Log Book - B.Arch

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

PRACTICAL TRAINING

LOG BOOK
B.ARCH. - IX Sem
SESSION -

Student’s Name
Student ID
University Roll No.

Training Office

DIT UNIVERSITY- School of Architecture, Planning & Design


Mussoorie – Diversion Road, Village –Makkawala
P.O.- Bhagwantpur, Dehradun (Uttarakhand)– 248009
Phone – 91-135-3000374, Fax: 91-135-3000305

i
PRACTICAL TRAINING
Introduction: PT -1A
DITU- School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand)

Introduction.
A. TRAINING RULES:
Extracts from Ordinances, Scheme of Examination & Syllabus
(For award of the degree of B. Arch by the DIT University, Dehradun.)

1. PRACTICAL TRANING
1.1 Each student will be required to proceed on ‘Practical Training’ for the IX semester after
appearing at the VIII semester examination. The Principal/Head of Department of
Architecture of the concerned Institute will approve the office of the ‘Practical-Training’
for the student.
1.2 The marks for ‘Practical Training’ will be awarded to each student in accordance with
the Regulations and Guidelines issued by the University.

B. AIMS OF PRACTICAL TRAINING:


1. The aim of the ‘Practical Training’ is to enable the students to gain the kind and range of practical
experience which will prepare them for their likely responsibilities, immediately after qualifying
B. Arch. Course.
2. The ‘Practical Training’ should be regarded as an important academic activity. Whatever good the
arrangement of training may be, the trainee student, still, has the responsibility to use his own
initiative in making the best use of the opportunities which he gets during training period and prepare
himself for profession.
3. The student should try to seek the variety of experiences, in the ‘Training office’, to acquaint himself
various works, procedures etc. of building trade.

ii
PRACTICAL TRAINING
Introduction: PT -1B
DITU- School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand)

Guidelines to Students/Trainees
1. Criteria for Selection of a Training Office
• In case of proprietorship firm, the proprietor shall be an architect; also, the firm shall have at least two
or more architects as employee/associates.
• In case of ‘Partnership’/ ‘Pvt. Ltd.’ firms, at least one of the partner/directors shall be an architect,
and the firm shall have at least one or more architects as Partner/director/employee/ associate.
• In case of a ‘Public-sector’/’State or Central Government office/academic institute or a multi-national
organization, there shall be a separate wing for architectural consultancy works.
• The said architect (Proprietor/Partner/Director/Head of Department/Chief Architect etc.) shall have
working experience as per the COA guidelines and the organization shall have variety of projects.
2. Working Relationship between Architect and Trainee
• The architect shall provide enough jobs to the trainee, to keep him/her occupied.
• The Architect shall expose the trainee to difference aspects of professional practice. The task shall
include the following-
- Preparation of
- Sketch designs, presentation drawings etc.
- Municipal drawings according to the byelaws.
- Workings drawings and details.
- Estimates, bill of quantities & specifications.
- Discussions with
- Clients.
- Structural Consultants.
- Services Consultants.
- Inspection and management of site.
- Preparation of
- Models, perspectives and photographs.
- Reports, progress charts etc.
- Other administrative works.
3. Honorarium/Stipend
• The architects usually pay some amount as honorarium/stipend to meet out of pocket expenditure, to the
trainee. The Institute shall have no objection if the trainees accept/receive such honorarium/stipend
• The mode and amount shall depend upon the office but may be based upon the mutual agreement
between the architect and trainee. However, it shall neither be a claim of the trainee nor binding
on the architect, but in order of professionalism and to maintain the dignity of profession, the
training office of architects pay a respectable amount as stipend/ honorarium.
• The Institute/Training and Placement cell of the Institute shall not, in any way, be responsible for the
payment against any sorts of damages, whatsoever.

