Control No.

:
Applicant Name :
Project Name : Date/Time Received:
Project Location: Date/Time Printed:

STANDARD PLAN EVALUATION CHECKLIST


As per Section 302 of P.D. 1096 Rev. IRR

Assigned Plan Evaluator: _____________________________________________ Assigned Plan Evaluator: _____________________________________________


ZONING OFFICE STRUCTURAL PLANS
CONFORMING 1. Construction Notes/Guidelines and Specifications
NON-CONFORMING 2. Structural Plans - as per Structural Design and Computation
ARCHITECTURAL PLANS a. Foundation Plan/s e. Structural Design Analysis
1. Standard Form (Type A1) for Bldg Plans b. Floor Farming Plan/s
(Complete with Borders and Title Block ) c. Roof/Roof Deck Framing Plan/s
2. Lot Plan - showing Orientation, Bearing, Distance, Adjacent d. other Details as deemed needed
roads, access roads and properties, Indicate Lot Area 3. Structural Details:
3. Site Development Plan - indicating the following: a. Schedule of Slabs/Slab Details
a. Drawn to Scale b. Schedule of Beams/Beams Details
b. with Technical Description and Orientation c. Schedule of Columns/Columns Details
c. Setback/Easement requirements d. Schedule of Footings/Footing Details
d. Indicate adjacent roads and lots e. Schedule of Trusses/Truss Details
e. Parking Layout f. other Details as deemed needed
: req'd = _______________ ; supplied = _________________ (Fc = ________________ Mpa) ; (Fy = ________________ Mpa)
4. Restrictions: AbuTments and Firewalls g. Soil Test
5. Vicinity Map/Location Plan - within 2km radius for (SBC = ________________ Mpa)
Commercial, Industrial and Institutional Complex
6. Perspective - Eye level or Bird's Eye View Assigned Plan Evaluator: _____________________________________________
7. Indicate Column Gridlines & Dimensions - site dev't, PLUMBING/SANITARY PLANS
all floor plans, elevations and sections, blow-up details 1. General Notes/Guidelines and Specifications
8. Floor Plans - min. scale of 1:100m, indicating doors and 2. Plumbing/Sanitary Plans
window labels, room labels and complete dimensions a. Potable Water Supply Layot/Hot and Cold Line
9. Min. of 4 Elevations and 2 Sections - showing natural b. Sewer/Soil pipe Line Layout
ground to finish grade elev, floor to floor heights c. Storm Drainange Layout
10. Stairs/Access - blow-up plans and sections d. Isometric Drawing
(comply with P.D. 1096 and B.P. 344) 3. Plumbing/Sanitary Details:
11. Toilet and Bath Details - blow-up plans and sections a. Septic Tank/Vault Details - must slab flooring
showing specifications of finishes and fixtures. b. Area Drain/Catch Basin Details
12. Kitchen Details - blow-up plans and sections c. Toilet Fixtures mounting and connection Details
showing specifications of finishes and fixtures. d. Kitchen Fixtures mounting and connection Details
13. Doors and Windows Schedule - blow-up details e. Hangers and Support Details; Legends
showing the type, location, material/finishes, and quantity f. other Details as deemed needed
14. Roof Plan/Roof Deck Plan - indicate in the Project Title f.a. STP
if Roof Deck is Passable or non- passable. f.b. Oil and Water Separator
15. Other Architectural Details: (as needed) 4. Vicinity Map
a. ___________________________________ Assigned Plan Evaluator: _____________________________________________
Lot Area: ________ m² ; Floor Area: ________ m² MECHANICAL PLANS
Assigned Plan Evaluator: _____________________________________________ 1. General Notes/Guidelines and Specifications
ELECTRICAL
ELECTRICAL PLANS
PLANS & SPECIFICATIONS
2. Mechanical Plans/Legend
1. LOCATION1. General Notes/Guidelines and Specifications
& SITE PLANS a. A/C Layout/HVAC/AFSS/Elevators
2. LEGEND OR SYMBOLS
2. Electrical Plans/Legend b. other Details as deemed needed
3. GENRAL NOTES AND/OR SPECIFICATIONS
4. ELECTRICAL LAYOUTa. Lighting and Power Layout, indicate switches 3. Mechanical Details:
5. SCHEDULE OF LOADS
b. other Details as deemed needed a. Schedule of Machines/Equipment
6. ONE LINE DIAGRAM
7. DESIGN3.ANALYSIS
Electrical Details: b. Typical Connection/Support Details
a. Branch Circuits, sub-feeders,
a. Schedule feeders,
of Loads andbusways & service entrance
Computation c. Blow-up Details/Single Line Diagaram
b. Types, ratings & trip settings of overload protective devices
b. Voltage
c. Calculation of Riser Diagram/Single
drop Line Diagram d. other Details as deemed needed: ______________________________
d. Calculation c.
of Panel
short circuit
Boardcurrent for determining
Details/Circuit BreakertheDiagram
interrupting 4. Vicinity Map
capacity of overcurrent protective device for residential commercial
& industriald.establishment
Design Analysis
e. Protection coordination of overcurrent
e. Short Circuit protective devices
Calculations Assigned Plan Evaluator: _____________________________________________
f. Arc-Flash Hazard Analysis to determine the required personal
f. Voltage Drop Calculations
protective equipment (PPE) in other than dwelling place (see ELECTRONICS PLANS
Appendix H forMap
4. Vicinity PEE) 1. General Notes/Guidelines and Specifications
g. Certification of Electrical Safety from (PEE) for Existing Bldg.
/Expansion /Extension of a Bldg. Structure. 2. Electronics Plans/Legend
a. Data and Voice, Tel, PABX, FDAS, CCTV, CATV
b. other Details as deemed needed
COMMENTS: 3. Electronics Details:
_________________________________________________________________ a. Schedule of Equipment
_________________________________________________________________ b. Typical Connection/Support Details
_________________________________________________________________ c. Blow-up Details/Single Line Diagram
_________________________________________________________________ d. other Details as deemed needed: _____________________________
______________________________________________________ 4. Vicinity Map

APPLICANTS MAY USE THIS BOX FOR DISCUSSIONS AND/OR CLASSIFICATIONS


_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________

You might also like