0% found this document useful (0 votes)
31 views1 page

ST 02

The document shows the monthly statement of kvarh units received and sent out for a 132 kV grid station in Rahim Yar Khan for a given month, listing the power transformer, present and previous readings, difference, and total MF units.

Uploaded by

khalid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

ST 02

The document shows the monthly statement of kvarh units received and sent out for a 132 kV grid station in Rahim Yar Khan for a given month, listing the power transformer, present and previous readings, difference, and total MF units.

Uploaded by

khalid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MULTAN ELECTRIC POWER COMPANY .

LTD(MEPCO)
MONTHLY STATEMENT SHOWING KVARH UNITS RECEIVED & SENT OUT
I.R.O 132 KV GRID STATION INDUSTRIAL ESTATE RAHIM YAR KHAN. FOR THE MONTH OF ___/20____
ST-02
POWER PRESENT PREVIOUS TOTAL
SR.NO DIFFERENCE MF REMARKS
TRANSFORMER READING (KVARH) READING (KVARH) UNITS
31.5/40
TR-01

No: Date:

Incharge
132 KV G/S Industrial Estate
Forward to A.M (T) SS&T Sub Division Rahim Yar Khan Rahim Yar Khan

You might also like