iii
4. Code of Conduct for Trainee
• He/ She shall abide by the rules, regulations and general instructions of the office/firm.
• He/ She shall remain punctual and regular in attendance.
• He/ She shall make all efforts to learn the work involved in profession of architecture, and if so
required for the work, shall stay beyond the scheduled time in the office.
• He/ She shall respect & obey the senior members of the office/firm.
• He/ She shall take up the job with full responsibility and show utmost interest in the work allotted.
• He/ She shall inform, the institute/training and placement cell, about joining in the training office, its
address and contact numbers. He/ She shall also inform about the address of the accommodation
acquired during the training period.
• He/ She shall remain in regular touch with the institute/training and placement cell and shall keep
informing about the progress.
• In case of any complaint of misconduct, the Institute/’Training and Placement Cell’ may take suitable
and strict action against the student.
5. Arranging/Fixing-up the Training office
• The Department of Architecture, directly or through the ‘Training and Placement Cell’ of the Institute
shall provide a list of offices, along with address, of some well-established and recognizedarchitects.
Addition, alteration and deletion in such a list may be made from time to time, in conformation to
‘Criteria’ as laid down for selection of a training office.
• After seeking advice from ‘Training and Placement Cell’, the student shall make his/her options
available to the training and placement cell.
• With the help of ‘Training and Placement Cell’, the student shall make all efforts to settle his/her
appointment as trainee with an established and recognized architect.
6. Joining and Leaving the Training Office
• The trainee is expected to join the training office on the scheduled date, and submit his ‘Joining Report’
on the letterhead of the office, duly signed by Head of the Training, to the Institute in the proforma
prescribed in this Log Book.
• The trainee must obtain the ‘No Dues Certificate’ duly and get relieved from the office, at the end
of the training period or before changing the ‘Training Office’. The trainee must submit this ‘No Dues
Certificate’ along with the Log Book.
7. Change of Training Office
• In case of any emergency the trainee may be permitted to change the training office/place of training,
once only, during the period of training. He/she shall inform the Principal/Director/Head of
Department/Officer in-charge of the ‘Training and Placement cell’, and seek prior permission for such
a change. The trainee must obtain the ‘No Dues Certificate’ from the office before changing the
‘Training Office’ and intimate the same to the University.
• The total duration of the practical training shall be the sum of the period of stay in different offices. It
shall be in conformity with the ‘Duration of Training’ as prescribed by COA/the University.
8. Final Submissions
After completion of practical training, the trainee is required to submit the following.
• ‘Certificate’ (duly signed and stamped) of successful completion of the practical training also
mentioning the attendance in percentage, from the architect/supervisor.
• ‘Daily Diary’ with details of the day-to-day work record, which will be returned to the student after
assessment and viva voce examination.
• ‘Training report’ supplemented with the prints and documents of work done during practical training.
The prints and documents shall be obtained with the permission of the Training office and shall be
duly signed by the ‘Supervisor’.

iv
• Training report shall be submitted in two copies. First copy shall be returned to the student after
assessment of sessional marks and viva voce examination. The second copy shall be retained by the
training and placement cell/library. These shall be presented in min. A-3 size with ring binding (If
required, the printout of duly signed dwg could be in A-2 size, properly folded within the report as per
the standards).
9. Failures
• In case the student/trainee remains unsuccessful or fails in completing his/her practical training or viva-
voce examination, the matter shall be dealt with accordance with the relevant ‘Rules and Regulations’
of the university.

v
PRACTICAL TRAINING
Introduction: PT -1C
DITU- School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand)

Conduct and Record of Training


A. TRAINING SUPERVISOR:
While receiving practical training in an architect’s office, each trainee must work under the directions of
a ‘Training Supervisor’ who has a special responsibility for training. The ‘Training Supervisor’ must
forward a report about the performance of trainee, confidentially direct to the concerned Institute,
on performance of the trainee, during the period of training and, authenticate the information
recorded on the ‘Log-sheets’ and the ‘Daily Diary’ maintained by the trainee, by affixing his
signature thereon, so that the information could form the basis for viva voce examination for award of
the training marks.
B. DAILY DIARY:
The trainee should maintain a ‘Daily Diary’ during his practical training to supplement the information
kept in the Log-Sheets. The diary should contain enough details to refresh his memories after long interval
of time. It should have the record of work done during the office period and overtime. It is also the place
to record the decisions made regarding various projects and reasons behind them. He is also expected to
make his own comments on various decisions/discussions etc. taken for each project and his feeling of
what he has learnt from handling a particular job. This part should be given the sub-heading “comments”
and “observations.”
C. LOG-BOOK:
1 This ‘Log-Book’ contains an ‘Index Sheet’ marked as PT-2 and a set of ‘Log-Sheets’ marked as PT-
3A/ through PT-3C/ , in which you are expected to summarize and record theinformation of
work done by you during the training period. Following is the procedure thatis to be adopted for
filling up information. (Page number in serial order is to be written after (/) the slash.)
(A set of sample log sheets has been attached at the end of log book marked as PT-2/S (sample),
PT-3A/S (sample), PT-3B/S (sample) and PT -3 C/S (sample).
2 In the Index Sheet PT-2, you should record the details of your training office/s in the Table: 1/PT-2
which is titled as Index of Training Office, while the contents of next ‘Log-Sheets’ are summarized
in the Table: 2/PT-2, which is titled as Table of Contents.
3 You should supply the ‘Work information’ on the set of log sheets PT-3A, PT-3 B and PT- 3C. One
such set is to be used for one month. The table 1/PT-3A, seeks information regarding the projects
handled with the time (in hours) devoted to each project in a particular week. In the first column a
project serial number for each project is already printed. This serial number is referred to in tables
2/PT-3 B & 3/ PT-3C. In the next column ‘Office Job No.’ note down the number of jobs as allocated
by the training office for their records. In the next column write the number of hours spent by you
during office hours/certified over- time, for the particular project in the first calendar week (beginning
with 1st Monday of the calendar month), second week (beginning with 2nd Monday) and so on. The
column of remarks should carry brief note, if required.

