pile
width or diagonal section.

Page-2

M.R FOUNDATION
III. According to IS:2911 (Part-VI)-1979 ultimate capacity is smaller of the following two:

(a) Load corresponding to a settlement equal to 10% of the pile diagonal dia in the case
of normal uniform dia pile or 7.5% of base dia in case of under-reamed or large
Cast-in Situ pile.

(b) Load corresponding to a settlement of 12 mm.

(4) The Bangladesh National Building Code, BNBC (2006) recommends that the allowable load
Capacity of pile shall not be more than one-half of that test loads which produces a permanent net
Settlement (i.e., gross Settlement less rebound) of not more than 0.00028 mm/kg of test load nor 20
mm.
(5) According to Indian Standard Code of practice (IS: 2911), 1979, allowable pile capacity is
smaller of the following
(a) Two thirds of the final load at which the total settlement attains a value of 12 mm.

(b) Half of the final load settlement equal to 10% of the diagonal section in the case of
normal uniform dia in case of under-reamed pile.

(6) According to the Code of Practice 2004 of British Standards Institution (1972), the allowable pile
capacity should be 50% of the final load, which cause the pile to settlement a depth of 10% of pile
width or diagonal section.

6.0 OBSERVATION
The result of the test is shown in the figures and tables enclosed, summary of the test result are as
follows:
Test result is provided in Table-3 bellow; also load test curves of Appendix A-1 are referred.
Table-3
Test Pile and Test Results
Test Result
Test Size of m
length of Max applied Gross Net Failure
pile no Pile
Pile load Settlement Settlement Condition
TP-01 100ft 500mm 240.00 Tons 27.61 mm 23.76 mm Fail
TP-02 100ft 500mm 243.75 Tons 25.619 mm 12.614 mm Fail
TP-03 100ft 500mm 236.25 Tons 26.474 mm 11.954 mm Fail
TP-04 100ft 500mm 225.00 Tons 26.554 mm 16.834 mm Fail
TP-05 100ft 500mm 225.00 Tons 27.849 mm 21.149 mm Fail
TP-06 100ft 500mm 230.00 Tons 26.549 mm 11.724 mm Fail

Page-3
M.R FOUNDATION
Ultimate & allowable load capacities by different methods are presented in Table-4 & 5
Table-4
Ultimate Load Capacity of the Test Pile
Ultimate Load Capacity in Ton
Test Pile
SL. No. BNBC Davisson IS : 2911
No.
(2006) (1973)
1.0 TP-01 230.00 Tons 230.00 Tons 166.00 Tons
2.0 TP-02 230.00 Tons 230.00 Tons 188.00 Tons
3.0 TP-03 227.00 Tons 227.00 Tons 160.00 Tons
4.0 TP-04 202.00 Tons 202.00 Tons 150.00 Tons
5.0 TP-05 210.00 Tons 210.00 Tons 178.00 Tons
6.0 TP-06 226.00 Tons 226.00 Tons 157.00 Tons

Table-5
Allowable Load Capacity of the Test Pile
Allowable Load Capacity in Ton
Test Pile
SL. No. BNBC (2006) Davisson (1973) IS : 2911
No.
(F.S=2.0) (F.S=2.0) (F.S=1.5)
1.0 TP-01 115.00 Tons 115.00 Tons 110.66 Tons
2.0 TP-02 115.00 Tons 115.00 Tons 125.33 Tons
3.0 TP-03 113.50 Tons 113.50 Tons 106.66 Tons
4.0 TP-04 101.00 Tons 101.00 Tons 100.00 Tons
5.0 TP-05 105.00 Tons 105.00 Tons 118.66 Tons
6.0 TP-06 113.00 Tons 113.00 Tons 104.66 Tons

Page-4

M.R FOUNDATION
M.R FOUNDATION
Information on site, pile, loading equipment etc

1. Scheme : Fame Apparels Limited (Printing Unit).

2. Client : Fame Apparels Limited.

3. Pile no. : TP- 01,02,03,04,05 & 06

4. Length of Pile : 100ft

5. Dia. of Pile : 500mm

6. Test Pile top level : NA

7. Test Pile tip level : NA

8. Condition of Pile head : Good & leveled by high strength cement mortar

9. Date of Casting : 20,23,27-04-2022 & 05,20,22-05-2022

10. Date of Testing : 18-06-2022 to 30-06-2022

11. Design load : 75.0 Ton

12. Test load : 240.00 Ton

13. Weight of Kent ledge : 5.0 ton

14. Wt. of dead load over the kentl’edge : 264.00 ton ( 7542 No. of sand bags containing 35 kg in each
bag)

15. Diameter of Piston : 28.00 cm

16. Area of Piston : 615.75 cm2

17. Capacity of Hydraulic Jack : 350.0 ton

Page-5

M.R FOUNDATION
APPENDIX A1

Load Test Curves

Data Plots

Calibration Chart

Pressure Calculation & Sequence

Field Data Record Computer Sheet

Field Data Records

Pile Load Test Kentledge

M.R FOUNDATION
LOAD TEST PLOTS
Project: Fame Apparels Limited ( Printing Unit).
Pile ID: TP-01
Time Vs Settlement Plot Load Vs Settlement Plot
0 400 800 1,200 1,600 2,000 0 40 80 120 160 200 240
0 0

4 4

8 8
Settlement (mm)

Settlement (mm)
12
12
16
16
20
20
24
24
28
28
32
32 Load (Ton)
Time (Minute)

Time Vs Load Plot


260
Test Pile No: TP-01
240
220 Pile Size: 500mm
200 Length of Pile: 100'.0"
180 Design Load (Ton): 75.00
160 Max. Test Load (Ton): 240.00
Load

140
Maximum Settlement: 27.609mm
120
100 Net Settlement: 23.774mm
80
60
40
20
0
0 400 800 1,200 1,600 2,000
Time (Minute)
LOAD TEST PLOTS
Project: Fame Apparels Limited ( Printing Unit).
Pile ID: TP-02
Time Vs Settlement Plot Load Vs Settlement Plot
0 400 800 1,200 1,600 2,000 0 40 80 120 160 200 240
0 0

4 4

8 8
Settlement (mm)

Settlement (mm)
12
12
16
16
20
20
24
24
28
28
32
32 Load (Ton)
Time (Minute)

Time Vs Load Plot


260
Test Pile No: TP-02
240
220 Pile Size: 500mm
200 Length of Pile: 100'.0"
180 Design Load (Ton): 75.00
160 Max. Test Load (Ton): 243.75
Load

140
Maximum Settlement: 25.619mm
120
100 Net Settlement: 12.614mm
80
60
40
20
0
0 400 800 1,200 1,600 2,000
Time (Minute)
LOAD TEST PLOTS
Project: Fame Apparels Limited ( Printing Unit).
Pile ID: TP-03
Time Vs Settlement Plot Load Vs Settlement Plot
0 400 800 1,200 1,600 2,000 0 40 80 120 160 200 240
0 0

4 4

8 8
Settlement (mm)

Settlement (mm)
12
12
16
16
20
20
24
24
28
28
32
32 Load (Ton)
Time (Minute)

Time Vs Load Plot


260
Test Pile No: TP-03
240
220 Pile Size: 500mm
200 Length of Pile: 100'.0"
180 Design Load (Ton): 75.00
160 Max. Test Load (Ton): 236.25
Load

140
Maximum Settlement: 26.474mm
120
100 Net Settlement: 11.954mm
80
60
40
20
0
0 400 800 1,200 1,600 2,000
Time (Minute)
LOAD TEST PLOTS
Project: Fame Apparels Limited ( Printing Unit).
Pile ID: TP-04
Time Vs Settlement Plot Load Vs Settlement Plot
0 400 800 1,200 1,600 2,000 0 20 40 60 80 100 120 140 160 180 200 220 240 260
0 0

4 4

8 8
Settlement (mm)

Settlement (mm)
12
12
16
16
20
20
24
24
28
28
32
32 Load (Ton)
Time (Minute)

Time Vs Load Plot


260
Test Pile No: TP-04
240
220 Pile Size: 500mm
200 Length of Pile: 100'.0"
180 Design Load (Ton): 75.00
160 Max. Test Load (Ton): 225.00
Load

140
Maximum Settlement: 26.554mm
120
100 Net Settlement: 16.834mm
80
60
40
20
0
0 400 800 1,200 1,600 2,000
Time (Minute)
LOAD TEST PLOTS
Project: Fame Apparels Limited ( Printing Unit).
Pile ID: TP-05
Time Vs Settlement Plot Load Vs Settlement Plot
0 400 800 1,200 1,600 2,000 0 20 40 60 80 100 120 140 160 180 200 220 240 260
0 0

4 4

8 8
Settlement (mm)

Settlement (mm)
12
12
16
16
20
20
24
24
28
28
32
32 Load (Ton)
Time (Minute)

Time Vs Load Plot


260
Test Pile No: TP-05
240
220 Pile Size: 500mm
200 Length of Pile: 100'.0"
180 Design Load (Ton): 75.00
160 Max. Test Load (Ton): 225.00
Load

140
Maximum Settlement: 27.849mm
120
100 Net Settlement: 21.149mm
80
60
40
20
0
0 400 800 1,200 1,600 2,000
Time (Minute)
LOAD TEST PLOTS
Project: Fame Apparels Limited ( Printing Unit).
Pile ID: TP-06
Time Vs Settlement Plot Load Vs Settlement Plot
0 400 800 1,200 1,600 2,000 0 20 40 60 80 100 120 140 160 180 200 220 240 260
0 0

4 4

8 8
Settlement (mm)

Settlement (mm)
12
12
16
16
20
20
24
24
28
28
32
32 Load (Ton)
Time (Minute)

Time Vs Load Plot


260
Test Pile No: TP-06
240
220 Pile Size: 500mm
200 Length of Pile: 100'.0"
180 Design Load (Ton): 75.00
160 Max. Test Load (Ton): 230.25
Load

140
Maximum Settlement: 26.549mm
120
100 Net Settlement: 11.724mm
80
60
40
20
0
0 400 800 1,200 1,600 2,000
Time (Minute)
Data Emerged from Compressive Load Test, Pile: TP-01
(Average Gage Reading)
(Used for Different Curves)
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

0 0.000 690 13.454 0 0.00 690 187.50 0.00 0.000 187.50 13.454
0 1.869 705 13.524 0 18.75 705 187.50 18.75 1.869 187.50 13.524
15 1.909 720 13.569 15 18.75 720 187.50 18.75 1.909 187.50 13.569
30 1.929 735 13.599 30 18.75 735 187.50 18.75 1.929 187.50 13.599
45 1.949 750 13.609 45 18.75 750 187.50 18.75 1.949 187.50 13.609
60 1.959 750 14.314 60 18.75 750 206.25 18.75 1.959 206.25 14.314
60 2.909 765 14.389 60 37.50 765 206.25 37.50 2.909 206.25 14.389
75 2.929 780 14.429 75 37.50 780 206.25 37.50 2.929 206.25 14.429
90 2.939 795 14.454 90 37.50 795 206.25 37.50 2.939 206.25 14.454
105 2.949 810 14.474 105 37.50 810 206.25 37.50 2.949 206.25 14.474
120 2.959 810 16.274 120 37.50 810 225.00 37.50 2.959 225.00 16.274
120 3.304 825 16.299 120 56.25 825 225.00 56.25 3.304 225.00 16.299
135 3.319 840 16.374 135 56.25 840 225.00 56.25 3.319 225.00 16.374
150 3.339 855 16.439 150 56.25 855 225.00 56.25 3.339 225.00 16.439
165 3.354 870 16.489 165 56.25 870 225.00 56.25 3.354 225.00 16.489
180 3.354 870 27.174 180 56.25 870 240.00 56.25 3.354 240.00 27.174
180 5.344 885 27.249 180 75.00 885 240.00 75.00 5.344 240.00 27.249
195 5.434 900 27.309 195 75.00 900 240.00 75.00 5.434 240.00 27.309
210 5.474 915 27.349 210 75.00 915 240.00 75.00 5.474 240.00 27.349
225 5.494 930 27.369 225 75.00 930 240.00 75.00 5.494 240.00 27.369
240 5.514 930 27.409 240 75.00 930 240.00 75.00 5.514 240.00 27.409
240 5.429 990 27.449 240 56.25 990 240.00 56.25 5.429 240.00 27.449
250 5.414 1,050 27.484 250 56.25 1,050 240.00 56.25 5.414 240.00 27.484
250 5.279 1,110 27.514 250 37.50 1,110 240.00 37.50 5.279 240.00 27.514
260 5.259 1,170 27.539 260 37.50 1,170 240.00 37.50 5.259 240.00 27.539
260 5.144 1,230 27.559 260 18.75 1,230 240.00 18.75 5.144 240.00 27.559
270 5.134 1,290 27.569 270 18.75 1,290 240.00 18.75 5.134 240.00 27.569
270 4.919 1,350 27.579 270 0.00 1,350 240.00 0.00 4.919 240.00 27.579
285 4.909 1,410 27.589 285 0.00 1,410 240.00 0.00 4.909 240.00 27.589
300 4.899 1,470 27.599 300 0.00 1,470 240.00 0.00 4.899 240.00 27.599
315 4.899 1,530 27.609 315 0.00 1,530 240.00 0.00 4.899 240.00 27.609
330 4.899 1,530 27.609 330 0.00 1,530 225.00 0.00 4.899 225.00 27.609
330 5.589 1,540 27.599 330 75.00 1,540 225.00 75.00 5.589 225.00 27.599
345 5.684 1,540 27.494 345 75.00 1,540 206.25 75.00 5.684 206.25 27.494
360 5.729 1,550 27.484 360 75.00 1,550 206.25 75.00 5.729 206.25 27.484

Page 1 of 2
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

375 5.749 1,550 27.414 375 75.00 1,550 187.50 75.00 5.749 187.50 27.414
390 5.749 1,560 27.404 390 75.00 1,560 187.50 75.00 5.749 187.50 27.404
390 7.729 1,560 26.894 390 93.75 1,560 168.75 93.75 7.729 168.75 26.894
405 7.824 1,570 26.884 405 93.75 1,570 168.75 93.75 7.824 168.75 26.884
420 7.869 1,570 26.774 420 93.75 1,570 150.00 93.75 7.869 150.00 26.774
435 7.884 1,580 26.764 435 93.75 1,580 150.00 93.75 7.884 150.00 26.764
450 7.894 1,580 26.639 450 93.75 1,580 131.25 93.75 7.894 131.25 26.639
450 9.304 1,590 26.629 450 112.50 1,590 131.25 112.50 9.304 131.25 26.629
465 9.364 1,590 25.819 465 112.50 1,590 112.50 112.50 9.364 112.50 25.819
480 9.394 1,600 25.809 480 112.50 1,600 112.50 112.50 9.394 112.50 25.809
495 9.414 1,600 25.694 495 112.50 1,600 93.75 112.50 9.414 93.75 25.694
510 9.424 1,610 25.684 510 112.50 1,610 93.75 112.50 9.424 93.75 25.684
510 10.204 1,610 25.479 510 131.25 1,610 75.00 131.25 10.204 75.00 25.479
525 10.289 1,620 25.469 525 131.25 1,620 75.00 131.25 10.289 75.00 25.469
540 10.329 1,620 25.319 540 131.25 1,620 56.25 131.25 10.329 56.25 25.319
555 10.349 1,630 25.309 555 131.25 1,630 56.25 131.25 10.349 56.25 25.309
570 10.359 1,630 24.904 570 131.25 1,630 37.50 131.25 10.359 37.50 24.904
570 11.379 1,640 24.894 570 150.00 1,640 37.50 150.00 11.379 37.50 24.894
585 11.439 1,640 24.479 585 150.00 1,640 18.75 150.00 11.439 18.75 24.479
600 11.479 1,650 24.469 600 150.00 1,650 18.75 150.00 11.479 18.75 24.469
615 11.489 1,650 23.809 615 150.00 1,650 0.00 150.00 11.489 0.00 23.809
630 11.499 1,665 23.799 630 150.00 1,665 0.00 150.00 11.499 0.00 23.799
630 12.174 1,680 23.789 630 168.75 1,680 0.00 168.75 12.174 0.00 23.789
645 12.249 1,695 23.779 645 168.75 1,695 0.00 168.75 12.249 0.00 23.779
660 12.289 1,710 23.774 660 168.75 1,710 0.00 168.75 12.289 0.00 23.774
675 12.309 0 0.000 675 168.75 0 0.00 168.75 12.309 0.00 0.000
690 12.309 END 690 168.75 END 168.75 12.309 END

Page 2 of 2
Data Emerged from Compressive Load Test, Pile: TP-02
(Average Gage Reading)
(Used for Different Curves)
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

