MR and Technical Tender Pig Launcher 85c295
MR and Technical Tender Pig Launcher 85c295
MR and Technical Tender Pig Launcher 85c295
S.No. Description Document/ Drawing No. Rev. No. Pages Page No.
II TECHNICAL VOLUME II OF II
8 DATA SHEET Quick Opening End Closure for Pig Launcher/Receiver P.013751 D 11087 010 1 2 25
9 DATA SHEET Non Intrusive type PIG Signaller P.013751 D 11087 011 0 2 27
13 PTS Painting System and Colour Code for Final Layer P.013751 D11077 056 0 3 62
TABLE OF CONTENTS
1. INTRODUCTION ................................................................................................................. 3
2. DEFINITIONS ..................................................................................................................... 3
1. INTRODUCTION
Bharat Gas Resources Limited (BGRL)is planning to lay a 250.00 kms (approx.) Natural Gas Pipeline, with Dispatch
Station (DT) near Shrigonda, Intermediate Pigging station at Ahmednagar, Receiving station at Aurangabad &
kopargaon .
BGRL is also executing project of laying a 160 kms (approx.) Natural Gas Pipeline, with Dispatch Station (DT) at
CGS near Village Mouje Vadgaon, District Kolhapur and Intermediate Pigging station near Waghwadi in Sangli
District at , Receiving station at Sangli and Satara in Maharashtra State.
These proposed pipelines are hereinafter referred to as Limpangaon Ahmednagar Aurangabad Kopargaon (
LAAKPL) Pipeline Project and Mouje Vadgaon-Waghwadi-Sangli/Satara ( VWSS) Pipeline Project respectively.
The Pipeline Size has been finalized for piggable section as below i.e.:
i. 24” NB for Limpangaon to Ahmednaagr section & Ahmednagar to Aurangabad section
ii. 16” NB for Ahmednaagr to Kopargaon section
iii. 18” NB for Mouje Vadgaon to Waghwadi section
iv. 16” NB for Waghwadi to Sangli section and Waghwadi to Satara section
TE-India is now inviting tenders for procurement of Pig Launcher/Receiver for this project.
The present document covers the technical specifications for this procurement enquiry. It forms an integral part and
is to be read in conjunction with ‘Volume I of II: Commercial
2. DEFINITIONS
Third Party Inspection Agency (TPIA) Means the Inspection Agency to be appointed by
Client / Client Approved TPIA.
* Jib crane capacity (Ton) and reach shall be proposed by vendor and to be located at best suitable location.
Proposed capacity to be approved by Client/Consultant.
** Downstream Piping (Blow Down/ Vent) including Flange, Fittings etc. shall be of LTCS material (i.e. -20
Degree C)
A. REMARKS / COMMENTS
1. GENERAL NOTES
VENDOR's compliance
Vendor must include the following statement in his bid:
We certify that our bid is fully complying with your enquiry dated……………, and referenced……………… .
Compliance with this material requisition in any instance shall not relieve the Vendor of his responsibility to
meet the specified performance.
2. COMPLIANCE WITH SPECIFICATION
The VENDOR shall be completely responsible for the design, materials, fabrication, testing, inspection,
preparation for shipment and transport of the above equipment strictly in accordance with the Material
Requisition and all attachments there to.
3. VENDOR'S SCOPE
Vendor’s scope of work includes Design, supply, testing, inspection, packing & forwarding and transportation
of Flow Tee.
4. INSPECTION
Inspection shall be performed by Third party inspection agency (TPIA) appointed by vendor from
recommended TPIA or its authorized representative. Inspection shall be carried out only after drawing &
documents are approved by Owner’s Engineer, as set out and specified in the codes and documents forming
this Material Requisition.
In addition to stamping, the specifications & manufactures symbols as specified in ASME material
specifications.
Vendor shall appoint a TPIA for inspection purpose and issuance of 3.2 certificates in a manner described
below:
The successful vendor shall propose minimum two (02) Nos. of TPIA‘s from the below list within (02) weeks
from the date of FOA for Purchaser / Purchaser’s consultant approval. Vendor shall appoint approved TPIA
for inspection purpose.”
Representative, as set out and specified in the codes and particular documents forming this MR.
6. APPLICABLE DOCUMENTS
General prescriptions, requirements and information are listed in annex C of this Material Requisition.
7. VENDOR'S DOCUMENTS
Vendor shall submit the documents as listed under point B of this Material Requisition.
All documents shall be submitted in English language only.
Vendor shall ensure that following information are properly entered in each drawing/document
• Tender Number
• No. of Equipment /Package
• Name of Project
• Owner
• Vendor Name
• Drawing/Document Title
• Drawing/Document No.
• Drawing/Document Rev. No. & Date
• Transmittal No. & Date.
B. LIST OF ATTACHMENTS
The table here below lists the documents which are integral part of
Material Requisition revision
this Material Requisition. The applicable revision index of each
document is mentioned in the column below the current Material 0
Requisition revision index.
The table hereunder specifies the quantities and the nature of the documents to be submitted by the
CONTRACTOR/ VENDOR to the ENGINEER.
The documents required at the inquiry stage and to be included in the bid are listed under column A.
The documents required after award of the AGREEMENT and subject to the written approval of the ENGINEER
are listed under column B.
Any document, even when preliminary, shall be binding and therefore duly identified and signed by the
CONTRACTOR. It shall bear the ENGINEER's Project reference, the Material Requisition number and the
identification number.
THE DOCUMENTS ARE FULLY PART OF THE SUPPLY WHICH SHALL BE COMPLETE ONLY IF
AND WHEN THE DOCUMENTS COMPLYING FULLY WITH THE MATERIAL REQUISITION
REQUIREMENTS ARE RECEIVED BY THE ENGINEER.
Document A B C
Index No.
Item Documents and Data Number Number Number
of copies of copies Required of copies Required date
date
2 weeks
before
1 ISO Certification latest CDS 1 6 2 weeks 6 despatch
with final
techn. file
2 weeks
before
Completed data sheet for pig
2 CDS 1 6 2 weeks 6 despatch
launcher/receiver
with final
techn. file
Recommended arrangement of Pig
Launcher/Receiver along with
internal tray, pig handling device,
3 jib crane assembly showing RAP 1 6 2 weeks 6 2 weeks
direction of opening of Quick
Opening Closure for each plot
along with details
Drawing/data submittal 2 weeks +
4 DLS - 6 6 2 weeks
list/schedule monthly
Fabrication, test and delivery 2 weeks +
5 FTD - 6 6 2 weeks
schedule (per item) monthly
2 weeks +
6 Progress report PRT - 6 6 2 weeks
monthly
With final
7 Catalogues / References CRS 1 - - 3
techn. file
Document A B C
Index No.
Item Documents and Data Number Number Number
of copies of copies Required of copies Required date
date
2 weeks
2 weeks before
Packing/shipping list with weights
9 PLD - 6 before 6 despatch
and dimensions
shipping with final
techn. file
DMU - 6 2 weeks 6 2 weeks
Detail drawing + material before
10 specification + unit weight + despatch
calculations + Welding details with final
techn. file
Document A B C
Index No.
Item Documents and Data Number Number Number
of copies of copies Required of copies Required date
date
Document A B C
Index No.
Item Documents and Data Number Number Number
of copies of copies Required of copies Required date
date
2 weeks
before
26 Painting system description PSD - 6 2 weeks 6 despatch
with final
techn. file
2 weeks
before
List of subcontractors with their
27 LSS - 6 2 weeks 6 despatch
scope
with final
techn. file
2 weeks
before
28 Instrument data sheets IDS - 6 2 weeks 6 despatch
with final
techn. file
2 weeks
before
29 Wiring diagrams WDG - 6 2 weeks 6 despatch
with final
techn. file
2 weeks
CENELEC certificates for before
30 electrical instruments in hazardous CCE - 6 2 weeks 6 despatch
locations with final
techn. file
Final technical file, preliminary 2 weeks
31 copy for approval (In Soft & Hard FTP - 3 before - -
copy) shipping
Final technical file (In Soft & Hard Before
32 FTF - - - 6
copy) shipping
* QA/QC Program shall comprise of In-House testing facilities, Resources and Quality Procedure being followed by
the vendor to ensure Quality of Product in line with tender requirement.
Page 1 of 2
1 FOR : BHARAT GAS RESOURCES LIMITED UNIT :
6 CODE : ASME B 31.8 / ASME SEC. VIII Div 1 DESIGN FACTOR : 0.4 EMPTY (SHIPPING - ERECTION) : *
7 WIND VELOCITY : - 47 m/s (To be finalized during detail engineering) TOTAL OPERATING : *
8 EARTHQUAKE ZONE - Zone IV (To be finalized during detail engineering) FULL OF WATER (SITE TEST) : *
INTERNALS : *
INSULATION/ FIRE PROOFING : NA
ACCESSORIES : * (SEE SR. NO.: 50)
CAPACITIES
NOMINAL : * m3
9 MATERIAL CERTIFICATE : EN 10204 3.2 EFFECTIVE : * m3
10 INSPECTION BY : AUTHORISED INSPECTION AGENCY FULL : * m3
DESIGN DATA SHELL JACKET
16 OPER. TEMP. : Min.- Max. °C
17 DESIGN TEMP. : Min.- Max. °C 0 65
N.A.
18 OPER. PRESSURE : Min.- Max. barg
19 DESIGN PRESSURE : Min.- Max. barg - 49
20 HYDROSTATIC TEST PRESSURE : barg 1.5 Times Design Pressure
21 PNEUMATIC TEST PRESSURE : barg NA
22 CORROSION ALLOWANCE=CA : mm 3.0
23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS
25 LINING : mm
26 FLUID NATURE/ PHASE NATURAL GAS
27 FILLING : %
28 SPECIFIC GRAVITY : kg/m3
29
FABRICATION - TESTING DATA
30 SHELL / HEAD JOINT EFFICIENCY 1
31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY
32 SHELL / HEAD X-RAY 100 %
33
For CS : At 0°C Minimum Average Absorbed Energy shall be SMYS
(Mpa)/10, with a minimum of 27 J, for the transerve direction.
SHELL / HEAD ADDITIONAL TESTS (Impact Test)
At 0°C Minimum Individual Energy value shall not be less than 80 % of the
Minimum required average value, for the transerve direction.
For LTCS : at -20 0C Energy Absorbed Min. 28J & Avg. 35J
and at temperature specified in Material Spec.
34 HEAT TREATMENT : PWHT/ SPECIAL AS PER ASME SECTION VIII DIV. I
35 HEAD SHAPE
36 QUICK OPENING CLOSURE BAND LOCK TYPE 'O' ring with ASME U stamp (NOTE 8)
MATERIAL CS (PIPING CLASS 3C1) SPECIFIED PROPOSED SPECIFIED PROPOSED
Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including instrumented
pigs (such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required.
The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least five
rows of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts being in
50 ACCESSORIES
contact with each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock bracket shall
be provided to such that the basket does not slide within the trap. Rear end of the basket shall be provided with suitable lug to
enable retrieval of the basket by hooks. The handling system (for inserting and retracting the pigs from the Pig launcher ) shall
be complete with handling devices. In case any rails are required for sliding of the handling system, the same shall be provided
by the Pig launcher manufacturer.
Page 2 of 2
NOZZLE SCHEDULE
1 ITEM Nos NOZZLE NECK FLANGE STANDOUT SERVICE REMARKS
2 DIA SCH RATING FACING TYPE
3 N1 1 24" By Vendor 300 # RF WN * Connection to 24" main pipeline B16.5
4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5
5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5
6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5
To match I.D. of
8 N7 1 28" 300 # Note 8 Note 8 * Quick-opening closure
major barrel
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44 FIELD INSTALLATION LAYOUT
45
46 Note - All Dimensions are tentative and in mm only. Vendor to indicate final dimensions in drawings submitted for approval.
47 NOTES :
48 1. All nozzles reinforcements & clips to be same material quality as shell plate/Pipe.
2. The dimensions indicated above are suggested dimensions only. The Vendor/ Manufacturer shall check and provide dimensions suitable for accommodating latest online inspection tool (longest). Final dimensions shall be approved by
49
Owner/Consultant.
50 3. Nozzles standouts are from T.L. or C.L. of vessels to flange gasket seating face.
51 4. Nozzle positions are from reference lines unless otherwise stated.
52 5. Nozzle orientation will be Finalised during detail engineering.
53 6. Bolt holes to straddle centre lines except as noted.
54 7. Thicknesses must be checked by Vendor at bidding time.
55 8. ASME U Stamp applicable only for Quick opening closure only. Quick-opening closure shall include a safety device to prevent opening before depressurizing in compliance with ASME section VIII, Div, UG. 35 (b).
