Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
77 views
29 pages
97Q1
istructe
Uploaded by
Alvin To AAHK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save 97Q1 For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
77 views
29 pages
97Q1
istructe
Uploaded by
Alvin To AAHK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save 97Q1 For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save 97Q1 For Later
You are on page 1
/ 29
Search
Fullscreen
lar? Question 1 Science Park Office Building Client's requit irements TA ulding wits [ERECT pany pitched roo ee Figure QI. The ere roti Al i 2. Te Res ie undef th send celine at ach ee sO, clare dsm CI’0% is required at all levels for services. The floor to floor height, including the basement, is'4.0m(13'0"). 3."The client does not require to use\the roof space except for a small water tank and access for mmaotenanc. 4, Eleva a 1 be fieuinwaline aig req ine extemal elevations Fler ae ee Sen Tog apps. Lif suppor structures cannot be used for stability: the extemal elevations but.considerton-maus-he "The intemalcolumns’ at the upper floor 5, There is no restriction on column location see tie ground floor plan, 6. ‘The client requires Figure Ql. Imposed 0.6KN/m* (12.SIbf/fe) Services 1.0KN/m* (201b f/f) ore to: Tepes se) wrt ‘ie mis on otis otefetonn an wind es OH (0 miteh Ground conditions 9. Ground level - 3.0m (10'0") ‘Topsoil and loose fill 3.0m (10°0") - 5.0m (16'6") ‘Dense sand. Safe bearing pressure -200kN/m* (4000Ibf/ft*) 5.0m (16'6") to depth Stiff clay, Safe bearing pressure SSO cE Cross nt poet ‘Omit from consideration 10. Detailed design of cladding, stairs, curtain walling and lift structure. Part 1 . (40 marks) a. Prepare a design appraisal with appropriate sketches indicating two distinct and viable solutions for the building, foundations and floors. Indicate clearly the functional framing, the load transfer and Stability aspects of each scheme. Identify the solution you recommend, giving reasons for your choice. b been approved in principle, the clientasks' whether the first fl jade colun same extent as the ground floor. Write a letter to the client explaining the effect of this request on the design. Part 2 ' (60 marks) For the solution recommended in Part 1(2): . Prepare sufficient design calculations to establish the form and size of all principal structural elements including the foundations and basement walls. 4. Prepare general arrangement plans, sections and elevations to show the dimensions, layout and disposition of the structural elements for estimating purposes. Prepare clearly annotated sketches to illustrate details of: {) The connection of an intemal column to the foundation and basement slab. eee 9 structure. jon of the building and provide a programme showing the main construction act“eos = slateases | GROUND FLOOR PLAN SGaTERALEOUIINE ARE ¢FTED ONLY AT THE POSITIONS SHOWN) oo) |-----------5 Fm, 1309 Ory (30 tr basewelr pee Tasos SECTION A-A Alldimensions ore in metres (Feet and inches) PLAN (BASEMENT AND FLOOR LEVELS 1,2 AND3 MINIMUM COLUMN SPACING ANTERNAWW OF 60M(200") Ese as 5 Zee strcur( — 00S Sc © Guile FIGURE Qton 22 A P Ove Arup & Partners Job No. ‘Sheet No, AAT, > RU (447% | oS Naw by verze be Apr ce Mulveductics Tus Mable sefzmus wiih be propesed Kare a ae storey beAllivey stile basen auch portly, Petebud von Ss bailing Se ging Ae Bd