Anheuser Busch
Anheuser Busch
Anheuser Busch
©Anheuser-Busch InBev 2
Lid Manufacturing – Cross Section
Compound
©Anheuser-Busch InBev 3
Lid Manufacturing – Compound Application
©Anheuser-Busch InBev 4
Lid Manufacturing – Seaming Cross Section
The completed
double seam is
Lid
made of 5 layers
12345
Can
Lid
Can
©Anheuser-Busch InBev 5
1Aa Describe the types of data and quality tools used to select the project, and why they were used. (1 of 2)
Tools &
Data Why Used
Methods
Key
MCC Strategy Multi- Subject matter
KPI Analysis Performance
• SWOT Disciplined expertise
Indicators
• Benchmarks • Corp. Targets Senior Ensure all
Input/targets
• Trends Management aspects are
from corporate
Team covered
functions
Brainstorming
Analyze trends
Key
and identify
Line Graphs Performance
gaps for each
Indicators
metric
3-Year
Operating Listing of ideas
Proven,
effective tool to
Plan Brainstorming
and thoughts
on ideas for
gather many
ideas and
improvement
suggestions
©Anheuser-Busch InBev 6
1Aa Describe the types of data and quality tools used to select the project, and why they were used. (2 of 2)
Link to Summary
LID PLANT - THREE-YEAR OPERATIONS PLAN
ACTUALS TARGET TARGET TARGET TARGET
BENCH PROCESS
METRIC / KPI 2009 2010 2011 2012 2013 METHODS, PLANS, RESOURCES, & MILESTONES
MARK LEADER
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2000
2001
2002
2003
2004
2005
2006
2007
2008
Cross functional team to ensure capability with compound
16. Compound Film Weight Ppk 1.6 >1.33 >1.33 >1.33 >1.33 CW optimization efforts 3 Year 2009 Act. 2010 Bud. 2011 2012 2013
Maintain current capability thru daily management Goals: Comp w t 24.3 24.3 23.4 22.5 22.5
Cross functional team to ensure capability with compound
17. Compound Cut Edge Distance 1.65 >1.33 >1.33 >1.33 >1.33 CW optimization efforts EOY
Maintain current capability thru daily management
Beer 1.28 Achieve capability on beer metal: Wise to increase KSI,
18. Converted Buckle Strength Ppk Bev 1.79 >1.33 >1.33 >1.33 >1.33 CW OKC team address outliers on SP2
LOE 1.79 Daily management to achieve/maintain capability
Maintain current capability thru daily management
19. Tab Strength Ppk 2.25 >1.33 >1.33 >1.33 >1.33 CW
Target increased rivet diameter on .010" colored tab stock ACTION PLANS
Operations
OJT/proficiency certification
OKC
20. Volume (per Day) 39,719 38,257 38,784 39,010 39,236 43,454 SR
Plant maintenance - optimized overhauls, innovation Methods and Plans Who When
8 swings/year LOE/OLOF - apply VPO management tools
(2006)
Atluss/Tetrad CPIT teams a Plant CPIT team working on reduction SR/CW/LL Ongoing
OJT/proficiency certification
Plant maintenance - optimized overhauls, innovation a DOX for liner optimization SR/CW/LL 1st qtr
RVS
21. Asset Utilization 89.65% 87.81% 89.00% 89.50% 90.00% SR 8 swings/year LOE/OLOF - apply VPO management tools
92.81%
Atluss/Tetrad CPIT teams
2010 a Color pigment change CW/MC/EB 3rd qtr
Larger colored tab stock coil diameter
Perfect process on swings - apply VPO management tools
OKC SR/CW/ ePLM/eQUAL Pressco development
22. Spoilage (%) 0.76% 0.89% 0.87% 0.85% 0.83%
0.76% LL Conversion press vision systems Corporate PIC evaluation of seams
Spoilage teams
Support Needed Cross Functional team - Keller, Urbanowicz
OKC SAP/maintenance guidelines
23. Maint. Audit (% compl.) 97.8% >95% >95% >95% >95% LB
97.8% SME/operator training
Cost
Variable cost reductions in compound, manufacturing
Methods and Plans Who When
supplies & packaging supplies a Partner with beer company on reduced weight CW/MC 1st qtr
Semi-variable cost reductions in maintenance & utilities.
