0% found this document useful (0 votes)
18 views1 page

ST 11

The document provides information about the maximum extra load recorded for a power transformer at a 132 kV grid station in Industrial Estate Rahim Yar Khan for a month. It includes the grid station code, transformer details, whether it was running at full demand, and feeders that were under force shedding or breakdown during that period.

Uploaded by

khalid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

ST 11

The document provides information about the maximum extra load recorded for a power transformer at a 132 kV grid station in Industrial Estate Rahim Yar Khan for a month. It includes the grid station code, transformer details, whether it was running at full demand, and feeders that were under force shedding or breakdown during that period.

Uploaded by

khalid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MULTAN ELECTRIC POWER COMPANY .

LTD(MEPCO)
MONTHLY STATEMENT SHOWING EXTRA MAXIMUM LOAD RECORDED OF POWER TRANSFORMER
I.R.O 132 KV GRID STATION INDUSTRIAL ESTATE RAHIM YAR KHAN. FOR THE MONTH OF ___/20____
ST-11
COPY.2

MAXIMUM LOAD RECORDED RUNNING 11KV FEEDERS UNDER THE


NAME OF SCHEDULE
GRID CODE EXTRA
FORCE SHEDING BREAK DOWN PTW REMARKS
NO. OF SHEDING
STATION MAXIMUM DATE TIME LOAD
FDR,S
LOAD NO. OF NO. OF NO. OF NO. OF
LOAD LOAD LOAD LOAD
FDR,S FDR,S FDR,S FDR,S
INDUSTRIAL ESTATE RAHIM YAR
132 KV GRID STATION

TR-1
31.5/40
MVA
KHAN

FULL
DEMAND

No: Date:
Incharge
132 KV G/S Industrial Estate
Forward to A.M (T) SS&T Sub Division Rahim Yar Khan Rahim Yar Khan

You might also like