56 9. Bore of Flange (N1) shall match with the bore of Connecting Pipeline.
57 10. If the minor barrel is fabricated from plates, dimensional tolerance of the barrel shall be same as pipes manufactured as per API 5L, Latest Edition.
58 11. This data sheet shall be read in conjunction with Specification for Pig Launcher and PMS.
59 12. * Vendor to indicate
60 13. All the permissible forces on nozzles to be furnished by vendor.
61 14. Foundation details of Pig launcher / Receiver to be furnished by vendor.
62 15. In the barrel, Slope is required 1: 100 towards the pipeline.
DATE REV PREPARED CHECKED APPROVED DESCRIPTION
07.01.2020 0 VA RP GSS Issued for Procurement
Page 1 of 2
1 FOR : BHARAT GAS RESOURCES LIMITED UNIT :
6 CODE : ASME B 31.8 / ASME SEC. VIII Div 1 DESIGN FACTOR : 0.4 EMPTY (SHIPPING - ERECTION) : *
7 WIND VELOCITY : - 47 m/s (To be finalized during detail engineering) TOTAL OPERATING : *
8 EARTHQUAKE ZONE - Zone IV (To be finalized during detail engineering) FULL OF WATER (SITE TEST) : *
INTERNALS : *
INSULATION/ FIRE PROOFING : NA
ACCESSORIES : * (SEE SR. NO.: 50)
CAPACITIES
NOMINAL : * m3
9 MATERIAL CERTIFICATE : EN 10204 3.2 EFFECTIVE : * m3
10 INSPECTION BY : AUTHORISED INSPECTION AGENCY FULL : * m3
DESIGN DATA SHELL JACKET
16 OPER. TEMP. : Min.- Max. °C
17 DESIGN TEMP. : Min.- Max. °C 0 65
N.A.
18 OPER. PRESSURE : Min.- Max. barg
19 DESIGN PRESSURE : Min.- Max. barg - 49
20 HYDROSTATIC TEST PRESSURE : barg 1.5 Times Design Pressure
21 PNEUMATIC TEST PRESSURE : barg NA
22 CORROSION ALLOWANCE=CA : mm 3.0
23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS
25 LINING : mm
26 FLUID NATURE/ PHASE NATURAL GAS
27 FILLING : %
28 SPECIFIC GRAVITY : kg/m3
29
FABRICATION - TESTING DATA
30 SHELL / HEAD JOINT EFFICIENCY 1
31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY
32 SHELL / HEAD X-RAY 100 %
33
For CS : At 0°C Minimum Average Absorbed Energy shall be SMYS
(Mpa)/10, with a minimum of 27 J, for the transerve direction.
SHELL / HEAD ADDITIONAL TESTS (Impact Test)
At 0°C Minimum Individual Energy value shall not be less than 80 % of the
Minimum required average value, for the transerve direction.
0
For LTCS : at -20 C Energy Absorbed Min. 28J & Avg. 35J
and at temperature specified in Material Spec.
34 HEAT TREATMENT : PWHT/ SPECIAL AS PER ASME SECTION VIII DIV. I
35 HEAD SHAPE
36 QUICK OPENING CLOSURE BAND LOCK TYPE 'O' ring with ASME U stamp (NOTE 8)
MATERIAL CS (PIPING CLASS 3 C1) SPECIFIED PROPOSED SPECIFIED PROPOSED
Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including instrumented
pigs (such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required.
The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least five
rows of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts being in
50 ACCESSORIES
contact with each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock bracket shall
be provided to such that the basket does not slide within the trap. Rear end of the basket shall be provided with suitable lug to
enable retrieval of the basket by hooks. The handling system (for inserting and retracting the pigs from the Pig launcher ) shall
be complete with handling devices. In case any rails are required for sliding of the handling system, the same shall be provided
by the Pig launcher manufacturer.
Page 2 of 2
NOZZLE SCHEDULE
1 ITEM Nos NOZZLE NECK FLANGE STANDOUT SERVICE REMARKS
2 DIA SCH RATING FACING TYPE
3 N1 1 24" By Vendor 300 # RF WN * Connection to 24" main pipeline B16.5
4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5
5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5
6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5
To match I.D. of
8 N7 1 28" 300 # Note 8 Note 8 * Quick-opening closure
major barrel
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44 FIELD INSTALLATION LAYOUT
45
46 Note - All Dimensions are tentative and in mm only. Vendor to indicate final dimensions in drawings submitted for approval.
47 NOTES :
48 1. All nozzles reinforcements & clips to be same material quality as shell plate/Pipe.
2. The dimensions indicated above are suggested dimensions only. The Vendor/ Manufacturer shall check and provide dimensions suitable for accommodating latest online inspection tool (longest). Final dimensions shall be approved by
49
Owner/Consultant.
50 3. Nozzles standouts are from T.L. or C.L. of vessels to flange gasket seating face.
51 4. Nozzle positions are from reference lines unless otherwise stated.
52 5. Nozzle orientation will be Finalised during detail engineering.
53 6. Bolt holes to straddle centre lines except as noted.
54 7. Thicknesses must be checked by Vendor at bidding time.
55 8. ASME U Stamp applicable only for Quick opening closure only. Quick-opening closure shall include a safety device to prevent opening before depressurizing in compliance with ASME section VIII, Div, UG. 35 (b).
56 9. Bore of Flange (N1) shall match with the bore of Connecting Pipeline.
57 10. If the minor barrel is fabricated from plates, dimensional tolerance of the barrel shall be same as pipes manufactured as per API 5L, Latest Edition.
58 11. This data sheet shall be read in conjunction with Specification for Pig Launcher and PMS.
59 12. * Vendor to indicate
60 13. All the permissible forces on nozzles to be furnished by vendor.
61 14. Foundation details of Pig launcher / Receiver to be furnished by vendor.
62 15. In the barrel, Slope is required 1: 100 towards the End Closure.
DATE REV PREPARED CHECKED APPROVED DESCRIPTION
07.01.2020 0 VA RP GSS Issued for Procurement
Page 1 of 2
1 FOR : BHARAT GAS RESOURCES LIMITED UNIT :
6 CODE : ASME B 31.8 / ASME SEC. VIII Div 1 DESIGN FACTOR : 0.4 EMPTY (SHIPPING - ERECTION) : *
7 WIND VELOCITY : - 47 m/s (To be finalized during detail engineering) TOTAL OPERATING : *
8 EARTHQUAKE ZONE - Zone IV (To be finalized during detail engineering) FULL OF WATER (SITE TEST) : *
INTERNALS : *
INSULATION/ FIRE PROOFING : NA
ACCESSORIES : * (SEE SR. NO.: 50)
CAPACITIES
NOMINAL : * m3
9 MATERIAL CERTIFICATE : EN 10204 3.2 EFFECTIVE : * m3
10 INSPECTION BY : AUTHORISED INSPECTION AGENCY FULL : * m3
DESIGN DATA SHELL JACKET
16 OPER. TEMP. : Min.- Max. °C
17 DESIGN TEMP. : Min.- Max. °C 0 65
N.A.
18 OPER. PRESSURE : Min.- Max. barg
19 DESIGN PRESSURE : Min.- Max. barg - 49
20 HYDROSTATIC TEST PRESSURE : barg 1.5 Times Design Pressure
21 PNEUMATIC TEST PRESSURE : barg NA
22 CORROSION ALLOWANCE=CA : mm 3.0
23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS
25 LINING : mm
26 FLUID NATURE/ PHASE NATURAL GAS
27 FILLING : %
28 SPECIFIC GRAVITY : kg/m3
29
FABRICATION - TESTING DATA
30 SHELL / HEAD JOINT EFFICIENCY 1
31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY
32 SHELL / HEAD X-RAY 100 %
33 For CS : At 0°C Minimum Average Absorbed Energy shall be SMYS
(Mpa)/10, with a minimum of 27 J, for the transerve direction.
SHELL / HEAD ADDITIONAL TESTS (Impact Test)
At 0°C Minimum Individual Energy value shall not be less than 80 % of the
Minimum required average value, for the transerve direction.
0
For LTCS : at -20 C Energy Absorbed Min. 28J & Avg. 35J
and at temperature specified in Material Spec.
Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including instrumented
pigs (such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required.
The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least five
rows of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts being in
50 ACCESSORIES
contact with each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock bracket shall
be provided to such that the basket does not slide within the trap. Rear end of the basket shall be provided with suitable lug to
enable retrieval of the basket by hooks. The handling system (for inserting and retracting the pigs from the Pig launcher ) shall
be complete with handling devices. In case any rails are required for sliding of the handling system, the same shall be provided
by the Pig launcher manufacturer.
Page 2 of 2
NOZZLE SCHEDULE
1 ITEM Nos NOZZLE NECK FLANGE STANDOUT SERVICE REMARKS
2 DIA SCH RATING FACING TYPE
3 N1 1 16" By Vendor 300 # RF WN * Connection to 16" main pipeline B16.5
4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5
5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5
6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5
To match I.D. of
8 N7 1 20" 300 # Note 8 Note 8 * Quick-opening closure
major barrel
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44 FIELD INSTALLATION LAYOUT
45
46 Note - All Dimensions are tentative and in mm only. Vendor to indicate final dimensions in drawings submitted for approval.
47 NOTES :
48 1. All nozzles reinforcements & clips to be same material quality as shell plate/Pipe.
2. The dimensions indicated above are suggested dimensions only. The Vendor/ Manufacturer shall check and provide dimensions suitable for accommodating latest online inspection tool (longest). Final dimensions shall be approved by
49
Owner/Consultant.
50 3. Nozzles standouts are from T.L. or C.L. of vessels to flange gasket seating face.
51 4. Nozzle positions are from reference lines unless otherwise stated.
52 5. Nozzle orientation will be Finalised during detail engineering.
53 6. Bolt holes to straddle centre lines except as noted.
54 7. Thicknesses must be checked by Vendor at bidding time.
55 8. ASME U Stamp applicable only for Quick opening closure only. Quick-opening closure shall include a safety device to prevent opening before depressurizing in compliance with ASME section VIII, Div, UG. 35 (b).
56 9. Bore of Flange (N1) shall match with the bore of Connecting Pipeline.
57 10. If the minor barrel is fabricated from plates, dimensional tolerance of the barrel shall be same as pipes manufactured as per API 5L, Latest Edition.
58 11. This data sheet shall be read in conjunction with Specification for Pig Launcher and PMS.
59 12. * Vendor to indicate
60 13. All the permissible forces on nozzles to be furnished by vendor.
61 14. Foundation details of Pig launcher / Receiver to be furnished by vendor.
62 15. In the barrel, Slope is required 1: 100 towards the pipeline.
DATE REV PREPARED CHECKED APPROVED DESCRIPTION
07.01.2020 0 VA RP GSS Issued for Procurement
12.03.2020 1 VA RP GSS Reissued for Procurement
Page 1 of 2
1 FOR : BHARAT GAS RESOURCES LIMITED UNIT :
6 CODE : ASME B 31.8 / ASME SEC. VIII Div 1 DESIGN FACTOR : 0.4 EMPTY (SHIPPING - ERECTION) : *
7 WIND VELOCITY : - 47 m/s (To be finalized during detail engineering) TOTAL OPERATING : *
8 EARTHQUAKE ZONE - Zone IV (To be finalized during detail engineering) FULL OF WATER (SITE TEST) : *
INTERNALS : *
INSULATION/ FIRE PROOFING : NA
ACCESSORIES : * (SEE SR. NO.: 50)
CAPACITIES
NOMINAL : * m3
9 MATERIAL CERTIFICATE : EN 10204 3.2 EFFECTIVE : * m3
10 INSPECTION BY : AUTHORISED INSPECTION AGENCY FULL : * m3
DESIGN DATA SHELL JACKET
16 OPER. TEMP. : Min.- Max. °C
17 DESIGN TEMP. : Min.- Max. °C 0 65
N.A.
18 OPER. PRESSURE : Min.- Max. barg
19 DESIGN PRESSURE : Min.- Max. barg - 49
20 HYDROSTATIC TEST PRESSURE : barg 1.5 Times Design Pressure
21 PNEUMATIC TEST PRESSURE : barg NA
22 CORROSION ALLOWANCE=CA : mm 3.0
23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS
25 LINING : mm
26 FLUID NATURE/ PHASE NATURAL GAS
27 FILLING : %
28 SPECIFIC GRAVITY : kg/m3
29
FABRICATION - TESTING DATA
30 SHELL / HEAD JOINT EFFICIENCY 1
31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY
32 SHELL / HEAD X-RAY 100 %
33
For CS : At 0°C Minimum Average Absorbed Energy shall be SMYS
(Mpa)/10, with a minimum of 27 J, for the transerve direction.
