0% found this document useful (0 votes)
77 views29 pages

97Q1

istructe

Uploaded by

Alvin To AAHK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
77 views29 pages

97Q1

istructe

Uploaded by

Alvin To AAHK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 29
lar? Question 1 Science Park Office Building Client's requit irements TA ulding wits [ERECT pany pitched roo ee Figure QI. The ere roti Al i 2. Te Res ie undef th send celine at ach ee sO, clare dsm CI’0% is required at all levels for services. The floor to floor height, including the basement, is'4.0m(13'0"). 3."The client does not require to use\the roof space except for a small water tank and access for mmaotenanc. 4, Eleva a 1 be fieuinwaline aig req ine extemal elevations Fler ae ee Sen Tog apps. Lif suppor structures cannot be used for stability: the extemal elevations but.considerton-maus-he "The intemalcolumns’ at the upper floor 5, There is no restriction on column location see tie ground floor plan, 6. ‘The client requires Figure Ql. Imposed 0.6KN/m* (12.SIbf/fe) Services 1.0KN/m* (201b f/f) ore to: Tepes se) wrt ‘ie mis on otis otefetonn an wind es OH (0 miteh Ground conditions 9. Ground level - 3.0m (10'0") ‘Topsoil and loose fill 3.0m (10°0") - 5.0m (16'6") ‘Dense sand. Safe bearing pressure -200kN/m* (4000Ibf/ft*) 5.0m (16'6") to depth Stiff clay, Safe bearing pressure SSO cE Cross nt poet ‘Omit from consideration 10. Detailed design of cladding, stairs, curtain walling and lift structure. Part 1 . (40 marks) a. Prepare a design appraisal with appropriate sketches indicating two distinct and viable solutions for the building, foundations and floors. Indicate clearly the functional framing, the load transfer and Stability aspects of each scheme. Identify the solution you recommend, giving reasons for your choice. b been approved in principle, the clientasks' whether the first fl jade colun same extent as the ground floor. Write a letter to the client explaining the effect of this request on the design. Part 2 ' (60 marks) For the solution recommended in Part 1(2): . Prepare sufficient design calculations to establish the form and size of all principal structural elements including the foundations and basement walls. 4. Prepare general arrangement plans, sections and elevations to show the dimensions, layout and disposition of the structural elements for estimating purposes. Prepare clearly annotated sketches to illustrate details of: {) The connection of an intemal column to the foundation and basement slab. eee 9 structure. jon of the building and provide a programme showing the main construction act “eos = slateases | GROUND FLOOR PLAN SGaTERALEOUIINE ARE ¢FTED ONLY AT THE POSITIONS SHOWN) oo) |-----------5 Fm, 1309 Ory (30 tr basewelr pee Tasos SECTION A-A Alldimensions ore in metres (Feet and inches) PLAN (BASEMENT AND FLOOR LEVELS 1,2 AND3 MINIMUM COLUMN SPACING ANTERNAWW OF 60M(200") Ese as 5 Zee strcur( — 00S Sc © Guile FIGURE Qt on 22 A P Ove Arup & Partners Job No. ‘Sheet No, AAT, > RU (447% | oS Naw by verze be Apr ce Mulveductics Tus Mable sefzmus wiih be propesed Kare a ae storey beAllivey stile basen auch portly, Petebud von Ss bailing Se ging Ae Bd on the eutseints oe} a Large toron Structure. Appesse’ ; Gort Seger to the CRent!s