on the eutseints oe} a Large toron Structure. Appesse’ ; Gort Seger to the CRent!s wepearrensints: tr, Site cenattions » the felloosiug. factors shodd, be considered Gm the Structarah testes Chrewd’s Requdocenaks q Rnglicetions Site Conditions ke stistan [ 4-storg falda, Pregrscve Collagse Wet Cxtticah as ue. dy Korey Qoce thaw S Ceseug Bowever, stil grevids aflect\ve Kies fe exswe vebustues S @D Bycewads VD Pevids vekaldee stractue « IS Byourd Waker eesecK w WerertreoG tho WE ORAL |] Horak clad Y) Siwwtorrah dostye fe Keke Tired Rook w e& Reo seca Yet yoy use, fox struckual Wse eagd lor ee wwcter to wie,Mage By Dae © Glazed curtadn Set bade celumn by Wall Systane Les mn wet \ IQ No lesrcktor ew Te rovde regular Gereruol elevaeas and bux Seuld constder QA gpearane be Kind Ah curtain vselbie). @ Tesoro Cal. Spacing, Cork ok Gn¥ Gm. Square $7 Em a o \amer she wager —Lloor © +p Column Fee Tom Treneler Shucture x Gf er Ranger Structure vequirecl , @ soe ok Assems ne estitettor cutslats oh a ew site Wworvkn Spice Lage Kew - ard shuctutee, Com Jecate owt AY bre, Soot pink : Meo, aseuns we resirtetion om ercwlation ch teasenatk > Open Cvearigtion can be adoyted CAs betes cheegest).ARU P Ove Arup & Partners 5.0 = path (Gwe Forlecnanet Requarenen wie syeiGed ‘ Ce te Joo No. Niaae by oae ea SD Required Clear rare Stwctur§ Zene = SE mm 2 Cand. = dew Senta Tene = Od 71 q ese 4 Bea Boce Ee Re eetbes, Cem DBD Leayn Leade Fa Sen Rak LL = Ree £ Ze oe - On Offtee Flea 2 as le Bie @ Cound Condition - Not suttable fer O- Bem Top Sei! and jen gone st loose Fell Be Be Pense Satel. Stiff Clog Resse Testamme hh Hat, Derorne Me darnty 2 hoa meete Cover BS BLO. ac corteone 22 ARU P Ove Arup & Partners Job No [ vee! © louse Oe Selection el Construction Metertad . Sage vern{exced Cemereke. Ga cheser ao +o cenckvuction morte ah fer be He sefamas Fecause, of the Gilowing, teases» — A. Re. Structure Can pevide oo ace westetawte te Wathen / good send ard thrameQ \ndulectten + gen poekee Heo agednsk Corrente 1 ad afin . 2) Bethe comerete and reiwfercwect Available — flecatly , ne pre -erdertny rwred ard fener ora flexibGty to Accomsdate Yoke. chars: and Teper cable eyeing Ae hasensicd, are teadt hy Ree Le 3S. Mece dumble recesses, yeetection, te Ahengh donetnnctow req Ores tra Kins “ee vetoing PRFERLN, 7 KR cae GL saved a deytin Nuys ard tepet
Whe = OTR, Jatera Wind lead. will m+ Control the ouARU Pp Ove Arup & Partners ade by Sefton ©. - RG. Tran um ae anchor Beau and Beam- Slab Poor Stcton BSARU Pp Ove Arup & Partners Struc tural Grant The floor syptens ~enusishs. ° 4 (se fleor Sleb Stem Keway onte Secondory ba berms seppertine, by Wee peams between ¢ slhanns VertteaS Lend Tons\er and Stebiiey The wertteal load path is Andseated cw Section BB. lead te the Kanner AMS [ ste the transfer beam ak veoh down +o the foundation - between Columns whrck continue down to he Fpundeien . [ le] Mage By Bae Gene tl, -|+ [ne q a \ ‘ . Tye Boe Silas + Iso THe. Sreonilnndy Bess? Ace x Goody. Main Bann + been 65e ay ‘ The beam slab sare transfers Kleen eres Wat in Kun et eMoe fransuit UR eo The Frans§or beams at rook spanARU P Ove Arup & Partners Laterat bead Trenshen aud Stabiit The Araus her beam and sagper te columns. form * Regd pore h frame So vesisk the lakere load . Tha wind leads exerts on the eurtate boalliea are serawferred to the veststtna aqotem Heveugn she wigid dia