SHELL / HEAD ADDITIONAL TESTS (Impact Test)
At 0°C Minimum Individual Energy value shall not be less than 80 % of the
Minimum required average value, for the transerve direction.
0
For LTCS : at -20 C Energy Absorbed Min. 28J & Avg. 35J
and at temperature specified in Material Spec.
Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including instrumented pigs
(such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required.
The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least five rows
50 ACCESSORIES of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts being in contact with
each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock bracket shall be provided to
such that the basket does not slide within the trap. Rear end of the basket shall be provided with suitable lug to enable retrieval of the
basket by hooks. The handling system (for inserting and retracting the pigs from the Pig launcher ) shall be complete with handling
devices. In case any rails are required for sliding of the handling system, the same shall be provided by the Pig launcher manufacturer.
Page 2 of 2
NOZZLE SCHEDULE
1 ITEM Nos NOZZLE NECK FLANGE STANDOUT SERVICE REMARKS
2 DIA SCH RATING FACING TYPE
3 N1 1 16" By Vendor 300 # RF WN * Connection to 16" main pipeline B16.5
4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5
5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5
6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5
To match I.D. of
8 N7 1 20" 300 # Note 8 Note 8 * Quick-opening closure
major barrel
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44 FIELD INSTALLATION LAYOUT
45
46 Note - All Dimensions are tentative and in mm only. Vendor to indicate final dimensions in drawings submitted for approval.
47 NOTES :
48 1. All nozzles reinforcements & clips to be same material quality as shell plate/Pipe.
2. The dimensions indicated above are suggested dimensions only. The Vendor/ Manufacturer shall check and provide dimensions suitable for accommodating latest online inspection tool (longest). Final dimensions shall be approved by
49
Owner/Consultant.
50 3. Nozzles standouts are from T.L. or C.L. of vessels to flange gasket seating face.
51 4. Nozzle positions are from reference lines unless otherwise stated.
52 5. Nozzle orientation will be Finalised during detail engineering.
53 6. Bolt holes to straddle centre lines except as noted.
54 7. Thicknesses must be checked by Vendor at bidding time.
55 8. ASME U Stamp applicable only for Quick opening closure only. Quick-opening closure shall include a safety device to prevent opening before depressurizing in compliance with ASME section VIII, Div, UG. 35 (b).
56 9. Bore of Flange (N1) shall match with the bore of Connecting Pipeline.
57 10. If the minor barrel is fabricated from plates, dimensional tolerance of the barrel shall be same as pipes manufactured as per API 5L, Latest Edition.
58 11. This data sheet shall be read in conjunction with Specification for Pig Launcher and PMS.
59 12. * Vendor to indicate
60 13. All the permissible forces on nozzles to be furnished by vendor.
61 14. Foundation details of Pig launcher / Receiver to be furnished by vendor.
62 15. In the barrel, Slope is required 1: 100 towards the End Closure.
DATE REV PREPARED CHECKED APPROVED DESCRIPTION
07.01.2020 0 VA RP GSS Issued for Procurement
12.03.2020 1 VA RP GSS Reissued for Procurement
Page 1 of 2
1 FOR : BHARAT GAS RESOURCES LIMITED UNIT :
6 CODE : ASME B 31.8 / ASME SEC. VIII Div 1 DESIGN FACTOR : 0.4 EMPTY (SHIPPING - ERECTION) : *
7 WIND VELOCITY : - 47 m/s (To be finalized during detail engineering) TOTAL OPERATING : *
8 EARTHQUAKE ZONE - Zone IV (To be finalized during detail engineering) FULL OF WATER (SITE TEST) : *
INTERNALS : *
INSULATION/ FIRE PROOFING : NA
ACCESSORIES : * (SEE SR. NO.: 50)
CAPACITIES
NOMINAL : * m3
9 MATERIAL CERTIFICATE : EN 10204 3.2 EFFECTIVE : * m3
10 INSPECTION BY : AUTHORISED INSPECTION AGENCY FULL : * m3
DESIGN DATA SHELL JACKET
16 OPER. TEMP. : Min.- Max. °C
17 DESIGN TEMP. : Min.- Max. °C 0 65
N.A.
18 OPER. PRESSURE : Min.- Max. barg
19 DESIGN PRESSURE : Min.- Max. barg - 49
20 HYDROSTATIC TEST PRESSURE : barg 1.5 Times Design Pressure
21 PNEUMATIC TEST PRESSURE : barg NA
22 CORROSION ALLOWANCE=CA : mm 3.0
23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS
25 LINING : mm
26 FLUID NATURE/ PHASE NATURAL GAS
27 FILLING : %
28 SPECIFIC GRAVITY : kg/m3
29
FABRICATION - TESTING DATA
30 SHELL / HEAD JOINT EFFICIENCY 1
31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY
32 SHELL / HEAD X-RAY 100 %
33 For CS : At 0°C Minimum Average Absorbed Energy shall be SMYS
(Mpa)/10, with a minimum of 27 J, for the transerve direction.
SHELL / HEAD ADDITIONAL TESTS (Impact Test)
At 0°C Minimum Individual Energy value shall not be less than 80 % of
the Minimum required average value, for the transerve direction.
For LTCS : at -20 0C Energy Absorbed Min. 28J & Avg. 35J
and at temperature specified in Material Spec.
Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including
instrumented pigs (such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required.
The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least
five rows of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts
50 ACCESSORIES
being in contact with each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock
bracket shall be provided to such that the basket does not slide within the trap. Rear end of the basket shall be provided with
suitable lug to enable retrieval of the basket by hooks. The handling system (for inserting and retracting the pigs from the Pig
launcher ) shall be complete with handling devices. In case any rails are required for sliding of the handling system, the same
shall be provided by the Pig launcher manufacturer.
Page 2 of 2
NOZZLE SCHEDULE
1 ITEM Nos NOZZLE NECK FLANGE STANDOUT SERVICE REMARKS
2 DIA SCH RATING FACING TYPE
3 N1 1 18" By Vendor 300 # RF WN * Connection to 18" main pipeline B16.5
4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5
5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5
6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5
To match I.D. of
8 N7 1 22" 300 # Note 8 Note 8 * Quick-opening closure
major barrel
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44 FIELD INSTALLATION LAYOUT
45
46 Note - All Dimensions are tentative and in mm only. Vendor to indicate final dimensions in drawings submitted for approval.
47 NOTES :
48 1. All nozzles reinforcements & clips to be same material quality as shell plate/Pipe.
2. The dimensions indicated above are suggested dimensions only. The Vendor/ Manufacturer shall check and provide dimensions suitable for accommodating latest online inspection tool (longest). Final dimensions shall be approved by
49
Owner/Consultant.
50 3. Nozzles standouts are from T.L. or C.L. of vessels to flange gasket seating face.
51 4. Nozzle positions are from reference lines unless otherwise stated.
52 5. Nozzle orientation will be Finalised during detail engineering.
53 6. Bolt holes to straddle centre lines except as noted.
54 7. Thicknesses must be checked by Vendor at bidding time.
55 8. ASME U Stamp applicable only for Quick opening closure only. Quick-opening closure shall include a safety device to prevent opening before depressurizing in compliance with ASME section VIII, Div, UG. 35 (b).
56 9. Bore of Flange (N1) shall match with the bore of Connecting Pipeline.
57 10. If the minor barrel is fabricated from plates, dimensional tolerance of the barrel shall be same as pipes manufactured as per API 5L, Latest Edition.
58 11. This data sheet shall be read in conjunction with Specification for Pig Launcher and PMS.
59 12. * Vendor to indicate
60 13. All the permissible forces on nozzles to be furnished by vendor.
61 14. Foundation details of Pig launcher / Receiver to be furnished by vendor.
62 15. In the barrel, Slope is required 1: 100 towards the pipeline.
DATE REV PREPARED CHECKED APPROVED DESCRIPTION
12.03.2020 0 VA RP GSS Issued for Procurement
Page 1 of 2
1 FOR : BHARAT GAS RESOURCES LIMITED UNIT :
6 CODE : ASME B 31.8 / ASME SEC. VIII Div 1 DESIGN FACTOR : 0.4 EMPTY (SHIPPING - ERECTION) : *
7 WIND VELOCITY : - 47 m/s (To be finalized during detail engineering) TOTAL OPERATING : *
8 EARTHQUAKE ZONE - Zone IV (To be finalized during detail engineering) FULL OF WATER (SITE TEST) : *
INTERNALS : *
INSULATION/ FIRE PROOFING : NA
ACCESSORIES : * (SEE SR. NO.: 50)
CAPACITIES
NOMINAL : * m3
9 MATERIAL CERTIFICATE : EN 10204 3.2 EFFECTIVE : * m3
10 INSPECTION BY : AUTHORISED INSPECTION AGENCY FULL : * m3
DESIGN DATA SHELL JACKET
16 OPER. TEMP. : Min.- Max. °C
17 DESIGN TEMP. : Min.- Max. °C 0 65
N.A.
18 OPER. PRESSURE : Min.- Max. barg
19 DESIGN PRESSURE : Min.- Max. barg - 49
20 HYDROSTATIC TEST PRESSURE : barg 1.5 Times Design Pressure
21 PNEUMATIC TEST PRESSURE : barg NA
22 CORROSION ALLOWANCE=CA : mm 3.0
23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS
25 LINING : mm
26 FLUID NATURE/ PHASE NATURAL GAS
27 FILLING : %
28 SPECIFIC GRAVITY : kg/m3
29
FABRICATION - TESTING DATA
30 SHELL / HEAD JOINT EFFICIENCY 1
31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY
32 SHELL / HEAD X-RAY 100 %
33 For CS : At 0°C Minimum Average Absorbed Energy shall be SMYS
(Mpa)/10, with a minimum of 27 J, for the transerve direction.
SHELL / HEAD ADDITIONAL TESTS (Impact Test)
At 0°C Minimum Individual Energy value shall not be less than 80 % of
the Minimum required average value, for the transerve direction.
For LTCS : at -20 0C Energy Absorbed Min. 28J & Avg. 35J
and at temperature specified in Material Spec.
Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including instrumented
pigs (such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required.
The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least five
rows of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts being in
50 ACCESSORIES
contact with each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock bracket shall be
provided to such that the basket does not slide within the trap. Rear end of the basket shall be provided with suitable lug to enable
retrieval of the basket by hooks. The handling system (for inserting and retracting the pigs from the Pig launcher ) shall be
complete with handling devices. In case any rails are required for sliding of the handling system, the same shall be provided by the
Pig launcher manufacturer.
Page 2 of 2
NOZZLE SCHEDULE
1 ITEM Nos NOZZLE NECK FLANGE STANDOUT SERVICE REMARKS
2 DIA SCH RATING FACING TYPE
3 N1 1 18" By Vendor 300 # RF WN * Connection to 18" main pipeline B16.5
4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5
5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5
6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5
To match I.D. of
8 N7 1 22" 300 # Note 8 Note 8 * Quick-opening closure
major barrel
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44 FIELD INSTALLATION LAYOUT
45
46 Note - All Dimensions are tentative and in mm only. Vendor to indicate final dimensions in drawings submitted for approval.
47 NOTES :
48 1. All nozzles reinforcements & clips to be same material quality as shell plate/Pipe.
2. The dimensions indicated above are suggested dimensions only. The Vendor/ Manufacturer shall check and provide dimensions suitable for accommodating latest online inspection tool (longest). Final dimensions shall be approved by
49
Owner/Consultant.
50 3. Nozzles standouts are from T.L. or C.L. of vessels to flange gasket seating face.
51 4. Nozzle positions are from reference lines unless otherwise stated.
52 5. Nozzle orientation will be Finalised during detail engineering.
53 6. Bolt holes to straddle centre lines except as noted.
54 7. Thicknesses must be checked by Vendor at bidding time.
55 8. ASME U Stamp applicable only for Quick opening closure only. Quick-opening closure shall include a safety device to prevent opening before depressurizing in compliance with ASME section VIII, Div, UG. 35 (b).
56 9. Bore of Flange (N1) shall match with the bore of Connecting Pipeline.
57 10. If the minor barrel is fabricated from plates, dimensional tolerance of the barrel shall be same as pipes manufactured as per API 5L, Latest Edition.
58 11. This data sheet shall be read in conjunction with Specification for Pig Launcher and PMS.
59 12. * Vendor to indicate
60 13. All the permissible forces on nozzles to be furnished by vendor.
61 14. Foundation details of Pig launcher / Receiver to be furnished by vendor.
62 15. In the barrel, Slope is required 1: 100 towards the End Closure.