0 0.000 690 11.839 0 0.00 690 187.50 0.00 0.000 187.50 11.839
0 1.229 705 11.879 0 18.75 705 187.50 18.75 1.229 187.50 11.879
15 1.259 720 11.899 15 18.75 720 187.50 18.75 1.259 187.50 11.899
30 1.279 735 11.909 30 18.75 735 187.50 18.75 1.279 187.50 11.909
45 1.289 750 11.919 45 18.75 750 187.50 18.75 1.289 187.50 11.919
60 1.294 750 14.229 60 18.75 750 206.25 18.75 1.294 206.25 14.229
60 2.119 765 14.269 60 37.50 765 206.25 37.50 2.119 206.25 14.269
75 2.154 780 14.289 75 37.50 780 206.25 37.50 2.154 206.25 14.289
90 2.169 795 14.309 90 37.50 795 206.25 37.50 2.169 206.25 14.309
105 2.179 810 14.319 105 37.50 810 206.25 37.50 2.179 206.25 14.319
120 2.179 810 18.719 120 37.50 810 225.00 37.50 2.179 225.00 18.719
120 3.039 825 18.769 120 56.25 825 225.00 56.25 3.039 225.00 18.769
135 3.069 840 18.789 135 56.25 840 225.00 56.25 3.069 225.00 18.789
150 3.089 855 18.809 150 56.25 855 225.00 56.25 3.089 225.00 18.809
165 3.099 870 18.819 165 56.25 870 225.00 56.25 3.099 225.00 18.819
180 3.099 870 23.829 180 56.25 870 243.75 56.25 3.099 243.75 23.829
180 4.229 885 24.269 180 75.00 885 243.75 75.00 4.229 243.75 24.269
195 4.269 900 24.614 195 75.00 900 243.75 75.00 4.269 243.75 24.614
210 4.289 915 24.714 210 75.00 915 243.75 75.00 4.289 243.75 24.714
225 4.309 930 24.779 225 75.00 930 243.75 75.00 4.309 243.75 24.779
240 4.319 930 25.154 240 75.00 930 243.75 75.00 4.319 243.75 25.154
240 4.269 990 25.289 240 56.25 990 243.75 56.25 4.269 243.75 25.289
250 4.259 1,050 25.364 250 56.25 1,050 243.75 56.25 4.259 243.75 25.364
250 4.129 1,110 25.434 250 37.50 1,110 243.75 37.50 4.129 243.75 25.434
260 4.109 1,170 25.484 260 37.50 1,170 243.75 37.50 4.109 243.75 25.484
260 3.929 1,230 25.524 260 18.75 1,230 243.75 18.75 3.929 243.75 25.524
270 3.909 1,290 25.564 270 18.75 1,290 243.75 18.75 3.909 243.75 25.564
270 3.229 1,350 25.594 270 0.00 1,350 243.75 0.00 3.229 243.75 25.594
285 3.199 1,410 25.609 285 0.00 1,410 243.75 0.00 3.199 243.75 25.609
300 3.179 1,470 25.619 300 0.00 1,470 243.75 0.00 3.179 243.75 25.619
315 3.169 1,530 25.619 315 0.00 1,530 243.75 0.00 3.169 243.75 25.619
330 3.169 1,530 25.619 330 0.00 1,530 225.00 0.00 3.169 225.00 25.619
330 4.539 1,540 25.599 330 75.00 1,540 225.00 75.00 4.539 225.00 25.599
345 4.579 1,540 24.709 345 75.00 1,540 206.25 75.00 4.579 206.25 24.709
360 4.599 1,550 25.189 360 75.00 1,550 206.25 75.00 4.599 206.25 25.189

Page 1 of 2
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

375 4.609 1,550 23.769 375 75.00 1,550 187.50 75.00 4.609 187.50 23.769
390 4.619 1,560 23.749 390 75.00 1,560 187.50 75.00 4.619 187.50 23.749
390 5.499 1,560 22.619 390 93.75 1,560 168.75 93.75 5.499 168.75 22.619
405 5.529 1,570 22.599 405 93.75 1,570 168.75 93.75 5.529 168.75 22.599
420 5.559 1,570 21.739 420 93.75 1,570 150.00 93.75 5.559 150.00 21.739
435 5.579 1,580 21.719 435 93.75 1,580 150.00 93.75 5.579 150.00 21.719
450 5.589 1,580 20.894 450 93.75 1,580 131.25 93.75 5.589 131.25 20.894
450 6.639 1,590 20.874 450 112.50 1,590 131.25 112.50 6.639 131.25 20.874
465 6.669 1,590 19.469 465 112.50 1,590 112.50 112.50 6.669 112.50 19.469
480 6.699 1,600 19.449 480 112.50 1,600 112.50 112.50 6.699 112.50 19.449
495 6.714 1,600 18.674 495 112.50 1,600 93.75 112.50 6.714 93.75 18.674
510 6.719 1,610 18.659 510 112.50 1,610 93.75 112.50 6.719 93.75 18.659
510 8.049 1,610 17.799 510 131.25 1,610 75.00 131.25 8.049 75.00 17.799
525 8.094 1,620 17.779 525 131.25 1,620 75.00 131.25 8.094 75.00 17.779
540 8.114 1,620 16.349 540 131.25 1,620 56.25 131.25 8.114 56.25 16.349
555 8.129 1,630 16.329 555 131.25 1,630 56.25 131.25 8.129 56.25 16.329
570 8.139 1,630 15.679 570 131.25 1,630 37.50 131.25 8.139 37.50 15.679
570 9.379 1,640 15.659 570 150.00 1,640 37.50 150.00 9.379 37.50 15.659
585 9.409 1,640 14.619 585 150.00 1,640 18.75 150.00 9.409 18.75 14.619
600 9.429 1,650 14.599 600 150.00 1,650 18.75 150.00 9.429 18.75 14.599
615 9.439 1,650 12.664 615 150.00 1,650 0.00 150.00 9.439 0.00 12.664
630 9.449 1,665 12.649 630 150.00 1,665 0.00 150.00 9.449 0.00 12.649
630 10.609 1,680 12.634 630 168.75 1,680 0.00 168.75 10.609 0.00 12.634
645 10.649 1,695 12.624 645 168.75 1,695 0.00 168.75 10.649 0.00 12.624
660 10.669 1,710 12.614 660 168.75 1,710 0.00 168.75 10.669 0.00 12.614
675 10.679 0 0.000 675 168.75 0 0.00 168.75 10.679 0.00 0.000
690 10.689 END 690 168.75 END 168.75 10.689 END

Page 2 of 2
Data Emerged from Compressive Load Test, Pile: TP-03
(Average Gage Reading)
(Used for Different Curves)
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

0 0.000 690 14.949 0 0.00 690 187.50 0.00 0.000 187.50 14.949
0 1.154 705 15.044 0 18.75 705 187.50 18.75 1.154 187.50 15.044
15 1.209 720 15.089 15 18.75 720 187.50 18.75 1.209 187.50 15.089
30 1.234 735 15.139 30 18.75 735 187.50 18.75 1.234 187.50 15.139
45 1.244 750 15.159 45 18.75 750 187.50 18.75 1.244 187.50 15.159
60 1.244 750 17.174 60 18.75 750 206.25 18.75 1.244 206.25 17.174
60 2.269 765 17.224 60 37.50 765 206.25 37.50 2.269 206.25 17.224
75 2.309 780 17.264 75 37.50 780 206.25 37.50 2.309 206.25 17.264
90 2.339 795 17.289 90 37.50 795 206.25 37.50 2.339 206.25 17.289
105 2.354 810 17.309 105 37.50 810 206.25 37.50 2.354 206.25 17.309
120 2.359 810 19.179 120 37.50 810 225.00 37.50 2.359 225.00 19.179
120 2.839 825 19.224 120 56.25 825 225.00 56.25 2.839 225.00 19.224
135 2.879 840 19.259 135 56.25 840 225.00 56.25 2.879 225.00 19.259
150 2.904 855 19.299 150 56.25 855 225.00 56.25 2.904 225.00 19.299
165 2.909 870 19.304 165 56.25 870 225.00 56.25 2.909 225.00 19.304
180 2.919 870 24.154 180 56.25 870 236.25 56.25 2.919 236.25 24.154
180 3.949 885 24.329 180 75.00 885 236.25 75.00 3.949 236.25 24.329
195 3.999 900 24.444 195 75.00 900 236.25 75.00 3.999 236.25 24.444
210 4.019 915 24.619 210 75.00 915 236.25 75.00 4.019 236.25 24.619
225 4.029 930 24.679 225 75.00 930 236.25 75.00 4.029 236.25 24.679
240 4.029 930 25.069 240 75.00 930 236.25 75.00 4.029 236.25 25.069
240 3.869 990 25.399 240 56.25 990 236.25 56.25 3.869 236.25 25.399
250 3.859 1,050 25.614 250 56.25 1,050 236.25 56.25 3.859 236.25 25.614
250 3.604 1,110 25.954 250 37.50 1,110 236.25 37.50 3.604 236.25 25.954
260 3.589 1,170 26.104 260 37.50 1,170 236.25 37.50 3.589 236.25 26.104
260 3.224 1,230 26.259 260 18.75 1,230 236.25 18.75 3.224 236.25 26.259
270 3.219 1,290 26.439 270 18.75 1,290 236.25 18.75 3.219 236.25 26.439
270 2.664 1,350 26.474 270 0.00 1,350 236.25 0.00 2.664 236.25 26.474
285 2.629 1,410 26.474 285 0.00 1,410 236.25 0.00 2.629 236.25 26.474
300 2.609 1,470 26.474 300 0.00 1,470 236.25 0.00 2.609 236.25 26.474
315 2.594 1,530 26.474 315 0.00 1,530 236.25 0.00 2.594 236.25 26.474
330 2.584 1,530 26.409 330 0.00 1,530 225.00 0.00 2.584 225.00 26.409
330 4.114 1,540 26.389 330 75.00 1,540 225.00 75.00 4.114 225.00 26.389
345 4.164 1,540 25.739 345 75.00 1,540 206.25 75.00 4.164 206.25 25.739
360 4.189 1,550 25.724 360 75.00 1,550 206.25 75.00 4.189 206.25 25.724

Page 1 of 2
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

375 4.204 1,550 25.284 375 75.00 1,550 187.50 75.00 4.204 187.50 25.284
390 4.214 1,560 25.269 390 75.00 1,560 187.50 75.00 4.214 187.50 25.269
390 5.944 1,560 24.699 390 93.75 1,560 168.75 93.75 5.944 168.75 24.699
405 6.014 1,570 24.679 405 93.75 1,570 168.75 93.75 6.014 168.75 24.679
420 6.054 1,570 23.904 420 93.75 1,570 150.00 93.75 6.054 150.00 23.904
435 6.074 1,580 23.889 435 93.75 1,580 150.00 93.75 6.074 150.00 23.889
450 6.094 1,580 23.194 450 93.75 1,580 131.25 93.75 6.094 131.25 23.194
450 7.754 1,590 23.129 450 112.50 1,590 131.25 112.50 7.754 131.25 23.129
465 7.824 1,590 22.269 465 112.50 1,590 112.50 112.50 7.824 112.50 22.269
480 7.864 1,600 22.249 480 112.50 1,600 112.50 112.50 7.864 112.50 22.249
495 7.889 1,600 19.074 495 112.50 1,600 93.75 112.50 7.889 93.75 19.074
510 7.899 1,610 19.054 510 112.50 1,610 93.75 112.50 7.899 93.75 19.054
510 9.594 1,610 18.174 510 131.25 1,610 75.00 131.25 9.594 75.00 18.174
525 9.649 1,620 18.129 525 131.25 1,620 75.00 131.25 9.649 75.00 18.129
540 9.689 1,620 17.324 540 131.25 1,620 56.25 131.25 9.689 56.25 17.324
555 9.714 1,630 17.304 555 131.25 1,630 56.25 131.25 9.714 56.25 17.304
570 9.719 1,630 15.664 570 131.25 1,630 37.50 131.25 9.719 37.50 15.664
570 10.894 1,640 15.639 570 150.00 1,640 37.50 150.00 10.894 37.50 15.639
585 10.949 1,640 14.534 585 150.00 1,640 18.75 150.00 10.949 18.75 14.534
600 10.994 1,650 14.504 600 150.00 1,650 18.75 150.00 10.994 18.75 14.504
615 11.024 1,650 12.139 615 150.00 1,650 0.00 150.00 11.024 0.00 12.139
630 11.039 1,665 12.074 630 150.00 1,665 0.00 150.00 11.039 0.00 12.074
630 12.729 1,680 12.024 630 168.75 1,680 0.00 168.75 12.729 0.00 12.024
645 12.829 1,695 11.964 645 168.75 1,695 0.00 168.75 12.829 0.00 11.964
660 12.864 1,710 11.954 660 168.75 1,710 0.00 168.75 12.864 0.00 11.954
675 12.889 0 0.000 675 168.75 0 0.00 168.75 12.889 0.00 0.000
690 12.899 END 690 168.75 END 168.75 12.899 END

Page 2 of 2
Data Emerged from Compressive Load Test, Pile: TP-04
(Average Gage Reading)
(Used for Different Curves)
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

0 0.000 645 14.329 0 0.00 645 168.75 0.00 0.000 168.75 14.329
0 1.509 660 14.369 0 18.75 660 168.75 18.75 1.509 168.75 14.369
15 1.529 675 14.389 15 18.75 675 168.75 18.75 1.529 168.75 14.389
30 1.539 690 14.399 30 18.75 690 168.75 18.75 1.539 168.75 14.399
45 1.549 690 17.469 45 18.75 690 187.50 18.75 1.549 187.50 17.469
60 1.549 705 17.529 60 18.75 705 187.50 18.75 1.549 187.50 17.529
60 2.619 720 17.569 60 37.50 720 187.50 37.50 2.619 187.50 17.569
75 2.649 735 17.609 75 37.50 735 187.50 37.50 2.649 187.50 17.609
90 2.659 750 17.629 90 37.50 750 187.50 37.50 2.659 187.50 17.629
105 2.669 750 20.549 105 37.50 750 206.25 37.50 2.669 206.25 20.549
120 2.679 765 20.619 120 37.50 765 206.25 37.50 2.679 206.25 20.619
120 3.889 780 20.674 120 56.25 780 206.25 56.25 3.889 206.25 20.674
135 3.919 795 20.704 135 56.25 795 206.25 56.25 3.919 206.25 20.704
150 3.939 810 20.724 150 56.25 810 206.25 56.25 3.939 206.25 20.724
165 3.949 810 26.099 165 56.25 810 225.00 56.25 3.949 225.00 26.099
180 3.959 825 26.224 180 56.25 825 225.00 56.25 3.959 225.00 26.224
180 5.369 840 26.309 180 75.00 840 225.00 75.00 5.369 225.00 26.309
195 5.419 855 26.369 195 75.00 855 225.00 75.00 5.419 225.00 26.369
210 5.449 870 26.419 210 75.00 870 225.00 75.00 5.449 225.00 26.419
225 5.469 930 26.459 225 75.00 930 225.00 75.00 5.469 225.00 26.459
240 5.479 990 26.479 240 75.00 990 225.00 75.00 5.479 225.00 26.479
240 5.419 1,050 26.489 240 56.25 1,050 225.00 56.25 5.419 225.00 26.489
250 5.409 1,110 26.499 250 56.25 1,110 225.00 56.25 5.409 225.00 26.499
250 5.209 1,170 26.509 250 37.50 1,170 225.00 37.50 5.209 225.00 26.509
260 5.199 1,230 26.519 260 37.50 1,230 225.00 37.50 5.199 225.00 26.519
260 4.829 1,290 26.529 260 18.75 1,290 225.00 18.75 4.829 225.00 26.529
270 4.809 1,350 26.539 270 18.75 1,350 225.00 18.75 4.809 225.00 26.539
270 3.799 1,410 26.549 270 0.00 1,410 225.00 0.00 3.799 225.00 26.549
285 3.719 1,470 26.554 285 0.00 1,470 225.00 0.00 3.719 225.00 26.554
300 3.699 1,530 26.554 300 0.00 1,530 225.00 0.00 3.699 225.00 26.554
315 3.679 1,530 26.554 315 0.00 1,530 206.25 0.00 3.679 206.25 26.554
330 3.669 1,540 26.544 330 0.00 1,540 206.25 0.00 3.669 206.25 26.544
330 5.639 1,540 26.399 330 75.00 1,540 187.50 75.00 5.639 187.50 26.399
345 5.659 1,550 26.389 345 75.00 1,550 187.50 75.00 5.659 187.50 26.389
360 5.679 1,550 25.854 360 75.00 1,550 168.75 75.00 5.679 168.75 25.854