wepearrensints: tr, Site cenattions » the felloosiug. factors shodd, be considered Gm the Structarah testes Chrewd’s Requdocenaks q Rnglicetions Site Conditions ke stistan [ 4-storg falda, Pregrscve Collagse Wet Cxtticah as ue. dy Korey Qoce thaw S Ceseug Bowever, stil grevids aflect\ve Kies fe exswe vebustues S @D Bycewads VD Pevids vekaldee stractue « IS Byourd Waker eesecK w WerertreoG tho WE ORAL |] Horak clad Y) Siwwtorrah dostye fe Keke Tired Rook w e& Reo seca Yet yoy use, fox struckual Wse eagd lor ee wwcter to wie, Mage By Dae © Glazed curtadn Set bade celumn by Wall Systane Les mn wet \ IQ No lesrcktor ew Te rovde regular Gereruol elevaeas and bux Seuld constder QA gpearane be Kind Ah curtain vselbie). @ Tesoro Cal. Spacing, Cork ok Gn¥ Gm. Square $7 Em a o \amer she wager —Lloor © +p Column Fee Tom Treneler Shucture x Gf er Ranger Structure vequirecl , @ soe ok Assems ne estitettor cutslats oh a ew site Wworvkn Spice Lage Kew - ard shuctutee, Com Jecate owt AY bre, Soot pink : Meo, aseuns we resirtetion om ercwlation ch teasenatk > Open Cvearigtion can be adoyted CAs betes cheegest). ARU P Ove Arup & Partners 5.0 = path (Gwe Forlecnanet Requarenen wie syeiGed ‘ Ce te Joo No. Niaae by oae ea SD Required Clear rare Stwctur§ Zene = SE mm 2 Cand. = dew Senta Tene = Od 71 q ese 4 Bea Boce Ee Re eetbes, Cem DBD Leayn Leade Fa Sen Rak LL = Ree £ Ze oe - On Offtee Flea 2 as le Bie @ Cound Condition - Not suttable fer O- Bem Top Sei! and jen gone st loose Fell Be Be Pense Satel. Stiff Clog Resse Testamme hh Hat, Derorne Me darnty 2 hoa meete Cover BS BLO. ac corte one 22 ARU P Ove Arup & Partners Job No [ vee! © louse Oe Selection el Construction Metertad . Sage vern{exced Cemereke. Ga cheser ao +o cenckvuction morte ah fer be He sefamas Fecause, of the Gilowing, teases» — A. Re. Structure Can pevide oo ace westetawte te Wathen / good send ard thrameQ \ndulectten + gen poekee Heo agednsk Corrente 1 ad afin . 2) Bethe comerete and reiwfercwect Available — flecatly , ne pre -erdertny rwred ard fener ora flexibGty to Accomsdate Yoke. chars: and Teper cable eyeing Ae hasensicd, are teadt hy Ree Le 3S. Mece dumble recesses, yeetection, te Ahengh donetnnctow req Ores tra Kins “ee vetoing PRFERLN, 7 KR cae GL saved a deytin Nuys ard tepet Whe = OTR, Jatera Wind lead. will m+ Control the ou ARU Pp Ove Arup & Partners ade by Sefton ©. - RG. Tran um ae anchor Beau and Beam- Slab Poor Stcton BS ARU Pp Ove Arup & Partners Struc tural Grant The floor syptens ~enusishs. ° 4 (se fleor Sleb Stem Keway onte Secondory ba berms seppertine, by Wee peams between ¢ slhanns VertteaS Lend Tons\er and Stebiiey The wertteal load path is Andseated cw Section BB. lead te the Kanner AMS [ ste the transfer beam ak veoh down +o the foundation - between Columns whrck continue down to he Fpundeien . [ le] Mage By Bae Gene tl, -|+ [ne q a \ ‘ . Tye Boe Silas + Iso THe. Sreonilnndy Bess? Ace x Goody. Main Bann + been 65e ay ‘ The beam slab sare transfers Kleen eres Wat in Kun et eMoe fransuit UR eo The Frans§or beams at rook span ARU P Ove Arup & Partners Laterat bead Trenshen aud Stabiit The Araus her beam and sagper te columns. form * Regd pore h frame So vesisk the lakere load . Tha wind leads exerts on the eurtate boalliea are serawferred to the veststtna