DATE REV PREPARED CHECKED APPROVED DESCRIPTION
12.03.2020 0 VA RP GSS Issued for Procurement
DATA SHEET
QUICK OPENING END CLOSURE (QOEC)
GENERAL
ASME BPVC SEC VIII Div 1 (Latest edition), ASME
Design Standard :
B31.8 (Latest edition)
Type of QOEC : Band lock type having 'O' ring with ASME U stamp.
Size : As per Pig Launcher & Receiver Data Sheet
Orientation : Horizontal
End Connection : Butt Joint, ASME B 31.8, Appendix I, Fig. I-4.
ASME SEC VIII Div 1 (Latest edition), ASME B31.8
Design Standard :
(Latest edition)
ANSI Rating : 300#
DESIGN CONDITION :
Corrosion Allowance, mm : 3.0
Service : Natural Gas – Non Sour
Pressure in Bar(g) : 49
Temperature in 0C : 0 to (+) 65
Design Factor : 0.4
Thickness of closure hub, mm :
Installation : Above ground
Connecting Pipe : As per Pig Launcher & Receiver Data Sheet
MATERIAL SPECIFICATION
(Equivalent or Superior)
Description
ASTM A 694 F 65 (Pig Trap – 22” x 18”)
QOEC ASTM A 694 F 65 (Pig Trap – 20” x 16”)
ASTM A 694 F 60 (Pig Trap – 28” x 24”)
Seal Viton
Name Plate AISI 304, min 2mm
TESTING REQUIREMENTS
Charpy Impact Test Required (Note 4)
Hydrostatic test pressure (with vessel) ASME SEC VIII Div 1
Pneumatic Test (with vessel) To be same as mentioned in Pig Launcher /Receiver
Cyclic test Atleast 10 closing and opening cycles
Radiography 100% (Full)
PAINTING :
Surface Preparation SA 2 1/2
External Surface *
Internal Surface *
Notes:
1. This data sheet shall be read in conjunction with Specification, Data Sheet for Pig Launcher and
PMS.
2. Quick opening closures shall be equipped with safety locking devices in compliance with Section
VIII, Division I, UG-35.2 of the BPV Code.
3. For the welding end, the out of roundness (i.e. difference between maximum and minimum ID at
pipe end) tolerance shall be OD > 6” - 3 mm (max.)
4. The Charpy V-notch test shall be conducted at 0°C. Test procedure shall conform to ASTM A 370.
At 0°C Minimum Average Absorbed Energy shall be SMYS (Mpa)/10, with a minimum of 27 J,
for the Transerve direction. At 0°C Minimum Individual Energy value shall not be less than 80 %
of the Minimum required average value, for the transerve direction..
6. Correct operation of QOEC & system shall be established and furnished to purchaser for as built
condition of piping system.
7. All Inspection and tests shall be carried out as per approved QAP. Unless otherwise specified, all
tests shall be witnessed by the purchase / control authority.
9. The painting shall be carried out as per Painting specification no. P.013312 D 11077 056
10. Minimum Marking: Manufacturer Name, Nominal Diameter, Heat number, Tag number, Material,
Design Pressure, and Hydro test Pressure, Year of Manufacturing.
Electrical Area Classification : IEC zone-1 / zone-2, Gas Group IIA/IIB, Temp. Class T3
SENSING ELEMENT :
Type : Non-Intrusive (Bi-directional)
Sensing Element : Magnetic type
Sensor Repeatability : 1% Minimum
Detection : Non Intrusive
1 no. potential free contact (DPDT), 1 no serial communication interface (Modbus over RS-485
Signal Output :
/ Ethernet)
Required and Pig Signaller shall be capable of detecting all type of pigging devices (permanent
Pig Detection :
magnet type and transmitter equipped intelligent pigs).
ENCLOSURE :
Body Material : AISI SS316L
Degree of Protection : EEx ‘d’, IP- 65
Power Supply : 24V, DC + 10%
Signal Interface : Local control panel and RTU
½”NPTF (Four Nos. ½”NPTF cable gland entries are to be provided. One (1) nos. for signal,
Electrical Entry : One (1) nos. for power, One (1) for communication and one (1) nos. as a spare. All entries shall
be supplied with suitably Ex’d’ entry plugs.)
PIG DETAILS :
Pig Material : Carbon Steel/ Poly urethane
Pig Length : 600mm ~ 3000mm (indicative)
Pig Diameter : 95% ~ 100% of Pipeline ID
Local Indicator : Red LED based, EExe/EEx’d’, IIB, T5, IP65 (visible/locate from min. 5 meters)
Local Reset Button : Black colour, EExe/EEx’d’, IP65 (visible/locate from min. 5 meters)
Required with a minimum lifespan of 1 year) Required (All Pig Signaler shall have two (2) nos.
Inbuilt Battery :
of inbuilt batteries (1 working + 1 spare), with a minimum lifespan of 1 year)
Required or inbuilt also accepted, AISI SS316L material. Termination box of EExe / EEx’d’
Termination Junction Box : type shall be suitable for hazardous area classification for connecting the sensor cables , power
and signal cables, the light indication and reset switch as applicable
Bolting & Nut Material : ASTM A 320 L7 & ASTM A194 Gr.4/ Gr.7
Seals : Viton
Cable gland : Required and shall be EExe / EExd certified double compression type with PVC shrouds.
NOTES:
2 All cable glands supplied by the Vendor shall be EExe/ EExd certified double compression type with PVC shrouds.
The Pig Signaller / detectors sensor is mounted in hermetically sealed AISI SS316L housing and to be clamped to the
3
external surface of the pipe through which the pig is passing.
7 Pig Velocity shall be as per prevalent industrial practices for Oil & Gas pipelines.
PROJECT: CGD
0 07.01.2020 VA RP GSS
VENDOR: REV. DATE PREP CHKD APPD
TABLE OF CONTENTS
1. SCOPE ...................................................................................................................................... 2
2. GENERAL REQUIREMENTS ...................................................................................................... 2
3. DESIGN DATA .......................................................................................................................... 2
4. MATERIALS .............................................................................................................................. 2
5. REFERENCE DOCUMENTS ........................................................................................................ 2
6. TECHNICAL REQUIREMENT ..................................................................................................... 3
7. WELDING ................................................................................................................................. 4
8. INSPECTION AND TESTING ..................................................................................................... 5
9. STANDARD OF ACCEPTABILITY ............................................................................................... 6
10. CLEANING, PAINTING & PROTECTIVE COATING .................................................................... 7
11. TRANSPORTATION .................................................................................................................. 7
12. MARKING ................................................................................................................................. 7
13. DOCUMENTATION .................................................................................................................... 8
14. CERTIFIED DRAWINGS ........................................................................................................... 8
15. VENDOR’s OBLIGATIONS ........................................................................................................ 9
16. BID CONDITIONS .................................................................................................................... 9
17. DELIVERY ................................................................................................................................ 9
18. WORKING SCHEDULE .............................................................................................................. 9
1. SCOPE
This specification covers the requirements for design, material procurement fabrication, inspection testing
and supply of launchers/ receivers installed at various stations in the pipeline Project.
Scope of supply include Pig Launcher/Receiver along with internal tray, pig handling device -
Removable type, Quick Opening End Closure (QOEC).
2. GENERAL REQUIREMENTS
All the equipment to be supplied must comply with the requirements of the latest edition of ASME B
31.8/ ASME Sec VIII Div.1 for the gas pig launcher and pig receiver.
The Launcher and Receiver shall be provided with pig tray, lifting devices and handling trolleys for pigs.
Following order of procedure shall be followed for any conflict in technical requirement.
1. Data sheet
2. This specification
3. Codes and standards
3. DESIGN DATA
1. Alternative equivalent materials may be used when approved by the OWNER OR OWNER’S
REPRESENTATIVE / Consultant.
2. The steel plates used in the construction of the Pig Launcher and Pig Receiver must be certified
materials as per specification.
3. All materials used in the manufacturing of Pig Launcher and Receiver assemblies shall be subject
to approval by the OWNER OR OWNER’S REPRESENTATIVE / Consultant. All pressure
containing components NPS 2 and larger shall have proven notch toughness meeting the
requirements of ASME Section VIII, paragraph UG-84, in the final heat-treated condition Charpy
V- notch impact tests shall be performed as per the requirement of the Oil and line pipe data
sheets.
4. All branch outlets larger than NPDS 3 shall be extruded or reinforced saddle as per ASME B 31.8
Code.
5. The OWNER OR OWNER’S REPRESENTATIVE / Consultant has the right to request all the
necessary destructive and non – destructive material tests in order to verify that all the components
comply with the required specifications.
6. The costs of the above-mentioned tests, materials, equipment, and personnel to be borne by the
SUPPLIER.
5. REFERENCE DOCUMENTS
Pig launchers and receivers specified herein shall be designed, manufactured and tested in accordance
with the latest edition of the following codes and standards and / or others as applicable. These Codes and
Standards are the minimum requirements, and manufactured design shall meet or exceed them.
6. TECHNICAL REQUIREMENT
• The pig launcher and pig receiver shall be suitable for launching and receiving pigs /
intelligent pigs.
• Mechanical design of each pig launcher and pig receiver shall be as per ASME Sec VIII Div.1
/ASME B31.8. All the launcher/ receiver shall be horizontal type and shall be supported on 2
no. saddles suitably spaced and designed to withstand the maximum dead load including
pipeline reaction on barrel flange.
• Launcher/Receiver shall be suitable for intelligent pigging.
• Orientation of all the nozzles is indicative only and same shall be confirmed during Detailed
Engineering.
• Each pig launcher and pig receiver assembly shall be equipped with a quick opening closure
with a davit so designed as to permit one man to load or remove pig from the assembly. The
closure hinge pin shall be vertical with the closure opening in a horizontal plane.
• The quick closure shall be manufactured with a safety system as per ASME Sec VII Div.1,
UG35 (b) which grants the opening only when the pig launcher and pig receiver is not under
pressure. It shall be manually operated. The design shall allow opening or closing by one man
in a period of one (1) minute or less without the use of additional equipment.
• Quick opening closure shall be Band lock / Clamp ring type. Pig traps shall be designed in
accordance ASME Section VIII Div.1 with corrosion allowance of 3mm. Material of QOEC
shall be similar to that of major barrel. QOEC shall be band lock type having 'O' ring with
ASME U stamp. The Scrapper Trap manufacturer shall have “U” stamping of fabrication yard.
• Quick Opening Closure shall be ASME "U" stamped.
• Screwed type or plug-in types of end closures are not permitted
• Scraper trap shall be provided with suitable handling system for retraction, insertion &
launching of pigs including instrumented pigs (such as basket / tray; retracting rod/ mechanism
etc.) from the trap. Price of scraper trap shall be inclusive of pig handling system.
• The pig receiving traps shall be equipped with a half internal removable filtering basket
consisting of a punched plate with at least five rows of drain holes. The filtering basket shall
slide on guides/rails or wheels and in all cases the material of the parts being in contact with
each other shall be of anti-spark type. The filtering basket shall be provided with suitable
stops. Lock bracket shall be provided to such that the basket does not slide within the trap.
Rear end of the basket shall be provided with suitable lug to enable retrieval of the basket by
hooks. The handling system (for inserting and retracting the scraper and instrumented pigs
from the trap) shall be complete with handling devices. In case any rails are required for
sliding of the handling system, the same shall be provided by the scraper trap manufacturer
• The internal diameter of the pig launcher and pig receiver assembly shall have a smooth
continuous level surface and shall have the same diameter as the export pipeline.
• The pig launcher shall have saddle mounting to create a fall towards the pipeline to a
minimum 1:100. Vendor to provide suitable cleats for installation.
• The pig receiver shall have saddle mounting to create a fall towards the trap door to a
minimum 1:100. Vendor to provide suitable cleats for installation.
7. WELDING
• All nozzle attachment welds including added reinforcement shall be full penetration nozzle
less than or equal to 2” shall be attached with the barrel using weldolet.
• All fillet welds shall be continuous.
• The welders and the welding procedures shall be qualified and performed according to the
requirements of the ASME code, section IX. This shall be verified by the authorized Inspector.
• Welding procedure specifications (WPS’s) together with the supporting procedure
qualifications records (PQR’s) shall be submitted INSPECTOR for review and acceptability
before commencement of fabrication.
• Each WPS submitted should closely relate to the production weld it represents. The actual
joint preparation, fit up and weld consumables to be used shall be described.
• When the ambient temperature is 00C and below, the base metal shall be preheated to 150C
minimum before welding unless a higher preheat temperature is dictated by the code.
• All butt weld joints shall be welded with full penetration full fusion and double sides. All
nozzles to shell / head welds shall also be full penetration.
• There is no opening to permit access for internal welding of the final closure scam, Gas
Tungsten Are Welding or other techniques, shall be used that will assure a quality root pass as
specified in code.