vi
4 The table 2/PT-3B seeks to elaborate the information given in Table 1/PT-3A by expanding to the
number of hours put in the different types of work done in different projects. In the first major column
is listed the types of work that might have been done by you while on training. The second major
column provides 8 sub-columns which serialize the projects as indicated in table 1/PT -3A. In each
cell below various sub-columns, you should record the number of hours spent for different types of
work in the respective row. For example- Number of hours spent by you on preparing, say,
presentation drawing for project no. 2, 3, & 6 etc. should be recorded in the cell located at the
intersection of the row of presentation drawing and column of project serial no. 2,3, & 6, and
appropriate brief notes may be recorded in the column of remarks.
In the table 3/PT-3C should be recorded the brief descriptive details of the work done for the particular
project which is indicated by project serial number shown the table 1/PT- 3 A. For example- If you
have prepared, among the say working drawings, the foundation plan for a project it should be detailed
in the table in a suitable and brief description. You may make detailed supplementary notes in the
daily diary.
5 The information recorded on every log sheet should be verified by your supervisor in the space
provided on each ‘Log-Sheet’.
6 Important Note:
If one log sheet no. PT-3A/ falls short to record the number of projects handled by you in one month, make photocopies
and use it consecutively and add (2) after PT-3A__ to make it PT-3A__ (2) or PT -3A__ (3) etc. and likewise use additional
copies for log sheet PT-3B__ or PT-3C__.

vii
DIT UNIVERSITY- School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand)

Practical Training
B.Arch. IX Sem

Session -

Name of Student:

Training Place and Firm:

viii
(To be issued on the Letterhead by the Architect Supervisor/Head of the Office and sent to the institute by post)

JOINING REPORT
Mr./ Ms. .......................................................... , a student of Bachelor of Architecture (IX
Semester) of the School of Architecture, Planning & Design, DIT University, Dehradun has
joined our office, as a trainee, in the forenoon/afternoon on ………………………, as a
part of the compulsory sixteen-week practical training during IX Semester of the B.Arch.
programme under the DIT University, Dehradun.

……………………………..
Signature of Architect
With office Seal

COA No……………………...

Place……………
Date…………….

ix
(To be issued on the office Letterhead by the Architect Supervisor/Head of the Office and sent to the Institute by Post)

NO DUES & RELIEVING CERTIFICATE

This is to certify that Mr./Ms. ……………………….……., a student of B.Arch. (IX


semester) of the School of Architecture, Planning & Design, DIT University, Dehradun has
completed his/her compulsory sixteen weeks Practical training as stipulated by the DIT
University, Dehradun, in our office.

He worked under the under the supervision of …………………………. From


………………... to ………………and is being relieved from this office this
forenoon/afternoon of ……………………

It is further certified that, he has handed over the charge of materials/books etc., which were
in his custody, and no outstanding dues are pending against him/her.