OKC
24. Cash Conversion Cost $1.990 $2.083 $2.025 $1.978 $1.922 TP/SR Labor cost increases, partially offset by staffing reductions. a Capital for gun angle and upper turret SR/LL 1st qtr
$1.990/M Fixed cost increases in salaries & fringes offset by staffing
reductions and increases in volume (or variable/semi- 2011
variable savings from shutdowns)
Cross-functional team with Keller, Urbanowicz and OKC
R&D money for application angle modification 2010
RVS CW/LL/
25. Primary Materials 24.3 24.3 23.4 22.5 22.5 DOX & color pigment change in 2010, capital in 2011
$0.163/M SR
Beer customer in 2011, soft drink customers in 2012 Corporate Corporate support team
Contingent on soft drink customer acceptance Support Needed Sales, Kellerman, Urbanowicz
RVS
26. Manufacturing Supplies $/M $0.019 $0.019 $0.018 $0.018 $0.017 MVH / MC Pursue opportunities with vendors for cost reductions
$0.012/M
Optimized overhauls
OKC/RVS Utilize Business Warehouse for cost champion team
30. Maintenance $/M $0.238 $0.268 $0.249 $0.237 $0.210
$0.238/M
LL/SR/EK
Apply VPO maintenance practices
Corporate Corporate support team
Team/innovation activities Support Needed Sales, Kellerman, Urbanowicz
Optimize staffing to accommodate projected
OKC attritions/retirements
31. Labor 153 151 148 145 142 SR
$0.636/M Evaluate staffing levels annually based on actual Methods and Plans Who When
attritions/retirements & O/T impact
OKC
Comprehensive review of all outside services a Maintain the gain CW Ongoing
32. Buildings & Grounds $0.016/M $0.019/M $0.018/M $0.018/M $0.017/M TP/EK/SR Research alternative landscaping methods
$0.016/M
Explore outside warehousing opportunities
OKC TP/EK/
Reduce T & E 2013
33. Administrative Expense $0.027/M $0.021/M $0.020/M $0.019/M $0.019/M Reduce office expense
$0.027/M CW
Reduce telephone expense
Corporate
Support Needed
©Anheuser-Busch InBev 7
1Ab Explain the reasons why the project was selected.
3Y Plan Priorities
Reduce Spoilage
Compound Weight
26
Reduce Metal
Usage
Lower Cash 24
Conversion Cost
Reduce
Compound
Weight 22
7.4%
OKC Actual
Reduction
OKC 3YP
Reduce Utility
Usage Benchmark
20
Reduce 2006 2007 2008 2009 2010 2011
Maintenance
Expense
Lower Staffing
Expense
©Anheuser-Busch InBev 8
1Ac Describe the involvement of potential stakeholders in project selection.
Stakeholder
Interests / Needs Involvement
Group
©Anheuser-Busch InBev 9
1Ba Identify the affected organizational goals, performance measures, and/or strategies.
©Anheuser-Busch InBev 10
1Bb Identify the types of impact on each goal, performance measure, and/or strategy.
©Anheuser-Busch InBev 11
1Bc Identify the types of impact on each goal, performance measure, and/or strategy.
Have no negative
A-BI Supplier effects caused by Based on project
No Difference
Be the clear Scorecard project goals
industry leader implementation
in customer
satisfaction and Have no negative
quality Process effects caused by Based on project
No Difference
Capability project goals
implementation
Conduct our
business in a ... Reduce VOCs by Direct correlation
VOC
environmentally reducing compound Reduce 7.4% with film weight
Emissions
responsible usage reduction
manner
©Anheuser-Busch InBev 12
1Ca Identify potential internal and external stakeholders and explain how they were identified.