Page 1 of 2
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

375 5.689 1,560 25.844 375 75.00 1,560 168.75 75.00 5.689 168.75 25.844
390 5.699 1,560 24.694 390 75.00 1,560 150.00 75.00 5.699 150.00 24.694
390 6.499 1,570 24.674 390 93.75 1,570 150.00 93.75 6.499 150.00 24.674
405 6.539 1,570 23.414 405 93.75 1,570 131.25 93.75 6.539 131.25 23.414
420 6.559 1,580 23.404 420 93.75 1,580 131.25 93.75 6.559 131.25 23.404
435 6.569 1,580 22.809 435 93.75 1,580 112.50 93.75 6.569 112.50 22.809
450 6.579 1,590 22.789 450 93.75 1,590 112.50 93.75 6.579 112.50 22.789
450 7.479 1,590 21.684 450 112.50 1,590 93.75 112.50 7.479 93.75 21.684
465 7.509 1,600 21.664 465 112.50 1,600 93.75 112.50 7.509 93.75 21.664
480 7.529 1,600 20.269 480 112.50 1,600 75.00 112.50 7.529 75.00 20.269
495 7.539 1,610 20.249 495 112.50 1,610 75.00 112.50 7.539 75.00 20.249
510 7.549 1,610 19.494 510 112.50 1,610 56.25 112.50 7.549 56.25 19.494
510 9.359 1,620 19.449 510 131.25 1,620 56.25 131.25 9.359 56.25 19.449
525 9.404 1,620 18.624 525 131.25 1,620 37.50 131.25 9.404 37.50 18.624
540 9.424 1,630 18.604 540 131.25 1,630 37.50 131.25 9.424 37.50 18.604
555 9.439 1,630 17.514 555 131.25 1,630 18.75 131.25 9.439 18.75 17.514
570 9.454 1,640 17.494 570 131.25 1,640 18.75 131.25 9.454 18.75 17.494
570 11.709 1,640 16.929 570 150.00 1,640 0.00 150.00 11.709 0.00 16.929
585 11.749 1,655 16.889 585 150.00 1,655 0.00 150.00 11.749 0.00 16.889
600 11.779 1,670 16.859 600 150.00 1,670 0.00 150.00 11.779 0.00 16.859
615 11.799 1,685 16.844 615 150.00 1,685 0.00 150.00 11.799 0.00 16.844
630 11.809 1,700 16.834 630 150.00 1,700 0.00 150.00 11.809 0.00 16.834
630 14.264 END 630 168.75 END 168.75 14.264 END

Page 2 of 2
Data Emerged from Compressive Load Test, Pile: TP-05
(Average Gage Reading)
(Used for Different Curves)
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

0 0.000 645 10.279 0 0.00 645 168.75 0.00 0.000 168.75 10.279
0 1.149 660 10.319 0 18.75 660 168.75 18.75 1.149 168.75 10.319
15 1.219 675 10.339 15 18.75 675 168.75 18.75 1.219 168.75 10.339
30 1.249 690 10.349 30 18.75 690 168.75 18.75 1.249 168.75 10.349
45 1.274 690 13.579 45 18.75 690 187.50 18.75 1.274 187.50 13.579
60 1.279 705 13.659 60 18.75 705 187.50 18.75 1.279 187.50 13.659
60 2.059 720 13.689 60 37.50 720 187.50 37.50 2.059 187.50 13.689
75 2.119 735 13.709 75 37.50 735 187.50 37.50 2.119 187.50 13.709
90 2.154 750 13.719 90 37.50 750 187.50 37.50 2.154 187.50 13.719
105 2.169 750 18.269 105 37.50 750 206.25 37.50 2.169 206.25 18.269
120 2.179 765 18.409 120 37.50 765 206.25 37.50 2.179 206.25 18.409
120 2.979 780 18.439 120 56.25 780 206.25 56.25 2.979 206.25 18.439
135 3.014 795 18.459 135 56.25 795 206.25 56.25 3.014 206.25 18.459
150 3.034 810 18.469 150 56.25 810 206.25 56.25 3.034 206.25 18.469
165 3.049 810 24.979 165 56.25 810 225.00 56.25 3.049 225.00 24.979
180 3.059 825 25.379 180 56.25 825 225.00 56.25 3.059 225.00 25.379
180 4.119 840 25.599 180 75.00 840 225.00 75.00 4.119 225.00 25.599
195 4.169 855 25.779 195 75.00 855 225.00 75.00 4.169 225.00 25.779
210 4.189 870 25.979 210 75.00 870 225.00 75.00 4.189 225.00 25.979
225 4.199 930 26.519 225 75.00 930 225.00 75.00 4.199 225.00 26.519
240 4.209 990 26.919 240 75.00 990 225.00 75.00 4.209 225.00 26.919
240 4.149 1,050 27.259 240 56.25 1,050 225.00 56.25 4.149 225.00 27.259
250 4.139 1,110 27.379 250 56.25 1,110 225.00 56.25 4.139 225.00 27.379
250 4.019 1,170 27.539 250 37.50 1,170 225.00 37.50 4.019 225.00 27.539
260 4.009 1,230 27.639 260 37.50 1,230 225.00 37.50 4.009 225.00 27.639
260 3.749 1,290 27.759 260 18.75 1,290 225.00 18.75 3.749 225.00 27.759
270 3.729 1,350 27.819 270 18.75 1,350 225.00 18.75 3.729 225.00 27.819
270 3.409 1,410 27.839 270 0.00 1,410 225.00 0.00 3.409 225.00 27.839
285 3.349 1,470 27.849 285 0.00 1,470 225.00 0.00 3.349 225.00 27.849
300 3.329 1,530 27.849 300 0.00 1,530 225.00 0.00 3.329 225.00 27.849
315 3.319 1,530 27.849 315 0.00 1,530 206.25 0.00 3.319 206.25 27.849
330 3.319 1,540 27.849 330 0.00 1,540 206.25 0.00 3.319 206.25 27.849
330 4.399 1,540 27.779 330 75.00 1,540 187.50 75.00 4.399 187.50 27.779
345 4.429 1,550 27.779 345 75.00 1,550 187.50 75.00 4.429 187.50 27.779
360 4.449 1,550 27.689 360 75.00 1,550 168.75 75.00 4.449 168.75 27.689

Page 1 of 2
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

375 4.454 1,560 27.679 375 75.00 1,560 168.75 75.00 4.454 168.75 27.679
390 4.459 1,560 27.489 390 75.00 1,560 150.00 75.00 4.459 150.00 27.489
390 5.039 1,570 27.479 390 93.75 1,570 150.00 93.75 5.039 150.00 27.479
405 5.079 1,570 27.059 405 93.75 1,570 131.25 93.75 5.079 131.25 27.059
420 5.109 1,580 27.049 420 93.75 1,580 131.25 93.75 5.109 131.25 27.049
435 5.129 1,580 26.639 435 93.75 1,580 112.50 93.75 5.129 112.50 26.639
450 5.139 1,590 26.619 450 93.75 1,590 112.50 93.75 5.139 112.50 26.619
450 5.719 1,590 26.089 450 112.50 1,590 93.75 112.50 5.719 93.75 26.089
465 5.779 1,600 26.069 465 112.50 1,600 93.75 112.50 5.779 93.75 26.069
480 5.799 1,600 25.379 480 112.50 1,600 75.00 112.50 5.799 75.00 25.379
495 5.809 1,610 25.359 495 112.50 1,610 75.00 112.50 5.809 75.00 25.359
510 5.819 1,610 24.789 510 112.50 1,610 56.25 112.50 5.819 56.25 24.789
510 7.039 1,620 24.759 510 131.25 1,620 56.25 131.25 7.039 56.25 24.759
525 7.104 1,620 24.079 525 131.25 1,620 37.50 131.25 7.104 37.50 24.079
540 7.129 1,630 24.059 540 131.25 1,630 37.50 131.25 7.129 37.50 24.059
555 7.149 1,630 23.389 555 131.25 1,630 18.75 131.25 7.149 18.75 23.389
570 7.159 1,640 23.339 570 131.25 1,640 18.75 131.25 7.159 18.75 23.339
570 8.519 1,640 21.549 570 150.00 1,640 0.00 150.00 8.519 0.00 21.549
585 8.579 1,655 21.369 585 150.00 1,655 0.00 150.00 8.579 0.00 21.369
600 8.609 1,670 21.229 600 150.00 1,670 0.00 150.00 8.609 0.00 21.229
615 8.629 1,685 21.169 615 150.00 1,685 0.00 150.00 8.629 0.00 21.169
630 8.639 1,700 21.149 630 150.00 1,700 0.00 150.00 8.639 0.00 21.149
630 10.179 END 630 168.75 END 168.75 10.179 END

Page 2 of 2
Data Emerged from Compressive Load Test, Pile: TP-06
(Average Gage Reading)
(Used for Different Curves)
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

0 0.000 690 13.099 0 0.00 690 187.50 0.00 0.000 187.50 13.099
0 1.029 705 13.149 0 18.75 705 187.50 18.75 1.029 187.50 13.149
15 1.089 720 13.179 15 18.75 720 187.50 18.75 1.089 187.50 13.179
30 1.109 735 13.199 30 18.75 735 187.50 18.75 1.109 187.50 13.199
45 1.119 750 13.209 45 18.75 750 187.50 18.75 1.119 187.50 13.209
60 1.119 750 15.229 60 18.75 750 206.25 18.75 1.119 206.25 15.229
60 2.029 765 15.269 60 37.50 765 206.25 37.50 2.029 206.25 15.269
75 2.069 780 15.289 75 37.50 780 206.25 37.50 2.069 206.25 15.289
90 2.089 795 15.299 90 37.50 795 206.25 37.50 2.089 206.25 15.299
105 2.109 810 15.309 105 37.50 810 206.25 37.50 2.109 206.25 15.309
120 2.109 810 17.819 120 37.50 810 225.00 37.50 2.109 225.00 17.819
120 3.159 825 17.919 120 56.25 825 225.00 56.25 3.159 225.00 17.919
135 3.179 840 17.979 135 56.25 840 225.00 56.25 3.179 225.00 17.979
150 3.199 855 17.999 150 56.25 855 225.00 56.25 3.199 225.00 17.999
165 3.209 870 18.019 165 56.25 870 225.00 56.25 3.209 225.00 18.019
180 3.219 870 26.089 180 56.25 870 230.25 56.25 3.219 230.25 26.089
180 4.329 885 26.164 180 75.00 885 230.25 75.00 4.329 230.25 26.164
195 4.369 900 26.204 195 75.00 900 230.25 75.00 4.369 230.25 26.204
210 4.389 915 26.244 210 75.00 915 230.25 75.00 4.389 230.25 26.244
225 4.399 930 26.274 225 75.00 930 230.25 75.00 4.399 230.25 26.274
240 4.409 930 26.344 240 75.00 930 230.25 75.00 4.409 230.25 26.344
240 4.339 990 26.394 240 56.25 990 230.25 56.25 4.339 230.25 26.394
250 4.329 1,050 26.444 250 56.25 1,050 230.25 56.25 4.329 230.25 26.444
250 4.129 1,110 26.484 250 37.50 1,110 230.25 37.50 4.129 230.25 26.484
260 4.119 1,170 26.524 260 37.50 1,170 230.25 37.50 4.119 230.25 26.524
260 3.799 1,230 26.549 260 18.75 1,230 230.25 18.75 3.799 230.25 26.549
270 3.779 1,290 26.549 270 18.75 1,290 230.25 18.75 3.779 230.25 26.549
270 3.229 1,350 26.549 270 0.00 1,350 230.25 0.00 3.229 230.25 26.549
285 3.129 1,410 26.549 285 0.00 1,410 230.25 0.00 3.129 230.25 26.549
300 3.099 1,470 26.549 300 0.00 1,470 230.25 0.00 3.099 230.25 26.549
315 3.089 1,530 26.549 315 0.00 1,530 230.25 0.00 3.089 230.25 26.549
330 3.089 1,530 26.524 330 0.00 1,530 225.00 0.00 3.089 225.00 26.524
330 4.639 1,540 26.524 330 75.00 1,540 225.00 75.00 4.639 225.00 26.524
345 4.669 1,540 26.354 345 75.00 1,540 206.25 75.00 4.669 206.25 26.354
360 4.689 1,550 26.349 360 75.00 1,550 206.25 75.00 4.689 206.25 26.349

Page 1 of 2
Data for Data for Data for
Time - Settlement Time - Load Load - Settlement
Curve Curve Curve
Cumula. Cumula. Cumula. Cumula.
Average Average Average Average
Elapsed Elapsed Elapsed Load Elapsed Load Load Load
Settlem. Settlem. Settlem. Settlem.
Time Time Time (Ton) Time (Ton) (Ton) (Ton)
(mm) (mm) (mm) (mm)
(min) (min) (min) (min)
X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis X-axis Y-axis

375 4.699 1,550 26.049 375 75.00 1,550 187.50 75.00 4.699 187.50 26.049
390 4.709 1,560 26.039 390 75.00 1,560 187.50 75.00 4.709 187.50 26.039
390 5.529 1,560 25.739 390 93.75 1,560 168.75 93.75 5.529 168.75 25.739
405 5.569 1,570 25.729 405 93.75 1,570 168.75 93.75 5.569 168.75 25.729
420 5.589 1,570 25.274 420 93.75 1,570 150.00 93.75 5.589 150.00 25.274
435 5.609 1,580 25.264 435 93.75 1,580 150.00 93.75 5.609 150.00 25.264
450 5.629 1,580 24.914 450 93.75 1,580 131.25 93.75 5.629 131.25 24.914
450 6.729 1,590 24.899 450 112.50 1,590 131.25 112.50 6.729 131.25 24.899
465 6.759 1,590 24.159 465 112.50 1,590 112.50 112.50 6.759 112.50 24.159
480 6.789 1,600 24.139 480 112.50 1,600 112.50 112.50 6.789 112.50 24.139
495 6.809 1,600 23.654 495 112.50 1,600 93.75 112.50 6.809 93.75 23.654
510 6.819 1,610 23.649 510 112.50 1,610 93.75 112.50 6.819 93.75 23.649
510 8.059 1,610 23.049 510 131.25 1,610 75.00 131.25 8.059 75.00 23.049
525 8.109 1,620 23.039 525 131.25 1,620 75.00 131.25 8.109 75.00 23.039
540 8.129 1,620 22.604 540 131.25 1,620 56.25 131.25 8.129 56.25 22.604
555 8.149 1,630 22.574 555 131.25 1,630 56.25 131.25 8.149 56.25 22.574
570 8.159 1,630 21.839 570 131.25 1,630 37.50 131.25 8.159 37.50 21.839
570 9.629 1,640 21.829 570 150.00 1,640 37.50 150.00 9.629 37.50 21.829
585 9.669 1,640 17.104 585 150.00 1,640 18.75 150.00 9.669 18.75 17.104
600 9.689 1,650 17.099 600 150.00 1,650 18.75 150.00 9.689 18.75 17.099
615 9.699 1,650 11.844 615 150.00 1,650 0.00 150.00 9.699 0.00 11.844
630 9.709 1,665 11.774 630 150.00 1,665 0.00 150.00 9.709 0.00 11.774
630 11.129 1,680 11.729 630 168.75 1,680 0.00 168.75 11.129 0.00 11.729
645 11.159 1,695 11.724 645 168.75 1,695 0.00 168.75 11.159 0.00 11.724
660 11.179 1,710 11.724 660 168.75 1,710 0.00 168.75 11.179 0.00 11.724
675 11.199 0 0.000 675 168.75 0 0.00 168.75 11.199 0.00 0.000
690 11.209 END 690 168.75 END 168.75 11.209 END

Page 2 of 2
CamScanner
CamScanner
CamScanner
Project: Fame Apparels Limited ( Printing Unit).

Individual Pile Under Static Axial Compressive Load (ASTM-D-1143)


Pressure Calculation for Pile: TP-01

Dia of Ram)Cm): 28.00


Desing Load (Ton)= 75.00 Area of Ram(cm2): 615.75
Maxm Test Load (Ton)= 240.00 Regression Equal, Y= 1.0067X - 8.5106
(3×design load) Pressure Gauge Capacity 1000 bar
Maxm Applied Load (Ton)= 240.00 Calibration Date: 29.05.22 from BUET

% of Actual Observed Holding Reading


LOAD
LOADING STEPS 75 Pressure Pressure Time Intervel
(Ton)
(Ton)Load (kg/cm2) (Bar) (Minute) (Minute)
1st Increment 25 18.75 30.45 38.12 60 15
nd
2 Increment 50 37.50 60.90 67.78 60 15
rd
3 Increment 75 56.25 91.35 97.44 60 15
th
4 Increment 100 75.00 121.80 127.11 60 15
th
1 Decrement 75 56.25 91.35 97.44 10 10
2th Decrement 50 37.50 60.90 67.78 10 10
th
3 Decrement 25 18.75 30.45 38.12 10 10
th
4 Decrement 0 0.00 0.00 0.00 60 15
th
5 Increment 100 75.00 121.80 127.11 60 15
th
6 Increment 125 93.75 152.25 156.77 60 15
7th Increment 150 112.50 182.70 186.43 60 15
th
8 Increment 175 131.25 213.15 216.10 60 15
th
9 Increment 200 150.00 243.60 245.76 60 15
th
10 Increment 225 168.75 274.05 275.43 60 15
th
11 Increment 250 187.50 304.50 305.09 60 15
12th Increment 275 206.25 334.96 334.75 60 15
th
13 Increment 300 225.00 365.41 364.42 60 15
th
14 Increment 320 240.00 389.77 388.15 720 15\60
th
5 Decrement 300 225.00 365.41 364.42 10 10
th
6 Decrement 275 206.25 334.96 334.75 10 10
7th Decrement 250 187.50 304.50 305.09 10 10
th
8 Decrement 225 168.75 274.05 275.43 10 10
th
9 Decrement 200 150.00 243.60 245.76 10 10
th
10 Decrement 175 131.25 213.15 216.10 10 10
th
11 Decrement 150 112.50 182.70 186.43 10 10
12th Decrement 125 93.75 152.25 156.77 10 10
th
13 Decrement 100 75.00 121.80 127.11 10 10
th
14 Decrement 75 56.25 91.35 97.44 10 10
th
15 Decrement 50 37.50 60.90 67.78 10 10
th
16 Decrement 25 18.75 30.45 38.12 10 10
17th Decrement 0 0 0.00 0.00 60 15
Project: Fame Apparels Limited ( Printing Unit).