…………………………….
Signature of Architect
With office Seal

COA No: …………………………


Place…………………….
Date ……………………

x
(To be issued on the Letterhead by the Architect Supervisor/Head of the Office and sent to the institute by post)

EVALUATION SUMMARY OF TRAINEE

Name of Trainee - …………………………


Course – B. Arch., IX SEMESTER, YEAR –

DIT UNIVERSITY- School of Architecture, Planning & Design


Dehradun-248009 (Uttarakhand)
S.No. Head Under which the Trainee Below Average Above Out Trully Marks Obtained
has to be Judged & Evaluated Average Average Standing Exceptional (for office use only)
(Tick only) 20% 40% 60% 80% 100% Out of -
1 Experimental Skill/Research
Aptitude
2 Creative Ability & Imagination
3 Ability to Analyze a problem &
Formalize Solution
4 Initiative / Willingness to learn
5 Perseverance / commitment
6 Firmness in Thoughts
7 Ability to Organize & Work in
Group
8 Command in Computer
Presentation
9 Communication Skill - Graphic
10 Communication Skill - Oral
11 Communication Skill - Written
12 Knowhow of other Subject &
their Involvement in Design
13 Interest for visit to Site during
Construction
14 Overall Development &
Behavior during the stay in the
office
15 Attendance & Punctuality
Total

Remark of the Architect Supervisor / Head of the Office -


…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………

Signature of Architect
With office Seal
COA
No……………
Place……………...
Date……………...

xi
PRACTICAL TRAINING
Log Sheet: PT-2
DITU- School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand)

Index of Training office


Table: 1/PT – 2

S. No. Name of Training Staff Strength Date of Stipend


Office (Expect Trainees) Joining Leaving Received

TABLE OF CONTENTS
Table: 2/PT - 2
S. No.

xii
PRACTICAL TRAINING
DITU - School of Architecture, Planning & Design Log Sheet: PT-3A/
Dehradun-248009 (Uttarakhand)

Student’s Name: ……………………………………………………


Month: ……………………....................
Class & Section: ……………………………………………………
No. of Weeks in Training………………

Name & Address: ………………………………………………………………………………….


Of Training Office …………………………………………………………………………………
…………………………………………………………………………………

Qualification:
Supervisor’s Name: ………………………………… ……………………………………
………………………………… ……………………………………

Entries on this Log Sheet are Verified

…………………………
Signature of Supervisor

WORK INFORMATION:
Table: 1/PT. 3A/
Size of the

Project’s Office No. of hours put into the project during


Project

Remarks
Name & Job the calendar WEEK starting with DATES
work
Sl.

its Location No.

10

xiii
PRACTICAL TRAINING
DITU- School of Architecture, Planning & Design Log Sheet: PT-3B/
Dehradun-248009 (Uttarakhand)

Entries Herein verified


WORK INFORMATION: Month ………………………...
Table 2/PT-3 B …………………………….
Signature of Supervisor
No. of Hours put in
Type of Remarks
S. Project S .No. from Table: 1/PT-3A/
Work done for
No Project
projects 1 2 3 4 5 6 7 8 9 10
No.
Municipal Drawings
1.

2
Presentation Drawings

3
Working Drawings

4
Construction Details

5
Structural Analysis/Design

6 Structural Drawings

7 Services Design/Details

8 Planning & Design

9 Interiors

10 Models

11 Site Supervision/Visit

12 Estimate & Costing

13 Specifications etc.

14

15

16

17

18

19

20

23

24

25

xiv
PRACTICAL TRAINING
Log Sheet: PT-3C/

DITU- School of Architecture, Planning & Design


Dehradun-248009 (Uttarakhand)
WORK INFORMATION:
Table 3/PT-3 C

Details of work done as informed through Tables- 1/PT-3A/ & 2/PT-3B/


(Use Additional sheets if need Be)
Project Details
S. No.

xv
LOG BOOK OF TRAINING WORK

Week:
Date :

1. Office Work:

A. Sketching :
B. Design Proposal :
C. Drawings/ Architectural/ Structural/ Corporation drawings/ Working drawings/ detail
drawings/perspective :

D. Model Making.

2.
A. Estimation :
B. Specification :
C. Report :

3.
A. Billing of Quantities :
B. Tendering :
C. Materials Analysis :
D. Rate Analysis :
E. Services :

4. Site Work.
A. Inspection Report :
B. Checking of Materials/ Testing :
C. Measurement Book (M.B. Book) :
D. Checking of M.B. Book records at sites :

5. Bill Verification:

Certification by the Training Incharge of the Firm with seal & Signature.

xvi
SAMPLE
DITU- School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand) PRACTICAL TRAINING
Log Sheet: PT-2
Index of Training office
Table: 1/PT – 2

Sl. Staff Strength Date of Stipend


Name of Training Office Joinin Leaving
No (Expect Trainees) Received
. g
Architects – 4
CHADDHA AND July Nov. Rs.
1 Structural Engineer-1
ASSOCIATES 16,2003 26,2003 2,500/-
ARCHITECTS & TOWN Arch. Asstts - 6
per
PLANNERS FLAT NO.2 CAD Asstts. – 2
Month
SHANKER MARKET, NEW Secrt. Asst. - 1
DELHI-1

TABLE OF CONTENTS
Table: 2/PT - 2
S. No.