erage Aekien yroutded by he Kiece slab. Except hse vporte & Grows formed by ths tracker beam, he beam ~ cela Krawns alse poskhe Some Jaterah Yeststanck -A RU P Ove Arup & Partners [ le] Niage by re CO OT TT tthe Constd erections, ID Proisten Verne + ks *He San area he enly 24m YK tder, revered Jethe Jo considered nek wecassavy - BS Terstow > Ke the stetrected ate lecetedl asymnstiventty oe alam, torsion vow be Wdeced - Thus should be ceustdered Us Aeroried design stage BD varebirey : Under ermal ctreumstance Bc stucttee re durable and smatetanca Sree @ Bosement + Sra the basement 1 relatively Shallow , an wit Bo. wal cAoug the pernwek eX, too the. “bo provide ak ee whe yer rans tekotatny shuccture- As aets no site veckwetten , epen cute method may be adopted fer TRL coustrctten os hageest. Cr°e Gocmduontey As Pease.job No. nana ARU P Ove Arup & Partners l S Wate by = Tey Se ; = Leese Gi, 3 x — Bers ate = aed ARERR A ae © BAK a oie Clay" Treesiva. 3: 4 Qo Raa Preset is Fonnting erecta (Steff Clay) > Soke Banu. Presa gan loo Pe. Estiweted Total Leek = (setae G Cleows = FotPa
econpies less Yeoh space ck alless easthy glans ne, ey weter tanks <& ren). @ Steel Reo} truss can be pe fabwantea\ off-stre itele Getter quatre, centroh. Bn addition , tte aunt, coutrel AL Rc. ~vansher bem TS were ger ATGeulk he to Verge cenerete, Volum and verwlercewmact Yrkio - .ARU P Ove Arup & Partners shes hoki TAR mate spbergous ek the Kilowt ng design. calewlatims are te justify We section size, estimate requaved petvefe ccs quawerses er cosh estimate +onze A Ri P Ove Arup & Partners soo Ne peciqn Standards and Relerenas pesign Standar\s ane Referens @ Bssic © sssiso © ers & Bs eet S SSE Gree Book faaiye Warten Material Leonie Concce te, Exvade B0/ro Ren = 3 Nore Coensity 7 24 ey?) Rernkers mick > Ran Viet \ YS Performed Bar te BS AAG sy = Kee nm Steelworle » Grads tA Ay [FN ew™ Cage TEE bN nD Ce st Gand Jey = 2e SNe Ct
dD sebaeny Fxpeseck Cerdtinrs > Tnternah F Muth Eoternn Se Necarerte ERY AL AawkS 2 hes Crm , Conerete Cover Slate as Becton Ae Colromn 38 Rake. se Basemank Wai/ Stele oxone ze dod No. Sheet No. ARU P Ove Arup & Partners Design ead CRW. Meage Tastes Sentes PRartittas — Tnepeeel Level kool 2S Lo - Oe 6 itce (.e as lve Be Wind Lead Baste Wd Speend,V > Fom/s Take So = Se 2h a = ty = : oa =o As Ya = ~7gg = 07 soe ‘ We 22m F S2 = OZ. C Be ceuservetived, J. Resign wid Tessure Ae (s Sse)" xaes (S® +e Ra Bs rhe asgect vrei VN only, fe > OLR, Se be ecpented| wemd lead wetoalel Kets Ceoletretled the dastan. Ta *Re subseq ask achawrud Calotetion 5 enced lead coubnetien Ge “Bry bAPCe CE Urewtuer , the elfeek AL Wind lead FRendd be cRecked Gy darerled artgn.ab Mie ARU P Ove Arup & Partners a ade by =o Design Assumptions - \rens, Fer shhend epurgee 7 The Kellowsine AUTML rok be Tnekided” Te Ha Mbsequact bik skedld be chached ly teredled design: BD Abel deheckion eo bualdina dus to volved « Bi Kettah delleoter slay dus to Rravtty, \oadk . CB Reandation — Settlemu ZB Beerdonttah \oadk te creak Pgressive collageARU P Ove Arup & Partners Flak Stub Westar C2se HED Ap Leading , : is Ons Us Ge Mi Pw Ser Tat to= h4eocek LO = 26,2 Pe Cot:
Seoxses CRocke For Sictewah “Pere L. pe sy n fran © Curtlesd = @e tax Gs FVAEN < oF BSBUS Table 347 Maye. ME Cor KTP KOE Max. MW = PYo ER. = C063 x 727%*6 = Wskem. Distihetion © Mewack No Spee Cots Stig = he Cerm> wys KD > er Mid. Stag 2G SV rition = Ons xs 2 GT Mr Loe Col Stee Osy KROL 17] wrt Ler mrad Sh > DAS sR\O 2 lao chede Bendis yam NM = 22S kr.m be Been A= 230 H 2s te = 2S EM KV -e.c4r Se Ag lref&> = 251 Sp eee * => = D3 ete vam for Prottis TWe- roe TRB C lees rd Chede Rurctiva Shear \ F\ASk 23 ORY . _ SS 3eytc? Yuretinn = btevas 215 Sy SAar <0 Slee ATS OA oe |.onze ARU P Ove Arup & Partners ob No Cheele Shear at isd yew Cok Anes Perimeter = Was ¥ 4 = ry we B38 y (Gr \aas®) we? \ f A Dey \sd War Xe oS w= -a eas = Oe Show™ + as As- ocd Od = aes Phe > OG RKaw™ mm. Tmereasce fe “Eaemace Tro~ (se C Defawnr~nd we = er NY eer Re Sheer retiforce me Seon 22 ARU P Ove Arup & Partners 0b No. C&oc\k Good _ Yer stetug + \ ‘ Reese BL > ee ERe- Soo! Leck Pleo ts LL So Ra { \ Tae! \ Column Load Suede AY Total DL = Aen rexBxcis PET Te aad ? eee Area + esy rem (e = 36m%. = \PS7EN — 3, Tetal LL = Bo ¥ 36K 2XK0T ve > b7y kw |e Bios Pe Laoes boce = 2682 ka. Pesiqn Reine Ks Creqiad ee Qeezic™ = 0?) mm SEQ 607 C46 Brotada (G23 CTESG mm, 2.2% - Sheet No.Job No “Sheet No. owe ARI P Ove Arup & Partners U [Te] Nace by Dae Mate Cel, Close %lbee eet For giatw Floor l= Celta Cy som \avekta CRec\> — ger Flee LL= Se leTa Cyd Tess, & GbR CRealy. Column Led © ae B/E. pee (Ax Fe 2K DO XIEE X27 LU= (S¥ ae e Cem KIAAK FT = Pe Wer there = (Ee | EDS Pesan = dee: a > hese - YU, = ing - 6 SIE Secky cat Provide 247 BU CIDFE mm*, Ren Cds few he & Ab7 Sy As , = 1BAZ EN SR FEEL VADRU Pp Ove Arup & Partners — Sheet Ne A KD rarfer eadtna From Manger Column PeL= lseokX Puke Peeks hae peat Sol ePp> 2 I4een Resign Mena PAS Medes eet = Mom BW HOM Ee WUHOKIT = Sar San C Revel resign Leeel a as ( f= mM = = Yé22 eS > Adept uc 356 % 406 Kee 24e Kym CPewag, = Woes FAD.ARI P Ove Arup & Pariners Job No. Sheet No. Node by na Dect Csee HED bat ¥ % per Axe xh S7 RA, Los SYS Ox) = 26 kPa. Br kPa <4- Se Slee Res CSexfle Beorng Pressed, Chee Rane by Shear och Col. Face . Bax. Cot bead R= leor{ ead (Mead cer tacay) Cel. Size = leee Xeno: > EG, dept os rae ~ (bee SE to—st ef ~ (BJ wm. Aer Leer xe = Fe lm < ToT leeekXt% BIS cel SS42 syyerted yp Gest 5 (Rese ok pElak Beam. a a heaece d= (goo-So-de- 42. = Be dmwe Me lsviee %8 x Ge = We2s bom, a a B= Bet ae Aslreqidd= 3682 FO N27 ow Pode Tas veo Botte Ses Cas A wr {hn , OLEZD qt (ee Raon 22 A RU P Ove Arup & Partners Site Sule Cleet aver BK Ex conarion adyne st “Leger hans Screen ot Beck ave Book Truss teeeueens Job No. Nags by ‘Sheet No.Job No. Sheet No. ARU P Ove Arup & Partners e@ dy. PRATEPHAL Ube eretere Osu SSN, fh mR RcEMEAE ST a fe Bee Cape. pe ; Tie tee LAKES © COMPRESSED ‘ | LAP RAFT Tenant Ibo [ Feat ing . Be (-d : a 6 0 e Comecton of ae wwienal Cebumt te the aAoundection awd asewowkK, slabs WES. 0)job No. ‘Sheet No- owe A RU P Ove Arup & Partners Niage by Date eatd £ OF coLuMN eit = Fe Se OC uaban ern — oid gz T 3 | 3 Js e3 Ties ase LINES Eo SLAB _ Ls =o [een fe . r “fr 4 ~s (ry a ae Lier2s —rot at FUL Tense LAP CORRECTION OF AN INTERNAL Colunnt Wit THE FIRST Asconze Job No. ‘Sheet No. tage by A RU P Ove Arup & Partners ‘Date so 2 Gay CoBNECTICN CE THE CURTAIS WALLINE
You might also like
Structural Design & Drawing Volume 1 by Dr. D Krishnamurthy
PDF
100% (17)
Structural Design & Drawing Volume 1 by Dr. D Krishnamurthy
160 pages
Double Classroom Building Option 3
PDF
No ratings yet
Double Classroom Building Option 3
9 pages
2017-Q2 Mark Scheme
PDF