Individual Pile Under Static Axial Compressive Load (ASTM-D-1143)


Pressure Calculation for Pile: TP-02

Dia of Ram)Cm): 28.00


Desing Load (Ton)= 75.00 Area of Ram(cm2): 615.75
Maxm Test Load (Ton)= 243.75 Regression Equal, Y= 1.0067X - 8.5106
(3×design load) Pressure Gauge Capacity 1000 bar
Maxm Applied Load (Ton)= 243.75 Calibration Date: 29.05.22 from (BUET)

% of Actual Observed Holding Reading


LOAD
LOADING STEPS 75 Pressure Pressure Time Intervel
(Ton)
(Ton)Load (kg/cm2) (Bar) (Minute) (Minute)
1st Increment 25 18.75 30.45 38.12 60 15
nd
2 Increment 50 37.50 60.90 67.78 60 15
rd
3 Increment 75 56.25 91.35 97.44 60 15
th
4 Increment 100 75.00 121.80 127.11 60 15
th
1 Decrement 75 56.25 91.35 97.44 10 10
2th Decrement 50 37.50 60.90 67.78 10 10
th
3 Decrement 25 18.75 30.45 38.12 10 10
th
4 Decrement 0 0.00 0.00 0.00 60 15
th
5 Increment 100 75.00 121.80 127.11 60 15
th
6 Increment 125 93.75 152.25 156.77 60 15
7th Increment 150 112.50 182.70 186.43 60 15
th
8 Increment 175 131.25 213.15 216.10 60 15
th
9 Increment 200 150.00 243.60 245.76 60 15
th
10 Increment 225 168.75 274.05 275.43 60 15
th
11 Increment 250 187.50 304.50 305.09 60 15
12th Increment 275 206.25 334.96 334.75 60 15
th
13 Increment 300 225.00 365.41 364.42 60 15
th
14 Increment 325 243.75 395.86 394.08 720 15\60
th
5 Decrement 300 225.00 365.41 364.42 10 10
th
6 Decrement 275 206.25 334.96 334.75 10 10
7th Decrement 250 187.50 304.50 305.09 10 10
th
8 Decrement 225 168.75 274.05 275.43 10 10
th
9 Decrement 200 150.00 243.60 245.76 10 10
th
10 Decrement 175 131.25 213.15 216.10 10 10
th
11 Decrement 150 112.50 182.70 186.43 10 10
12th Decrement 125 93.75 152.25 156.77 10 10
th
13 Decrement 100 75.00 121.80 127.11 10 10
th
14 Decrement 75 56.25 91.35 97.44 10 10
th
15 Decrement 50 37.50 60.90 67.78 10 10
th
16 Decrement 25 18.75 30.45 38.12 10 10
17th Decrement 0 0 0.00 0.00 60 15
Project: Fame Apparels Limited ( Printing Unit).

Individual Pile Under Static Axial Compressive Load (ASTM-D-1143)


Pressure Calculation for Pile: TP-03

Dia of Ram)Cm): 28.00


Desing Load (Ton)= 75.00 Area of Ram(cm2): 615.75
Maxm Test Load (Ton)= 236.25 Regression Equal, Y= 1.0067X - 8.5106
(3×design load) Pressure Gauge Capacity 1000 bar
Maxm Applied Load (Ton)= 236.25 Calibration Date: 29.05.22 from BUET

% of Actual Observed Holding Reading


LOAD
LOADING STEPS 75 Pressure Pressure Time Intervel
(Ton)
(Ton)Load (kg/cm2) (Bar) (Minute) (Minute)
1st Increment 25 18.75 30.45 38.12 60 15
nd
2 Increment 50 37.50 60.90 67.78 60 15
rd
3 Increment 75 56.25 91.35 97.44 60 15
th
4 Increment 100 75.00 121.80 127.11 60 15
th
1 Decrement 75 56.25 91.35 97.44 10 10
2th Decrement 50 37.50 60.90 67.78 10 10
th
3 Decrement 25 18.75 30.45 38.12 10 10
th
4 Decrement 0 0.00 0.00 0.00 60 15
th
5 Increment 100 75.00 121.80 127.11 60 15
th
6 Increment 125 93.75 152.25 156.77 60 15
7th Increment 150 112.50 182.70 186.43 60 15
th
8 Increment 175 131.25 213.15 216.10 60 15
th
9 Increment 200 150.00 243.60 245.76 60 15
th
10 Increment 225 168.75 274.05 275.43 60 15
th
11 Increment 250 187.50 304.50 305.09 60 15
12th Increment 275 206.25 334.96 334.75 60 15
th
13 Increment 300 225.00 365.41 364.42 60 15
th
14 Increment 315 236.25 383.68 382.21 720 15\60
th
5 Decrement 300 225.00 365.41 364.42 10 10
th
6 Decrement 275 206.25 334.96 334.75 10 10
7th Decrement 250 187.50 304.50 305.09 10 10
th
8 Decrement 225 168.75 274.05 275.43 10 10
th
9 Decrement 200 150.00 243.60 245.76 10 10
th
10 Decrement 175 131.25 213.15 216.10 10 10
th
11 Decrement 150 112.50 182.70 186.43 10 10
12th Decrement 125 93.75 152.25 156.77 10 10
th
13 Decrement 100 75.00 121.80 127.11 10 10
th
14 Decrement 75 56.25 91.35 97.44 10 10
th
15 Decrement 50 37.50 60.90 67.78 10 10
th
16 Decrement 25 18.75 30.45 38.12 10 10
17th Decrement 0 0 0.00 0.00 60 15
Project: Fame Apparels Limited ( Printing Unit).

Individual Pile Under Static Axial Compressive Load (ASTM-D-1143)


Pressure Calculation for Pile: TP-04

Dia of Ram)Cm): 28.00


Desing Load (Ton)= 75.00 Area of Ram(cm2): 615.75
Maxm Test Load (Ton)= 225.00 Regression Equal, Y= 1.0067X - 8.5106
(3×design load) Pressure Gauge Capacity 1000 bar
Maxm Applied Load (Ton)= 225.00 Calibration Date: 29.05.22 from BUET

% of Actual Observed Holding Reading


LOAD
LOADING STEPS 75 Pressure Pressure Time Intervel
(Ton)
(Ton)Load (kg/cm2) (Bar) (Minute) (Minute)
1st Increment 25 18.75 30.45 38.12 60 15
nd
2 Increment 50 37.50 60.90 67.78 60 15
rd
3 Increment 75 56.25 91.35 97.44 60 15
th
4 Increment 100 75.00 121.80 127.11 60 15
th
1 Decrement 75 56.25 91.35 97.44 10 10
2th Decrement 50 37.50 60.90 67.78 10 10
th
3 Decrement 25 18.75 30.45 38.12 10 10
th
4 Decrement 0 0.00 0.00 0.00 60 15
th
5 Increment 100 75.00 121.80 127.11 60 15
th
6 Increment 125 93.75 152.25 156.77 60 15
7th Increment 150 112.50 182.70 186.43 60 15
th
8 Increment 175 131.25 213.15 216.10 60 15
th
9 Increment 200 150.00 243.60 245.76 60 15
th
10 Increment 225 168.75 274.05 275.43 60 15
th
11 Increment 250 187.50 304.50 305.09 60 15
12th Increment 275 206.25 334.96 334.75 60 15
th
13 Increment 300 225.00 365.41 364.42 720 15\60
th
5 Decrement 275 206.25 334.96 334.75 10 10
th
6 Decrement 250 187.50 304.50 305.09 10 10
th
7 Decrement 225 168.75 274.05 275.43 10 10
8th Decrement 200 150.00 243.60 245.76 10 10
th
9 Decrement 175 131.25 213.15 216.10 10 10
th
10 Decrement 150 112.50 182.70 186.43 10 10
th
11 Decrement 125 93.75 152.25 156.77 10 10
th
12 Decrement 100 75.00 121.80 127.11 10 10
13th Decrement 75 56.25 91.35 97.44 10 10
th
14 Decrement 50 37.50 60.90 67.78 10 10
th
15 Decrement 25 18.75 30.45 38.12 10 10
th
16 Decrement 0 0 0.00 0.00 60 15
Project: Fame Apparels Limited ( Printing Unit).

Individual Pile Under Static Axial Compressive Load (ASTM-D-1143)


Pressure Calculation for Pile: TP-05

Dia of Ram)Cm): 28.00


Desing Load (Ton)= 75.00 Area of Ram(cm2): 615.75
Maxm Test Load (Ton)= 225.00 Regression Equal, Y= 1.0067X - 8.5106
(3×design load) Pressure Gauge Capacity 1000 bar
Maxm Applied Load (Ton)= 225.00 Calibration Date: 29.05.22 from BUET

% of Actual Observed Holding Reading


LOAD
LOADING STEPS 75 Pressure Pressure Time Intervel
(Ton)
(Ton)Load (kg/cm2) (Bar) (Minute) (Minute)
1st Increment 25 18.75 30.45 38.12 60 15
nd
2 Increment 50 37.50 60.90 67.78 60 15
rd
3 Increment 75 56.25 91.35 97.44 60 15
th
4 Increment 100 75.00 121.80 127.11 60 15
th
1 Decrement 75 56.25 91.35 97.44 10 10
2th Decrement 50 37.50 60.90 67.78 10 10
th
3 Decrement 25 18.75 30.45 38.12 10 10
th
4 Decrement 0 0.00 0.00 0.00 60 15
th
5 Increment 100 75.00 121.80 127.11 60 15
th
6 Increment 125 93.75 152.25 156.77 60 15
7th Increment 150 112.50 182.70 186.43 60 15
th
8 Increment 175 131.25 213.15 216.10 60 15
th
9 Increment 200 150.00 243.60 245.76 60 15
th
10 Increment 225 168.75 274.05 275.43 60 15
th
11 Increment 250 187.50 304.50 305.09 60 15
12th Increment 275 206.25 334.96 334.75 60 15
th
13 Increment 300 225.00 365.41 364.42 720 15\60
th
5 Decrement 275 206.25 334.96 334.75 10 10
th
6 Decrement 250 187.50 304.50 305.09 10 10
th
7 Decrement 225 168.75 274.05 275.43 10 10
8th Decrement 200 150.00 243.60 245.76 10 10
th
9 Decrement 175 131.25 213.15 216.10 10 10
th
10 Decrement 150 112.50 182.70 186.43 10 10
th
11 Decrement 125 93.75 152.25 156.77 10 10
th
12 Decrement 100 75.00 121.80 127.11 10 10
13th Decrement 75 56.25 91.35 97.44 10 10
th
14 Decrement 50 37.50 60.90 67.78 10 10
th
15 Decrement 25 18.75 30.45 38.12 10 10
th
16 Decrement 0 0 0.00 0.00 60 15
Project: Fame Apparels Limited ( Printing Unit).

Individual Pile Under Static Axial Compressive Load (ASTM-D-1143)


Pressure Calculation for Pile: TP-06

Dia of Ram)Cm): 28.00


Desing Load (Ton)= 75.00 Area of Ram(cm2): 615.75
Maxm Test Load (Ton)= 230.25 Regression Equal, Y= 1.0067X - 8.5106
(3×design load) Pressure Gauge Capacity 1000 bar
Maxm Applied Load (Ton)= 230.25 Calibration Date: 29.05.22 from BUET

% of Actual Observed Holding Reading


LOAD
LOADING STEPS 75 Pressure Pressure Time Intervel
(Ton)
(Ton)Load (kg/cm2) (Bar) (Minute) (Minute)
1st Increment 25 18.75 30.45 38.12 60 15
nd
2 Increment 50 37.50 60.90 67.78 60 15
rd
3 Increment 75 56.25 91.35 97.44 60 15
th
4 Increment 100 75.00 121.80 127.11 60 15
th
1 Decrement 75 56.25 91.35 97.44 10 10
2th Decrement 50 37.50 60.90 67.78 10 10
th
3 Decrement 25 18.75 30.45 38.12 10 10
th
4 Decrement 0 0.00 0.00 0.00 60 15
th
5 Increment 100 75.00 121.80 127.11 60 15
th
6 Increment 125 93.75 152.25 156.77 60 15
7th Increment 150 112.50 182.70 186.43 60 15
th
8 Increment 175 131.25 213.15 216.10 60 15
th
9 Increment 200 150.00 243.60 245.76 60 15
th
10 Increment 225 168.75 274.05 275.43 60 15
th
11 Increment 250 187.50 304.50 305.09 60 15
12th Increment 275 206.25 334.96 334.75 60 15
th
13 Increment 300 225.00 365.41 364.42 60 15
th
14 Increment 307 230.25 373.93 372.72 720 15\60
th
5 Decrement 300 225.00 365.41 364.42 10 10
th
6 Decrement 275 206.25 334.96 334.75 10 10
7th Decrement 250 187.50 304.50 305.09 10 10
th
8 Decrement 225 168.75 274.05 275.43 10 10
th
9 Decrement 200 150.00 243.60 245.76 10 10
th
10 Decrement 175 131.25 213.15 216.10 10 10
th
11 Decrement 150 112.50 182.70 186.43 10 10
12th Decrement 125 93.75 152.25 156.77 10 10
th
13 Decrement 100 75.00 121.80 127.11 10 10
th
14 Decrement 75 56.25 91.35 97.44 10 10
th
15 Decrement 50 37.50 60.90 67.78 10 10
th
16 Decrement 25 18.75 30.45 38.12 10 10
17th Decrement 0 0 0.00 0.00 60 15
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 1 of 7

Project: Fame Apparels Limited ( Printing Unit).