Stakeholder Classification
Stakeholder How
Group Identified
Technical Critical to Critical to Impacted
Expert Implement Sustain by Results
Operators Brainstorming
Superintendents Brainstorming
Plant
Management Formed Team
Customers Brainstorming
©Anheuser-Busch InBev 13
1Cb Identify the types of potential impact on stakeholders and explain how these were determined.
implementation
cost
Product qualification support 3YP review
©Anheuser-Busch InBev 14
1Cc Identify the degree of potential impact on stakeholders and explain how this was determined.
©Anheuser-Busch InBev 15
2Aa Describe the methods and tools used to identify possible root causes/ improvement opportunities. (1 of 2)
Improvement
Continuous Process Improvement
Why Team Members, Leader, Facilitator chosen and how involved 5A
Team
Training Provided as Necessary for Team Members 5B
Information
Team groundrules established 5C
Method for storyboard construction determined 5B
Identify a Theme and Reason for Working on It
Data and Tools Used to Select Project (Plant Steering Comm) 1Aa
Team methodology (CPIT)
Results
Countermeasures Final Countermeasures Established/Validated 3Ca, 3Cc
Tangible/Intangible Benefits Defined 3Cb
Stakeholder involvement in Implementation/Resistance/Buy-in 4A
Action plan developed 4Ba
Countermeasure(s) implemented 4Ba
Confirm that Countermeasure(s) are Effective and Targeted Improvement was Achieved
Check for improvement of tangible/intangible indicators 4Ca
Results compared to targets/organizational goals 4Cb
Results
Reasons for success / failure have been analyzed 4Ca,4Cb
Future Plans
Fill out summary and post to Sharepoint 4Bc
Plan Action for Remaining Problems and Evaluate the Effectiveness of the Team
Future
Conduct evaluation of team effectiveness 5C
Plans
The need for further action has been evaluated
Analysis
Measurement to track specific problem selected 1Bb,1Bc
Clear problem statement has been written 2Ab
Identify and Verify the Root Cause(s) of the Problem
Possible causes were identified 2Ab of bisected the finished
double seams double seam
Stakeholder involvement in identifying root cause(s) 2Ac
Analysis
"Five Why" method / Quality Tools used to find root cause(s) 2Ba
Root cause determined from data analysis 2Bb
Root cause validated 2Bc
Plan and Implement Countermeasures that Correct the Root Cause(s) of the Problem
Potential countermeasures developed and evaluated 3A,3Ba,3Bb
Stakeholder involvement in Final Countermeasure(s) 3Bc
Proven
Steering Team presentation and approval 3Bc
Develop a list
method used
Countermeasures Final Countermeasures Established/Validated 3Ca, 3Cc
of possible
Tangible/Intangible Benefits Defined 3Cb
Stakeholder involvement in Implementation/Resistance/Buy-in 4A
Action plan developed 4Ba
Brainstorming to gather
Countermeasure(s) implemented 4Ba
actions to
many ideas in
Confirm that Countermeasure(s) are Effective and Targeted Improvement was Achieved
investigate
Check for improvement of tangible/intangible indicators 4Ca
Results compared to targets/organizational goals 4Cb
a short time
Results
Reasons for success / failure have been analyzed 4Ca,4Cb
Results shared with Stakeholders 4Cc
Other countermeasures used if results unsatisfactory 4Ba
Implement Standard Procedures to Prevent the Specific Problem from Returning
Effective countermeasure standardized 4Cc
Affected employees trained on SOPs 4Cc
Standardization Indicator/Systems developed/monitored to hold the gains 4Bb,4Bc
Replication of new SOP/systems considered for other areas 4Bb,4Bc
Document all steps and learnings/Systems 4Bc
Fill out summary and post to Sharepoint 4Bc
Plan Action for Remaining Problems and Evaluate the Effectiveness of the Team
Future
Conduct evaluation of team effectiveness 5C
Plans
The need for further action has been evaluated
©Anheuser-Busch InBev 17
2Ab Describe the team’s analysis of data to identify possible root causes/improvement opportunities.
