564SHJ22 01 Gym TC 101 1
564SHJ22 01 Gym TC 101 1
564SHJ22 01 Gym TC 101 1
PART 1
PH-1
PH-3
GYM KEY PLAN
PH-2
NOTES :
A
GROUND FLOOR = ± 0.00 PROJECT LEVEL = + XXX DMD LEVEL
C T O B E LO W
THE PROPERTY OF THE ARCHITECT.
-THE CONTRACTOR SHALL VERIFY THE CONTENT OF THIS DRAWING AND
SHALL NOTIFY THE CONSULTANTS OF ANY DEVIATION OR DISCREPANCY.
-CORRECTNESS, BUILDABILITY AND STABILITY OF THE CONSTRUCTION
REVISIONS :
REV. DATE DESCRIPTION
00 21.02.2022 ISSUED FOR CONSTRUCTION
D PROJECT DESCRIPTION :
GLASS HANDRAIL
MADAR PHASE 2
BLOCK E, ALJADA, SHARJAH
HEIGHT 1.3M PLOT NO.: كلم11 /3288 يموكح7122 , AREA: ةيراحت
/ كوحلي
PROPOSED [TRAMPOLINE CLUB BUILDING (G+ MEZZ+ROOF), BOH BUILDING
(G+ROOF), GYM BUILDING (G+1+ROOF), PARKING, KIDS PLAY
AREA+EXTENSION FOR OPEN TO SKYSKATE PARK]
OWNER :
AL JADA
E DEVELOPMENTS
DEVELOPER :
ARADA
DEVELOPMENTS LLC
LEAD CONSULTANT :
ISSUE STATUS :
CANOPY ISSUED FOR CONSTRUCTION
F OPEN TO
SCALE :
TITLE :
1:100 REVIEWED BY :