BOQ Finishing Work
BOQ Finishing Work
BOQ Finishing Work
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
1 ANTI-TERMITE TREATMENT
Providing & performing anti termite treatment by
spray/sprinkling/injecting the chemical Agenda Biflex Job 1
(FMC. USA) or approved equivalent
WARRANTY
10 years comprehensive warranty is requireed that
covers effectiveness of termite treatment. Any failure in
this regard has to be addressed and rectified bh the
a) vandor in 7 calender days. Undertaking will be required
from the vendor that the product is environment friendly
and non-hazardous. Treatment shall be carried out as
per manufacturer's specifications and instructiions in
stages given below...:
b) Treatment Stages
i) Stage # 1
In and around raft foundation
ii) Stage # 2
Building periphery, electrical and plumbing sleeves
iii) Stage # 3
Complete treatment of all timber door frames.
3 BLOCK MASONRY
BOQ Page - 1
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
Provide and lay machine made block masonry of
approved quality in line level and plumb, setting the
blocks in 1:6 cement sand mortar, including filling joints,
pointing, niche, curing, placing scaffolding, including
appropiate steel anchors tied to RCC columns/walls,
hacking of existing surface for bending where necessary,
wastage etc., complete in all respect as per drawings
specifications and directed by architect including the cost
of reinforcement anchors if required. (The compressive
strength shall be minimum 1000 psi for blocks)
4.1 4" thick solid Sft 425,773
4.2 6" thick solid Sft 68,096
5 INTERNAL PLASTER
Provide & apply 1:4 cement & sand, 1/2" thick internal
plaster as specified including making grooves (1/2" x
1/2"), chamfered corners at all horizontal and vertical
exposed corner.edges, making of niche, 12" wide
galvanized metal lathe of 18SWG at the junctions of
concrete and block masonry/concrete and
5.1
concrete/conduit chasses etc., fixed with stainless steel
nails and G.I. sheet strip, smooth finished in line, level,
plumb, curing, scaffolding, hacking/chipping of existing
surface for bonding where necessary etc., complete in all
respect as per drawings specifications & as directed by
teh Engineer.
i) Ceiling Sft 341,898
ii) Internal Vertical Surface Sft 1,031,764
6 EXTERNAL PLASTER
Providing and applying 3/4" thick 1:4 cement sand
external plaster including making groove of specified size
where required, making edges in plumb and level,
6.1 Sft 357,239
hacking/chippping of existing surface, curing and
finishing, etc., complete in all respect as per drawings
specifications and instructions of the Engineer.
BOQ Page - 2
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
7 DISTEMPER PAINT
Provide and apply Distemper Paint (ICI / Berger or
approved equivalent minimun three coats of approved
shade over a cost of primer to internal ceiling prepared
7.1 smooth with carborandum stone, filling the depression Sft 463,572
with plaster of paris etc., including scaffolding, etc.
complete in all respect as per drawing, specifications and
as instructed by the Engineer.
11 FLOORING
11.1 PORCELAIN TILE FLOOR
BOQ Page - 3
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
Provide and lay porcelain tile of approved sample for
flooring in slope if required with 1:4 cement sand mortar
base of required thickness (minimum 2") & tile bond
(Shabbir/Equivalent), so as to achieve a minimum overall
finished floor thickness including tiles as 3" setting the
tiles with neat cement mortar, grouting the butt joints with
approved grout & approved colour as per manufacturer's
specifications & instructions, including curing, cleaning,
hacking / chipping etc. of existing surfaces for bonding
where necessary. All tiles to be grinded at 45 o before
placing at exposed corners, rubber hammer to be used to
fix the tiles, complete in all respect as per drawing,
specifications and as instructed by the Engineer.
BOQ Page - 4
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
b) Ceramic Tile 12"x12" Sft 23,095
BOQ Page - 5
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
18 ARTIFICIAL GRASS Sft 2,090
20 WINDOWS
ALUMINIUM COATING 5MM GLASS WITH FLY
20.1
PROOF SHUTTER
Providing & fixing sliding glazed window comprising of
2mm thick best quality natural anodized aluminium
section from Pakistan Cables or equivalent using 5mm
glass including standard hardware, fly mesh, gasket,
silicon, wastage etc. Complete as per drawings,
specefications and instructions of the Engineer.