Lid
Can
Can Lid
©Anheuser-Busch InBev 18
Describe how or if any of the stakeholders were involved in identifying the possible root causes/improvement
2Ac opportunities.
Liner operation
Brainstorming
Operators Quality assurance
Consulted by team
Liner maintenance
No direct participation
Customer perspective provided
Customers Seam lids
by corporate resources and senior
management team
©Anheuser-Busch InBev 19
2Ba Describe the methods and tools used to identify the final root cause/ improvement opportunity. (1 of 2)
Team
Information
Why Team Members, Leader, Facilitator chosen and how involved
Training Provided as Necessary for Team Members
5A
5B
Tool Used Description Why Used
Team groundrules established 5C
Method for storyboard construction determined 5B
Identify a Theme and Reason for Working on It
Identify the
Data and Tools Used to Select Project (Plant Steering Comm) 1Aa
Statistical
Reasons why Project Selected (Plant Steering Comm) 1Ab
impact of
Involvement of Stakeholders Selecting Project (Plant Steering Comm) 1Ac
Experimental approach to test
Reason Theme(s) ties to plant's strategic business objectives 1Ba
variables and
For Theme selected and importance verified (with data) 1Bb
Design multiple factors
Improvement How much improvement needed was determined 1Bc
optimize
Indicator to track theme was selected 1Bb,1Bc
and levels
Stakeholders (internal/external) identified
Stakeholder impacts and degree of impact identified
1Ca
1Cb,1Cc settings
Completion Date Established
Select a Specific Problem from the Theme and Set a Target for Improvement
Process in problem area flowcharted
Data were collected on all aspects of the theme
2Aa
2Aa Microscopic Observe the
Current Theme was evaluated from various viewpoints 2Aa,2Ab
visual and impact of
Situation Specific problem selected from evaluation 2Ab
Cross Section
Performance gap has been identified 1Bc
measurement of compound on
Measurement to track specific problem selected 1Bb,1Bc
Analysis
Clear problem statement has been written
Identify and Verify the Root Cause(s) of the Problem
2Ab
bisected double the finished
Possible causes were identified
Stakeholder involvement in identifying root cause(s)
2Ab
2Ac seams double seam
Analysis "Five Why" method / Quality Tools used to find root cause(s) 2Ba
Root cause determined from data analysis 2Bb
Root cause validated 2Bc
Proven method
Plan and Implement Countermeasures that Correct the Root Cause(s) of the Problem
Develop a list of
Potential countermeasures developed and evaluated 3A,3Ba,3Bb
used to gather
Stakeholder involvement in Final Countermeasure(s) 3Bc
Brainstorming possible actions
Steering Team presentation and approval 3Bc
many ideas in a
Countermeasures Final Countermeasures Established/Validated 3Ca, 3Cc
to investigate
Tangible/Intangible Benefits Defined
Stakeholder involvement in Implementation/Resistance/Buy-in
3Cb
4A short time
Action plan developed 4Ba
Countermeasure(s) implemented 4Ba
Confirm that Countermeasure(s) are Effective and Targeted Improvement was Achieved
Check for improvement of tangible/intangible indicators 4Ca Compare
Results
Results compared to targets/organizational goals 4Cb
potential
Reasons for success / failure have been analyzed 4Ca,4Cb
Comparison
Results shared with Stakeholders 4Cc
opportunities for
Other countermeasures used if results unsatisfactory 4Ba
Benchmarking data from other
improvement
Implement Standard Procedures to Prevent the Specific Problem from Returning
plants
Effective countermeasure standardized 4Cc
against existing
Affected employees trained on SOPs 4Cc
Standardization Indicator/Systems developed/monitored to hold the gains 4Bb,4Bc
methods
Replication of new SOP/systems considered for other areas 4Bb,4Bc
Document all steps and learnings/Systems 4Bc
Fill out summary and post to Sharepoint 4Bc
Plan Action for Remaining Problems and Evaluate the Effectiveness of the Team
Future
Conduct evaluation of team effectiveness 5C
Plans
The need for further action has been evaluated
©Anheuser-Busch InBev 20
2Ba Describe the methods and tools used to identify the final root cause/ improvement opportunity. (2 of 2)
©Anheuser-Busch InBev 21
2Bb Describe the team’s analysis of data to select the final root cause/improvement opportunity. (1 of 4)
Better
Control
©Anheuser-Busch InBev 22
2Bb Describe the team’s analysis of data to select the final root cause/improvement opportunity. (2 of 4)
Better
Control
Target
©Anheuser-Busch InBev 23
2Bb Describe the team’s analysis of data to select the final root cause/improvement opportunity. (3 of 4)
Better
Control
©Anheuser-Busch InBev 25
Identify the root cause/ improvement opportunity and explain how the team validated the final root
2Bc cause/improvement opportunity.