Name of the Client: Fame Apparels Limited. Dia of Ram)Cm): 28.00 Consultant: Orbit Consultant.
Contractor: Fame Apparels Limited. Area of Ram(cm2): 615.75
Test Pile No: TP-01 Design Load (Ton): 75.00
Pile Size: 500mm Max. Test Load (Ton): 240.00
Length of Pile: 100'.0" Date of Casting: 20.04.2022
Pile Type: Cast-in Situ Pile Date of Calibration: 29.05.2022
Test Method: ASTM D-1143-81 Regression Equal, Y= 1.0067X - 8.5106
Maximum Settlement: 27.609mm Test Starting Date: 18-Jun-22
Net Settlement: 23.774mm Test Complet Date: 19-Jun-22

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
18-Jun-22
11:00 AM 0.00 0 0 0 0 0 0 0 0 0.000 Starting
11:00 AM 18.75 25 30.45 0 0 184 190 1.839 1.899 1.869 Load
11:15 AM " " " 15 15 186 196 1.859 1.959 1.909
11:30 AM " " " 15 30 188 198 1.879 1.979 1.929
11:45 AM " " " 15 45 190 200 1.899 1.999 1.949
12:00 PM " " " 15 60 191 201 1.909 2.009 1.959
12:00 PM 37.50 50 60.90 0 60 286 296 2.859 2.959 2.909 Load
12:15 PM " " " 15 75 288 298 2.879 2.979 2.929

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 2 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
12:30 PM " " " 15 90 289 299 2.889 2.989 2.939
12:45 PM " " " 15 105 290 300 2.899 2.999 2.949
1:00 PM " " " 15 120 291 301 2.909 3.009 2.959
1:00 PM 56.25 75 91.35 0 120 326 335 3.259 3.349 3.304 Load
1:15 PM " " " 15 135 326 338 3.259 3.379 3.319
1:30 PM " " " 15 150 328 340 3.279 3.399 3.339
1:45 PM " " " 15 165 330 341 3.299 3.409 3.354
2:00 PM " " " 15 180 330 341 3.299 3.409 3.354
2:00 PM 75.00 100 121.80 0 180 526 543 5.259 5.429 5.344 Load
2:15 PM " " " 15 195 534 553 5.339 5.529 5.434
2:30 PM " " " 15 210 538 557 5.379 5.569 5.474
2:45 PM " " " 15 225 540 559 5.399 5.589 5.494
3:00 PM " " " 15 240 542 561 5.419 5.609 5.514
3:00 PM 56.25 75 91.35 0 240 535 551 5.349 5.509 5.429 Un-Load
3:10 PM " " " 10 250 533 550 5.329 5.499 5.414
3:10 PM 37.50 50 60.90 0 250 522 534 5.219 5.339 5.279 Un-Load
3:20 PM " " " 10 260 520 532 5.199 5.319 5.259
3:20 PM 18.75 25 30.45 0 260 511 518 5.109 5.179 5.144 Un-Load
3:30 PM " " " 10 270 510 517 5.099 5.169 5.134

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 3 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
3:30 PM 0.00 0 0.00 0 270 486 498 4.859 4.979 4.919 Un-Load
3:45 PM " " " 15 285 485 497 4.849 4.969 4.909
4:00 PM " " " 15 300 484 496 4.839 4.959 4.899
4:15 PM " " " 15 315 484 496 4.839 4.959 4.899
4:30 PM " " " 15 330 484 496 4.839 4.959 4.899
4:30 PM 75.00 100 121.80 0 330 550 568 5.499 5.679 5.589 Load
4:45 PM " " " 15 345 561 576 5.609 5.759 5.684
5:00 PM " " " 15 360 566 580 5.659 5.799 5.729
5:15 PM " " " 15 375 568 582 5.679 5.819 5.749
5:30 PM " " " 15 390 568 582 5.679 5.819 5.749
5:30 PM 93.75 125 152.25 0 390 766 780 7.659 7.799 7.729 Load
5:45 PM " " " 15 405 775 790 7.749 7.899 7.824
6:00 PM " " " 15 420 780 794 7.799 7.939 7.869
6:15 PM " " " 15 435 782 795 7.819 7.949 7.884
6:30 PM " " " 15 450 783 796 7.829 7.959 7.894
6:30 PM 112.50 150 182.70 0 450 920 941 9.199 9.409 9.304 Load
6:45 PM " " " 15 465 926 947 9.259 9.469 9.364
7:00 PM " " " 15 480 930 949 9.299 9.489 9.394
7:15 PM " " " 15 495 932 951 9.319 9.509 9.414

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 4 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
7:30 PM " " " 15 510 933 952 9.329 9.519 9.424
7:30 PM 131.25 175 213.15 0 510 1,015 1,026 10.149 10.259 10.204 Load
7:45 PM " " " 15 525 1,024 1,034 10.239 10.339 10.289
8:00 PM " " " 15 540 1,028 1,038 10.279 10.379 10.329
8:15 PM " " " 15 555 1,030 1,040 10.299 10.399 10.349
8:30 PM " " " 15 570 1,031 1,041 10.309 10.409 10.359
8:30 PM 150.00 200 243.60 0 570 1,134 1,142 11.339 11.419 11.379 Load
8:45 PM " " " 15 585 1,140 1,148 11.399 11.479 11.439
9:00 PM " " " 15 600 1,144 1,152 11.439 11.519 11.479
9:15 PM " " " 15 615 1,148 1,150 11.479 11.499 11.489
9:30 PM " " " 15 630 1,149 1,151 11.489 11.509 11.499
9:30 PM 168.75 225 274.05 0 630 1,205 1,230 12.049 12.299 12.174 Load
9:45 PM " " " 15 645 1,214 1,236 12.139 12.359 12.249
10:00 PM " " " 15 660 1,218 1,240 12.179 12.399 12.289
10:15 PM " " " 15 675 1,220 1,242 12.199 12.419 12.309
10:30 PM " " " 15 690 1,220 1,242 12.199 12.419 12.309
10:30 PM 187.50 250 304.50 0 690 1,338 1,353 13.379 13.529 13.454 Load
10:45 PM " " " 15 705 1,345 1,360 13.449 13.599 13.524
11:00 PM " " " 15 720 1,350 1,364 13.499 13.639 13.569

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 5 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
11:15 PM " " " 15 735 1,353 1,367 13.529 13.669 13.599
11:30 PM " " " 15 750 1,354 1,368 13.539 13.679 13.609
11:30 PM 206.25 275 334.96 0 750 1,428 1,435 14.279 14.349 14.314 Load
11:45 PM " " " 15 765 1,436 1,442 14.359 14.419 14.389
12:00 AM " " " 15 780 1,440 1,446 14.399 14.459 14.429
12:15 AM " " " 15 795 1,443 1,448 14.429 14.479 14.454
12:30 AM " " " 15 810 1,445 1,450 14.449 14.499 14.474
12:30 AM 225.00 300 365.41 0 810 1,625 1,630 16.249 16.299 16.274 Load
12:45 AM " " " 15 825 1,627 1,633 16.269 16.329 16.299
1:00 AM " " " 15 840 1,635 1,640 16.349 16.399 16.374
1:15 AM " " " 15 855 1,641 1,647 16.409 16.469 16.439
1:30 AM " " " 15 870 1,646 1,652 16.459 16.519 16.489
1:30 AM 240.00 320 389.77 0 870 2,712 2,723 27.119 27.229 27.174 Load
1:45 AM " " " 15 885 2,720 2,730 27.199 27.299 27.249
2:00 AM " " " 15 900 2,726 2,736 27.259 27.359 27.309
2:15 AM " " " 15 915 2,730 2,740 27.299 27.399 27.349
2:30 AM " " " 15 930 2,732 2,742 27.319 27.419 27.369
3:30 AM " " " 60 930 2,736 2,746 27.359 27.459 27.409
4:30 AM " " " 60 990 2,740 2,750 27.399 27.499 27.449

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 6 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
5:30 AM " " " 60 1,050 2,744 2,753 27.439 27.529 27.484
6:30 AM " " " 60 1,110 2,747 2,756 27.469 27.559 27.514
7:30 AM " " " 60 1,170 2,750 2,758 27.499 27.579 27.539
8:30 AM " " " 60 1,230 2,752 2,760 27.519 27.599 27.559
9:30 AM " " " 60 1,290 2,753 2,761 27.529 27.609 27.569
10:30 AM " " " 60 1,350 2,754 2,762 27.539 27.619 27.579
11:30 AM " " " 60 1,410 2,755 2,763 27.549 27.629 27.589
12:30 PM " " " 60 1,470 2,756 2,764 27.559 27.639 27.599
1:30 PM " " " 60 1,530 2,757 2,765 27.569 27.649 27.609
1:30 PM 225.00 300 365.41 0 1,530 2,757 2,765 27.569 27.649 27.609 Un-Load
1:40 PM " " " 10 1,540 2,756 2,764 27.559 27.639 27.599
1:40 PM 206.25 275 334.96 0 1,540 2,744 2,755 27.439 27.549 27.494 Un-Load
1:50 PM " " " 10 1,550 2,743 2,754 27.429 27.539 27.484
1:50 PM 187.50 250 304.50 0 1,550 2,735 2,748 27.349 27.479 27.414 Un-Load
2:00 PM " " " 10 1,560 2,734 2,747 27.339 27.469 27.404
2:00 PM 168.75 225 274.05 0 1,560 2,687 2,692 26.869 26.919 26.894 Un-Load
2:10 PM " " " 10 1,570 2,686 2,691 26.859 26.909 26.884
2:10 PM 150.00 200 243.60 0 1,570 2,672 2,683 26.719 26.829 26.774 Un-Load
2:20 PM " " " 10 1,580 2,671 2,682 26.709 26.819 26.764

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 7 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
2:20 PM 131.25 175 213.15 0 1,580 2,657 2,671 26.569 26.709 26.639 Un-Load
2:30 PM " " " 10 1,590 2,656 2,670 26.559 26.699 26.629
2:30 PM 112.50 150 182.70 0 1,590 2,578 2,586 25.779 25.859 25.819 Un-Load
2:40 PM " " " 10 1,600 2,577 2,585 25.769 25.849 25.809
2:40 PM 93.75 125 152.25 0 1,600 2,564 2,575 25.639 25.749 25.694 Un-Load
2:50 PM " " " 10 1,610 2,563 2,574 25.629 25.739 25.684
2:50 PM 75.00 100 121.80 0 1,610 2,541 2,555 25.409 25.549 25.479 Un-Load
3:00 PM " " " 10 1,620 2,540 2,554 25.399 25.539 25.469
3:00 PM 56.25 75 91.35 0 1,620 2,527 2,537 25.269 25.369 25.319 Un-Load
3:10 PM " " " 10 1,630 2,526 2,536 25.259 25.359 25.309
3:10 PM 37.50 50 60.90 0 1,630 2,485 2,496 24.849 24.959 24.904 Un-Load
3:20 PM " " " 10 1,640 2,484 2,495 24.839 24.949 24.894
3:20 PM 18.75 25 30.45 0 1,640 2,444 2,452 24.439 24.519 24.479 Un-Load
3:30 PM " " " 10 1,650 2,443 2,451 24.429 24.509 24.469
3:30 PM 0.00 0 0.00 0 1,650 2,377 2,385 23.769 23.849 23.809 Un-Load
3:45 PM " " " 15 1,665 2,376 2,384 23.759 23.839 23.799
4:00 PM " " " 15 1,680 2,375 2,383 23.749 23.829 23.789
4:15 PM " " " 15 1,695 2,374 2,382 23.739 23.819 23.779
4:30 PM " " " 15 1,710 2,374 2,381 23.739 23.809 23.774 END

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 1 of 8

Project: Fame Apparels Limited ( Printing Unit).


Name of the Client: Fame Apparels Limited. Dia of Ram)Cm): 28.00 Consultant: Orbit Consultant.
Contractor: Fame Apparels Limited. Area of Ram(cm2): 615.75
Test Pile No: TP-02 Design Load (Ton): 75.00
Pile Size: 500mm Max. Test Load (Ton): 243.75
Length of Pile: 100'.0" Date of Casting: 23.04.2022
Pile Type: Cast-in Situ Pile Date of Calibration: 29.05.2022
Test Method: ASTM D-1143-81 Regression Equal, Y= 1.0067X - 8.5106
Maximum Settlement: 25.619mm Test Starting Date: 22-Jun-22
Net Settlement: 12.614mm Test Complet Date: 23-Jun-22

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
22-Jun-22
10:00 AM 0.00 0 0 0 0 0 0 0 0 0.000 Starting
10:00 AM 18.75 25 30.45 0 0 120 126 1.199 1.259 1.229 Load
10:15 AM " " " 15 15 123 129 1.229 1.289 1.259
10:30 AM " " " 15 30 125 131 1.249 1.309 1.279
10:45 AM " " " 15 45 126 132 1.259 1.319 1.289
11:00 AM " " " 15 60 126 133 1.259 1.329 1.294
11:00 AM 37.50 50 60.90 0 60 209 215 2.089 2.149 2.119 Load
11:15 AM " " " 15 75 213 218 2.129 2.179 2.154

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 2 of 8

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
11:30 AM " " " 15 90 215 219 2.149 2.189 2.169
11:45 AM " " " 15 105 216 220 2.159 2.199 2.179
12:00 PM " " " 15 120 216 220 2.159 2.199 2.179
12:00 PM 56.25 75 91.35 0 120 300 308 2.999 3.079 3.039 Load
12:15 PM " " " 15 135 303 311 3.029 3.109 3.069
12:30 PM " " " 15 150 305 313 3.049 3.129 3.089
12:45 PM " " " 15 165 306 314 3.059 3.139 3.099
1:00 PM " " " 15 180 306 314 3.059 3.139 3.099
1:00 PM 75.00 100 121.80 0 180 420 426 4.199 4.259 4.229 Load
1:15 PM " " " 15 195 424 430 4.239 4.299 4.269
1:30 PM " " " 15 210 426 432 4.259 4.319 4.289
1:45 PM " " " 15 225 428 434 4.279 4.339 4.309
2:00 PM " " " 15 240 429 435 4.289 4.349 4.319
2:00 PM 56.25 75 91.35 0 240 424 430 4.239 4.299 4.269 Un-Load
2:10 PM " " " 10 250 423 429 4.229 4.289 4.259
2:10 PM 37.50 50 60.90 0 250 410 416 4.099 4.159 4.129 Un-Load
2:20 PM " " " 10 260 408 414 4.079 4.139 4.109
2:20 PM 18.75 25 30.45 0 260 390 396 3.899 3.959 3.929 Un-Load

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 3 of 8

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
2:30 PM " " " 10 270 388 394 3.879 3.939 3.909
2:30 PM 0.00 0 0.00 0 270 320 326 3.199 3.259 3.229 Un-Load
2:45 PM " " " 15 285 316 324 3.159 3.239 3.199
3:00 PM " " " 15 300 314 322 3.139 3.219 3.179
3:15 PM " " " 15 315 313 321 3.129 3.209 3.169
3:30 PM " " " 15 330 313 321 3.129 3.209 3.169
3:30 PM 75.00 100 121.80 0 330 450 458 4.499 4.579 4.539 Load
3:45 PM " " " 15 345 454 462 4.539 4.619 4.579
4:00 PM " " " 15 360 456 464 4.559 4.639 4.599
4:15 PM " " " 15 375 457 465 4.569 4.649 4.609
4:30 PM " " " 15 390 458 466 4.579 4.659 4.619
4:30 PM 93.75 125 152.25 0 390 548 552 5.479 5.519 5.499 Load
4:45 PM " " " 15 405 551 555 5.509 5.549 5.529
5:00 PM " " " 15 420 554 558 5.539 5.579 5.559
5:15 PM " " " 15 435 556 560 5.559 5.599 5.579
5:30 PM " " " 15 450 557 561 5.569 5.609 5.589
5:30 PM 112.50 150 182.70 0 450 662 666 6.619 6.659 6.639 Load
5:45 PM " " " 15 465 664 670 6.639 6.699 6.669

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 4 of 8

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
6:00 PM " " " 15 480 667 673 6.669 6.729 6.699
6:15 PM " " " 15 495 668 675 6.679 6.749 6.714
6:30 PM " " " 15 510 669 675 6.689 6.749 6.719
6:30 PM 131.25 175 213.15 0 510 800 810 7.999 8.099 8.049 Load
6:45 PM " " " 15 525 805 814 8.049 8.139 8.094
7:00 PM " " " 15 540 807 816 8.069 8.159 8.114
7:15 PM " " " 15 555 809 817 8.089 8.169 8.129
7:30 PM " " " 15 570 810 818 8.099 8.179 8.139
7:30 PM 150.00 200 243.60 0 570 936 940 9.359 9.399 9.379 Load
7:45 PM " " " 15 585 939 943 9.389 9.429 9.409
8:00 PM " " " 15 600 941 945 9.409 9.449 9.429
8:15 PM " " " 15 615 942 946 9.419 9.459 9.439
8:30 PM " " " 15 630 943 947 9.429 9.469 9.449
8:30 PM 168.75 225 274.05 0 630 1,060 1,062 10.599 10.619 10.609 Load
8:45 PM " " " 15 645 1,064 1,066 10.639 10.659 10.649
9:00 PM " " " 15 660 1,066 1,068 10.659 10.679 10.669
9:15 PM " " " 15 675 1,067 1,069 10.669 10.689 10.679
9:30 PM " " " 15 690 1,068 1,070 10.679 10.699 10.689

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 5 of 8

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
9:30 PM 187.50 250 304.50 0 690 1,182 1,186 11.819 11.859 11.839 Load
9:45 PM " " " 15 705 1,186 1,190 11.859 11.899 11.879
10:00 PM " " " 15 720 1,188 1,192 11.879 11.919 11.899
10:15 PM " " " 15 735 1,189 1,193 11.889 11.929 11.909
10:30 PM " " " 15 750 1,190 1,194 11.899 11.939 11.919
10:30 PM 206.25 275 334.96 0 750 1,420 1,426 14.199 14.259 14.229 Load
10:45 PM " " " 15 765 1,424 1,430 14.239 14.299 14.269
11:00 PM " " " 15 780 1,426 1,432 14.259 14.319 14.289
11:15 PM " " " 15 795 1,428 1,434 14.279 14.339 14.309
11:30 PM " " " 15 810 1,429 1,435 14.289 14.349 14.319
11:30 PM 225.00 300 365.41 0 810 1,870 1,874 18.699 18.739 18.719 Load
11:45 PM " " " 15 825 1,875 1,879 18.749 18.789 18.769
12:00 AM " " " 15 840 1,877 1,881 18.769 18.809 18.789
12:15 AM " " " 15 855 1,879 1,883 18.789 18.829 18.809
12:30 AM " " " 15 870 1,880 1,884 18.799 18.839 18.819
12:30 AM 243.75 325 395.86 0 870 2,380 2,386 23.799 23.859 23.829 Load
12:45 AM " " " 15 885 2,423 2,431 24.229 24.309 24.269
1:00 AM " " " 15 900 2,450 2,473 24.499 24.729 24.614

