Topic 8 - Earthworks

The document describes methods for calculating cut and fill volumes for earthworks on road projects. It provides equations and examples for computing cross-sectional areas using triangles and trapezoids based on cut/fill depths and slope ratios. Sample calculations are shown using the end-area method to determine volume between two stations by adding the initial and final cross-sectional areas and dividing by two. Diagrams illustrate cross-sections and label relevant dimensions for cut, fill, and combined cut/fill areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views7 pages

Topic 8 - Earthworks

The document describes methods for calculating cut and fill volumes for earthworks on road projects. It provides equations and examples for computing cross-sectional areas using triangles and trapezoids based on cut/fill depths and slope ratios. Sample calculations are shown using the end-area method to determine volume between two stations by adding the initial and final cross-sectional areas and dividing by two. Diagrams illustrate cross-sections and label relevant dimensions for cut, fill, and combined cut/fill areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

EARTHWORKS

A. AREA COMPUTATIONS
TYPES OF CROSS-SECTIONAL AREA OF ROAD EARTHWORKS:
Natural Ground Line
1. CUT AREA
Area to be excavated or cut
Road Pavement
DL DR

C
hL 1 1 hR
1 1

m B/2 B/2 n

B
(width of pavement)

Cross-section notes:

LEFT CENTER RIGHT

+𝐡𝐋 +𝐡𝐑
+𝐂
−𝐃𝐋 +𝐃𝐑

2. FILL AREA
Road Pavement
Area of backfill or fill
B
(width of pavement) Natural Ground Line

m B/2 B/2 n

1.5 C 1.5
hL 1 1 hR
`

`
DL DR

Cross-section notes:

LEFT CENTER RIGHT

−𝐡𝐋 −𝐡𝐑
−𝐂
−𝐃𝐋 +𝐃𝐑

Prepared by:Engr. Jhed Chan Uy Jambongana Page 1


Faculty, CIT-U – CE Department
3. CUT and FILL AREA

B
Road Pavement (width of pavement)
Natural Ground Line
m B/2 B/2 n

CUT 1 hR
1

C
1.5 FILL
hL 1

DL DR

Cross-section notes:

LEFT CENTER RIGHT

−𝐡𝐋 +𝐡𝐑
−𝐂
−𝐃𝐋 +𝐃𝐑

where:
C = Center Height
hR = side height right
= y-coordinates at right
hL = side height left Note:
= y-coordinates at left Side Slopes:
DR = distance out right For Cut = 1H: 1V
= x-coordinates at right For Fill = 1.5H: 1V
DL = distance out left
= x-coordinates at right
B = base
= width of the pavement

B. VOLUME COMPUTATIONS

VOLUME by END-AREA METHOD:

𝐀𝟏 + 𝐀𝟐
𝐕=[ ]𝐋
A2 𝟐

Where:
A1, A2 = Cross-sectional Areas of end sections
A1 L L = distance between the two areas.

Prepared by:Engr. Jhed Chan Uy Jambongana Page 2


Faculty, CIT-U – CE Department
SAMPLE PROBLEMS:
1. From the given cross-section notes, compute the volume of earthworks between the two stations. Width of roadway is 20m.
Use End-Area Method.

STATION 11 + 020m: STATION 11 + 040m

+𝟑. 𝟖 +𝟒. 𝟎 +𝟔. 𝟎 +𝟑. 𝟎


+𝟔. 𝟎 +𝟒. 𝟎
−𝟏𝟖. 𝟎 +𝟏𝟔. 𝟎 −𝟐𝟐. 𝟎 +𝟏𝟔. 𝟎

Solution:
Station 11 + 020m:

18m 16m

A2 A3
6m
3.8m 4m
A1 A4

10m 10m

20m
AREA COMPUTATIONS:
From,
𝟏
𝐀= (𝐛 × 𝐡) Area by TRIANGLES
𝟐

1 1
A1 = (10)(3.8) = 19. 00 m2 A3 = (6)(16) = 48. 00 m2
2 2
1 1
A2 = (6)(18) = 54. 00 m2 A4 = (10)(4) = 20. 00 m2
2 2

ATOTAL = 141.00 m2

Station 11 + 040m:
22m 16m

6m A2
4m A3
A1 3m
A4

10m 10m

20m

Prepared by:Engr. Jhed Chan Uy Jambongana Page 3


Faculty, CIT-U – CE Department
AREA COMPUTATIONS:
From,
𝟏
𝐀= (𝐛 × 𝐡) Area by TRIANGLES
𝟐

1 1
A1 = (10)(6) = 30. 00 m2 A3 = (4)(16) = 32. 00 m2
2 2
1 1
A2 = (4)(22) = 44. 00 m2 A4 = (10)(3) = 15. 00 m2
2 2

ATOTAL = 121.00 m2
VOLUME by END-AREA METHOD
𝐀𝟏 + 𝐀𝟐
𝐕=[ ]𝐋
𝟐

141 + 121
V=[ ] 20
2

𝐕 = 𝟐, 𝟔𝟐𝟎 𝐜𝐮𝐛𝐢𝐜 𝐦𝐞𝐭𝐞𝐫 ans.