aqotem Heveugn she wigid dia erage Aekien yroutded by he Kiece slab. Except hse vporte & Grows formed by ths tracker beam, he beam ~ cela Krawns alse poskhe Some Jaterah Yeststanck - A RU P Ove Arup & Partners [ le] Niage by re CO OT TT tthe Constd erections, ID Proisten Verne + ks *He San area he enly 24m YK tder, revered Jethe Jo considered nek wecassavy - BS Terstow > Ke the stetrected ate lecetedl asymnstiventty oe alam, torsion vow be Wdeced - Thus should be ceustdered Us Aeroried design stage BD varebirey : Under ermal ctreumstance Bc stucttee re durable and smatetanca Sree @ Bosement + Sra the basement 1 relatively Shallow , an wit Bo. wal cAoug the pernwek eX, too the. “bo provide ak ee whe yer rans tekotatny shuccture- As aets no site veckwetten , epen cute method may be adopted fer TRL coustrctten os hageest. Cr°e Gocmduontey As Pease. job No. nana ARU P Ove Arup & Partners l S Wate by = Tey Se ; = Leese Gi, 3 x — Bers ate = aed ARERR A ae © BAK a oie Clay" Treesiva. 3: 4 Qo Raa Preset is Fonnting erecta (Steff Clay) > Soke Banu. Presa gan loo Pe. Estiweted Total Leek = (setae G Cleows = FotPa econpies less Yeoh space ck alless easthy glans ne, ey weter tanks <& ren). @ Steel Reo} truss can be pe fabwantea\ off-stre itele Getter quatre, centroh. Bn addition , tte aunt, coutrel AL Rc. ~vansher bem TS were ger ATGeulk he to Verge cenerete, Volum and verwlercewmact Yrkio - . ARU P Ove Arup & Partners shes hoki TAR mate spbergous ek the Kilowt ng design. calewlatims are te justify We section size, estimate requaved petvefe ccs quawerses er cosh estimate + onze A Ri P Ove Arup & Partners soo Ne peciqn Standards and Relerenas pesign Standar\s ane Referens @ Bssic © sssiso © ers & Bs eet S SSE Gree Book faaiye Warten Material Leonie Concce te, Exvade B0/ro Ren = 3 Nore Coensity 7 24 ey?) Rernkers mick > Ran Viet \ YS Performed Bar te BS AAG sy = Kee nm Steelworle » Grads tA Ay [FN ew™ Cage TEE bN nD Ce st Gand Jey = 2e SNe Ct dD sebaeny Fxpeseck Cerdtinrs > Tnternah F Muth Eoternn Se Necarerte ERY AL AawkS 2 hes Crm , Conerete Cover Slate as Becton Ae Colromn 38 Rake. se Basemank Wai/ Stele ox one ze dod No. Sheet No. ARU P Ove Arup & Partners Design ead CRW. Meage Tastes Sentes PRartittas — Tnepeeel Level kool 2S Lo - Oe 6 itce (.e as lve Be Wind Lead Baste Wd Speend,V > Fom/s Take So = Se 2h a = ty = : oa =o As Ya = ~7gg = 07 soe ‘ We 22m F S2 = OZ. C Be ceuservetived, J. Resign wid Tessure Ae (s Sse)" xaes (S® +e Ra Bs rhe asgect vrei VN only, fe > OLR, Se be ecpented| wemd lead wetoalel Kets Ceoletretled the dastan. Ta *Re subseq ask achawrud Calotetion 5 enced lead coubnetien Ge “Bry bAPCe CE Urewtuer , the elfeek AL Wind lead FRendd be cRecked Gy darerled artgn. ab Mie ARU P Ove Arup & Partners a ade by =o Design Assumptions - \rens, Fer shhend epurgee 7 The Kellowsine AUTML rok be Tnekided” Te Ha Mbsequact bik skedld be chached ly teredled design: BD Abel deheckion eo bualdina dus to volved « Bi Kettah delleoter slay dus to Rravtty, \oadk . CB Reandation — Settlemu ZB Beerdonttah \oadk te creak Pgressive collage ARU P Ove Arup & Partners Flak Stub Westar C2se HED Ap Leading , : is Ons Us Ge Mi Pw Ser Tat to= h4eocek LO = 26,2 Pe Cot: Seoxses CRocke For Sictewah “Pere L. pe sy n fran © Curtlesd = @e tax Gs FVAEN < oF BSBUS Table 347 Maye. ME Cor KTP KOE Max. MW = PYo ER. = C063 x 727%*6 = Wskem. Distihetion © Mewack No Spee Cots Stig = he Cerm> wys KD > er Mid. Stag 2G SV rition = Ons xs 2 GT Mr Loe Col Stee Osy KROL 17] wrt Ler mrad Sh > DAS sR\O 2 lao chede Bendis yam NM = 22S kr.m be Been A= 230 H 2s te = 2S EM KV -e.c4r Se Ag lref&> = 251 Sp eee * => = D3 ete vam for Prottis TWe- roe TRB C lees rd Chede Rurctiva Shear \ F\ASk 23 ORY . _ SS 3eytc? Yuretinn = btevas 215 Sy SAar <0 Slee ATS OA oe |. onze ARU P Ove Arup & Partners ob No Cheele Shear at isd yew Cok Anes Perimeter = Was ¥ 4 = ry we B38 y (Gr \aas®) we? \ f A Dey \sd War Xe oS w= -a eas = Oe Show™ + as As- ocd Od = aes Phe > OG RKaw™ mm. Tmereasce fe “Eaemace Tro~ (se C Defawnr~nd we = er NY eer Re Sheer retiforce me Se on 22 ARU P Ove Arup & Partners 0b No. C&oc\k Good _ Yer stetug + \ ‘ Reese BL > ee ERe- Soo! Leck Pleo ts LL So Ra { \ Tae! \ Column Load Suede AY Total DL = Aen rexBxcis PET Te aad ? eee Area + esy rem (e = 36m%. = \PS7EN — 3, Tetal LL = Bo ¥ 36K 2XK0T ve > b7y kw |e Bios Pe Laoes boce = 2682 ka. Pesiqn Reine Ks Creqiad ee Qeezic™ = 0?) mm SEQ 607 C46 Brotada (G23 CTESG mm, 2.2% - Sheet No. Job No “Sheet No. owe ARI P Ove Arup & Partners U [Te] Nace by Dae Mate Cel, Close %lbee eet For giatw Floor l= Celta Cy som \avekta CRec\> — ger Flee LL= Se leTa Cyd Tess, & GbR CRealy. Column Led © ae B/E. pee (Ax Fe 2K DO XIEE X27 LU= (S¥ ae e Cem KIAAK FT = Pe Wer there = (Ee | EDS Pesan = dee: a > hese - YU, = ing - 6 SIE Secky cat Provide 247 BU CIDFE mm*, Ren Cds few he & Ab7 Sy As , = 1BAZ EN SR FEEL VAD RU Pp Ove Arup & Partners — Sheet Ne A KD rarfer eadtna From Manger Column PeL= lseokX Puke Peeks hae peat Sol ePp> 2 I4een Resign Mena PAS Medes eet = Mom BW HOM Ee WUHOKIT = Sar San C Revel resign Leeel a as ( f= mM = = Yé22 eS > Adept uc 356 % 406 Kee 24e Kym CPewag, = Woes FAD. ARI P Ove Arup & Pariners Job No. Sheet No. Node by na Dect Csee HED bat ¥ % per Axe xh S7 RA, Los SYS Ox) = 26 kPa. Br kPa <4- Se Slee Res CSexfle Beorng Pressed, Chee Rane by Shear och Col. Face . Bax. Cot bead R= leor{ ead (Mead cer tacay) Cel. Size = leee Xeno: > EG, dept os rae ~ (bee SE to—st ef ~ (BJ wm. Aer Leer xe = Fe lm < ToT leeekXt% BIS cel SS42 syyerted yp Gest 5 (Rese ok pElak Beam. a a heaece d= (goo-So-de- 42. = Be dmwe Me lsviee %8 x Ge = We2s bom, a a B= Bet ae Aslreqidd= 3682 FO N27 ow Pode Tas veo Botte Ses Cas A wr {hn , OLEZD qt (ee Ra on 22 A RU P Ove Arup & Partners Site Sule Cleet aver BK Ex conarion adyne st “Leger hans Screen ot Beck ave Book Truss teeeueens Job No. Nags by ‘Sheet No. Job No. Sheet No. ARU P Ove Arup & Partners e@ dy. PRATEPHAL Ube eretere Osu SSN, fh mR RcEMEAE ST a fe Bee Cape. pe ; Tie tee LAKES © COMPRESSED ‘ | LAP RAFT Tenant Ibo [ Feat ing . Be (-d : a 6 0 e Comecton of ae wwienal Cebumt te the aAoundection awd asewowkK, slabs WES. 0) job No. ‘Sheet No- owe A RU P Ove Arup & Partners Niage by Date eatd £ OF coLuMN eit = Fe Se OC uaban ern — oid gz T 3 | 3 Js e3 Ties ase LINES Eo SLAB _ Ls =o [een fe . r “fr 4 ~s (ry a ae Lier2s —rot at FUL Tense LAP CORRECTION OF AN INTERNAL Colunnt Wit THE FIRST Asc onze Job No. ‘Sheet No. tage by A RU P Ove Arup & Partners ‘Date so 2 Gay CoBNECTICN CE THE CURTAIS WALLINE

You might also like