Final Improvement
Validation
Opportunity
©Anheuser-Busch InBev 26
3Aa Describe the methods and tools used to develop possible solutions/improvement actions.
Statistical
Steering Team presentation and approval 3Bc
me
approach to find a
ter
Step 2
Tangible/Intangible Benefits Defined 3Cb
Determine the
Stakeholder involvement in Implementation/Resistance/Buy-in 4A
un
small number of
Action plan developed 4Ba
Co
©Anheuser-Busch InBev 27
3Ab Describe the team’s analysis of data to develop possible solutions/improvement actions.
Conducted screening
Wide compound
experiment that showed
bandwidth wastes promise. The side drilled tips
compound and Use side drilled nozzle tip
successfully reduced
increases the risk of compound bandwidth in
defects by placing trials.
compound in a non-
sealing area Redesign side drilled
Investigated with vendor and
nozzle tips with detents to
OKC’s tool and die makers.
maintain position
Moderate difficulty
to implement Potential risk;
Moderate Manageable
Medium impact funds required
Sustainability issues must be
can be quickly monitored
resolved
©Anheuser-Busch InBev 29
3Ba Describe the methods and tools used by the team to select the final solution/improvement action. (1 of 3)
Prioritization Matrix
Information
Team groundrules established 5C
Method for storyboard construction determined 5B
Identify a Theme and Reason for Working on It
Data and Tools Used to Select Project (Plant Steering Comm)
Reasons why Project Selected (Plant Steering Comm)
1Aa
1Ab Impact on reducing film weight
Involvement of Stakeholders Selecting Project (Plant Steering Comm) 1Ac
Cost to implement
Reason Theme(s) ties to plant's strategic business objectives 1Ba
For Theme selected and importance verified (with data) 1Bb
Improvement How much improvement needed was determined 1Bc
Feasibility to implement
Indicator to track theme was selected 1Bb,1Bc
Stakeholders (internal/external) identified 1Ca
Stakeholder impacts and degree of impact identified 1Cb,1Cc
Operational Risk
Completion Date Established
Select a Specific Problem from the Theme and Set a Target for Improvement
Process in problem area flowcharted 2Aa
Data were collected on all aspects of the theme 2Aa
Current Theme was evaluated from various viewpoints 2Aa,2Ab
Situation Specific problem selected from evaluation 2Ab
Performance gap has been identified 1Bc
Measurement to track specific problem selected 1Bb,1Bc
Clear problem statement has been written 2Ab
Experimentation
Identify and Verify the Root Cause(s) of the Problem
Possible causes were identified 2Ab
Stakeholder involvement in identifying root cause(s) 2Ac
Analysis
"Five Why" method / Quality Tools used to find root cause(s) 2Ba
Root cause determined from data analysis
Root cause validated
2Bb
2Bc Prototype testing
Plan and Implement Countermeasures that Correct the Root Cause(s) of the Problem
optimal settings
Tangible/Intangible Benefits Defined 3Cb
Stakeholder involvement in Implementation/Resistance/Buy-in 4A
un
Effect on Quality
Other countermeasures used if results unsatisfactory 4Ba
Implement Standard Procedures to Prevent the Specific Problem from Returning
Effective countermeasure standardized 4Cc
©Anheuser-Busch InBev 30
3Ba Describe the methods and tools used by the team to select the final solution/improvement action. (2 of 3)
Possible
Improvement Operational
Improvement Impact Cost Feasibility
Opportunity Risk
Actions
Increase chuck
Low Low High High
speed
Redesign turret
brackets
placing nozzles High High Medium Low
at a better
angle
©Anheuser-Busch InBev 31
3Ba Describe the methods and tools used by the team to select the final solution/improvement action. (3 of 3)
©Anheuser-Busch InBev 32
3Bb Describe the team’s analysis of data to select the final solution/improvement action. (1 of 5)
Background
Through previous experiments the angled nozzle turret design has successfully maintained cut
edge while reducing bandwidth. This DOE is designed to find the appropriate compound weight
target and chuck speed that maintains cross sectional placement settings through the sealing
area and produces interchangeable seams with the control.