2. From the given cross-section notes, compute the volume of earthworks between the two stations. Width of roadway is 15m.
Use End-Area Method. Use side slope of 2:1 for both cut and fill. Complete the cross-section notes at each station.

STATION 10 + 120m: STATION 10 + 140m:

+𝟓. 𝟎 +𝟒. 𝟎 −𝟒. 𝟎 −𝟗. 𝟎


+𝟑. 𝟎 −𝟓. 𝟎
−? +? −? +?

Solution:
Station 10 + 120m:

DL DR Thus,

−𝟓. 𝟎 +𝟒. 𝟎
+𝟑. 𝟎
+𝟏𝟕. 𝟓𝟎 +𝟏𝟓. 𝟓𝟎

5m A2
1 A3 1 4m
3m
2 A1 A4 2

m 7.5m 7.5m n

15m
SOLVING FOR DL AND DR: AREA COMPUTATIONS:
From slope formula, also, From,
𝐯𝐞𝐫𝐭𝐢𝐜𝐚𝐥 1 4m 𝟏
𝐬= = 𝐀= (𝐛 × 𝐡) Area by TRIANGLES
𝐡𝐨𝐫𝐢𝐳𝐨𝐧𝐭𝐚𝐥 2 n 𝟐
𝐧= 𝟖𝐦
1 1
A1 = (7.5)(5) = 18. 75 m2 A3 = (3)(15.50) = 23. 25 m2
2 2
So, thus,
1 1
1 5m DL = 7.5 + 10 = 𝟏𝟕. 𝟓𝟎 𝐦 A2 = (3)(17.50) = 26. 50 m2 A4 = (7.5)(4) = 15. 00 m2
= 2 2
2 m
DR = 7.5 + 8 = 𝟏𝟓. 𝟓𝟎 𝐦
𝐦 = 𝟏𝟎 𝐦 ATOTAL = 83.50 m2 (cut)

Prepared by:Engr. Jhed Chan Uy Jambongana Page 4


Faculty, CIT-U – CE Department
Station 10 + 140m:

15m
Thus,
m 7.5m 7.5m n

−𝟒. 𝟎 −𝟗. 𝟎
−𝟓. 𝟎
A1 −𝟏𝟓. 𝟓𝟎 +𝟐𝟓. 𝟓𝟎
4m 2 A4
1 5m
A2 2
A3 1 9m

DL DR

SOLVING FOR DL AND DR: AREA COMPUTATIONS:


From slope formula, also, From,
𝐯𝐞𝐫𝐭𝐢𝐜𝐚𝐥 1 9m 𝟏
𝐬= = 𝐀= (𝐛 × 𝐡) Area by TRIANGLES
𝐡𝐨𝐫𝐢𝐳𝐨𝐧𝐭𝐚𝐥 2 n 𝟐
𝐧 = 𝟏𝟖 𝐦
1 1
A1 = (7.5)(4) = 15. 00 m2 A3 = (5)(25.50) = 63. 75 m2
2 2
So, thus,
1 1
1 4m DL = 7.5 + 8 = 𝟏𝟓. 𝟓𝟎 𝐦 A2 = (5)(15.50) = 38. 75 m2 A4 = (7.5)(9) = 33. 75 m2
= 2 2
2 m
DR = 7.5 + 18 = 𝟐𝟓. 𝟓𝟎 𝐦
𝐦 = 𝟖𝐦 ATOTAL = 151.25 m2 (fill)

PROFILE OF THE GROUND AT THE CENTER:


Point of Zero Volume (volume of cut terminates)

10+120m 10+127.50m 10+140m


Length of CUT, x Length of FILL, (20 – x)

Road Pavement
3m
CUT

FILL
5m

By RATIO and PROPORTION: VOLUME by END-AREA METHOD:


x 20−x
= 𝐀𝟏 + 𝐀𝟐 𝐀𝟏 + 𝐀𝟐
3m 5m 𝐕𝐂𝐔𝐓 = [ ]𝐋 𝐕𝐅𝐈𝐋𝐋 = [ ]𝐋
𝟐 𝟐
𝐱 = 𝟕. 𝟓 𝐦 length of CUT
83.50 + 0 0 + 151.25
x = 20 − 7.5 VCUT = [ ] 7.50 VFILL = [ ] 12.50
2 2
(𝐱 − 𝟐𝟎) = 𝟏𝟐. 𝟓 𝐦 length of FILL
𝐕𝐂𝐔𝐓 = 𝟑𝟏𝟑. 𝟏𝟑 𝐜𝐮. 𝐦. ans. 𝐕𝐅𝐈𝐋𝐋 = 𝟗𝟒𝟓. 𝟑𝟏 𝐜𝐮. 𝐦. ans.

Prepared by:Engr. Jhed Chan Uy Jambongana Page 5


Faculty, CIT-U – CE Department
3. From the given cross-section notes, compute the volume of earthworks between the two stations. Width of roadway is 10m.
Use End-Area Method. Complete the cross-section notes at each station.