No ratings yet
2017-Q2 Mark Scheme
10 pages
Plan Construction of Covered Court With Stage 1 PDF
PDF
No ratings yet
Plan Construction of Covered Court With Stage 1 PDF
17 pages
P110 Slim Floor Design and Construction
PDF
No ratings yet
P110 Slim Floor Design and Construction
168 pages
RCC Standard Drawings Drainage PDF
PDF
No ratings yet
RCC Standard Drawings Drainage PDF
34 pages
+worked Examples For Eurocode 2 Final - DeF080723 (SL 16 09 08) - Potporni Zidovi+
PDF
No ratings yet
+worked Examples For Eurocode 2 Final - DeF080723 (SL 16 09 08) - Potporni Zidovi+
11 pages
Preparation of Master Plan For Mongla Port
PDF
100% (1)
Preparation of Master Plan For Mongla Port
141 pages
Concrete Specifications 20140520
PDF
No ratings yet
Concrete Specifications 20140520
45 pages
Introduction To RC Design
PDF
No ratings yet
Introduction To RC Design
67 pages
2017 - ConditionAssessmentReport Wharf 6
PDF
No ratings yet
2017 - ConditionAssessmentReport Wharf 6
29 pages
Structural Basics Content en Preview
PDF
No ratings yet
Structural Basics Content en Preview
25 pages
RCC Standard Drawings Drainage PDF
PDF
No ratings yet
RCC Standard Drawings Drainage PDF
34 pages
4610 sl4
PDF
100% (1)
4610 sl4
73 pages
Combined Rec Footing
PDF
No ratings yet
Combined Rec Footing
10 pages
ADC Section 4 - Commuter Facilities Design Requirements
PDF
No ratings yet
ADC Section 4 - Commuter Facilities Design Requirements
127 pages
Ground Improvement For Low Rise Buildings - Structural Guide
PDF
No ratings yet
Ground Improvement For Low Rise Buildings - Structural Guide
3 pages
Minimum Standards For Civil Engineering Services in Townships CoCT Part 2
PDF
No ratings yet
Minimum Standards For Civil Engineering Services in Townships CoCT Part 2
300 pages
Connection Design - Reinforced Concrete Connections BS8110
PDF
No ratings yet
Connection Design - Reinforced Concrete Connections BS8110
27 pages
Advantages and Disadvantages of Using Raft Foundations
PDF
No ratings yet
Advantages and Disadvantages of Using Raft Foundations
4 pages
Reinforced Concrete Framed Structures - Comparative Design Study To EC2 and BS8110
PDF
100% (1)
Reinforced Concrete Framed Structures - Comparative Design Study To EC2 and BS8110
128 pages
23 1877 C1 A Structural - Design - Adequacy 2023 03 08
PDF
No ratings yet
23 1877 C1 A Structural - Design - Adequacy 2023 03 08
13 pages
Julius Emuriat
PDF
No ratings yet
Julius Emuriat
106 pages
Ports and Harbors
PDF
No ratings yet
Ports and Harbors
41 pages
Pile Foundation Tos Assignment - 2 Amey Deshmukh
PDF
100% (1)
Pile Foundation Tos Assignment - 2 Amey Deshmukh
13 pages
Bridge Deck PDF
PDF
100% (1)
Bridge Deck PDF
2 pages
Analysis of Hollow-Core Slab Floors PDF
PDF
No ratings yet
Analysis of Hollow-Core Slab Floors PDF
13 pages
Hangin Calculation
PDF
No ratings yet
Hangin Calculation
85 pages
Topic10 SeismicDesignofSteelStructuresHandouts
PDF
No ratings yet
Topic10 SeismicDesignofSteelStructuresHandouts
20 pages
Foundation Design - Day 1-Day 2
PDF
0% (1)
Foundation Design - Day 1-Day 2
86 pages
Estimating Nearshore Conditions For Irregular Waves: Coastal Engineering Research Center
PDF
No ratings yet
Estimating Nearshore Conditions For Irregular Waves: Coastal Engineering Research Center
50 pages
Danny Bonnett (2005) Wind Turbine Foundations - Loading, Dynamics and Design
PDF
100% (1)
Danny Bonnett (2005) Wind Turbine Foundations - Loading, Dynamics and Design
