ITP 1093 201 09A V01.C (ITP For Interior Painting System) 74943
ITP 1093 201 09A V01.C (ITP For Interior Painting System) 74943
ITP 1093 201 09A V01.C (ITP For Interior Painting System) 74943
Construction
A
I A a rabtec
I ~COM
DOCUMENT SUBMITTAL
Contract No DS No DS/040111264
~ P:io
5
. ~\
Contract Title Midfield Terminal Building - Main ~act5 \l .... -~n~'). ~; Rev. 01
~ \ ~ \)'t:.v '-" ·- ~
From TCA - Joint Venture ~~ ,.. b.. J\l §j Date 12/12/2013
To
Item # Document No Description Rev Action Required
1 ITP-1093-201-09A 11P for Interior Painting System 01 Approval
Contrae-tf!:t.
~-----r--------------~
1'/BSCo({"'
Code 1 - NO EXCEPTION TAKEN: the work covered by the submittal may proceed provided it complies with the Contrnct Documents. Final acceptance of the work will depend on that
compliance
Code 2- EXCEPTIONS AS NOTED REVISE AND RESUBMIT FOR RECORD: The submittal is approved with only minor comments that needs to be inco~porated into the documents and
issued for work to proceed in compliance with the contract docwnent
Code 3 - REVISE AI~D RESUBMIT: do not proceed with the work covered by the submittal. Including purchase, fabrication, delivery, or other activity for the product submitted. Revise or
prepare a new submittal according to the Engineer's notations and corrections
Code 4 - REJEcrED: do not proceed with the work covered by the submittaL Prepare a new submittal for a product that complies with the Contract Documents
Code 5 - REVIEW NOT REQUIRED: it contains information that does not necessarily require Engineer's approval
Code 6- ISSUED :FOR CONSTRUCTION: only final submittals, where required in accordance with the Contrnct, with an appropriate accepted or consent stamp by Engineer or his
representative shall be used in connection with construction
Status Code
Reviewed By
I (1) ...............
2 I 3
Signature
I 4 5
Date
I 6
4/'rt,' ~~ ~\Lt..
l l-r· su};:u.J.t > l~\12..\13
1J}11 13 ,
:>
~.4 ~C. ftJt.P. ' t .
_/-\
~ Page 1 of 1
T,
~
.. j
odiiJ.I\
Construction arabtec
MIDFIELD TERMINAL BUILDING, ABU
DHABI INTERNATIONAL AIRPORT
REV. NO.
HANDOVER CLASS
PAGE NO.
:1
:FINISHING
:1 of 4
ABU DHABI-UAE
....--7 /J /l
_j ~ :d1-;9
'\
:A y ~
/
'f Surface preparation 09/12/13 John. G D. Dixon A. H. Oz~k
odDA I\
TAV-CCC-ARABTEC JOINT VENTURE
REV. NO. :1
MIDFIELD TERMINAL BUILDING, ABU HANDOVER : FINISHING
~
DHABI INTERNATIONAL AIRPORT CLASS
: 2 of 4
Construction . arabtec PAGE NO.
FORMS INDEX
LIST OF REFERENCES
Reference Description
MS-1093- Method Statement for Interior Painting
201- 09A system
The Inspection Forms are controlled outside of this ITP and are
included for information purposes only during the Review and
Approval cycle.
1. Approval of Method statement and • Document material approval • Project Specification Prior to start of paint Submittal of Method
material to be used for Wall and Ceiling MAR and Method statement 099123, Clause 1.3 activities H H H statement and material
Paint. inspection request for
aooroval.
2. Sample & Mock up Approval. • Check application I workmanship. • Project Specification Prior to start of • FM-1093-201-09A
099123, Clause 1.3 C interior painting
and 1.4 D activity for each
H R w • Mockup WIR
paint system.
3. Surface preparation . Visual Inspection of surfaces are within • Project Specification Before starting of • FM-1093-201 -09A
the required tolerance as per specification, 099123, Clause 3.2, primer application H H H • Approved WIR
MS requirements. MS
4 Conformity Checks of painting material Conform to specification I Approval of • Project Specification First time and as • Approved MAR
on arrival to site MAR. 099123, Clause 2 required.
