0% found this document useful (0 votes)
69 views1 page

PWM - Workflow For Structural Inspection

This document outlines a structural pre-fabrication process with two cases. Case 1 involves welded components that go through steps of cutting, beveling, fit-up, fit-up inspection, welding, visual inspection, and quality checks of dimensions before and after welding. Case 2 involves non-welded components like plates, beams, and pipes that go through cutting and beveling. Both cases involve a final inspection readiness for painting.

Uploaded by

Druid Family
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

PWM - Workflow For Structural Inspection

This document outlines a structural pre-fabrication process with two cases. Case 1 involves welded components that go through steps of cutting, beveling, fit-up, fit-up inspection, welding, visual inspection, and quality checks of dimensions before and after welding. Case 2 involves non-welded components like plates, beams, and pipes that go through cutting and beveling. Both cases involve a final inspection readiness for painting.

Uploaded by

Druid Family
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Legend:

Structural pre-Fabrication Process


(Rev.0, Date 13-Oct-22)
Quality Check Point

Construction steps, monitoring


Dimension
ACC
after Welding

REJ
Case #1: Welded components:
Fairing
Dimension IRN
Cut, Beveling Fit-up Fit-up Inspection Welding Visual Inspection
before Welding for Painting
MT

Delay Time

UT

Case #2: Non-Welded component: plates, beam, pipe, Ffitting, miscellaneous...


IRN
Cut, Beveling
for Painting

You might also like