Framed
Framed
Framed
WEATHERING COURSE
WITH BRICK JELLY
CONCRETE IN LIME 75mm
15 1 7 4 -
THICK AND TWO COURSES
OF FLAT TILES IN CM 1;3
OVER THE SLAB
ELECTRIFICATION WITH
16
ALL FITTINGS
WATER SUPPLY AND
17
SANITARY
CONTINGENCIES AND
18
UNFORSEEN
PETTY SUPERVISION
19
CHARGES
AMED STRUCTURE
QUANTITY UNITS REMARKS
36 (7.2+4.2)2=22.80
0.648 22.80-(8*1.5)=10.80
1.2+2(2*0.3+0.2)=2.8
0.224
(2*0.3)+0.2=0.8
36.872 cu m
2.7 (1.5+0.2)/2=0.85
1.734 (7.2+4.2)=22.80
(2.00-0.15-0.15-
0.352
0.3-0.3=1.10)
1.008 0.45+2.7=3.15
1.368 (7.2+4.2)2=22.80
0.684 (7.2+4.2)2=22.80
0.312
0.2928
0.1248 2.6+(2.175)=6.10
1.056 2.2+(0.2*2)=2.6
3.256 4.00+0.2+0.2=4.40
12.8876 cu m
(0.45+2.7+0.4+0.8)
19.836
=4.35
0.216 1.2+(0.3*4)=2.4
0.081 1.2+(0.3*2)=1.8
20.133 cu m
0.684 (7.2+4.2)2=22.80
0.528 size=1.2x2.2
1.89 size=0.9x1.5
1.392 size=1.2x1.2
0.96
5.454 cu m
14.679 cu m
8.4
8.4 cu m
28 sq m
28
0.24
28.24 sq m
66 (7.0+4.0)2=22.00
102.66 (7.4+4.4)2=23.60
4.56
17.6
1.44
0.36 (0.3+1.8+0.3)=2.4
0.54 (0.6+2.4+0.6)=3.6
0.27
193.43 sq m
2.64
9.45
12.09 sq m
181.34 sq m
28
8
7.8
7.56
3.12
54.48 cu m
179.9
55
234.9 sq m
247 sq m
1 No
7 NOS
PAINTING
COEFFICIENT
7.8 FOR PANELLED
DOORS AND
WINDOWS=2.6
24.57
32.37 sq m
28 sq m
LS
LS
LS
LS
ABSTRACT OF ESTIMATED COST
ITEM NO PARTICULARS OF ITEM QUANTITY UNIT RATE PER AMOUNT
Rs. P. Rs. P.
EARTHWORK
EXCAVATION
IN HARD SOIL FOR
1 FOUNDATION 36.872 cu m
PLAIN CEMENT
CONCRETE
1:4:8 MIX USING 40mm
JELLY FOR BASE
2 CONCRETE 2.924 cu m
PAINTING WITH
ENAMEL PAINT OVER
PRIMING COATS FOR
14 DOORS AND WINDOWS 32.37 sq m
WEATHERING COURSE
WITH BRICK JELLY
CONCRETE IN LIME
75mm THICK AND TWO
COURSES OF FLAT TILES
IN CM 1;3 OVER THE
15 SLAB 28 sq m
ELECTRIFICATION WITH
16 ALL FITTINGS LS
WATER SUPPLY AND
17 SANITARY LS
CONTINGENCIES AND
18 UNFORSEEN LS
PETTY SUPERVISION
19 CHARGES LS
TOTAL
GRAND TOTAL