0% found this document useful (0 votes)
58 views6 pages

RKA Weekly EHS Report - 032

This weekly EHS report from River King Ayeyar construction company summarizes the health and safety observations from their project to construct the R8 A substructure over the past week. It indicates that daily toolbox talks and proper use of PPE were conducted. Scaffolding, ladders, and work platforms were also found to be in satisfactory condition. Openings and electrical systems were properly protected or locked. First aid kits and fire extinguishers were adequately equipped. No accidents or incidents were reported during the week. Housekeeping and COVID-19 prevention measures were maintained at the site.

Uploaded by

Myo Lwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views6 pages

RKA Weekly EHS Report - 032

This weekly EHS report from River King Ayeyar construction company summarizes the health and safety observations from their project to construct the R8 A substructure over the past week. It indicates that daily toolbox talks and proper use of PPE were conducted. Scaffolding, ladders, and work platforms were also found to be in satisfactory condition. Openings and electrical systems were properly protected or locked. First aid kits and fire extinguishers were adequately equipped. No accidents or incidents were reported during the week. Housekeeping and COVID-19 prevention measures were maintained at the site.

Uploaded by

Myo Lwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Observations Yes No Action Taken
Sr.No Person Date

1. Is Toolbox Talk Conducting Every Day? √ Tin Htun Naing

Is the use of Personal Protection Gears such as Safety


2. √ Tin Htun Naing
Helmet , Safety Vest , Safety Footwear , Mask ?

Is the conditions of Scaffolding,Ladders and Work


3. √ Tin Htun Naing
Platforms Satisfactory ?
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Sr.No Observations Yes No Action Taken
Person Date

Are openings and other potential fall points are


4. √ Tin Htun Naing
appropriately protected or barricade and marked ?

Are distribution and switch boards properly insulated/


5. √ Htet Zaw Oo
locked ?

Are electric connections proper and without bare


6. √ Htet Zaw Oo
conductors visible ?
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Sr.No Observations Yes No Action Taken
Person Date

7. Is the installed conditions of cable satisfactory ? √ Htet Zaw Oo

Are Combustible and Inflammable materials properly


8. stocked to prevent fire hazards? √ Htet Zaw Oo

9. Warning Signs and Hazard Signs installed ? √ Tin Htun Naing


Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Sr.No Observations Yes No Action Taken
Person Date

Are First Aid Kit adequately equipped and medication


10. √ Tin Htun Naing
available ?

Is fire extinguishers adequately and serviceable and fire


11. √ Tin Htun Naing
extinguishers tags checked regularly ?

Is any accidect / incident reported ? If yes then attach


12. Tin Htun Naing NA
report's copy.
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Complecation
Sr.No Observations Yes No Action Taken
Person Date

13. Is site and office toilets are clean? √ Tin Htun Naing

Is housekeeping in site office and on site being taken


14. Tin Htun Naing
care of ?

Are usual have mosquito & COVID-19 prevention at site


15. √ Tin Htun Naing
office and on site ?
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Signed By:

Safety Representative Project Engineer Project Manager