5 pages
Framing Systems: Objectives
PDF
100% (1)
Framing Systems: Objectives
12 pages
Clifton (1985) Composite Design
PDF
No ratings yet
Clifton (1985) Composite Design
16 pages
Concrete Buildings Scheme Design Manual
PDF
No ratings yet
Concrete Buildings Scheme Design Manual
142 pages
3,0 Worked Example 1 Production Separator Module
PDF
No ratings yet
3,0 Worked Example 1 Production Separator Module
45 pages
Facade Retention - Temporary Works - Temp
PDF
No ratings yet
Facade Retention - Temporary Works - Temp
13 pages
Demolition Method Statement 394 Camden Road, London N7: Project Number 5588 Document Reference 5588.D006 P1 Revision P1
PDF
No ratings yet
Demolition Method Statement 394 Camden Road, London N7: Project Number 5588 Document Reference 5588.D006 P1 Revision P1
11 pages
TRM006 Geotechnical Design Consultancy
PDF
No ratings yet
TRM006 Geotechnical Design Consultancy
3 pages
Young Members IEM
PDF
No ratings yet
Young Members IEM
4 pages
Calculation of Earth Retaining Structure: To Ces
PDF
No ratings yet
Calculation of Earth Retaining Structure: To Ces
31 pages
Construction Techniques
PDF
No ratings yet
Construction Techniques
8 pages
Design For Seviceability
PDF
No ratings yet
Design For Seviceability
144 pages
CE421 Reinforced Concrete Structure Design
PDF
No ratings yet
CE421 Reinforced Concrete Structure Design
13 pages
P49 Method Statement For Demolition Rev.1
PDF
No ratings yet
P49 Method Statement For Demolition Rev.1
18 pages
Possible Solution To Past CM Examination Question: Question 2 - April 2008 Waterfront Development
PDF
No ratings yet
Possible Solution To Past CM Examination Question: Question 2 - April 2008 Waterfront Development
10 pages
Specialist Diploma: Seismic Design: Friday 7 July 2017
PDF
No ratings yet
Specialist Diploma: Seismic Design: Friday 7 July 2017
8 pages
Bridge Works in LTA Contract N107
PDF
No ratings yet
Bridge Works in LTA Contract N107
26 pages
Design Formula To EC2
PDF
No ratings yet
Design Formula To EC2
1 page
Sika - B Car Park Brochure
PDF
No ratings yet
Sika - B Car Park Brochure
15 pages
Subgrade Specification PDF
PDF
No ratings yet
Subgrade Specification PDF
48 pages
Q5 2009 (Art Gallery)
PDF
No ratings yet
Q5 2009 (Art Gallery)
19 pages
Elements of Soil Mechanics, 9th Edition Exercise 8.4: Ian Smith, June 2014
PDF
No ratings yet
Elements of Soil Mechanics, 9th Edition Exercise 8.4: Ian Smith, June 2014
11 pages
2013-08 Barangaroo Headland Park Ea Presentation Rev00
PDF
No ratings yet
2013-08 Barangaroo Headland Park Ea Presentation Rev00
117 pages
Ir DR James LAU Chi Wang
PDF
No ratings yet
Ir DR James LAU Chi Wang
6 pages
Design Lisbon
PDF
No ratings yet
Design Lisbon
11 pages
P082 Wind-Moment Design For Unbraced Frames
PDF
No ratings yet
P082 Wind-Moment Design For Unbraced Frames
71 pages
Institution of Structural Engineers Part 3 Exam: Paul Martin
PDF
No ratings yet
Institution of Structural Engineers Part 3 Exam: Paul Martin
20 pages
The Sail BCA Awards Write-Up-Final
PDF
No ratings yet
The Sail BCA Awards Write-Up-Final
21 pages
BR PDF Ad A 2010
PDF
No ratings yet
BR PDF Ad A 2010
52 pages
2016 12D Tower Report
PDF
No ratings yet
2016 12D Tower Report
86 pages
Hkaa Gm&Ws - July 2019
PDF
0% (1)
Hkaa Gm&Ws - July 2019
2 pages
2.5 Construction AL
PDF
No ratings yet
2.5 Construction AL
1 page
2.1 Conceptual Design - AL
PDF
No ratings yet
2.1 Conceptual Design - AL
1 page