Research Question
What levels of angle nozzle compound weight and chuck speed achieve seam dimensions that
are interchangeable with current turret settings (control)?
Factors / Levels
Target Weight (5) 1 2 3 4 5
Turret Style (2) Std Angled
Chuck Speed (3) 1 2 3
Seamer Condition (2) Tight Loose
Criterion Measures
Compound
o Applied Weight
o Distance from Cut Edge
o Bandwidth
Seam Dimensions
o Seam Thickness
o Seam Height
o Body Hook
o Cover Hook
o Overlap
©Anheuser-Busch InBev 33
3Bb Describe the team’s analysis of data to select the final solution/improvement action. (2 of 5)
©Anheuser-Busch InBev 34
3Bb Describe the team’s analysis of data to select the final solution/improvement action. (3 of 5)
=
weight
0.0035“
0.0016"
©Anheuser-Busch InBev 35
3Bb Describe the team’s analysis of data to select the final solution/improvement action. (4 of 5)
0.0019"
0.0016"
©Anheuser-Busch InBev 36
3Bb Describe the team’s analysis of data to select the final solution/improvement action. (5 of 5)
Compound
Bandwidth
Compound
Bandwidth
©Anheuser-Busch InBev 37
3Bc Describe the involvement of stakeholders in the selection of the final solution/improvement action.
Stakeholder
Angled Nozzle Turrets Lower Compound Weight
Group
Support qualifications at
customer locations
©Anheuser-Busch InBev 38
Describe the final solution/improvement action and explain how the team validated the final
3Ca solution/improvement action. (1 of 3)
Final Final
Improvement Improvement Validation
Opportunity Actions
©Anheuser-Busch InBev 39
Describe the final solution/improvement action and explain how the team validated the final
3Ca solution/improvement action. (2 of 3)
©Anheuser-Busch InBev 40
Describe the final solution/improvement action and explain how the team validated the final
3Ca solution/improvement action. (3 of 3)
Source
Product
DF
1
Seq SS
0.0003315
Adj SS
0.0001529
Adj MS
0.0001529
F
0.85
P
0.358 No statistically
Punish
Product*Punish
1
1
0.0000468
0.0002168
0.0000413
0.0002168
0.0000413
0.0002168
0.23
1.21
0.632
0.274
significant difference
Error 140 0.0251208 0.0251208 0.0001794
Total 143 0.0257160
©Anheuser-Busch InBev 41
Indicate the types of tangible and intangible benefits that are expected to be realized by implementing the
3Cb team’s solution/improvement action. (1 of 2)
Stakeholders Impacted
Expected
Customers
Operators
Corporate
Sr. Mgmt
Metric Tangible How Determined
Leaders
Supts
Team
Team
MCC
Benefits
Quality
Scorecard
Maintain
performance
Predicted process capability
from experimental results
Maintain
Process
Capability
process
capability
Predicted process capability
from experimental results
Reduced
VOC
Reduction
VOC
emissions
Reduced proportionally due to
lower compound usage
©Anheuser-Busch InBev 42
Indicate the types of tangible and intangible benefits that are expected to be realized by implementing the
3Cb team’s solution/improvement action. (2 of 2)
Stakeholders Impacted
Expected
Customers
Operators
Corporate
Sr. Mgmt
Intangible Reasoning
Leaders
Supts
Team
Team
MCC
Benefits
Significant portion of
Improved
employee compensation is
employee
morale
tied to achieving cost and
quality bonus targets
Ability to positively impact
the product design
Improved
Ability to fundamentally
sense of
ownership
redesign the process
Ability to impact the work
environment
Performance of new lid
Confidence in design in the filling
the OKC lid
plant
operations
Double seam quality
©Anheuser-Busch InBev 43
3Cc Explain how the team used data to justify the implementation of the team’s solution/improvement action.
