0% found this document useful (0 votes)
216 views5 pages

Construction Gantt Chart Excel Template

This Gantt chart Excel template tracks the progress of a construction project from August 30, 2021 to October 6, 2021. It outlines the project start date and schedules tasks over 11 weeks broken into daily intervals. The template includes an input column to add tasks and a calculated column to track progress.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
216 views5 pages

Construction Gantt Chart Excel Template

This Gantt chart Excel template tracks the progress of a construction project from August 30, 2021 to October 6, 2021. It outlines the project start date and schedules tasks over 11 weeks broken into daily intervals. The template includes an input column to add tasks and a calculated column to track progress.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

[PROJECT NAME] - Construction Gantt chart Excel template Project Manager : [Project Manager] [Company Name]

Input column Project start date: 30-Aug-21 1


Calculated column
WEEK 36 WEEK 37 WEEK 38 WEEK 39 WEEK 40 WEEK 41 WEEK 42 WEEK 43 WEEK 44

30-Aug-21
31-Aug-21
01-Sep-21
02-Sep-21
03-Sep-21
06-Sep-21
07-Sep-21
08-Sep-21
09-Sep-21
10-Sep-21
13-Sep-21
14-Sep-21
15-Sep-21
16-Sep-21
17-Sep-21
20-Sep-21
21-Sep-21
22-Sep-21
23-Sep-21
24-Sep-21
27-Sep-21
28-Sep-21

29-Sep-21
30-Sep-21
01-Oct-21
04-Oct-21
05-Oct-21
06-Oct-21
07-Oct-21
08-Oct-21
11-Oct-21
12-Oct-21
13-Oct-21
14-Oct-21
15-Oct-21
18-Oct-21
19-Oct-21
20-Oct-21
21-Oct-21
22-Oct-21

25-Oct-21

26-Oct-21

27-Oct-21

28-Oct-21

29-Oct-21
START WORK END ESTIMATED
TYPE TASK NAME RESOURCE % ACTUAL COST M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F
DATE DAYS DATE COST

P Architectural design 30-Aug-21 11 13-Sep-21


T Prepare construction document 30-Aug-21 10 10-Sep-21 Bob 100%
T Sign agreement with client 10-Sep-21 2 13-Sep-21 Alex 100% $80,000 $90,000
P Construction 15-Sep-21 11 29-Sep-21
T Foundation 15-Sep-21 11 29-Sep-21 Bob 50%
S Excavation 15-Sep-21 5 21-Sep-21 Alex 80% $80,000 $90,000
S Form footings 21-Sep-21 4 24-Sep-21 John 30%
S Place rebar 24-Sep-21 3 28-Sep-21
S Place concrete 29-Sep-21 1 29-Sep-21
T First floor 30-Sep-21 7 08-Oct-21
S Walls 30-Sep-21 6 07-Oct-21
S Windows and doors 05-Oct-21 4 08-Oct-21
T Second floor 11-Oct-21 10 22-Oct-21
S Walls 11-Oct-21 6 18-Oct-21
S Windows and doors 19-Oct-21 4 22-Oct-21
T Roof 25-Oct-21 5 29-Oct-21
S Roof structure 25-Oct-21 2 26-Oct-21
S Install water retention facilities 27-Oct-21 3 29-Oct-21
Getting started guide
• Enter the [Project Name], [Project Manager], and [Company Name].
• Enter the Project Start Date (P3). This will automatically update the dates shown in the
• Add details of your tasks, such as TYPE, TASK NAME, START DATE, the number of WO
Note: Type can be Phase (P), Task (T), or Subtask (S).
• To change the range of dates displayed in the timeline area, just slide the scroll bar.
Note: Do not change the dates in the timeline manually.
• To add more tasks:
Step 1: Copy a single row or several rows at once.
Step 2: Select the row after the last task (Row 36), then right-click and select Paste
Note: If you want to insert the copied cells between tasks, just select any task
• To add more dates in the timeline:
Step 1: Copy one-week columns (e.g. AY-BC)
Step 2: Select the column after the last date (BD), then right-click and select Insert

The calculation for END DATE


• If you enter a start date, by default, the end date is the same as the start date.
• Once you add the number of workdays, the end date is automatically updated. Weekend
Note: Do not enter end dates manually since the END DATE is a calculated column.

The calculation for Phases


• You can enter the start date and number of workdays of a Phase manually.
• However, if you want to do calculation automatically based on its tasks, use the following
START DATE =MIN(range_of_its_tasks_start_dates)
WORK DAYS =IF(ISBLANK(phase_start_date),"",NETWORKDAYS(phase_start_

The calculation for Tasks


• You can can enter the start date, number of workdays, and % completion of a tasks man
• However, if you want to do calculation automatically based on its subtasks, use the follow
START DATE =MIN(range_of_its_subtasks_start_dates)
WORKDAYS =IF(ISBLANK(task_start_date),"",NETWORKDAYS(task_start_date
% =SUMPRODUCT(range_of_its_subtasks_workdays,range_of_its_sub
e dates shown in the timeline.
, the number of WORKDAYS, RESOURCE, and ESTIMATED COST.

e the scroll bar.

k and select Paste or Insert Copied Cells (recommended).


just select any task's row, then right-click and select Insert Copied Cells.

and select Insert Copied Cells.

start date.
updated. Weekends are not included in the calculation.
calculated column.

ks, use the following formulas:

DAYS(phase_start_date,MAX(range_of_its_tasks_end_dates)))

etion of a tasks manually.


tasks, use the following formulas:

AYS(task_start_date,MAX(range_of_its_subtasks_end_dates)))
ys,range_of_its_subtasks_%completed/SUM(range_of_its_subtasks_workdays)

You might also like