• Electro slag or single pass Electro-gas process shall not be used to weld any components of
vessels.
• All internal and external attachments shall be continuously welded, unless specified otherwise.
• The maximum weld deposit per pass shall not exceed 6.5mm except root run.
• All welding including tack welding and non-pressure parts welding shall be performed by a
welder qualified as per code.
• No welding or weld repair is permitted on pressure parts after Post Weld Heat Treatment
(PWHT), unless specifically approved.
8. INSPECTION AND TESTING
• The longitudinal scam will be nondestructively tested for final acceptance only after hydrostatic
testing except for weld repairs.
• One (1) inch of each pipe end shall be examined around the periphery by an approved ultrasonic
method to check for lamination, pipe containing laminations greater than ¼ inch circumferentially
shall be rejected. All non-destructive examination shall be carried out in accordance with ASME
Section V and ASME Section VIII. All acceptance criteria shall be based on ASME Section VIII.
9. STANDARD OF ACCEPTABILITY
9.1 Dimensions
All surfaces shall be free of nicks, dents, gauges, taps, are burns and other defects.
9.3 Non-Destructive Inspections
Pig Launcher and pig receiver traps will not be accepted if any of the following defects are detected by
the ultrasonic or radiographic methods.
• Cracks
• Insufficient penetration or fusion
• Laminations
• Continuous occurrence, regardless of dimensions of undercuts, porosity gas pockets or slag
inclusions.
• Undercuts exceeding 0.35 mm in depth and 25 mm in length.
• Individual gas pockets exceeding 1.6 mm in diameter and/or concentrations of gas pockets with a
maximum diameter of 1 mm exceeding 6 per 4 cm2. Adjacent groups of two or more gas pockets,
which exceed 1 mm in diameter, shall be separated by at least 100 of sound material.
• Slag inclusions that exceed 3 mm in width or 1.6 mm in depth and length.
• VENDOR shall employ Non-destructive Test operators, qualified as required by code. VENDOR
shall also certify that each operator, engaged in NDT, is qualified to meet the code requirement.
• The extent of radiography shall be in accordance with the most stringent requirements of relevant
code or vessel data sheet and this specification.
• For vessels where butt weld seams are 100% radiographed, all other pressure containing welds and
all attachment welds to pressure containing parts shall be examined as follows (a) All
circumferential and longitudinal butt welds and butt welds joining heads, shells and nozzles shall
be fully radiographed (b) Nozzle to shell welds and pressure containing welds other than butt
welds shall be examined by the ultrasonic method, after PHWT (c) All root runs of longitudinal
and circumferential seams shall be examined by magnetic particle method or liquid penetrant
inspection method (d) All nozzle-to-shell welds, hold root runs and final nuts shall be examined
by magnetic particle method or liquid penetrant inspection method in addition to ultrasonic
method.
• Are strikes on the pressure parts shall be avoided. When they occur, the surfaces shall be properly
conditioned to eliminate surface stress raisers and such surfaces, shall be examined by, either
magnetic particle or liquid penetrant method of examination.
• Air and soapy water tests shall be performed on nozzle reinforcement pads by applying 1.05 kg/
cm2 (g) air for 5 minutes, subsequently reduce to 0.2 kg/cm2 g before applying soap solution.
• Irrespective of code requirements, welds shall be free from all surface breaking defects.
• All exterior surfaces in contact with the atmosphere under operating conditions must be cleaned
and painted according to the paint manufacturer’s standards suitable for the site conditions.
Cleaning and painting procedures is required to be approved by OWNER OR OWNER’S
REPRESENTATIVE.
• The pig launcher/receiver shall be shot blasted and primed as follows.
• Blast clean to ISO 8501-1, Grade Sa 2-1/2.
• Painting shall be as per Design Basis of Pipeline of this project. (Document no. P.013751D 11077
056, latest revision)
• The inner surfaces must be free of loose particles lamination flakes, welding splatter, etc. They
also must be free of sharp edges or any protruding element that interferes with the free circulation
of the scrapper.
• Unless otherwise specified, the VENDOR shall include the following for painting.
• All internal and external surfaces of vessel shall be thoroughly cleaned to remove all loose mill
scales, rust, grease, dirt, weld spatters etc.
• Internal coating, if specified in vessel data sheet shall be carried out as per the requirements of
internal coating material specification and the complete procedure shall be approved by OWNER
OR OWNER’S REPRESENTATIVE / Consultant before start of any work.
• All machined and bright finish surfaces shall be coated with an easily removable corrosion
preventive.
• The painting, as specified in vessel data sheets, shall be carried out as per the painting material
specification requirements and painting specification.
• No painting or internal coating shall be applied before weld inspection leak test or hydrostatic test.
11. TRANSPORTATION
• Care shall be taken to ensure that mechanical damage is not caused during handling and
transportation. Weld bevels shall be suitably protected against damage during handling and
transportation. All open ends shall be blind with wooden or plastic discs to prevent the ingress of
dirt or moisture.
• Care shall be taken to ensure that wire ropes, chains or other handling devices do not come into
metallic contact with the launcher/ receiver. It is recommended that broad band, non-metallic
slings to be used to load/ unload and support the tee when in transit.
• The protection, packing and shipping shall be subject to the approval of the OWNER OR
OWNER’S REPRESENTATIVE / Consultant.
12. MARKING
Each trap shall have a name plate clearly marked by the minimum following details:
• Manufacturer name
• Job number
• Specification number
• Year of production
• Nominal diameter ( at flanged or welding end)
• Maximum, design, operating and allowable pressures/ temperatures
• Test pressure
• Inspector stamp
• Project Name- HRDPL Pipeline Project
• CLIENT’s Name
Vendor to furnish name plate/ bracket Drawing. For OWNER OR OWNER’S REPRESENTATIVE /
Consultant approval
Transportation marking shall be painted with synthetic resin paint.
13. DOCUMENTATION
SUPPLIER shall provide a Manufacturer’s data report in compliance with their Supplier Document
requirement List (SDRL) for pig launchers and Receiver.
• Complete material specification, including certificates of mechanical and chemical test.
• Forming process with the indication of temperature at which the forming process has been
performed.
• Detailed description of welding process including type, size and grade of filler material and flux,
welding speed, electrical characteristics, number of weld passes, specific energy input ( in J/cm),
hardness test covering critical sections of welds.
• Heat treatment after forming and welding.
• Test reports on radiographic and ultrasonic inspections as well as on the hydrostatic test complete
with all diagrams.
• Protection coating.
• Quality control forms (Certified by SUPPLIER’s third party).
- Check of dimensions
- Verification of materials
- NDT Inspection
- Hydrostatic test
- Painting/ Coating
- Inspection Release Note (Released for Shipment) etc.
• Quality Assurance Plan and Procedures.
• Operation and maintenance instructions.
14. CERTIFIED DRAWINGS
SUPPLIER shall furnish drawings and /or specifications to the OWNER OR OWNER’S
REPRESENTATIVE for comments/ approval
It is understood that the suggestion, recommendations for design, variations and fabrication changes
issued by the OWNER OR OWNER’S REPRESENTATIVE / Consultant do not relieve the
CONTRACTOR from any responsibilities concerning the compliance with all requirements of this
Specification and/or from the fulfillment guaranties.
The drawings shall at least contain the following information
• Material (chemical composition, mechanical strength properties).
• Maximum, design, operating and allowable pressures/ temperatures.
• Maximum test pressure.
• Dimensions
• Welding procedure for each type of weld, including weld joint factor.
15. VENDOR’s OBLIGATIONS
For the supply of each of the equipment items indicated in this specification and supporting Data sheets/
purchase requisition including supply of all materials.
17. DELIVERY
TABLE OF CONTENTS
1.0 GENERAL ............................................................................................................................. 1
2.0 DESIGN AND CONSTRUCTION ............................................................................................ 3
3.0 MATERIALS ......................................................................................................................... 6
4.0 FABRICATION AND TEST .................................................................................................... 7
5.0 PHYSICAL TESTING ............................................................................................................ 9
6.0 NON DESTRUCTIVE EXAMINATIONS (NDE) ..................................................................... 11
7.0 INSPECTION AND TESTING .............................................................................................. 13
8.0 MARKING .......................................................................................................................... 14
9.0 DOCUMENTATION ............................................................................................................. 14
10.0 CORROSION PROTECTION ............................................................................................... 15
Σ Σ Σ
Owner plans to augment PNG network under City Gas Distribution Project. It supplies natural gas to
domestic & commercial consumers in the city of under City Gas Distribution Project.
The fittings & flanges have to be delivered in accordance to the particular specification: Codes, Norms
and standards (latest revision); but not limited to:
ANSI B16.5 Pipe flanges and flanged fittings
ANSI B16.9 Factory - made wrought steel butt welding fittings.
ANSI B 16.11 Forged steel fittings
ANSI B16.28 Wrought steel butt welding short radius elbows and returns
ANSI B31.3 ASME code for process piping.
ANSI B31.8 Gas transmission and distribution piping systems.
ANSI B36.10 Welded and seamless wrought steel pipe
ANSI B16.25 Butt Welding Ends
ASTM A 105/ Forging, carbon steel, for piping components.
A 105 M
ASTM A 203 Pressure vessel plates, alloy steel, nickels
ASTM A 234/ Piping, fittings of wrought carbon steel and alloy steel for m o d e r a t e and
elevated temperatures
A 234 M
ASTM A 333 Seamless and welded steel pipe for low temperature
ASTM A 350/ Forging, carbon and low alloy steel, requiring notch toughness testing for
piping components.
A 350 M
ASTM A 370 Mechanical testing of steel products.
ASTM A 420/ Piping fittings of wrought carbon steel and alloy steel for low temperature service.
A 420 M
ASTM E 112 Standard methods for determining the average grain size.
MSS SP 25 Standard marking system for valves, fittings, flanges and unions.
MSS SP 55 Quality standard for steel castings for valves, flanges and fittings and other
piping components (visual method).
MSS SP 75 Specification for high test wrought butt welding fittings. ASME
Boiler and Pressure Vessel code.
MSS SP 44 Specification for Steel Pipeline Flanges
MSS SP 97 Specification for Forged Carbon steel branch outlet fittings – Socket, Threaded and
Butt Welding ends.
DIN 2413 Design of Steel Pressure Pipes
EN 10204 Type of Inspection documents
ISO 148 Metallic Material - Charpy Pendulum impact test
ISO 9001 Quality management standard
Rev. 0 City Gas Distribution Project Page 1 of 21
P.013751
PTS – FITTINGS & FLANGES D11077
055
The present specification can confirm, complete or alter certain characteristics or tolerances of existing laws
or specifications.
In his offer, the manufacturer or vendor shall specify all proposed modifications or alternatives to the present
specification. In all cases, each modification has to be submitted to the Client/Consultant. All
c o n s e q u e n c e s after e v e n t u a l order f o r n o n -r espect of t h i s o b l i g a t i o n are a t t h e manufacturer's
charge and responsibility.
A valid copy of the ISO 9001 certificate shall be included in the offer.
The Owner / Owner’s representative keeps the right to audit the manufacturer’s and their subcontractor’s
manufacturing process and control methods.
The manufacturer’s specification of the steel, the manufacturing procedure itself and the laboratories in which
testing takes place, shall be approved by the client/consultant.
The Owner/ Owner’s representative may verify the control equipment of the manufacturer, its calibration and
the points at which it is located. If during the control of the fittings certain problems arise the
Owner/Owner’s representative may demand supplementary tests at the cost of the manufacturer.
At all times while work on the contract of the Client is being performed, the inspector representing the
Client shall have free entry to all parts of the manufacturer's facilities and those of all subcontractors, who are
involved in the manufacturing of the fittings. All reasonable facilities shall be afforded to the inspector to
satisfy him that the product is being furnished in accordance with these specifications. All tests and
inspections called for by these specifications will be made in the manufacturer's plant prior to shipment and at
the manufacturer's expense, unless otherwise, and shall be conducted as not to interfere unnecessarily
with the operations of the manufacturer's plant. The manufacturer shall notify the Client prior to
completion or shipment of all fittings requiring such inspection.
Eventual interpretations and deviations to this specification by the Manufacturer shall be requested by writing
in his offer with detailed justification and approved by the Client/Consultant before eventual order to the
Manufacturer. The latter is responsible and shall indemnify the Client/Consultant for any damage resulting
from the non-respect of this obligation.
An approval of documents can never be considered as an acceptance of deviations or relaxations to
requirements. A deviation is only possible after specific request to the Client/Consultant.
1.1 Glossary
Representative The entity of the Client or the company nominated by the Client to
design the natural gas transport or distribution system and to specify
the equipment
2.1 The pressure temperature ratings for tee, weldolets, elbows and flanges shall be calculated respectively
in accordance with ANSI B31.8, DIN2413 and ANSI B16.5. For all other types of fittings (caps, reducers,
nipple) ASME section VIII shall apply.