©Anheuser-Busch InBev 44
4Aa Indicate the types of internal and external (if applicable) stakeholder involvement in implementation.
©Anheuser-Busch InBev 46
4Ac Explain how stakeholder buy-in was ensured. (1 of 2)
changes
Superintendents Communication of plans and results
©Anheuser-Busch InBev 47
4Ac Explain how stakeholder buy-in was ensured. (2 of 2)
CURRENT AGENDA
1 Review agenda 6 Training-SOPs
2 Select meeting facilitator/scribe/roster 7 Walk ons: liner 6, new nozzle brush relationship, old
3 Discussion items from previous meeting nozzles, mod 1 pm, liner 12
4 Previous Meeting action log 8 Set next meeting date/time
5 Testing and PMQ 9 Meeting evaluation
DISCUSSION ITEMS
1 Can start on new nozzle sops
2 reviewed videos of compound application - ground nozzles appear to be better -
3 brush may need to be powered - not cleaning the back of the nozzle
4 OLOF liner 6- testing variations slower with ground tips 1.5 turn raised pressure
5 LOE testing will start tomorrow
6 Slower chuck speed helps with the divot - too slow and we get .040" from the cutedge
7 May investigate variable speed drive to help with nailing chuck speed
8 Investigate issue with compound saving program - causing spoilage on liner 12? Reevalute for 18 mbs
9 Will do mod 1 pm this week
©Anheuser-Busch InBev 48
4Ba Describe the plan developed by the team to implement its solution/improvement action.
Expected
Final Improvement Actions Assigned To Completion
Date
Communicate roll out plan to all customers Rashmi Markan (Corp.) Jul 2011
Revise PMs for Angled Nozzle Turrets Dennis Wyatt Jul 2011
Develop SOPs for Angled Nozzle Turrets Jesse Kettler Aug 2011
©Anheuser-Busch InBev 49
Describe the procedure, system, or other changes that were made to implement the solution/ improvement
4Bb action and to sustain the results. (1 of 3)
Final
Improvement Description of Change Sustainability Measures
Actions
©Anheuser-Busch InBev 50
Describe the procedure, system, or other changes that were made to implement the solution/ improvement
4Bb action and to sustain the results. (2 of 3)
©Anheuser-Busch InBev 51
Describe the procedure, system, or other changes that were made to implement the solution/ improvement
4Bb action and to sustain the results. (3 of 3)
©Anheuser-Busch InBev 52
4Bc Describe the creation and installation of a system for measuring and sustaining results. (1 of 2)
•Needs screen
prints and
details
©Anheuser-Busch InBev 53
4Bc Describe the creation and installation of a system for measuring and sustaining results. (2 of 2)
Ppk L1 L2 L3 L4 L5 L6
Weight 1.74 1.77 1.36 1.69 1.93 1.63
Cut Edge 1.92 2.33 1.13 3.42 2.53 1.72
L7 L8 L9 L10 L11 L12
Weight 1.74 1.82 2.31 1.80 2.09 2.36
Cut Edge 1.64 2.11 2.16 1.47 1.84 2.18
L13 L14 L15 L16 L17 L18
Weight 1.69 2.15 1.82 1.47 1.54 1.60
Cut Edge 1.75 2.16 2.15 2.06 2.15 2.16
L19 L20 L21 L22 L23 L24
Weight 1.74 2.39 2.10 1.85 2.50 1.80
Cut Edge 1.76 1.67 1.35 1.74 3.02 1.96
>1.33
1-1.33
<1.00
©Anheuser-Busch InBev 54
4Ca Indicate the types of tangible and intangible results that were realized. (1 of 4)
24
22
20
OKC Actual
OKC 3YP
18
2006 2007 2008 2009 2010 2011 2012
©Anheuser-Busch InBev 55
4Ca Indicate the types of tangible and intangible results that were realized. (2 of 4)
300
250
200
150
100
