4000 TCD
4000 TCD
Sequence of Temperature
Temp. 0C D (Temp. Elev) 0C Juice Temp. 0C I n Temp. Diff. 0C
Total 54.72
Vapour/Steam Consumption at Heaters
From To
Through material balance vapour required for pan boiling 41.360 tons/hr at 24.820 % on cane
1. All raw pan boiling (by 1st Vapour) vapour required 22.720 Tons/Hr.
2. All Refine pans boiling (by 1st vapour) ) vapour required 18.640 Tons/Hr.
Total Vapour 41.360 Tons/Hr.
Sequence of Temperature
Temp. 0C D (Temp. Elev) 0C Juice Temp. 0C I n Temp. Diff. 0C
Total 54.72
Vapour/Steam Consumption at Heaters
S# Description Temperature Rise 0C Heating Media
From To
Through material balance vapour required for pan boiling 34.250 tons/hr at 20.55 % on cane
1 All raw pan boiling (by 1st Vapour) vapour required 19.510 Tons/Hr.
2. All Refine pans boiling (by 1st vapour) ) vapour required 14.740 Tons/Hr.
Total Vapour 34.250 Tons/Hr.
ESTIMATED CALCULATION’S
DATA
ANALYSIS DATA.