2.3.1 The maximum allowable stress in the base material and in the weld shall be equal to fourty per cent (40%) of the
minimum yield strength guaranteed by the specification of the steel used.
2.3.2 The minimum wall thickness must be greater than the following:
a. Thickness calculated in line with requirements given in ASME B 16.9 and cl. no.. 2.7 o f t h i s
specification.
b. Nominal Thickness of pipe
Thickness calculation is to be submitted to Owner/Owner’s Representative for prior approval
before manufacturing.
2.3.3 If the fitting has yield strength lower than the yield strength of the pipe to which it is intended to be welded, the
wall thickness in each zone of the fitting is at least equal to the largest value define "tr" of either.
• The specified pipe wall thickness times the ratio of the minimum yield strength guaranteed by the
standard of the steel of the pipe and the minimum yield strength guaranteed by the standard of the steel
of the fitting;
• The absolute minimum thickness required by the applicable code(s).
2.3.4 The specified pipe wall thickness and grade (with reference to the equivalent grade in ASTM spec. or API 5L
spec.) with which the fitting and flange is intended to be used is specified in the piping material specification.
Fittings such as tees, elbows, reducers, etc. shall be either welded or seamless type. All welded fittings shall
be subjected to heat treatment. All fittings (except weldolets) shall comply with The requirements of MSS-SP-
75. Fittings such as weldolets etc. shall be manufactured in accordance with MSS- SP-97.
Welded pipes used for fittings shall be LSAW type only.
2.5 The design shall take into consideration performance requirements prescribed in paragraph 2 .6.
The design of tees, reducers or elbows must be established, by proof testing, in accordance with par. 2.7. The
design of the other fittings must be established by mathematical analysis according to ASME code.
2.6 All fittings under this specification shall be designed to withstand a field hydrostatic test pressure with non
corrosive water, after installation, during 24 hours at a following pressure level:
One of the principles of this standard is the maintenance of a fixed position for the welding ends with
reference to the centreline of the fittings or the overall dimensions, as the case may be.
Dimensional standards will be in accordance with §2.1.
2.9 Fitting and Flanges Tolerances
2.9.1 Tolerances for welding ends, out-of-roundness at the welding ends and inside diameter at the bevel are shown
hereafter. Other tolerances wall thickness are as per corresponding codes: ANSI B16.9 standard and for short
radius elbows ANSI B16.28 standard.
2.9.2 Welding ends
The welding end and bevel shall be in accordance with Figure 1 for wall thickness up to 20.0 mm ; for
thicker walls, refer to Figure 2. The welding end land of the fitting & flanges shall be machined flat and
shall not vary from the plane by more than 0.03 in (0.8 mm) at any point. If a fitting & flange has a
thickness unequal to the pipe with which it is intended to be used, the welding end preparation at the joint has
to conform with applicable I-5 of ASME B 31.8 Figure 3.
The inside diameter at any place at end (bevel) shall be the following:
(1) The tolerance refers to variation from nominal I.D. calculating by (O.D. nom. - 2 t nom.). (2) Flange
Bore to match with I.D. of the pipe.
3.0 MATERIALS
3.1 The steel used in the manufacture of fittings & flanges shall be selected by the manufacturer and submitted
for approval to the Client at the time of the offer. The manufacturer shall fill in the data sheet.
3.2 The chemical composition of the steel meets the requirements of Table 1.
3.3 The steel used has tensile properties conforming to the requirements prescribed in the ASTM standards.
3.4 The ratio of yield strength to tensile strength shall not exceed 0.90.
3.5 The material for fittings shall consist of blooms, billets, slabs, forging quality bar, plate, seamless or
fusion welded tubular products with filler metal added.
3.6 The steel shall be fully killed, fine grain practice.
3.7 The steel used shall be suitable for field welding to other fittings, pipes, flanges, or valves manufactured
under ASTM specifications A333, A350, A352, A381, A420, A694, A707 or API standards specifications
5L, 6D, 605 or MSS standards SP-44, SP-72, SP-75, EN 10208-2 in line with Piping Specification 6C1
attached with the tender document.
3.8 If preheating of the material is required to ensure proper weldability un der normal field conditions,
the manufacturer shall state so in the offer, specifying preheat requirements and if accepted by the Client
this shall be permanently indicated on the fitting & flanges.
3.9 The Manufacturer must deliver a 3.2 certificate EN 10204, stating the quality, the mechanical properties
(yield strength, tensile strength, percent elongation, impact test, chemical analysis, the process of
manufacture and the marking (for example the heat number of material) of the steel.
3.10 Chemical Composition
3.10.1 For each heat the manufacturer shall check a chemical analysis of the steel (see Table 1).
3.10.2 Check analysis
Carbon equivalent shall be computed by the following equation:
Mn Cr + Mo + V Ni + Cu
C.E. = C + + +
6 5 15
And shall not exceed 0.43
For all forging materials, the specimen shall be taken from the integral part of the forging. The par.4.1 to 4.2
are only applicable on welded fittings.
4.1 Welding Fabrication
4.1.1 All welds and repair welds shall be performed according to written procedures. The welding procedure must
be submitted for approval to the Owner/Owner’s representative before any fabrication.
Only qualified & approved welders and welding operators shall be used in production.
4.1.2 The joints shall be furnished in accordance with the requirements of Section VIII of ASME Boiler and
Pressure Vessel Code.
4.1.3 Machine welding shall be done by an electric process, preferably by submerged arc.
4.1.4 All butt welds shall have full penetration. Submerged arc machine welding shall be done with at least one
pass from the inside, except when accessibility makes this impossible, then a manual or machine root bead
may be employed provided that a visual inspection of the root bead is possible. Backing rings shall be not
used.
4.1.5 Repair, chipping or grinding of welds shall be done in such a manner as not to gouge, groove, or reduce the
original metal thickness by more than 6 1/2 % of nominal specified wall.
4.1.6 Except for bar in the tees, fillet welds shall not be permitted.
4.1.7 Welded-on braces, if used, should be removed before heat treatment and the weld spot shall be repaired and
ground flush and smooth. However, when braces are required for heat treatment, they shall be cut out and
the surface shall be ground flush and smooth after heat treatment. Except for bar in the tees, welding shall
not be permitted after heat treatment. The ground areas shall be inspected by magnetic particle or liquid
penetrant testing.
4.2 Welding Procedures
4.2.1 All welds, repair welds and repair by welding shall be performed according to written procedures.
These welding procedures shall be qualified according to the requirements of the ASME Boiler and Pressure
Vessel Code, Section IX.
The welding procedure tests are required on material which is on the high side of the chemistry
specification.
The manufacturer shall maintain a weld record of the procedure and performance test results. The test
coupons shall be submitted to the same fabrication and heat treatment as the actual fittings.
The welding procedure qualification must include an impact test set in the weld and in the
HAZ with requirements of paragraph 5.1.2 and a macrographic examination described in paragraph
4.2.2. These tests shall be performed after eventual final heat treatment.
4.2.2 Macrographic examination: the etched surface of the macro test specimen viewed macroscopically must
display the image of a well performed welded joint with sufficient penetration, free from linear defects and
important inclusions. In case of doubt, the etched surface must be examined microscopically and additional
macroscopical examinations of other areas may be required.
The macrographic examination will include hardness measurements in the weld and the HAZ. The
hardness will not exceed the values measured on the parent metal by more than 80 points for the welds
and 100 point for HAZ, with an absolute maximum of 350HV10.
The acceptance of inclusions can be decided upon with the NDE of the welded plates (see
paragraph 6).
The normalizing procedure requires the approval of the TPIA. Good care shall be taken to avoid direct
contact of the flames with the material to be heated.
During the normalizing period, the temperature of the heat treatment lot shall be automatically
recorded by a sufficient number of thermocouples attached to the material surface. The thermocouples
shall be adequately protected against the influence of heat radiation. Temperature variations shall b e
within ± 20°C. The manufacturer shall furnish time temperature charts of each heat treatment lot. The
fittings & flanges belonging to each treatment lot shall be specified on the charts. Temperature
measurements by other means are permitted only if approved by the TPIA.
4.3.2 The fine grained perlitic structure of the steel shall be verified by at least one micrographic examination per
lot (definition in §4.2.4), according to ASTM E 112. The grain size shall be in the range of 8 to 12.
4.3.3 The manufacturer shall include in the CMTR data of this treatment
5.0 PHYSICAL TESTING
The following mechanical tests shall be performed by the vendor under the supervision of the TPIA and
the certificates shall be added to the CMTR.
Test specimens may only be cut after a marking transfer by the Authorised TPIA. All the tests shall be
performed after final heat treatment.
Certification requirements to comply with EN 10204 – 3.2 certificates shall issued by
TPIA
5.1.1 Tension test
5.1.1.1. Requirements
The material shall be in conformance with the ASTM standards and the ratio of yield stress to tensile
stress shall not exceed 0.90.
For fittings containing welds, the fracture must be outside of the weld. If there is a fracture in weld or
HAZ, the tensile strength shall at least meet the requirements for tensile properties as per ASTM standards.
5.1.1.2. Test specimen
The test specimen shall represent all forgings from the same lot. Test specimens shall be taken from the
fitting after final heat treatment or from a piece of pipe or plate of the same nominal thickness, same heat
of steel from which the fitting is made and which has been heat treated in a lot with any of the fitting(s)
it represents. For welded fittings, this coupon (piece of pipe or plate) shall contain a weld in prolongation
of the weld of the fitting.
5.1.1.3. Number of tests
For fittings NPS 2 and greater the following number of test shall be performed:
For each lot/item a new chemical analysis of the steel shall be done.
The chemical analysis shall conform to the ASTM requirements specified in the specification. The carbon
equivalent shall be computed by "check analysis": see par. 3.10.2 with C.E. ≤ 0.43. The reports shall be
added to the CMTR reports and approved by the TPIA.
6.0 NON DESTRUCTIVE EXAMINATIONS (NDE)
The following mechanical tests shall be performed by the vendor under the supervision of the TPIA and
the certificates shall be added to the CMTR.
6.1.1 Radiography
All butt and repair welds shall be 100% radiographed in accordance with ASME section V - non
destructive examination - article 2 - using fine grain film and lead screens. Acceptance criteria shall be as
be ASME B 31.4 or ASME B 31.8 as applicable and API 1104. Radiography shall be performed after the
final heat treatment.
6.1.2 U.S., Magnetic, Visual and Dimensional examination
6.1.2.1. Non destructive examinations
In the presence of the TPIA, the manufacturer shall perform the following nondestructive examinations on
the fittings after the mechanical tests and according to an inspection procedure to be submitted for approval
7.1 Information
The manufacturer shall inform the TPIA MIN. 5 working days (15 in case of foreign supplier) in
advance of any intervention required by this specification and shall send a copy (fax) of it to
the Client/Consultant.
Hydrostatic testing by the manufacturer is not required, but welding fittings shall be capable to withstand a
field hydrostatic testing in accordance with par. 2.6.
7.2 Workmanship and Finish
7.3 Fittings & Flanges shall be free of injurious defects and shall have workmanlike finish.
7.4 Injurious defects are defined as those having a depth in excess of 6-1/2 % of specified nominal wall.
7.5 Machining and grinding of surface defects shall be treated as follows: sharp defects such as notches,
scratches, scraps, seams, laps, tears, or slivers not deeper than 6 -1/2 % of nominal
wall thickness shall be removed by grinding. Repair of injurious defects by welding shall be permitted
only after agreement by the Client and the TPIA, except that welding of injurious defects shall not be
permitted when the depth of defects exceeds 33-1/3 % of the nominal wall thickness, or the length of repair
exceeds 25 % of the specified diameter. Defects must be completely removed and welding performed by
a welder qualified specifically for repair welding, as per par. 4.2.1. Such repair welding shall be ground
flush with the surface and all welding shall be done before final heat treatment. Repair welding shall be
done with low hydrogen electrodes in shielded metal arc welding, gas metal arc process or submerged ar c
8.1 All fittings and flanges furnished under this specification shall be clearly identified on the O.D.
with the following information marked with low stress die stamps or interrupted dot stamps as noted (refer
to MS SP25):
Manufacturer's name or trademark.
Heat code identity.
Fitting or flange number: the fitting or flange number shall be made up of six figures specified as
follows:
the item and his number specified in the purchase order.
The monogram of the Owner/Counsultant. This marking shall only be applied after complete approval
of the Certified Material Test Report (see par. 9.2.).
8.2 In addition to the above, for NPS 2" and larger, it shall also include the following information:
Grade symbol: the grade symbol must designate the material of the fitting or
flange.