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 6 of 8

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
1:15 AM " " " 15 915 2,458 2,485 24.579 24.849 24.714
1:30 AM " " " 15 930 2,465 2,491 24.649 24.909 24.779
2:30 AM " " " 60 930 2,512 2,519 25.119 25.189 25.154
3:30 AM " " " 60 990 2,525 2,533 25.249 25.329 25.289
4:30 AM " " " 60 1,050 2,532 2,541 25.319 25.409 25.364
5:30 AM " " " 60 1,110 2,540 2,547 25.399 25.469 25.434
6:30 AM " " " 60 1,170 2,545 2,552 25.449 25.519 25.484
7:30 AM " " " 60 1,230 2,549 2,556 25.489 25.559 25.524
8:30 AM " " " 60 1,290 2,553 2,560 25.529 25.599 25.564
9:30 AM " " " 60 1,350 2,556 2,563 25.559 25.629 25.594
10:30 AM " " " 60 1,410 2,557 2,565 25.569 25.649 25.609
11:30 AM " " " 60 1,470 2,558 2,566 25.579 25.659 25.619
12:30 PM " " " 60 1,530 2,558 2,566 25.579 25.659 25.619
12:30 PM 225.00 300 365.41 0 1,530 2,558 2,566 25.579 25.659 25.619 Un-Load
12:40 PM " " " 10 1,540 2,556 2,564 25.559 25.639 25.599
12:40 PM 206.25 275 334.96 0 1,540 2,467 2,475 24.669 24.749 24.709 Un-Load
12:50 PM " " " 10 1,550 2,565 2,473 25.649 24.729 25.189
12:50 PM 187.50 250 304.50 0 1,550 2,372 2,382 23.719 23.819 23.769 Un-Load

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 7 of 8

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
1:00 PM " " " 10 1,560 2,370 2,380 23.699 23.799 23.749
1:00 PM 168.75 225 274.05 0 1,560 2,258 2,266 22.579 22.659 22.619 Un-Load
1:10 PM " " " 10 1,570 2,256 2,264 22.559 22.639 22.599
1:10 PM 150.00 200 243.60 0 1,570 2,170 2,178 21.699 21.779 21.739 Un-Load
1:20 PM " " " 10 1,580 2,168 2,176 21.679 21.759 21.719
1:20 PM 131.25 175 213.15 0 1,580 2,085 2,094 20.849 20.939 20.894 Un-Load
1:30 PM " " " 10 1,590 2,083 2,092 20.829 20.919 20.874
1:30 PM 112.50 150 182.70 0 1,590 1,940 1,954 19.399 19.539 19.469 Un-Load
1:40 PM " " " 10 1,600 1,938 1,952 19.379 19.519 19.449
1:40 PM 93.75 125 152.25 0 1,600 1,864 1,871 18.639 18.709 18.674 Un-Load
1:50 PM " " " 10 1,610 1,862 1,870 18.619 18.699 18.659
1:50 PM 75.00 100 121.80 0 1,610 1,775 1,785 17.749 17.849 17.799 Un-Load
2:00 PM " " " 10 1,620 1,773 1,783 17.729 17.829 17.779
2:00 PM 56.25 75 91.35 0 1,620 1,632 1,638 16.319 16.379 16.349 Un-Load
2:10 PM " " " 10 1,630 1,630 1,636 16.299 16.359 16.329
2:10 PM 37.50 50 60.90 0 1,630 1,563 1,573 15.629 15.729 15.679 Un-Load
2:20 PM " " " 10 1,640 1,561 1,571 15.609 15.709 15.659
2:20 PM 18.75 25 30.45 0 1,640 1,457 1,467 14.569 14.669 14.619 Un-Load

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 8 of 8

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
2:30 PM " " " 10 1,650 1,455 1,465 14.549 14.649 14.599
2:30 PM 0.00 0 0.00 0 1,650 1,261 1,272 12.609 12.719 12.664 Un-Load
2:45 PM " " " 15 1,665 1,260 1,270 12.599 12.699 12.649
3:00 PM " " " 15 1,680 1,259 1,268 12.589 12.679 12.634
3:15 PM " " " 15 1,695 1,258 1,267 12.579 12.669 12.624
3:30 PM " " " 15 1,710 1,257 1,266 12.569 12.659 12.614 END

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 1 of 7

Project: Fame Apparels Limited ( Printing Unit).


Name of the Client: Fame Apparels Limited. Dia of Ram)Cm): 28.00 Consultant: Orbit Consultant.
Contractor: Fame Apparels Limited. Area of Ram(cm2): 615.75
Test Pile No: TP-03 Design Load (Ton): 75.00
Pile Size: 500mm Max. Test Load (Ton): 236.25
Length of Pile: 100'.0" Date of Casting: 27.04.2022
Pile Type: Cast-in Situ Pile Date of Calibration: 29.05.2022
Test Method: ASTM D-1143-81 Regression Equal, Y= 1.0067X - 8.5106
Maximum Settlement: 26.474mm Test Starting Date: 24-Jun-22
Net Settlement: 11.954mm Test Complet Date: 25-Jun-22

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
24-Jun-22
9:00 AM 0.00 0 0 0 0 0 0 0 0 0.000 Starting
9:00 AM 18.75 25 30.45 0 0 110 121 1.099 1.209 1.154 Load
9:15 AM " " " 15 15 115 127 1.149 1.269 1.209
9:30 AM " " " 15 30 117 130 1.169 1.299 1.234
9:45 AM " " " 15 45 118 131 1.179 1.309 1.244
10:00 AM " " " 15 60 118 131 1.179 1.309 1.244
10:00 AM 37.50 50 60.90 0 60 221 233 2.209 2.329 2.269 Load
10:15 AM " " " 15 75 226 236 2.259 2.359 2.309

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 2 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
10:30 AM " " " 15 90 228 240 2.279 2.399 2.339
10:45 AM " " " 15 105 230 241 2.299 2.409 2.354
11:00 AM " " " 15 120 230 242 2.299 2.419 2.359
11:00 AM 56.25 75 91.35 0 120 280 288 2.799 2.879 2.839 Load
11:15 AM " " " 15 135 284 292 2.839 2.919 2.879
11:30 AM " " " 15 150 286 295 2.859 2.949 2.904
11:45 AM " " " 15 165 286 296 2.859 2.959 2.909
12:00 PM " " " 15 180 287 297 2.869 2.969 2.919
12:00 PM 75.00 100 121.80 0 180 390 400 3.899 3.999 3.949 Load
12:15 PM " " " 15 195 395 405 3.949 4.049 3.999
12:30 PM " " " 15 210 397 407 3.969 4.069 4.019
12:45 PM " " " 15 225 398 408 3.979 4.079 4.029
1:00 PM " " " 15 240 398 408 3.979 4.079 4.029
1:00 PM 56.25 75 91.35 0 240 383 391 3.829 3.909 3.869 Un-Load
1:10 PM " " " 10 250 382 390 3.819 3.899 3.859
1:10 PM 37.50 50 60.90 0 250 350 371 3.499 3.709 3.604 Un-Load
1:20 PM " " " 10 260 348 370 3.479 3.699 3.589
1:20 PM 18.75 25 30.45 0 260 315 330 3.149 3.299 3.224 Un-Load
1:30 PM " " " 10 270 314 330 3.139 3.299 3.219

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 3 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
1:30 PM 0.00 0 0.00 0 270 263 270 2.629 2.699 2.664 Un-Load
1:45 PM " " " 15 285 260 266 2.599 2.659 2.629
2:00 PM " " " 15 300 258 264 2.579 2.639 2.609
2:15 PM " " " 15 315 256 263 2.559 2.629 2.594
2:30 PM " " " 15 330 255 262 2.549 2.619 2.584
2:30 PM 75.00 100 121.80 0 330 405 418 4.049 4.179 4.114 Load
2:45 PM " " " 15 345 410 423 4.099 4.229 4.164
3:00 PM " " " 15 360 413 425 4.129 4.249 4.189
3:15 PM " " " 15 375 414 427 4.139 4.269 4.204
3:30 PM " " " 15 390 415 428 4.149 4.279 4.214
3:30 PM 93.75 125 152.25 0 390 589 600 5.889 5.999 5.944 Load
3:45 PM " " " 15 405 595 608 5.949 6.079 6.014
4:00 PM " " " 15 420 598 613 5.979 6.129 6.054
4:15 PM " " " 15 435 600 615 5.999 6.149 6.074
4:30 PM " " " 15 450 601 618 6.009 6.179 6.094
4:30 PM 112.50 150 182.70 0 450 768 783 7.679 7.829 7.754 Load
4:45 PM " " " 15 465 775 790 7.749 7.899 7.824
5:00 PM " " " 15 480 780 793 7.799 7.929 7.864
5:15 PM " " " 15 495 783 795 7.829 7.949 7.889

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 4 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
5:30 PM " " " 15 510 784 796 7.839 7.959 7.899
5:30 PM 131.25 175 213.15 0 510 953 966 9.529 9.659 9.594 Load
5:45 PM " " " 15 525 959 971 9.589 9.709 9.649
6:00 PM " " " 15 540 963 975 9.629 9.749 9.689
6:15 PM " " " 15 555 965 978 9.649 9.779 9.714
6:30 PM " " " 15 570 966 978 9.659 9.779 9.719
6:30 PM 150.00 200 243.60 0 570 1,083 1,096 10.829 10.959 10.894 Load
6:45 PM " " " 15 585 1,090 1,100 10.899 10.999 10.949
7:00 PM " " " 15 600 1,095 1,104 10.949 11.039 10.994
7:15 PM " " " 15 615 1,097 1,108 10.969 11.079 11.024
7:30 PM " " " 15 630 1,098 1,110 10.979 11.099 11.039
7:30 PM 168.75 225 274.05 0 630 1,265 1,281 12.649 12.809 12.729 Load
7:45 PM " " " 15 645 1,276 1,290 12.759 12.899 12.829
8:00 PM " " " 15 660 1,280 1,293 12.799 12.929 12.864
8:15 PM " " " 15 675 1,283 1,295 12.829 12.949 12.889
8:30 PM " " " 15 690 1,285 1,295 12.849 12.949 12.899
8:30 PM 187.50 250 304.50 0 690 1,490 1,500 14.899 14.999 14.949 Load
8:45 PM " " " 15 705 1,499 1,510 14.989 15.099 15.044
9:00 PM " " " 15 720 1,500 1,518 14.999 15.179 15.089

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 5 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
9:15 PM " " " 15 735 1,505 1,523 15.049 15.229 15.139
9:30 PM " " " 15 750 1,507 1,525 15.069 15.249 15.159
9:30 PM 206.25 275 334.96 0 750 1,710 1,725 17.099 17.249 17.174 Load
9:45 PM " " " 15 765 1,715 1,730 17.149 17.299 17.224
10:00 PM " " " 15 780 1,720 1,733 17.199 17.329 17.264
10:15 PM " " " 15 795 1,723 1,735 17.229 17.349 17.289
10:30 PM " " " 15 810 1,725 1,737 17.249 17.369 17.309
10:30 PM 225.00 300 365.41 0 810 1,915 1,921 19.149 19.209 19.179 Load
10:45 PM " " " 15 825 1,920 1,925 19.199 19.249 19.224
11:00 PM " " " 15 840 1,925 1,927 19.249 19.269 19.259
11:15 PM " " " 15 855 1,930 1,930 19.299 19.299 19.299
11:30 PM " " " 15 870 1,931 1,930 19.309 19.299 19.304
11:30 PM 236.25 315 383.68 0 870 2,410 2,421 24.099 24.209 24.154 Load
11:45 PM " " " 15 885 2,418 2,448 24.179 24.479 24.329
12:00 AM " " " 15 900 2,428 2,461 24.279 24.609 24.444
12:15 AM " " " 15 915 2,436 2,488 24.359 24.879 24.619
12:30 AM " " " 15 930 2,440 2,496 24.399 24.959 24.679
1:30 AM " " " 60 930 2,466 2,548 24.659 25.479 25.069
2:30 AM " " " 60 990 2,480 2,600 24.799 25.999 25.399

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 6 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
3:30 AM " " " 60 1,050 2,500 2,623 24.999 26.229 25.614
4:30 AM " " " 60 1,110 2,550 2,641 25.499 26.409 25.954
5:30 AM " " " 60 1,170 2,568 2,653 25.679 26.529 26.104
6:30 AM " " " 60 1,230 2,580 2,672 25.799 26.719 26.259
7:30 AM " " " 60 1,290 2,600 2,688 25.999 26.879 26.439
8:30 AM " " " 60 1,350 2,605 2,690 26.049 26.899 26.474
9:30 AM " " " 60 1,410 2,605 2,690 26.049 26.899 26.474
10:30 AM " " " 60 1,470 2,605 2,690 26.049 26.899 26.474
11:30 AM " " " 60 1,530 2,605 2,690 26.049 26.899 26.474
11:30 AM 225.00 300 365.41 0 1,530 2,600 2,682 25.999 26.819 26.409 Un-Load
11:40 AM " " " 10 1,540 2,598 2,680 25.979 26.799 26.389
11:40 AM 206.25 275 334.96 0 1,540 2,538 2,610 25.379 26.099 25.739 Un-Load
11:50 AM " " " 10 1,550 2,537 2,608 25.369 26.079 25.724
11:50 AM 187.50 250 304.50 0 1,550 2,500 2,557 24.999 25.569 25.284 Un-Load
12:00 PM " " " 10 1,560 2,498 2,556 24.979 25.559 25.269
12:00 PM 168.75 225 274.05 0 1,560 2,448 2,492 24.479 24.919 24.699 Un-Load
12:10 PM " " " 10 1,570 2,446 2,490 24.459 24.899 24.679
12:10 PM 150.00 200 243.60 0 1,570 2,381 2,400 23.809 23.999 23.904 Un-Load
12:20 PM " " " 10 1,580 2,380 2,398 23.799 23.979 23.889

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 7 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
12:20 PM 131.25 175 213.15 0 1,580 2,310 2,329 23.099 23.289 23.194 Un-Load
12:30 PM " " " 10 1,590 2,306 2,320 23.059 23.199 23.129
12:30 PM 112.50 150 182.70 0 1,590 2,221 2,233 22.209 22.329 22.269 Un-Load
12:40 PM " " " 10 1,600 2,220 2,230 22.199 22.299 22.249
12:40 PM 93.75 125 152.25 0 1,600 1,900 1,915 18.999 19.149 19.074 Un-Load
12:50 PM " " " 10 1,610 1,898 1,913 18.979 19.129 19.054
12:50 PM 75.00 100 121.80 0 1,610 1,810 1,825 18.099 18.249 18.174 Un-Load
1:00 PM " " " 10 1,620 1,806 1,820 18.059 18.199 18.129
1:00 PM 56.25 75 91.35 0 1,620 1,729 1,736 17.289 17.359 17.324 Un-Load
1:10 PM " " " 10 1,630 1,728 1,733 17.279 17.329 17.304
1:10 PM 37.50 50 60.90 0 1,630 1,563 1,570 15.629 15.699 15.664 Un-Load
1:20 PM " " " 10 1,640 1,560 1,568 15.599 15.679 15.639
1:20 PM 18.75 25 30.45 0 1,640 1,448 1,459 14.479 14.589 14.534 Un-Load
1:30 PM " " " 10 1,650 1,445 1,456 14.449 14.559 14.504
1:30 PM 0.00 0 0.00 0 1,650 1,210 1,218 12.099 12.179 12.139 Un-Load
1:45 PM " " " 15 1,665 1,205 1,210 12.049 12.099 12.074
2:00 PM " " " 15 1,680 1,200 1,205 11.999 12.049 12.024
2:15 PM " " " 15 1,695 1,193 1,200 11.929 11.999 11.964
2:30 PM " " " 15 1,710 1,191 1,200 11.909 11.999 11.954 END

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 1 of 7

Project: Fame Apparels Limited ( Printing Unit).