H H w • Material Inspection
All matertals delivered to be kept in safe Request
oiace and orotected.
5 Application of Primer putty filler coat . Visual Inspection of surfaces are • Project Specification During the activity
within the required tolerance, 099123, Clause 3.3, • FM-1 093-201-09A
Cleanliness, of surface free from oil MS. H H s
and dust as per specification, MS
reaui!llments..
6 Application of Prime coat • Project Specification Every Time • FM-1093-201 -09A
-Visual Inspection crf surfaces are ~ithin 099123 Clause 3.6
1he required tolerance as per specification,
MS Alquirnments. • Material Data sheet • MSDS
-Surface accepted for Cleanliness and • Approved Method
correctness of paint to be used. statement. H w s
- Ambient temperatures are between 10
and35 deg.C
- Do not paint when Relative humidity is
more that 85% and less than 3 deg C
~~-- JbOVe d_ewpolnt or damp or wet surface.
Legend: S -Surveillance Inspection W- Witness Inspection Point H- Mandatory Hold Point for Inspection R- Record Review
·I
odD A I\
C onstruction arabtec
TAV~CCC-ARABTEC
:1
:FINISHING
- ~
- - - -
7. Application of Intermediate Coat • Application and allowable time for • Project Specification Every Time. • FM-1093-201-09A
drying as per project specification 099123 Clause 3.6 I
and/or manufacturer's recommendation • Material Data sheet • MSDS
• Surface accepted for Cleanliness and • Approved Method
. and 35 deg.C
Do not paint when Relative hu1J1idity is
more that 85% and less than 3 deg C
above dew point or damp or wet
surface
8 Application of Top coat paint • Applicatlon and allowable time for • Project Specification Every time • FM -1093-201-09A
drying as per project specification 099123 Clause 3.6
and/or manufacturer's recommendation • Material Data sheet • MSDS
• Surface accepted for Cleanliness and • Approved Method
correctness of paint to be used. statement
• Dry film thickness checked by Third r\ • Approved WIR
party arrc1nged by Client. H ,...5"' H
• Ambient temperatures are between 10
and 35 deg.C
• Do not paint when Relative humidity is
more that 85% and less than 3 deg C
above dew point or damp or wet
Legend: S- Surveillance Inspection W- Witness Inspection Point H- Mandatory Hold Point for Inspection R- Record Review
-4-
TAV~CCC-ARABTEC JOINT FORM NO. : FM -1093-201-09A
odDA I\
Construction ~ arabtec
INTERNAL PAINTING SYSTEM OWNER
HANDOVER CLASS
PAGE NO.
:ITP- 1093 -201-9A
: FINISHING
: 1 of 2
Sign. JV QC Acceptance
INSPECTION ACTIVITIES JV Yes No
Cons!
1. Ensure the Painting Sample Panel approved by the consultant prior to proceed
the work at Site.
4. Ensure Materials and the colour chart for the different areas/ items are approved
by the Consultant/Client.
5. Check that th e surface is ready for painting which includes all the cement works
are completed in that area, Ensure the cracks and all other imperfections
rectified.
6. Check that the surface preparations are done as per the Manufacture's instruction
and specification. Ensure acceptable moisture content of the substrate.
7. Verify the concrete/ rendered/plastered/gypsum/metal/wood surface is completely
in dry condition prior to the application of painting works.
9. Ensure MEP items like switches, socket etc. to be protected satisfactory level (if
any)
10. Check that the Method of application is correct as per the specification/Method
statement.
11. Check the mixing of paint as per the manufacture's instruction
12. Ensure that the primer, Stucco and the number of coats of paint applied are
correct with the specified interval of time
13. Check that the Wet/Dry Film Thickness is as specified.
14. Ensure the application of Intermediate coat of paint applied is correct with the
specified interval of time.
15. Check that the Wet/Dry Film Thickness is as specified.
16. Ensure the application of Top coat of paint applied is correct with the specified
interval of time.
VENTURE
Ddi_AI\
REV. NO. :00
Note 1: Application of painting is carried out only when the ambient temperatures are between
10 and 35 degree C.
Note 2: Application of painting should not be carried out when the relative humidity exceeds 85%
and temperatures less than 3 degree C above dew point; or damp or wet surfaces.