8.3 Marking must be done prior to final inspection.
9.0 DOCUMENTATION
9.1 Before starting any control, the manufacturer shall submit for approval to the Third Party inspection
agency and the Client/Consultant the following documents:
Detailed fabrication drawing and calculations.
Fabrication and control procedure (if new -not if upgraded).
List of Operations of Control (LOC) in accordance with PTS (if new -not if upgraded).
Material list.
Qualified welding procedures (if new -not if upgraded).
Welder’s performances qualifications (if new -not if upgraded).
Heat treatment procedure-(if new -not if upgraded).
Non destructive testing procedures.
A Certified Material Test Report (CMTR) shall be furnished listing as built drawing and calculations,
the LOC (see paragraph 9.1.), the proof test certificate, the base material certificate, the chemical
check analysis. The certificate of the heat treatment, the mechanical tests, the non-destructive
examination, the mechanical properties, the quality release note (see paragraph 9.3) and any special
test required by the purchase order the fitting or flange individual number (see paragraph 8.1.1.) must
be indicated in the CMTR to permit the correct traceability of each piece. The manufacturer shall furnish
one copy of the CMTR to the TPIA and one original and one copy to the Client/Engineer.
9.3 IRN
After final approval of fittings/flanges and the acceptance of the CMTR, the Third Party inspection agency’s
delegate shall furnish to the Client/Consultant and to the manufacturer an Inspection Release Note (IRN).
The manufacturer shall deliver one copy of the IRN with the fittings/flanges and one copy shall be included
in the CMTR (see paragraph 9.2.)
All documents shall be in English language.
10.0 CORROSION PROTECTION
The corrosion protection will be applied by the manufacturer after final inspection by the TPIA.
The product shall meet the following criteria:
▪ Guarantee a corrosion protection for a storage period in open air for at least 6 months.
▪ Shall be easily removable by wire brushing or by grinding.
▪ It shall not produce toxic vapour or smoke when heated by blow torches or during welding.
TABLE 1
CHEMICAL COMPOSITION FOR FITTINGS
Maximum limit of chemical elements which may be used in material under this standard.
% MAXIMUM
C 0.230
Mn 1.60
Si 0.50
P 0.030
S 0.025
Nb 0.080
V 0.120
Mo 0.250
Nt 0.0150
Alternate alloy elements may be used but they shall be discussed with the user prior to delivery of the
material. This table is not intended to represent the composition of any heat of steel, but merely to record
the maximum permissible amounts of one element. The combination of elements of any heat must
conform to the carbon equivalent, subsection 3.10.2.
For each heat the manufacturer shall analyse the following elements: C, Mn, Si, P, S, Nb, V, Cr, Mo, Ni
and Cu.
The intentional addition of elements other than those specified is not permitted unless agreed upon by the
Client.
In any case, for unintentional additions, the following limitations shall be respected:
Cr
Ni ≤ 0.15
0.30 % Mo
Co ≤≤ 0.01
0.05 %
% Cu
Al ≤≤ 0.07
0.20
%
%
The content of N total (Nt) may be up to 0.0150 % and must be guaranteed by the manufacturer. If the
manufacturer cannot give any guaranty of N content, he shall analyse this element.
The total content for Nb + V will be limited to 0.150 %.
For each reduction of 0.01 % below the maximum carbon content, an increase of 0.05 % manganese
above the specified maximum is permissible, up to a maximum of 1.70 %.
FIG. 1
Fitting size 24" and smaller may be furnished with 37° ½ bevel at manufacturer's
option. Recommended bevel for wall thickness (t) at end of fitting: 20 mm or
less.
FIG. 2
Recommended bevel for wall thickness (t) at end of fitting, greater than 20 mm
FIG. 3
FIG 5
4 5t 6t 8t
t = specimen thickness t
A + 2t + 3.2
The manufacturer shall use a jig based on this dimension, A + dimension
or a smaller 2t + 3.2 at his
A + 2t + 3.2
option. mm mm mm
A + 2t +
3.2 mm
FIG. 6
SPECTACLE
FLANGE
PTS
PAINTING SYSTEM & COLOUR CODE FOR FINAL LAYER
The colour codes for final layer of Station Pipe Work & Metering Shed shall be as under:
The recommended painting system should be of Category C5 – I Very high (Industrial) as specified in the Standard ISO
12944 Part 1 to 8. The proposed Painting system shall conform to Table A 5 of ISO 12944 – 5 Standard.
X-RAYS 100%
SIZE RANGE 1/2"-28"
Note :
1. '3C1' INDICATES - 300# PIPING AND PIPELINE
2. ALL ABOVE GROUND (A/G) STATION PIPES SHALL BE BARE PIPES. THE PIPES SHALL BE PAINTED AT SITE, AS PER PROJECT
SPECIFICATIONS FOR PAINTING OF ABOVE GROUND STATION PIPING.
3. BLOW DOWN / VENT PIPING SHALL BE ASTM A 333, GRADE 6 (LTCS). LTCS MATERIAL SHALL BE CHARPY IMPACT TESTED AT (-20
°C).
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 API 5L X 60 or ASTM
A860 WPHY 60
ELBOWS 30 LR E30 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
ELBOWS 22.5 LR E22.5 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
ELBOWS 15 LR E15 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
REDUCERS RC 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
CONCENTRIC A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
REDUCERS RE 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
ECCENTRIC A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
TEES EQUAL T 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
(NOTE 3) 1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
TEES RED TR 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
(NOTE 2 & 3) 1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
1/2"-1 1/2" BW - ANSI B16.11 SEE PIPE & NOTE 1 MSS SP 97 ASTM A 105
SOCKOLET
SW
(NOTE 2)
1/2"-1 1/2" BW - ANSI B16.11 SEE PIPE & NOTE 1 MSS SP 97 ASTM A 350 LF 2 SEAMLESS LTCS (Blow Down/Vent)
2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 MSS SP 97 ASTM A 105
WELDOLETS 2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 MSS SP 97 ASTM A 350 LF 2 SEAMLESS LTCS (Blow Down/Vent)
WEL
(NOTE 2)
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 694 F 65
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 694 F 60
CAPS C 1/2"- 12" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 234 WPB SEAMLESS
1/2"- 8" BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 ASTM A 420 WPL6 SEAMLESS LTCS (Blow Down/Vent)
API 5L X 65 or ASTM
16" - 18'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9
A860 WPHY 65
API 5L X 60 or ASTM
24'' BW - ANSI B16.25 SEE PIPE & NOTE 1 ANSI B16.9 A860 WPHY 60
NIPPLES NBEP 1/2" - 1.1/2" BOTH ENDS PLAIN 160 ANSI B36.10 ASTM A 106 Gr. B SEAMLESS-LG=100mm
NOET 1/2" - 1.1/2" ONE END THRD-MNPT 160 ANSI B36.10 ASTM A 106 Gr. B SEAMLESS-LG=100mm
NBET 1/2" - 1.1/2" BOTH ENDS THRD-MNPT 160 ANSI B36.10 ASTM A 106 Gr. B SEAMLESS-LG=100mm
FULL CF 1/2" - 1.1/2" BW - ANSI B16.25 3000# ANSI B16.11 ASTM A 105 SEAMLESS
COUPLINGS FNPT - ANSI B1-20-1
CAPS C2 1/2" - 1.1/2" FNPT 3000# ANSI B16.11 ASTM A 105 SEAMLESS
THRD ANSI B1-20-1
PLUGS PL 1/2" - 1.1/2" MNPT 3000# ANSI B16.11 ASTM A 105 SEAMLESS
THRD ANSI B1-20-1
BALL VBA 1/2" - 11/2" FLGD RF:ANSI B16-5 300# ANSI B16-10 BODY: FULL BORE
6"- 12" FLGD RF:ANSI B16-5 300# ANSI B16-10 BODY: FULL BORE AS INDICATED DATA SHEET
GLOBE VGL 1/2"-1 1/2" FLGD RF:ANSI B16-5 300# ANSI B16-10 BODY: HANDWHEEL
(NOTE 8) TRIM:
ASTM A182 F6
2" - 18" FLGD RF:ANSI B16-5 300# ANSI B16-10 BODY: HANDWHEEL
TRIM:
ASTM A182 F6
SWING CHECK VCH 1/2" - 11/2" FLGD RF:ANSI B16-5 300# ANSI B16-10 BODY: HORIZONTAL INSTALLATION
TRIM:
ASTM A182 F6
2" - 18" FLGD RF:ANSI B16-5 300# ANSI B16-10 BODY: HORIZONTAL INSTALLATION
TRIM:
7. BALL VALVE MATERIAL FOR LTCS SERVICE : BODY : ASTM A350 LF2, CL1 / ASTM A 352 Gr. LCB , BALL : ASTM A 182 Gr. F316 OR ASTM A 351 GR. CF8M OR (ASTM A350 LF2, CL1 / ASTM A
352 Gr. LCB) + ENP
8. GLOBE VALVE MATERIAL FOR LTCS SERVICE : BODY : ASTM A350 LF2, CL1 / ASTM A 352 Gr. LCB, DISC / RING : (ASTM A350 LF2, CL1 / ASTM A 352 Gr. LCB) + 13% CR. STEEL FACING,
STEM : 13% CR. STEEL (NO CASTING)
SPECIFICATIONS ( 3C1 )
SHEET 5 OF 6
REDUCERS CHART
SMALL SIZE
1/2"3/4" 1" 1.1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24"
1/2"
3/4" X
1" X X
L 1.1/2" X X X
A 2" X X X
R 3" X X
G 4" X X X
E 6" X X
8" X X
S 10" X X X
I 12" X X X
z 14" X X X X
E 16" X X X X
18" X X X X
20" X X X X
24" X X X X
28" X X X
LEGEND
X : CONCENTRIC AND ECCENTRIC REDUCERS- BW
SHEET 6 OF 6
BRANCH CHART
BRANCH SIZE
1/2" 3/4" 1" 1.1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24"
1/2" T
3/4" TR T
1" TR TR T
H 1.1/2" SW TR TR T
E 2" SW SW TR TR T
A 3" SW SW SW TR TR T
D 4" SW SW SW SW TR TR T
E 6" SW SW SW SW W TR TR T
R 8" SW SW SW SW W TR TR TR T
10" SW SW SW SW W W TR TR TR T
S 12" SW SW SW SW W W BW* TR TR TR T
I 14" SW SW SW SW W W BW* BW* TR TR TR T
Z 16" SW SW SW SW W W BW* BW* BW* TR TR TR T
E 18" SW SW SW SW W W BW* BW* BW* BW* TR TR TR T
20" SW SW SW SW W W BW* BW* BW* BW* BW* TR TR TR T
24" SW SW SW SW W W BW* BW* BW* BW* BW* BW* TR TR TR T
LEGEND
T : TEE EQUAL-BW
TR : REDUCING TEE-BW (FLOW TEE WHEREVER INDICATED SHALL BE PROVIDED)
W : WELDOLET- BW
SW : SOCKOLET
BW : BRANCH WELD-CHECK IF REINFORCING PLATE IS NECESSARY ACCORDING ANSI B 31.8 (See Note)
*NOTE : IN PLACE OF BRANCH -WELD, EXTRUDED TEE, CONFORMING TO ASME B 16.9 SPECIFICATION,
MAY BE USED, SUBJECT TO AVAILABILITY
Approved : GSS
Scope of Inspection
Applicable
Sn Activity Extent of Check Acceptance Criteria Document Type
Standard/Document Third Party Inspection
Manufacturer Control Authority
Agency(by EPC)
1. Chemical analysis 1 per heat API 5L/ASTM E350 API 5L/ASTM E350 Cert. 3.2 P 100%W 100%R
1 per heat on samples taken from
2 Mechanical properties API 5L/ASTM A 370 API 5L/ASTM A 370 Cert. 3.2 P 100%W W/R
mill
Qualified Welding Procedures (WPS,
3 ASME Section IX ASME Section IX Cert. 3.2 P 100%W 100%R
PQR,WQT)
UT/Magnetic Test on weld and Butt ASME Section VIII Div. I,
4 100% ASME V Art. 7 Cert. 3.2 P 100%W W/R
welding ends/bevels APP. VI
ASME Section VIII Div. I,
5 UT of shell area under RF pass 100% ASME V Art. 6 Cert. 3.2 P 100%W W/R
APP. VIII
PT on fillet welds (Pressure parts and ASME Section VIII Div. I,
6 100% ASME V Art. 6 Cert. 3.2 P 100%W 100%R
barrel supports) APP. VIII
7 X - Ray Exam. All butt joints 100% ASME V, Art. 2 ASME VIII-UW 51 Cert. 3.2 P 100%W 100%R
8 Low temperature certificate (Impact test) 1 per heat ASTM A-370 ASME B 31.3/323 Cert. 3.2 P 100%W W/R
10 Hydrostatic test 100% Data Sheet Data Sheet Cert. 3.2 P 100%W 100%W
11 Painting 100% As per Painting specification As per Painting specification Cert. 3.2 P 100%W 100%W
12 Dimensional & Visual Check 100% ASME V, Art. 9 API 5L/ ASME B 31.3 Cert. 3.2 P 100%W 100%W
13 Drawing & Calculation approval Data Sheet Data Sheet P 100%R 100%R
LEGEND:
RT:Radiographic test PT:Liquid penetrant test MT:Magnetic particle test HT: Heat Treatment VT: Visual Test
P:Performed R:Review W:Witness WPS: Welding Procedure Specification PQR: Procedure qualification Record WQT: Welder Qualification Test
TPIA: Third Party Inspection Agency ; Control Authority : Owner/Engineer or their Authorised Inspection Agency.