i) W (6.00x6.00) No. 95
ii) W1 (5.00x6.00) No. 215
iii) W1a (5.00x3.50) No. 68
iv) W2 (4.00x6.50) No. 93
v) W3 (300x4.00) No. 9
vi) W3a (3.00x4.00) No. 47
vii) W3b (2.00x4.00) No. 34
viii) W3c (1.25x4.00) No. 3
ix) W3d (3.00x3.50) No. 26
x) W4 (4.33x6.00) (4.00x6.00) No. 29
xi) W5 (2.50x7.00) No. 6
xii) V1 (2.00x2.50) No. 644
xiii) V2 (1.75x2.50) No. 72
xiv) V3 (1.50x2.50) No. 5
xv) V3a (1.42x2.50) No. 3
BOQ Page - 6
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
xvi) V4 (4.00x2.00) No. 4
BOQ Page - 7
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
22 STEEL GRILL
ST No. 16
METAL DOOR
a) MD= 6'-0" x 7'-6" Nos. 7
b) MD1= 5'-0" x 7'-6" Nos. 1
c) MD2= 3'-0" x 7'-6" Nos. 7
d) MD3= 3'-0" x 7'-6" Nos. 3
PERFORATED SHUTTER
r) Shutter Nos. 6
GLASS DOOR
GD1= 6'-0" x 7'-6" No. 5
GD2= 5'-0" x 7'-6" No. 1
BOQ Page - 8
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
20.4 ACCESSORIES
a) Automatic Barrier Nos. 8
b) M.S. Grating Rft 15
c) Handrailing Terrace Rft 9,100
d) Handrailing 17th Floor Rft 144
e) Handrailing Staircase Rft 1,600
f) Sprial Stair Nos. 2
g) Bench Nos. 2
h) Shoes Rack Nos. 2
i) Bench Driver Nos. 4
j) Steel Locker Nos. 1
k) Grabage Box Nos. 2
l) Concave Marrior Nos. 2
m) Column Guard Nos. 80
n) Masjid's Pulpit Nos. 1
q) Screen for AC Outer Sft 5,268
r) Stainless Steel Ladder for Pool No. 1
s) Shed for Pool Sft 1,050
TOTAL Rs.
BOQ Page - 9
Remarks
BOQ Page - 10
Remarks
BOQ Page - 11
Remarks
BOQ Page - 12
Remarks
BOQ Page - 13
Remarks
BOQ Page - 14
Remarks
BOQ Page - 15
Remarks
BOQ Page - 16
Remarks
BOQ Page - 17
Remarks
BOQ Page - 18
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
1 ANTI-TERMITE TREATMENT
Providing & performing anti termite treatment by spray/sprinkling/injecting
Job 1
the chemical Agenda Biflex (FMC. USA) or approved equivalent
WARRANTY
10 years comprehensive warranty is requireed that covers effectiveness of
termite treatment. Any failure in this regard has to be addressed and
a) rectified bh the vandor in 7 calender days. Undertaking will be required
from the vendor that the product is environment friendly and non-
hazardous. Treatment shall be carried out as per manufacturer's
specifications and instructiions in stages given below...:
b) Treatment Stages
i) Stage # 1
In and around raft foundation
ii) Stage # 2
Building periphery, electrical and plumbing sleeves
iii) Stage # 3
Complete treatment of all timber door frames.
3 BLOCK MASONRY
Provide and lay machine made block masonry of approved quality in line
level and plumb, setting the blocks in 1:6 cement sand mortar, including
filling joints, pointing, niche, curing, placing scaffolding, including
appropiate steel anchors tied to RCC columns/walls, hacking of existing
surface for bending where necessary, wastage etc., complete in all
respect as per drawings specifications and directed by architect including
the cost of reinforcement anchors if required. (The compressive strength
shall be minimum 1000 psi for blocks)
4.1 4" thick solid Sft 425,773
4.2 6" thick solid Sft 68,096
BOQ Page - 19
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
5 INTERNAL PLASTER
Provide & apply 1:4 cement & sand, 1/2" thick internal plaster as specified
including making grooves (1/2" x 1/2"), chamfered corners at all horizontal
and vertical exposed corner.edges, making of niche, 12" wide galvanized
metal lathe of 18SWG at the junctions of concrete and block
5.1 masonry/concrete and concrete/conduit chasses etc., fixed with stainless
steel nails and G.I. sheet strip, smooth finished in line, level, plumb,
curing, scaffolding, hacking/chipping of existing surface for bonding where
necessary etc., complete in all respect as per drawings specifications & as
directed by teh Engineer.
i) Ceiling Sft 341,898
ii) Internal Vertical Surface Sft 1,031,764
6 EXTERNAL PLASTER
Providing and applying 3/4" thick 1:4 cement sand external plaster
including making groove of specified size where required, making edges in
6.1 plumb and level, hacking/chippping of existing surface, curing and Sft 357,239
finishing, etc., complete in all respect as per drawings specifications and
instructions of the Engineer.