STATION 5 + 360m: STATION 5 + 380m:

−𝟓. 𝟎 𝟎 +𝟒. 𝟎 −𝟓. 𝟎 −𝟕. 𝟎


+𝟏. 𝟓 −𝟔. 𝟎
−? −𝟏. 𝟎 +? −? +?
NOTE:
Solution: If the problem does not state for the side
Station 5 + 360m: 10m slopes, automatically the side slopes for:
CUT ------ 1H:1V
5m 5m n FILL ------ 1.5H:1V
m
Thus,
A2
−𝟓. 𝟎 𝟎 +𝟒. 𝟎
+𝟏. 𝟓
A3 CUT 1 +𝟏𝟐. 𝟓𝟎 −𝟏. 𝟎 +𝟗. 𝟎𝟎
1 4m
4m
1.5m A4

1.5 FILL 1m
5m 1 A1

DL DR
SOLVING FOR DL AND DR: AREA COMPUTATIONS:
From slope formula, also, From,
𝐯𝐞𝐫𝐭𝐢𝐜𝐚𝐥 1 4m 𝟏
𝐬= = 𝐀= (𝐛 × 𝐡) Area by TRIANGLES
𝐡𝐨𝐫𝐢𝐳𝐨𝐧𝐭𝐚𝐥 1 n 𝟐

𝐧= 𝟒𝐦
1 1
A1 = (4)(5) = 10.00 m2 (fill) A3 = (1.5)(9) = 23. 25 m2 (cut)
2 2
So, thus,
1 1
1 5m DL = 5 + 7.5 = 𝟏𝟐. 𝟓𝟎 𝐦 A2 = (1)(1.50) = 0. 75 m2 (cut) A4 = (5)(4) = 10. 00 m2 (cut)
= 2 2
1.5 m
DR = 5 + 4 = 𝟗. 𝟎𝟎 𝐦
𝐦 = 𝟕. 𝟓 𝐦 ACUT = 34.00 m2 AFILL = 10.00 m2

Station 5 + 380m:

10m
Thus,
m 5m 5m n

−𝟓. 𝟎 −𝟕. 𝟎
−𝟔. 𝟎
A1 −𝟏𝟐. 𝟓𝟎 +𝟏𝟓. 𝟓𝟎
5m 1.5 A4
1 6m
A2 1.5
A3 1 7m

DL DR

Prepared by:Engr. Jhed Chan Uy Jambongana Page 6


Faculty, CIT-U – CE Department
SOLVING FOR DL AND DR: AREA COMPUTATIONS:
From slope formula, also, From,
𝐯𝐞𝐫𝐭𝐢𝐜𝐚𝐥 1 7m 𝟏
𝐬= = 𝐀= (𝐛 × 𝐡) Area by TRIANGLES
𝐡𝐨𝐫𝐢𝐳𝐨𝐧𝐭𝐚𝐥 1.5 n 𝟐
𝐧 = 𝟏𝟎. 𝟓𝟎 𝐦
1 1
A1 = (5)(5) = 12. 50 m2 A3 = (6)(15.50) = 46.50 m2
2 2
So, thus,
1 1
1 5m DL = 5 + 7.5 = 𝟏𝟐. 𝟓𝟎 𝐦 A2 = (6)(12.50) = 37. 50 m2 A4 = (5)(7) = 17. 50 m2
= 2 2
1.5 m
DR = 5 + 10.50 = 𝟏𝟓. 𝟓𝟎 𝐦
𝐦 = 𝟕. 𝟓 𝐦 ATOTAL = 114.00 m2 (fill)

PROFILE OF THE GROUND AT THE RIGHT:


Point of Zero Volume (volume of cut terminates)

5+360m 5+367.27m 5+380m


Length of CUT, x Length of FILL, (20 – x)

Road Pavement
4m
CUT

FILL
7m

By RATIO and PROPORTION: VOLUME by END-AREA METHOD:


x 20−x
= 𝐀𝟏 + 𝐀𝟐 𝐀𝟏 + 𝐀𝟐
4m 7m 𝐕𝐂𝐔𝐓 = [ ]𝐋 𝐕𝐅𝐈𝐋𝐋 = [ ]𝐋
𝟐 𝟐
𝐱 = 𝟕. 𝟐𝟕 𝐦 length of CUT
34 + 0 10 + 114
VCUT = [ ] 7.27 VFILL =[ ] 20
2 2

𝐕𝐂𝐔𝐓 = 𝟏𝟐𝟑. 𝟓𝟗 𝐜𝐮. 𝐦. ans. 𝐕𝐅𝐈𝐋𝐋 = 𝟏, 𝟐𝟒𝟎 𝐜𝐮. 𝐦. ans.

PRACTICE PROBLEM:
4. From the given cross-section notes, compute the volume of earthworks between the two stations. Width of roadway is 20m.
Use End-Area Method. Complete the cross-section notes at each station.

STATION 12 + 440m: STATION 12 + 460m:

+𝟒. 𝟎 +𝟖. 𝟎 +𝟔. 𝟎 𝟎 −𝟒. 𝟎


+𝟔. 𝟎 −𝟐. 𝟓
−? +? −? −𝟏. 𝟐 +?