Note: 1 The Above Testing and acceptance criteria are minimum requirements, however, equipment supplier shall ensure that the product also comply to the additional requirements as per Technical specifications and data sheets.
2 The supplier shall submit their own detailed QAP prepared on the basis of the above for approval of Owner/Owner's representative and TPIA.
3 Supplier shall submit Calibration certificates of all Instruments/Equipment to be used for Inspection and Testing to TPIA with relevant procedures and updated standards for TPIA review/Approval.
4 TPIA will have Right to Inspect minimum 10% of all manufacturing activities on each day or as specified above.
5 TPIA along with Owner/Owner's representative shall review/approve all the documents related to QAP/Quality manuals/Drawings etc. submitted by supplier.
6 Supplier in coordination with Sub vendor shall issue detailed Production and Inspection schedule indicating the dates and the locations to facilitate Owner/Owner's representative and TPIA to organise Inspection.
7 All bought out items including Quick opening closure shall be provided with EN 10204 3.2 certificates.
8 Quick Opening Closure shall be ASME "U" stamped.
9 Certification requirements shall comply with European Standard EN 10204:3.2 (latest edition)
10 For All Forging Materials, The Specimen Shall Be Taken From The Integral Part of The Forging.
11 In case of conflict between purchase specification, contract documents and QAP, more stringent conditions shall be applicable.
Page 1 of 1
QCT No. : P.013751 D 11013 030
Date: 07.01.2020 Revision: 0
QUALITY CONTROL PLAN Prepared : VA
FITTINGS
Checked : RP
Approved : CKS
- list of operation in manufacturing and control 9.1 specification Perform review point review point
- Fabrication and Control procedure 9.1 specification Perform review point review point
- Design Proof test 2.7 specification Perform review point review point
- material part list 9.1; 2 and 3 specification Perform review point review point
- dimensional drawings 9.2 ; 2 specification Perform review point review point
- heat treatment procedure 2, 4, 5, 6 & 7 specification Perform review point review point
- non destructive testing procedures 6 specification Perform review point review point
- painting procedure As per Appl PTS specification Perform review point review point
1 BASE MATERIAL
1.1 MATERIALS
Tensile tests (YS, UTS, YS/UTS, %EL, RA, Bend etc. as applicable)
5.1.1 1 per heat PTS certif. 3.2 Perform hold point review report
(remark : marking transfer by TPIA)
Charpy-test at as per Mat. Spec. (Impact Energy & Shear Area)
5.1.2 1 per heat Mat. Spec. certif. 3.2 Perform hold point review report
(remark : marking transfer by TPIA)
- Cosumable Verification ASME SEC IX / SEC IIC PTS & ASME Sec-IX & Sec-II report Perform review point
Heat treatment (Loading & Unloading shall be witnessed by TPIA, Witness Point (Loading &
2.2 4.3 all fittings T/T Graph PTS certif. 3.2 Perform review report
Power failure log shall be maintained) Unloading)
- time temperature chart 4.3.1 1 per furnace charge report Perform review report review report
- micrographic examination 4.3.2 1 per lot* ASTM E 112 Grain size : range 8 to 12 certif. 3.2 Perform hold point review report
CONTROL testing
Mechanical BEFORE MANUFACTURING
2.3
(remark : marking transfer by TPIA)
Tension test for fitting ≥ 2" (YS, UTS, YS/UTS, %EL, RA,
-
Bend etc. as applicable)
4.2.4 & 5.1.1
- base material 1 per lot PTS + E/R <= 0.85 & Mat. Spec.
ASTM A 370
- weld 1 per lot PTS & Mat. Spec.
- Impact test for fitting ≥ 2"
- At 0°C Minimum Average
2 sets of 3 certif. 3.2 Perform hold point review report
- base material (Longitudinal & Transverse) Absorbed Energy shall be
specimens per lot
SMYS (Mpa)/10, with a minimum
1 sets of 3 of 27 J, for the transerve
- weld (Transverse) 4.2.4 & 5.1.2 specimens per lot direction.
ISO 148 - Charpy V - Notch
- At 0°C Minimum Individual
Energy value shall not be less
1 sets of 3 than 80 % of the Minimum
- HAZ (Transverse)
specimens per lot required average value, for the
transerve direction.
- Flattening test for fitting < 2" 5.1.3 1 per group (*) PTS PTS & Mat. Spec.
2.4 Chemical analysis & Carbon Equivalent 5.2 For each lot ASTM & PTS Cl 3.10.1 & 3.10. 2 PTS & Mat. Spec. certif. 3.2 Perform review report review report
6.1.2.1, 6.1.2.2,
- base material thickness ≥ 6 mm 100% ASME section V art 23, SA-388 ASME section VIII division1 UF-55
6.1.2.4 , 6.1.3.3 certif. 3.2 Perform witness point review report
6.1.2.1, 6.1.2.2,
- Ultrasonic inspection of 25 mm of base material (if t ≥ 6 mm) All finished bevels ASME V PTS & Mat. Spec.
6.1.2.4 , 6.1.3.3
6.1.2.3 &
3.5 - Visual examination 100% PTS & Mat. Spec. certif. 3.2 Perform hold point review report
6.1.3.1
10% NPS ≤ 6"
3.6 - Dimensionnal examination 6.1.2.5 PTS & Mat. Spec. certif. 3.2 Perform witness point review report
100% NPS > 6"
City Gas Distribution Project 2 of 3
QCT No. : P.013751 D 11013 030
Date: 07.01.2020 Revision: 0
QUALITY CONTROL PLAN Prepared : VA
FITTINGS
Checked : RP
Approved : CKS
4 CONTROL
FINAL BEFORE MANUFACTURING
INSPECTION TEST
4.1 Marking 8 all certif. 3.2 Perform witness point reiew report
4.2 Inspector's stamp 8.1.1 all certif. 3.2 Perform witness point reiew report
4.3 Documentation 9 - PTS & P.O. PTS & P.O. certif. 3.2 Perform hold point review report
(*) Fittings from the same heat of steel of the same shape and the same main pipe/plate dimension of the fittings
LOT - A lot consists of all fittings from one heat of steel with same initial wall thickness, from the same furnace charge for final heat treatment, from the same shape and the same main pipe/plate dimension.
LEGEND:
RT : Radiographic test PT : Liquid penetrant test MT : Magnetic particle test HT : Heat treatment VT : Visual test P : Performed
R : Review W : Witness TPIA : Third Party Inspection Agency; SMYS : Specified Minimum Yield Strength;
Hold point = No further steps may be undertaken before the intervention of the appointed responsible takes place.
Witness point = The appointed responsible has to be notified of the operation in advance, but production will continue whether the intervention took place or not.
Note: 1 The Above Testing and acceptance critera are minimum requirements, however, equipment supplier shall ensure that the product also comply to the additional requirements as per Technical specifications and data sheets.
2 The supplier shall submit their own detailed QAP prepared on the basis of the above for approval of Owner/Owner's representative and TPIA for each sizes.
3 Supplier shall submit Calibration certificates of all Instruments/Equipment to be used for Inspection and Testing to TPIA with relavant procedures and updated standards for TPIA reveiew/Approval.
4 TPIA will have Right to Inspect minimum 10% of all manufacturing activities on each day or as specified above.
5 TPIA along with Owner/Owner representative shall review/approve all the documents related to QAP/Quality manuals/Drawings etc.submitted by supplier.
6 Manufcaturer shall in coordination with Sub vendor shall issue detailed Production and Inspection schedule indicating the dates and the locations to facilitate Owner/Owner's representative and TPIA to organise Inspection.
7 Certification requirements shall comply with European Standard EN 10204 (latest edition)- 3.2 Type.
8 Heat treatment start and stop temperature chart shall be witnessed & signed by TPIA. Power failure log book / sheet shall be maintained
9 For All Forging Materials, The Specimen Shall Be Taken From The Integral Part of The Forging.
10 In case of conflict between purchase specification, contract documents and QAP, more stringent conditions shall be applicable.
11 Blow down / Vent piping including valves, Fittings & Flanges shall be charpy impact tested at (-20 °c)
Approved : CKS
- list of operation in manufacturing and control 9.1 1 per purchase order specification Perform review point review point
- Fabrication and Control procedure 9.1 specification Perform review point review point
- material part list 9.1; 2 and 3 specification Perform review point review point
- dimensional drawings 9.2 ; 2 specification Perform review point review point
- heat treatment procedure 2, 4, 5, 6 & 7 specification Perform review point review point
- non destructive testing procedures 6 specification Perform review point review point
- painting procedure As per PTS specification Perform review point review point
1 BASE MATERIAL
Mechanical tests
1.1 (remark : marking transfer by TPIA)
Approved : CKS
3.1 Radiographic examination 6.1.1 and 6.1.3.4 All butt welds ASME Section-V Girth welds : API 1104 section 6.0 certif. 3.2 Perform witness point review report
6.1.2.1, 6.1.2.2, ASME Section-V, Art- ASME section VIII division1 UF-
3.2 Ultrasonic inspection 100% certif. 3.2 Perform witness point review report
6.1.2.4 , 6.1.3.3 23, SA-388 55
3.5 Visual examination 6.1.2.3 & 6.1.3.1 100% PTS certif. 3.2 Perform hold point review report
10% NPS ≤ 6"
3.6 Dimensionnal examination 6.1.2.5 PTS certif. 3.2 Perform witness point review report
100% NPS > 6"
Approved : CKS
4 CONTROL
FINAL BEFORE TEST
INSPECTION MANUFACTURING
* LOT - A lot consists of all fittings from one heat of steel with same initial wall thickness, from the same furnace charge for final normalizing heat treatment, from the same shape and the same main pipe dimension.
LEGEND:
RT : Radiographic test PT : Liquid penetrant test MT : Magnetic particle test HT : Heat treatment VT : Visual test RM : Raw Material
R : Review W : Witness P : Performed TPIA : Third Party Inspection Agency; SMYS : Specified Minimum Yield Strength;
Hold point = No further steps may be undertaken before the intervention of the appointed responsible takes place.
Witness point = The appointed responsible has to be notified of the operation in advance, but production will continue whether the intervention took place or not.
Note: 1 The Above Testing and acceptance critera are minimum requirements, however, equipment supplier shall ensure that the product also comply to the additional requirements as per Technical specifications and data sheets.
The supplier shall submit their own detailed QAP prepared on the basis of the above for approval of Owner/Owner's representative and TPIA, for each size. Impact test at -20 deg C shall be conducted in addition to respective material
2
requirement.
3 Supplier shall submit Calibration certificates of all Instruments/Equipment to be used for Inspection and Testing to TPIA with relavant procedures and updated standards for TPIA reveiew/Approval.
4 TPIA will have Right to Inspect minimum 10% of all manufacturing activities on each day or as specified above. Owner reserves the right to inspect any quantity of item at any time during execution.
5 TPIA along with Owner/Owner representative shall review/approve all the documents related to QAP/Quality manuals/Drawings etc.submitted by supplier.
6 Manufacturer shall in coordination with Sub vendor shall issue detailed Production and Inspection schedule indicating the dates and the locations to facilitate Owner/Owner's representative and TPIA to organise Inspection.
7 Certification requirements shall comply with European Standard EN 10204 (latest edition)-3.2 issued by TPIA and Vendor.
8 Heat treatment start and stop temperature chart shall be witnessed & signed by TPIA. Power failure log book / sheet shall be maintained
9 For All Forging Materials, The Specimen Shall Be Taken From The Integral Part of The Forging.
10 Certification requirements shall comply with European Standard EN 10204 (latest edition)
11 In case of conflict between purchase specification, contract documents and QAP, more stringent conditions shall be applicable.
12 Blow down / Vent piping including valves, Fittings & Flanges shall be charpy impact tested at (-20 °c)