SPOTO CCIE DC V3.
CCIE DC V3.0 Example and Study Plan:
CCIE DC V3.0 DOO Part:
DOO Resource:
DOO Topology:
Lab Equipment List :
• APIC cluster
• Nexus 93XX ACI Spine Switch: 4 Sets
• Nexus 9372 Leaf Switch: 6 Sets
Leader of IT Certifications 1
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
• Nexus 93108 Switch: 1 Sets
• Nexus 7004 Switch :1 sets
• Supervisor 2 Enhanced
• 48-Port 10-Gb Ethernet SFP/SFP+ (F3 module)
• Nexus 5672 Switch: 4 Sets
• Nexus 2348 Fabric Extender: 2 Sets
• UCS C220 Series Rack Server : 2 Sets
• Virtual interface card (VIC) for C-Series
• UCS-6248 Fabric Interconnect: 2 Sets
• UCS 5108 Blade Server Chassis : 1 sets.
• B200 M4 Blade Server: 2 Sets.
• Cisco Virtual Interface Card
• VIC 1340
• Dual Attached JBOD with FC and iSCSI: 1 sets
• Cisco Catalyst 3750 Switch: 2 Sets
Cisco terminal Server: 1 Sets
Leader of IT Certifications 2
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
DOO Part 1: NXOS
Introduction
VPC IN DC1
In preparation for providing uplink connectivity for the server team, you
have been asked to configure and correct two virtual port channels to the
fabric interconnects:
• Use Port Channel ID 100 for FI A and Port Channel 200 for FI B. Use
N5K-1/2 port 1/8-9 to create vpc. Only trunk the required VLANs.
Use Interface VLAN 10 as needed.
• End to end connection to the VPC. One of the devices will be
selected as the master device, and the other device will become a
slave device.
• This function allows the gateway of local VPC device to forward the
message normally when the layer 3 message with the target MAC
address of peer VPC device is sent to the local
• Improve the convergence time of three-layer traffic.
• N5k is configured with a loopback address as the VXLAN address.
• Refer to the topology diagram as required.
Solution:
Leader of IT Certifications 3
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
N5K1
feature vpc
vpc domain 10
peer-switch
peer-keepalive destination 10.1.1.62 source 10.1.1.61
peer-gateway
ip arp synchronize
interface port-channel10
vpc peer-link
interface port-channel100
vpc 100
interface port-channel200
…snip…
EVPN VXLAN network
Referenced in the beginning of the section using the routed Network as
an underlay. Loopback0 should be used as a source and EVPN should be
the control-plane. Ensure that all EVPN Virtual Instances (EVI) use
Route-Distinguisher that contain Loopback0 IP address and
Route-Targets with the value and format of AS#:VNID. Do not statically
configure any values.
Leader of IT Certifications 4
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
First Stage 1: ACI part Solution Demo:
CONTENTS
Welcome ........................................................................................................................................................................... 错误!未定义书签。
DOO General Guidelines ............................................................................................................................................................................. 6
Physical Topology .......................................................................................................................................................................................... 6
Section3 ACI Infrastructure Configure ................................................................................................................................................... 7
3.1 Access policies config ................................................................................................................................................................. 8
3.2 Tenant Policy................................................................................................................................................................................. 23
3.3 Virtual Networking..................................................................................................................................................................... 23
3.4 L3out 23
3.5 Inter Fabric Connectivity- Host Based Routes .................................................................................................................. 23
3.6 Multicast-Multipod BUM Traffic ............................................................................................................................................ 23
3.7 Fabric Monitoring and Collector Policy .............................................................................................................................. 23
Preview of design part ................................................................................................................................................. 错误!未定义书签。
ACI-1: 错误!未定义书签。
ACI-2: 错误!未定义书签。
ACI-3: 错误!未定义书签。
ACI-4: 错误!未定义书签。
ACI-5: 错误!未定义书签。
ACI-6: 错误!未定义书签。
ACI-7: 错误!未定义书签。
ACI-8: 错误!未定义书签。
ACI-9: 错误!未定义书签。
ACI-10: 错误!未定义书签。
Leader of IT Certifications 5
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
DOO General Guidelines
Physical Topology
Leader of IT Certifications 6
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Section3 ACI Infrastructure Configure
Activity Objective:
l Finish Section3 Practice.
Required Resources:
These are the resources and equipment required to complete this activity:
l APIC
l ACI fabric (1-2-3 spines, 6leaves)
l VC、FEX
l Student VM
Leader of IT Certifications 7
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
3.1 Access policies config
Configure the access policies that are needed to discover FEX 102. FEX 102 must be
discovered so that the legacy2 application is learned as an endpoint on Node 202.
Leader of IT Certifications 8
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Solution:
APIC-1 : GUI/CLI configuration on APIC
Step 1: Check leaf interface
Step 2: config FEX
Leader of IT Certifications 9
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 10
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 11
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 12
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 13
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Step 3: Check FEX
Leader of IT Certifications 14
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Step 4: config interface for vcenter
Leader of IT Certifications 15
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 16
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Step 5: config legacy2 interface
Leader of IT Certifications 17
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Step 5: config legacy2 for vcenter
Leader of IT Certifications 18
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 19
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 20
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
Leader of IT Certifications 21
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
mac need same legacy2 vm adapter
Leader of IT Certifications 22
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie
SPOTO CCIE DC V3.0
3.2 Tenant Policy
3.3 Virtual Networking
3.4 L3out
3.5 Inter Fabric Connectivity- Host Based Routes
3.6 Multicast-Multipod BUM Traffic
3.7 Fabric Monitoring and Collector Policy
Leader of IT Certifications 23
Website: https://cciedump.spoto.net Email: [email protected]
phone / WhatsApp: +86 182 5015 1260 Facebook page: https://www.facebook.com/spotoccie