Quality Control Plan: Date: 21/10/22

This quality control plan outlines the inspection and testing procedures for manufacturing a boiler system across 8 departments. Key steps include visual and dimensional testing of boiler and coil components, pressure testing the heating coil and system, painting vessel parts, attaching energy and piping equipment, wiring controls and vessels, performing function tests, adjusting and mounting burners for fire testing, and conducting final documentation checks before dispatch. Sign-off is required at various hold points and by third party inspectors to ensure standards and specifications are met.

Uploaded by

ichi ezzahra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views3 pages

Quality Control Plan: Date: 21/10/22

This quality control plan outlines the inspection and testing procedures for manufacturing a boiler system across 8 departments. Key steps include visual and dimensional testing of boiler and coil components, pressure testing the heating coil and system, painting vessel parts, attaching energy and piping equipment, wiring controls and vessels, performing function tests, adjusting and mounting burners for fire testing, and conducting final documentation checks before dispatch. Sign-off is required at various hold points and by third party inspectors to ensure standards and specifications are met.

Uploaded by

ichi ezzahra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Quality Control Plan Page 1

Date: 21/10/22

1 Boiler Housing Department

1.1 visual/dimensional test appr. drawing H

2 Heating Coil Department

2.1 pressure test performed (final test) appr. procedure H H

2.2 heating Coil installed appr. drawing H

2.3 steam outlet directed appr. drawing H

3 Paint Shop

3.1 vessel parts painted appr. procedure H

4 Assembly Department

4.1 pressure equipment attached appr. drawing H

4.2 energy equipment attached appr. drawing H

H: HOLD POINT STAMP/SIGNATURE


W: WITNESSED
R: REVIEW OF DOCUMENTS III: THIRD PARTY INSPECTION
C: WAIVER OF TESTING WITH ISSUANCE OF
CERTIFICATES BY THE SUPPLIER
Quality Control Plan Page 2
Date: 21/10/22

Pos. ACTIVITIES REF. DOCUMENTS I II III Signature

5 Electronics Department

5.1 control unit wired appr. wiring plan H

5.2 vessel wired appr. wiring plan H

5.3 function test performed appr. procedure H

6 Container Installation Department

6.1 piping equipment attached appr. drawing H

6.2 system integration into the container appr. drawing H

7 Test Stand / Fire Test

7.1 water pumps mounted and tested appr. procedure H

7.2 burner adjusted and mounted appr. procedure H

7.3 visual/dimensional test appr. drawing H

7.4 system acceptance performed appr. procedure H H

7.5 final documentation check H

8 Dispatch Department

8.1 final dispatch check H

H: HOLD POINT STAMP/SIGNATURE


W: WITNESSED
III: THIRD PARTY INSPECTION
C: WAIVER OF TESTING WITH ISSUANCE OF
CERTIFICATES BY THE SUPPLIER