Name of the Client: Fame Apparels Limited. Dia of Ram)Cm): 28.00 Consultant: Orbit Consultant.
Contractor: Fame Apparels Limited. Area of Ram(cm2): 615.75
Test Pile No: TP-04 Design Load (Ton): 75.00
Pile Size: 500mm Max. Test Load (Ton): 225.00
Length of Pile: 100'.0" Date of Casting: 05.05.2022
Pile Type: Cast-in Situ Pile Date of Calibration: 29.05.2022
Test Method: ASTM D-1143-81 Regression Equal, Y= 1.0067X - 8.5106
Maximum Settlement: 26.554mm Test Starting Date: 20-Jun-22
Net Settlement: 16.834mm Test Complet Date: 21-Jun-22

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
20-Jun-22
11:30 AM 0.00 0 0 0 0 0 0 0 0 0.000 Starting
11:30 AM 18.75 25 30.45 0 0 150 152 1.499 1.519 1.509 Load
11:45 AM " " " 15 15 152 154 1.519 1.539 1.529
12:00 PM " " " 15 30 153 155 1.529 1.549 1.539
12:15 PM " " " 15 45 154 156 1.539 1.559 1.549
12:30 PM " " " 15 60 154 156 1.539 1.559 1.549
12:30 PM 37.50 50 60.90 0 60 260 264 2.599 2.639 2.619 Load
12:45 PM " " " 15 75 263 267 2.629 2.669 2.649

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 2 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
1:00 PM " " " 15 90 264 268 2.639 2.679 2.659
1:15 PM " " " 15 105 265 269 2.649 2.689 2.669
1:30 PM " " " 15 120 266 270 2.659 2.699 2.679
1:30 PM 56.25 75 91.35 0 120 387 391 3.869 3.909 3.889 Load
1:45 PM " " " 15 135 390 394 3.899 3.939 3.919
2:00 PM " " " 15 150 392 396 3.919 3.959 3.939
2:15 PM " " " 15 165 393 397 3.929 3.969 3.949
2:30 PM " " " 15 180 394 398 3.939 3.979 3.959
2:30 PM 75.00 100 121.80 0 180 535 539 5.349 5.389 5.369 Load
2:45 PM " " " 15 195 540 544 5.399 5.439 5.419
3:00 PM " " " 15 210 543 547 5.429 5.469 5.449
3:15 PM " " " 15 225 545 549 5.449 5.489 5.469
3:30 PM " " " 15 240 546 550 5.459 5.499 5.479
3:30 PM 56.25 75 91.35 0 240 540 544 5.399 5.439 5.419 Un-Load
3:40 PM " " " 10 250 539 543 5.389 5.429 5.409
3:40 PM 37.50 50 60.90 0 250 519 523 5.189 5.229 5.209 Un-Load
3:50 PM " " " 10 260 518 522 5.179 5.219 5.199
3:50 PM 18.75 25 30.45 0 260 480 486 4.799 4.859 4.829 Un-Load
4:00 PM " " " 10 270 478 484 4.779 4.839 4.809

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 3 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
4:00 PM 0.00 0 0.00 0 270 378 382 3.779 3.819 3.799 Un-Load
4:15 PM " " " 15 285 370 374 3.699 3.739 3.719
4:30 PM " " " 15 300 368 372 3.679 3.719 3.699
4:45 PM " " " 15 315 366 370 3.659 3.699 3.679
5:00 PM " " " 15 330 365 369 3.649 3.689 3.669
5:00 PM 75.00 100 121.80 0 330 562 566 5.619 5.659 5.639 Load
5:15 PM " " " 15 345 564 568 5.639 5.679 5.659
5:30 PM " " " 15 360 566 570 5.659 5.699 5.679
5:45 PM " " " 15 375 567 571 5.669 5.709 5.689
6:00 PM " " " 15 390 568 572 5.679 5.719 5.699
6:00 PM 93.75 125 152.25 0 390 648 652 6.479 6.519 6.499 Load
6:15 PM " " " 15 405 652 656 6.519 6.559 6.539
6:30 PM " " " 15 420 654 658 6.539 6.579 6.559
6:45 PM " " " 15 435 655 659 6.549 6.589 6.569
7:00 PM " " " 15 450 656 660 6.559 6.599 6.579
7:00 PM 112.50 150 182.70 0 450 747 749 7.469 7.489 7.479 Load
7:15 PM " " " 15 465 750 752 7.499 7.519 7.509
7:30 PM " " " 15 480 752 754 7.519 7.539 7.529
7:45 PM " " " 15 495 753 755 7.529 7.549 7.539

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 4 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
8:00 PM " " " 15 510 754 756 7.539 7.559 7.549
8:00 PM 131.25 175 213.15 0 510 930 942 9.299 9.419 9.359 Load
8:15 PM " " " 15 525 935 946 9.349 9.459 9.404
8:30 PM " " " 15 540 937 948 9.369 9.479 9.424
8:45 PM " " " 15 555 938 950 9.379 9.499 9.439
9:00 PM " " " 15 570 939 952 9.389 9.519 9.454
9:00 PM 150.00 200 243.60 0 570 1,168 1,174 11.679 11.739 11.709 Load
9:15 PM " " " 15 585 1,172 1,178 11.719 11.779 11.749
9:30 PM " " " 15 600 1,175 1,181 11.749 11.809 11.779
9:45 PM " " " 15 615 1,177 1,183 11.769 11.829 11.799
10:00 PM " " " 15 630 1,178 1,184 11.779 11.839 11.809
10:00 PM 168.75 225 274.05 0 630 1,420 1,433 14.199 14.329 14.264 Load
10:15 PM " " " 15 645 1,426 1,440 14.259 14.399 14.329
10:30 PM " " " 15 660 1,430 1,444 14.299 14.439 14.369
10:45 PM " " " 15 675 1,432 1,446 14.319 14.459 14.389
11:00 PM " " " 15 690 1,433 1,447 14.329 14.469 14.399
11:00 PM 187.50 250 304.50 0 690 1,744 1,750 17.439 17.499 17.469 Load
11:15 PM " " " 15 705 1,750 1,756 17.499 17.559 17.529
11:30 PM " " " 15 720 1,754 1,760 17.539 17.599 17.569

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 5 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
11:45 PM " " " 15 735 1,758 1,764 17.579 17.639 17.609
12:00 AM " " " 15 750 1,760 1,766 17.599 17.659 17.629
12:00 AM 206.25 275 334.96 0 750 2,052 2,058 20.519 20.579 20.549 Load
12:15 AM " " " 15 765 2,060 2,064 20.599 20.639 20.619
12:30 AM " " " 15 780 2,065 2,070 20.649 20.699 20.674
12:45 AM " " " 15 795 2,068 2,073 20.679 20.729 20.704
1:00 AM " " " 15 810 2,070 2,075 20.699 20.749 20.724
1:00 AM 225.00 300 365.41 0 810 2,605 2,615 26.049 26.149 26.099 Load
1:15 AM " " " 15 825 2,615 2,630 26.149 26.299 26.224
1:30 AM " " " 15 840 2,624 2,638 26.239 26.379 26.309
1:45 AM " " " 15 855 2,632 2,642 26.319 26.419 26.369
2:00 AM " " " 15 870 2,638 2,646 26.379 26.459 26.419
3:00 AM " " " 60 930 2,642 2,650 26.419 26.499 26.459
4:00 AM " " " 60 990 2,644 2,652 26.439 26.519 26.479
5:00 AM " " " 60 1,050 2,645 2,653 26.449 26.529 26.489
6:00 AM " " " 60 1,110 2,646 2,654 26.459 26.539 26.499
7:00 AM " " " 60 1,170 2,647 2,655 26.469 26.549 26.509
8:00 AM " " " 60 1,230 2,648 2,656 26.479 26.559 26.519
9:00 AM " " " 60 1,290 2,649 2,657 26.489 26.569 26.529

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 6 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
10:00 AM " " " 60 1,350 2,650 2,658 26.499 26.579 26.539
11:00 AM " " " 60 1,410 2,651 2,659 26.509 26.589 26.549
12:00 PM " " " 60 1,470 2,651 2,660 26.509 26.599 26.554
1:00 PM " " " 60 1,530 2,651 2,660 26.509 26.599 26.554
1:00 PM 206.25 275 334.96 0 1,530 2,651 2,660 26.509 26.599 26.554 Un-Load
1:10 PM " " " 10 1,540 2,650 2,659 26.499 26.589 26.544
1:10 PM 187.50 250 304.50 0 1,540 2,636 2,644 26.359 26.439 26.399 Un-Load
1:20 PM " " " 10 1,550 2,635 2,643 26.349 26.429 26.389
1:20 PM 168.75 225 274.05 0 1,550 2,580 2,591 25.799 25.909 25.854 Un-Load
1:30 PM " " " 10 1,560 2,579 2,590 25.789 25.899 25.844
1:30 PM 150.00 200 243.60 0 1,560 2,466 2,473 24.659 24.729 24.694 Un-Load
1:40 PM " " " 10 1,570 2,464 2,471 24.639 24.709 24.674
1:40 PM 131.25 175 213.15 0 1,570 2,338 2,345 23.379 23.449 23.414 Un-Load
1:50 PM " " " 10 1,580 2,337 2,344 23.369 23.439 23.404
1:50 PM 112.50 150 182.70 0 1,580 2,276 2,286 22.759 22.859 22.809 Un-Load
2:00 PM " " " 10 1,590 2,274 2,284 22.739 22.839 22.789
2:00 PM 93.75 125 152.25 0 1,590 2,166 2,171 21.659 21.709 21.684 Un-Load
2:10 PM " " " 10 1,600 2,164 2,169 21.639 21.689 21.664
2:10 PM 75.00 100 121.80 0 1,600 2,023 2,031 20.229 20.309 20.269 Un-Load

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 7 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
2:20 PM " " " 10 1,610 2,021 2,029 20.209 20.289 20.249
2:20 PM 56.25 75 91.35 0 1,610 1,945 1,954 19.449 19.539 19.494 Un-Load
2:30 PM " " " 10 1,620 1,940 1,950 19.399 19.499 19.449
2:30 PM 37.50 50 60.90 0 1,620 1,858 1,867 18.579 18.669 18.624 Un-Load
2:40 PM " " " 10 1,630 1,856 1,865 18.559 18.649 18.604
2:40 PM 18.75 25 30.45 0 1,630 1,749 1,754 17.489 17.539 17.514 Un-Load
2:50 PM " " " 10 1,640 1,747 1,752 17.469 17.519 17.494
2:50 PM 0.00 0 0.00 0 1,640 1,690 1,696 16.899 16.959 16.929 Un-Load
3:05 PM " " " 15 1,655 1,688 1,690 16.879 16.899 16.889
3:20 PM " " " 15 1,670 1,684 1,688 16.839 16.879 16.859
3:35 PM " " " 15 1,685 1,682 1,687 16.819 16.869 16.844
3:50 PM " " " 15 1,700 1,681 1,686 16.809 16.859 16.834 END

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 1 of 7

Project: Fame Apparels Limited ( Printing Unit).


Name of the Client: Fame Apparels Limited. Dia of Ram)Cm): 28.00 Consultant: Orbit Consultant.
Contractor: Fame Apparels Limited. Area of Ram(cm2): 615.75
Test Pile No: TP-05 Design Load (Ton): 75.00
Pile Size: 500mm Max. Test Load (Ton): 225.00
Length of Pile: 100'.0" Date of Casting: 20.04.2022
Pile Type: Cast-in Situ Pile Date of Calibration: 29.05.2022
Test Method: ASTM D-1143-81 Regression Equal, Y= 1.0067X - 8.5106
Maximum Settlement: 27.849mm Test Starting Date: 26-Jun-22
Net Settlement: 21.149mm Test Complet Date: 27-Jun-22

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
26-Jun-22
11:00 AM 0.00 0 0 0 0 0 0 0 0 0.000 Starting
11:00 AM 18.75 25 30.45 0 0 125 105 1.249 1.049 1.149 Load
11:15 AM " " " 15 15 132 112 1.319 1.119 1.219
11:30 AM " " " 15 30 135 115 1.349 1.149 1.249
11:45 AM " " " 15 45 137 118 1.369 1.179 1.274
12:00 PM " " " 15 60 138 118 1.379 1.179 1.279
12:00 PM 37.50 50 60.90 0 60 211 201 2.109 2.009 2.059 Load
12:15 PM " " " 15 75 218 206 2.179 2.059 2.119

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 2 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
12:30 PM " " " 15 90 222 209 2.219 2.089 2.154
12:45 PM " " " 15 105 224 210 2.239 2.099 2.169
1:00 PM " " " 15 120 225 211 2.249 2.109 2.179
1:00 PM 56.25 75 91.35 0 120 304 292 3.039 2.919 2.979 Load
1:15 PM " " " 15 135 307 296 3.069 2.959 3.014
1:30 PM " " " 15 150 309 298 3.089 2.979 3.034
1:45 PM " " " 15 165 310 300 3.099 2.999 3.049
2:00 PM " " " 15 180 311 301 3.109 3.009 3.059
2:00 PM 75.00 100 121.80 0 180 417 407 4.169 4.069 4.119 Load
2:15 PM " " " 15 195 422 412 4.219 4.119 4.169
2:30 PM " " " 15 210 424 414 4.239 4.139 4.189
2:45 PM " " " 15 225 425 415 4.249 4.149 4.199
3:00 PM " " " 15 240 426 416 4.259 4.159 4.209
3:00 PM 56.25 75 91.35 0 240 420 410 4.199 4.099 4.149 Un-Load
3:10 PM " " " 10 250 419 409 4.189 4.089 4.139
3:10 PM 37.50 50 60.90 0 250 406 398 4.059 3.979 4.019 Un-Load
3:20 PM " " " 10 260 405 397 4.049 3.969 4.009
3:20 PM 18.75 25 30.45 0 260 380 370 3.799 3.699 3.749 Un-Load
3:30 PM " " " 10 270 378 368 3.779 3.679 3.729

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 3 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
3:30 PM 0.00 0 0.00 0 270 346 336 3.459 3.359 3.409 Un-Load
3:45 PM " " " 15 285 340 330 3.399 3.299 3.349
4:00 PM " " " 15 300 338 328 3.379 3.279 3.329
4:15 PM " " " 15 315 337 327 3.369 3.269 3.319
4:30 PM " " " 15 330 337 327 3.369 3.269 3.319
4:30 PM 75.00 100 121.80 0 330 446 434 4.459 4.339 4.399 Load
4:45 PM " " " 15 345 449 437 4.489 4.369 4.429
5:00 PM " " " 15 360 451 439 4.509 4.389 4.449
5:15 PM " " " 15 375 452 439 4.519 4.389 4.454
5:30 PM " " " 15 390 452 440 4.519 4.399 4.459
5:30 PM 93.75 125 152.25 0 390 508 500 5.079 4.999 5.039 Load
5:45 PM " " " 15 405 512 504 5.119 5.039 5.079
6:00 PM " " " 15 420 515 507 5.149 5.069 5.109
6:15 PM " " " 15 435 517 509 5.169 5.089 5.129
6:30 PM " " " 15 450 518 510 5.179 5.099 5.139
6:30 PM 112.50 150 182.70 0 450 574 570 5.739 5.699 5.719 Load
6:45 PM " " " 15 465 580 576 5.799 5.759 5.779
7:00 PM " " " 15 480 582 578 5.819 5.779 5.799
7:15 PM " " " 15 495 583 579 5.829 5.789 5.809

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 4 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
7:30 PM " " " 15 510 584 580 5.839 5.799 5.819
7:30 PM 131.25 175 213.15 0 510 706 702 7.059 7.019 7.039 Load
7:45 PM " " " 15 525 712 709 7.119 7.089 7.104
8:00 PM " " " 15 540 715 711 7.149 7.109 7.129
8:15 PM " " " 15 555 717 713 7.169 7.129 7.149
8:30 PM " " " 15 570 718 714 7.179 7.139 7.159
8:30 PM 150.00 200 243.60 0 570 854 850 8.539 8.499 8.519 Load
8:45 PM " " " 15 585 860 856 8.599 8.559 8.579
9:00 PM " " " 15 600 863 859 8.629 8.589 8.609
9:15 PM " " " 15 615 865 861 8.649 8.609 8.629
9:30 PM " " " 15 630 866 862 8.659 8.619 8.639
9:30 PM 168.75 225 274.05 0 630 1,020 1,016 10.199 10.159 10.179 Load
9:45 PM " " " 15 645 1,030 1,026 10.299 10.259 10.279
10:00 PM " " " 15 660 1,034 1,030 10.339 10.299 10.319
10:15 PM " " " 15 675 1,036 1,032 10.359 10.319 10.339
10:30 PM " " " 15 690 1,037 1,033 10.369 10.329 10.349
10:30 PM 187.50 250 304.50 0 690 1,360 1,356 13.599 13.559 13.579 Load
10:45 PM " " " 15 705 1,368 1,364 13.679 13.639 13.659
11:00 PM " " " 15 720 1,371 1,367 13.709 13.669 13.689