1 Month July, 2003. ---- Log Sheet – PT-3A 2 Sheets


Log Sheet – PT- 3B 1 sheet
Log Sheet – PT- 3C 1 sheet

Month August, 2003. ---- Log Sheet – PT-3A 1 Sheets


2
Log Sheet – PT- 3B 1 sheet
Log Sheet – PT- 3C 1 sheet

xvii
PRACTICAL TRAINING
DITU-School of Architecture, Planning & Design Log Sheet: PT-3A/(S)
Dehradun-248009 (Uttarakhand)

Student’s Name: Ajay Sharma Month: June 2018

Class & Section: B.ARCH IXth sem ; 2018-19 No. of Weeks in Training: 4

Name & Address: CHADDA & ASSOCIATES, ARCHITECTS AND TOWN PLANNERS,

Of Training Office Flat No. 2, Shanker Market, New Delhi-1

Qualification:
Supervisor’s Name: Mr. Mahendra Kumar B.Arch. MURP,
School of Planning & Architecture
Entries on this Log Sheet are Verified

…………………………
Signature of Supervisor
WORK INFORMATION:
Table: 1/PT. 3A/

Project’s No. of hours put into the project


Size of the

Office
Project

during the calendar WEEK starting

Remarks
Name & Job
with DATES
work

its Location
Sl.

No.
2 9 16 23 30

1 Sharma Apartments J-93/176 5 10 7 14 - 5


Asaf Ali Road New Delhi
2 Super Tyres (Factory R-92/389 4 5 3 - 10 6
Building)
Ohkla Industrial Estate Okhla
New Delhi
3 Holy-Family Hospital J-92/365 h 4 15 18 - 8 10
(Housing)
Vasant Vihar, New Delhi
4 Hotel Skylark C-93/651-P 3 - 6 18 10 12
Ridge Road, Shimla
5 Hotel ‘EHIYATT’ COH- 6 - - 6 15 15
Dubai 23/201
6 - - - - - - - - -

7 - - - - - - - - -

8 - - - - - - - - -

9 - - - - - - - - -

10 - - - - - - - - -

xviii
PRACTICAL TRAINING
Log Sheet: PT-3B/ (S)
DITU-School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand)

Entries Herein verified


WORK INFORMATION: Month: June 2018
Table 2/PT-3 B …………………………….
Signature of Supervisor
No. of Hours put in
Type of Remarks
S. Project S.No. from Table: 1/PT-3A/
Work done for
No Project
projects 1 2 3 4 5 6 7 8 9 10
No.
1. Municipal Drawings - - - - - - - - - -

2 - - 10 - 36 - - - - - CAD
Presentation Drawings Presentation

3 Working Drawings 14 - - - - - - - - -

4 Construction Details 12 12 - - - - - - - -

5 Structural Analysis/Design - - - - - - - - - -

6
Structural Drawings - - - - - - - - - -

7
Services Design/Details - - 5 - - - - - - -

8
Planning & Design - - 15 30 - - - - - -

9
Interiors - 10 - - - - - - - -

10
Models - 10 - - - - - - - -

11
Site Supervision/Visit 5 - 3 - - - - - - -

12
Estimate & Costing - - - - 6 - - - - -

13
Specifications etc. - - - - - - - - - -

14

15

16

17

18

19

20

23

24

25

xix
PRACTICAL TRAINING
Log Sheet: PT-3B/(S)
DITU-School of Architecture, Planning & Design
Dehradun-248009 (Uttarakhand)

WORK INFORMATION:
Table 3/PT-3 C

Details of work done as informed through Tables- 1/PT-3A/ & 2/PT-3B/


(Use Additional sheets if need Be)
Project Details
S. No.
1 Working Drawings also included the typical floor plans and some constructional details
of Panelled Partitions and Windows of the main Entrance Foyer.
2 Panelling of the Foreman’s Cabin and False Ceiling of the ancillary sub-unit.

3 An Interior Perspective Sketch Presentation, and Floor Plans. The work included a
study Block Model.
4 Plans of the Hotel and Plan for the site layout, Estimate of the Part of the Project.

5 Presentation Drawings in ink and assistance in other general work at Design Stage.

xx

You might also like