7 DISTEMPER PAINT
Provide and apply Distemper Paint (ICI / Berger or approved equivalent
minimun three coats of approved shade over a cost of primer to internal
7.1 ceiling prepared smooth with carborandum stone, filling the depression Sft 463,572
with plaster of paris etc., including scaffolding, etc. complete in all respect
as per drawing, specifications and as instructed by the Engineer.
11 FLOORING
BOQ Page - 20
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
BOQ Page - 21
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
b) Ceramic Tile Skirting 4"x12" Rft 11,742
20 WINDOWS
BOQ Page - 22
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
Providing & fixing sliding glazed window comprising of 2mm thick best
quality natural anodized aluminium section from Pakistan Cables or
equivalent using 5mm glass including standard hardware, fly mesh,
gasket, silicon, wastage etc. Complete as per drawings, specefications
and instructions of the Engineer.
i) W (6.00x6.00) No. 95
ii) W1 (5.00x6.00) No. 215
iii) W1a (5.00x3.50) No. 68
iv) W2 (4.00x6.50) No. 93
v) W3 (300x4.00) No. 9
vi) W3a (3.00x4.00) No. 47
vii) W3b (2.00x4.00) No. 34
viii) W3c (1.25x4.00) No. 3
ix) W3d (3.00x3.50) No. 26
x) W4 (4.33x6.00) (4.00x6.00) No. 29
xi) W5 (2.50x7.00) No. 6
xii) V1 (2.00x2.50) No. 644
xiii) V2 (1.75x2.50) No. 72
xiv) V3 (1.50x2.50) No. 5
xv) V3a (1.42x2.50) No. 3
xvi) V4 (4.00x2.00) No. 4
BOQ Page - 23
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
Providing & fixing sliding glazed window comprising of 2mm thick best
quality natural anodized aluminium section from Pakistan Cables or
equivalent using 5mm glass including standard hardware, gasket, silicon,
wastage etc. Complete as per drawings, specefications and instructions of
the Engineer.
i) SW1 9.00 x 18.75 No. 16
22 STEEL GRILL
ST No. 16
23 WOODEN FLUSH DOORS
a) D1=8'-0"x 7'-6" (Local Door) Nos. 1
b) D2=7'-0"x 7'-6" (Local Door) Nos. 1
c) D3=5'-0"x 7'-6" (Local Door) Nos. 7
d) D4=5'-0"x 7'-6" (Wooden Polished Door) Nos. 178
e) D4a=2'-6"x 7'-6" (Chinese Door) Nos. 1
f) D5=3'-6"x 7'-6" (Chinese Door) Nos. 3
g) D6=3'-0"x 7'-6" (Chinese Door) Nos. 954
h) D7=2'-6"x 7'-6" (Chinese Door) Nos. 1,043
i) D7a=2'-6"x 7'-6" (Chinese Door) Nos. 36
METAL DOOR
a) MD= 6'-0" x 7'-6" Nos. 7
b) MD1= 5'-0" x 7'-6" Nos. 1
c) MD2= 3'-0" x 7'-6" Nos. 7
d) MD3= 3'-0" x 7'-6" Nos. 3
PERFORATED SHUTTER
r) Shutter Nos. 6
GLASS DOOR
GD1= 6'-0" x 7'-6" No. 5
GD2= 5'-0" x 7'-6" No. 1
20.4 ACCESSORIES
a) Automatic Barrier Nos. 8
b) M.S. Grating Rft 15
c) Handrailing Terrace Rft 9,100
d) Handrailing 17th Floor Rft 144
BOQ Page - 24
RASHEEDA ENTERPRISES
PLOT # 9
THE COURT REGENCY
BILL OF QUANTITIES
FINISHING WORK
Item Description Unit Quantity Rate Amount
ARCHITECTURE / FINISHING WORKS
Basement, Ground, 1st, Tower A & B
e) Handrailing Staircase Rft 1,600
f) Sprial Stair Nos. 2
g) Bench Nos. 2
h) Shoes Rack Nos. 2
i) Bench Driver Nos. 4
j) Steel Locker Nos. 1
k) Grabage Box Nos. 2
l) Concave Marrior Nos. 2
m) Column Guard Nos. 80
n) Masjid's Pulpit Nos. 1
q) Screen for AC Outer Sft 5,268
r) Stainless Steel Ladder for Pool No. 1
s) Shed for Pool Sft 1,050