2009 2010 2011 2012 (PYE)
©Anheuser-Busch InBev 56
4Ca Indicate the types of tangible and intangible results that were realized. (3 of 4)
Good
Good
After OP Lid
Conversion
©Anheuser-Busch InBev 57
4Ca Indicate the types of tangible and intangible results that were realized. (4 of 4)
Results
Expected
Benefits
Actual Description
9.92
Scorecard No consumer complaint issues
100% > 1.33 Ppk Distance from Cut Edge and Film Weight
100% > 1.33 Ppk
process capability exceed Ppk targets
VOC emissions
146.5 tons (PYE) Full year total
< 227.2 tons
Improved sense of Achieved product and Positive feedback from employees either on
ownership process changes or supporting the team
©Anheuser-Busch InBev 58
4Cb Explain how the project’s results link with the organization’s goals, performance measures, and/or strategies.
Quality
> 9.80 9.92
Scorecard
Be the clear industry leader
in customer satisfaction and
quality
Process 100% with 100% with
Capability Ppk > 1.33 Ppk > 1.33
©Anheuser-Busch InBev 59
4Cc Explain how results were shared with stakeholders. (1 of 2)
©Anheuser-Busch InBev 60
4Cc Explain how results were shared with stakeholders. (2 of 2)
©Anheuser-Busch InBev 61
5A Explain how the team members were selected and how they were involved throughout the project.
Reason for
Member Role Function Involvement
Selection
Team Pressco SME Pressco and electrical Provided Pressco vision system expertise
Eddie Burks
Member Electrician expert Provided PLC programming
Team
Koby Smith Machinist Machinist skills Provided machining expertise
Member
Steve Team
Operator Liner operator experience Provided input from operator perspective
Robinson Member
Don Roetker Facilitator Tooling SME Machinist skills Provided machining and tooling expertise
©Anheuser-Busch InBev 62
5B Explain how the team was prepared to work together in addressing the project.
All LCIT team members previously had our 4-day Continuous Process
Improvement Team training
Problem solving methodology
Tools (e.g., Pareto charts, histograms)
Team facilitation
Group dynamics
Developed team ground rules
Defined team roles
Leader
Scribe
Coach
Established meeting times
Tracked progress and participation through meeting minutes
At the conclusion of each team meeting action items, owners, and
completion dates were clearly identified
©Anheuser-Busch InBev 63
5C Explain how the team managed its performance to ensure it was effective as a team.
process checklist
our environmental footprint x Dennis Wyatt
Born On Date: 01/27/10 x Steve Robinson
TEAM NAME: Liner Continuous Improvement Team x Eddie Burks
• Established team ground NEXT MEETING DATE: 03/22/11 x Koby Smith
NEXT MEETING TIME: 3:45 pm x Ron Hamilton
rules LOCATION: Conference Room x Mark Karns
GUESTS PRESENT:
• Followed agenda in
meetings SharePoint Site: http://abpgshr/C11/LinerCPIT/default.aspx
• Published meeting 1
CURRENT AGENDA
Review agenda 6 Training-SOPs
minutes 2
3
Select meeting facilitator/scribe/roster
Discussion items from previous meeting
7 Walk ons- flowmeters, new gun set up, lower turrets, nozzle
position, brush brake, flow meter, current trial for stack test
4 Previous Meeting action log 8 Set next meeting date/time
Monthly results posted on 5 Testing and PMQ 9 Meeting evaluation
©Anheuser-Busch InBev 64