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 5 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
11:15 PM " " " 15 735 1,373 1,369 13.729 13.689 13.709
11:30 PM " " " 15 750 1,374 1,370 13.739 13.699 13.719
11:30 PM 206.25 275 334.96 0 750 1,830 1,824 18.299 18.239 18.269 Load
11:45 PM " " " 15 765 1,844 1,838 18.439 18.379 18.409
12:00 AM " " " 15 780 1,847 1,841 18.469 18.409 18.439
12:15 AM " " " 15 795 1,849 1,843 18.489 18.429 18.459
12:30 AM " " " 15 810 1,850 1,844 18.499 18.439 18.469
12:30 AM 225.00 300 365.41 0 810 2,500 2,496 24.999 24.959 24.979 Load
12:45 AM " " " 15 825 2,540 2,536 25.399 25.359 25.379
1:00 AM " " " 15 840 2,562 2,558 25.619 25.579 25.599
1:15 AM " " " 15 855 2,580 2,576 25.799 25.759 25.779
1:30 AM " " " 15 870 2,600 2,596 25.999 25.959 25.979
2:30 AM " " " 60 930 2,654 2,650 26.539 26.499 26.519
3:30 AM " " " 60 990 2,694 2,690 26.939 26.899 26.919
4:30 AM " " " 60 1,050 2,724 2,728 27.239 27.279 27.259
5:30 AM " " " 60 1,110 2,740 2,736 27.399 27.359 27.379
6:30 AM " " " 60 1,170 2,756 2,752 27.559 27.519 27.539
7:30 AM " " " 60 1,230 2,766 2,762 27.659 27.619 27.639
8:30 AM " " " 60 1,290 2,778 2,774 27.779 27.739 27.759

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 6 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
9:30 AM " " " 60 1,350 2,784 2,780 27.839 27.799 27.819
10:30 AM " " " 60 1,410 2,786 2,782 27.859 27.819 27.839
11:30 AM " " " 60 1,470 2,787 2,783 27.869 27.829 27.849
12:30 PM " " " 60 1,530 2,787 2,783 27.869 27.829 27.849
12:30 PM 206.25 275 334.96 0 1,530 2,787 2,783 27.869 27.829 27.849 Un-Load
12:40 PM " " " 10 1,540 2,787 2,783 27.869 27.829 27.849
12:40 PM 187.50 250 304.50 0 1,540 2,780 2,776 27.799 27.759 27.779 Un-Load
12:50 PM " " " 10 1,550 2,780 2,776 27.799 27.759 27.779
12:50 PM 168.75 225 274.05 0 1,550 2,771 2,767 27.709 27.669 27.689 Un-Load
1:00 PM " " " 10 1,560 2,770 2,766 27.699 27.659 27.679
1:00 PM 150.00 200 243.60 0 1,560 2,750 2,748 27.499 27.479 27.489 Un-Load
1:10 PM " " " 10 1,570 2,749 2,747 27.489 27.469 27.479
1:10 PM 131.25 175 213.15 0 1,570 2,708 2,704 27.079 27.039 27.059 Un-Load
1:20 PM " " " 10 1,580 2,707 2,703 27.069 27.029 27.049
1:20 PM 112.50 150 182.70 0 1,580 2,666 2,662 26.659 26.619 26.639 Un-Load
1:30 PM " " " 10 1,590 2,664 2,660 26.639 26.599 26.619
1:30 PM 93.75 125 152.25 0 1,590 2,610 2,608 26.099 26.079 26.089 Un-Load
1:40 PM " " " 10 1,600 2,608 2,606 26.079 26.059 26.069
1:40 PM 75.00 100 121.80 0 1,600 2,540 2,536 25.399 25.359 25.379 Un-Load

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 7 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
1:50 PM " " " 10 1,610 2,538 2,534 25.379 25.339 25.359
1:50 PM 56.25 75 91.35 0 1,610 2,480 2,478 24.799 24.779 24.789 Un-Load
2:00 PM " " " 10 1,620 2,477 2,475 24.769 24.749 24.759
2:00 PM 37.50 50 60.90 0 1,620 2,409 2,407 24.089 24.069 24.079 Un-Load
2:10 PM " " " 10 1,630 2,407 2,405 24.069 24.049 24.059
2:10 PM 18.75 25 30.45 0 1,630 2,340 2,338 23.399 23.379 23.389 Un-Load
2:20 PM " " " 10 1,640 2,335 2,333 23.349 23.329 23.339
2:20 PM 0.00 0 0.00 0 1,640 2,160 2,150 21.599 21.499 21.549 Un-Load
2:35 PM " " " 15 1,655 2,142 2,132 21.419 21.319 21.369
2:50 PM " " " 15 1,670 2,128 2,118 21.279 21.179 21.229
3:05 PM " " " 15 1,685 2,122 2,112 21.219 21.119 21.169
3:20 PM " " " 15 1,700 2,120 2,110 21.199 21.099 21.149 END

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 1 of 7

Project: Fame Apparels Limited ( Printing Unit).


Name of the Client: Fame Apparels Limited. Dia of Ram)Cm): 28.00 Consultant: Orbit Consultant.
Contractor: Fame Apparels Limited. Area of Ram(cm2): 615.75
Test Pile No: TP-06 Design Load (Ton): 75.00
Pile Size: 500mm Max. Test Load (Ton): 230.25
Length of Pile: 100'.0" Date of Casting: 22.05.2022
Pile Type: Cast-in Situ Pile Date of Calibration: 29.05.2022
Test Method: ASTM D-1143-81 Regression Equal, Y= 1.0067X - 8.5106
Maximum Settlement: 26.549mm Test Starting Date: 29-Jun-22
Net Settlement: 11.724mm Test Complet Date: 30-Jun-22

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
29-Jun-22
10:30 AM 0.00 0 0 0 0 0 0 0 0 0.000 Starting
10:30 AM 18.75 25 30.45 0 0 100 106 0.999 1.059 1.029 Load
10:45 AM " " " 15 15 106 112 1.059 1.119 1.089
11:00 AM " " " 15 30 108 114 1.079 1.139 1.109
11:15 AM " " " 15 45 109 115 1.089 1.149 1.119
11:30 AM " " " 15 60 109 115 1.089 1.149 1.119
11:30 AM 37.50 50 60.90 0 60 200 206 1.999 2.059 2.029 Load
11:45 AM " " " 15 75 204 210 2.039 2.099 2.069

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 2 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
12:00 PM " " " 15 90 206 212 2.059 2.119 2.089
12:15 PM " " " 15 105 208 214 2.079 2.139 2.109
12:30 PM " " " 15 120 208 214 2.079 2.139 2.109
12:30 PM 56.25 75 91.35 0 120 312 320 3.119 3.199 3.159 Load
12:45 PM " " " 15 135 314 322 3.139 3.219 3.179
1:00 PM " " " 15 150 316 324 3.159 3.239 3.199
1:15 PM " " " 15 165 317 325 3.169 3.249 3.209
1:30 PM " " " 15 180 318 326 3.179 3.259 3.219
1:30 PM 75.00 100 121.80 0 180 430 436 4.299 4.359 4.329 Load
1:45 PM " " " 15 195 434 440 4.339 4.399 4.369
2:00 PM " " " 15 210 436 442 4.359 4.419 4.389
2:15 PM " " " 15 225 437 443 4.369 4.429 4.399
2:30 PM " " " 15 240 438 444 4.379 4.439 4.409
2:30 PM 56.25 75 91.35 0 240 432 436 4.319 4.359 4.339 Un-Load
2:40 PM " " " 10 250 431 435 4.309 4.349 4.329
2:40 PM 37.50 50 60.90 0 250 411 415 4.109 4.149 4.129 Un-Load
2:50 PM " " " 10 260 410 414 4.099 4.139 4.119
2:50 PM 18.75 25 30.45 0 260 378 382 3.779 3.819 3.799 Un-Load
3:00 PM " " " 10 270 376 380 3.759 3.799 3.779

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 3 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
3:00 PM 0.00 0 0.00 0 270 320 326 3.199 3.259 3.229 Un-Load
3:15 PM " " " 15 285 310 316 3.099 3.159 3.129
3:30 PM " " " 15 300 307 313 3.069 3.129 3.099
3:45 PM " " " 15 315 306 312 3.059 3.119 3.089
4:00 PM " " " 15 330 306 312 3.059 3.119 3.089
4:00 PM 75.00 100 121.80 0 330 460 468 4.599 4.679 4.639 Load
4:15 PM " " " 15 345 463 471 4.629 4.709 4.669
4:30 PM " " " 15 360 465 473 4.649 4.729 4.689
4:45 PM " " " 15 375 466 474 4.659 4.739 4.699
5:00 PM " " " 15 390 467 475 4.669 4.749 4.709
5:00 PM 93.75 125 152.25 0 390 550 556 5.499 5.559 5.529 Load
5:15 PM " " " 15 405 554 560 5.539 5.599 5.569
5:30 PM " " " 15 420 556 562 5.559 5.619 5.589
5:45 PM " " " 15 435 558 564 5.579 5.639 5.609
6:00 PM " " " 15 450 559 567 5.589 5.669 5.629
6:00 PM 112.50 150 182.70 0 450 670 676 6.699 6.759 6.729 Load
6:15 PM " " " 15 465 673 679 6.729 6.789 6.759
6:30 PM " " " 15 480 676 682 6.759 6.819 6.789
6:45 PM " " " 15 495 678 684 6.779 6.839 6.809

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 4 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
7:00 PM " " " 15 510 679 685 6.789 6.849 6.819
7:00 PM 131.25 175 213.15 0 510 803 809 8.029 8.089 8.059 Load
7:15 PM " " " 15 525 808 814 8.079 8.139 8.109
7:30 PM " " " 15 540 810 816 8.099 8.159 8.129
7:45 PM " " " 15 555 812 818 8.119 8.179 8.149
8:00 PM " " " 15 570 813 819 8.129 8.189 8.159
8:00 PM 150.00 200 243.60 0 570 960 966 9.599 9.659 9.629 Load
8:15 PM " " " 15 585 964 970 9.639 9.699 9.669
8:30 PM " " " 15 600 966 972 9.659 9.719 9.689
8:45 PM " " " 15 615 967 973 9.669 9.729 9.699
9:00 PM " " " 15 630 968 974 9.679 9.739 9.709
9:00 PM 168.75 225 274.05 0 630 1,110 1,116 11.099 11.159 11.129 Load
9:15 PM " " " 15 645 1,114 1,118 11.139 11.179 11.159
9:30 PM " " " 15 660 1,116 1,120 11.159 11.199 11.179
9:45 PM " " " 15 675 1,118 1,122 11.179 11.219 11.199
10:00 PM " " " 15 690 1,119 1,123 11.189 11.229 11.209
10:00 PM 187.50 250 304.50 0 690 1,307 1,313 13.069 13.129 13.099 Load
10:15 PM " " " 15 705 1,312 1,318 13.119 13.179 13.149
10:30 PM " " " 15 720 1,315 1,321 13.149 13.209 13.179

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 5 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
10:45 PM " " " 15 735 1,317 1,323 13.169 13.229 13.199
11:00 PM " " " 15 750 1,318 1,324 13.179 13.239 13.209
11:00 PM 206.25 275 334.96 0 750 1,520 1,526 15.199 15.259 15.229 Load
11:15 PM " " " 15 765 1,524 1,530 15.239 15.299 15.269
11:30 PM " " " 15 780 1,526 1,532 15.259 15.319 15.289
11:45 PM " " " 15 795 1,527 1,533 15.269 15.329 15.299
12:00 AM " " " 15 810 1,528 1,534 15.279 15.339 15.309
12:00 AM 225.00 300 365.41 0 810 1,780 1,784 17.799 17.839 17.819 Load
12:15 AM " " " 15 825 1,790 1,794 17.899 17.939 17.919
12:30 AM " " " 15 840 1,796 1,800 17.959 17.999 17.979
12:45 AM " " " 15 855 1,798 1,802 17.979 18.019 17.999
1:00 AM " " " 15 870 1,800 1,804 17.999 18.039 18.019
1:00 AM 230.25 307 373.93 0 870 2,600 2,618 25.999 26.179 26.089 Load
1:15 AM " " " 15 885 2,610 2,623 26.099 26.229 26.164
1:30 AM " " " 15 900 2,616 2,625 26.159 26.249 26.204
1:45 AM " " " 15 915 2,619 2,630 26.189 26.299 26.244
2:00 AM " " " 15 930 2,622 2,633 26.219 26.329 26.274
3:00 AM " " " 60 930 2,630 2,639 26.299 26.389 26.344
4:00 AM " " " 60 990 2,634 2,645 26.339 26.449 26.394

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 6 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
5:00 AM " " " 60 1,050 2,639 2,650 26.389 26.499 26.444
6:00 AM " " " 60 1,110 2,644 2,653 26.439 26.529 26.484
7:00 AM " " " 60 1,170 2,650 2,655 26.499 26.549 26.524
8:00 AM " " " 60 1,230 2,652 2,658 26.519 26.579 26.549
9:00 AM " " " 60 1,290 2,652 2,658 26.519 26.579 26.549
10:00 AM " " " 60 1,350 2,652 2,658 26.519 26.579 26.549
11:00 AM " " " 60 1,410 2,652 2,658 26.519 26.579 26.549
12:00 PM " " " 60 1,470 2,652 2,658 26.519 26.579 26.549
1:00 PM " " " 60 1,530 2,652 2,658 26.519 26.579 26.549
1:00 PM 225.00 300 365.41 0 1,530 2,650 2,655 26.499 26.549 26.524 Un-Load
1:10 PM " " " 10 1,540 2,650 2,655 26.499 26.549 26.524
1:10 PM 206.25 275 334.96 0 1,540 2,630 2,641 26.299 26.409 26.354 Un-Load
1:20 PM " " " 10 1,550 2,630 2,640 26.299 26.399 26.349
1:20 PM 187.50 250 304.50 0 1,550 2,600 2,610 25.999 26.099 26.049 Un-Load
1:30 PM " " " 10 1,560 2,600 2,608 25.999 26.079 26.039
1:30 PM 168.75 225 274.05 0 1,560 2,568 2,580 25.679 25.799 25.739 Un-Load
1:40 PM " " " 10 1,570 2,566 2,580 25.659 25.799 25.729
1:40 PM 150.00 200 243.60 0 1,570 2,525 2,530 25.249 25.299 25.274 Un-Load
1:50 PM " " " 10 1,580 2,525 2,528 25.249 25.279 25.264

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
STATIC AXIAL PILE LOAD TEST FIELD DATA RECORD SHEET (M.R FOUNDATION)
Field Data Sheet 7 of 7

Date Load on Percent Of Observed Elapsed Cumulative Observer Reading Actual Reading (mm) Average
& Test Pile Design Pressure Time Elapsed M1 M2 M1 M2 Settlement Remarks
Time (Ton) Load (%) (bar) (min) Time (min) ID:7H8919 ID:6K6176 (mm) (mm) (mm)
Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-9 Col-10 Col-11 Col-12 Col-15 Col-16
1:50 PM 131.25 175 213.15 0 1,580 2,489 2,494 24.889 24.939 24.914 Un-Load
2:00 PM " " " 10 1,590 2,488 2,492 24.879 24.919 24.899
2:00 PM 112.50 150 182.70 0 1,590 2,410 2,422 24.099 24.219 24.159 Un-Load
2:10 PM " " " 10 1,600 2,408 2,420 24.079 24.199 24.139
2:10 PM 93.75 125 152.25 0 1,600 2,361 2,370 23.609 23.699 23.654 Un-Load
2:20 PM " " " 10 1,610 2,360 2,370 23.599 23.699 23.649
2:20 PM 75.00 100 121.80 0 1,610 2,300 2,310 22.999 23.099 23.049 Un-Load
2:30 PM " " " 10 1,620 2,300 2,308 22.999 23.079 23.039
2:30 PM 56.25 75 91.35 0 1,620 2,258 2,263 22.579 22.629 22.604 Un-Load
2:40 PM " " " 10 1,630 2,255 2,260 22.549 22.599 22.574
2:40 PM 37.50 50 60.90 0 1,630 2,180 2,188 21.799 21.879 21.839 Un-Load
2:50 PM " " " 10 1,640 2,180 2,186 21.799 21.859 21.829
2:50 PM 18.75 25 30.45 0 1,640 1,700 1,721 16.999 17.209 17.104 Un-Load
3:00 PM " " " 10 1,650 1,700 1,720 16.999 17.199 17.099
3:00 PM 0.00 0 0.00 0 1,650 1,180 1,189 11.799 11.889 11.844 Un-Load
3:15 PM " " " 15 1,665 1,175 1,180 11.749 11.799 11.774
3:30 PM " " " 15 1,680 1,170 1,176 11.699 11.759 11.729
3:45 PM " " " 15 1,695 1,170 1,175 11.699 11.749 11.724
4:00 PM " " " 15 1,710 1,170 1,175 11.699 11.749 11.724 END

Signature of Load Test Signature of Signature of Signature of


Firm Contractor Consultant Client
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
Compression Test Platform & Setup
vertical view

Loads
(bags filled
with filling
sands)

Existing Ground Main Beams Basement to


Reference Beams
carry out loads
Hydraulic Jack

Deflection Dial Gauge Rocker Beam


(to get pile settlement)
Static Frame
(anchored on ground)
l l

MS Plate Pressure Dial gauge


(to ensure equal load on Test Pile
test pile top surface) Hydraulic Pressure Pipe Hydraulic Pump
M.R FOUNDATION Client: Fame Apparels Limited
Scheme: Fame Apparels Limited (Printing Unit).

STATIC AXIAL PILE LOAD TEST

You might also like