Time and Work Questions and Answers by Ambitiousbaba

This document contains 31 multiple choice questions related to time and work problems. These questions test concepts like how long it would take individuals or groups of people working alone or together to complete a job or piece of work given information about their individual work rates or efficiencies. The questions require calculating work rates, setting up and solving equations, and applying logical reasoning to time and work scenarios.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
212 views54 pages

Time and Work Questions and Answers by Ambitiousbaba

This document contains 31 multiple choice questions related to time and work problems. These questions test concepts like how long it would take individuals or groups of people working alone or together to complete a job or piece of work given information about their individual work rates or efficiencies. The questions require calculating work rates, setting up and solving equations, and applying logical reasoning to time and work scenarios.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 54

ambitiousbaba.

com Online Test Series

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 1
ambitiousbaba.com Online Test Series

TIME and WORK


Question 1: Mohan can do a work in 15 days. After working
for 3 days he is joined by Vinod. If they complete the
remaining work in 3 more days, in how many days can Vinod
alone complete the work?
A.10 days
B.8 days
C.5 days
D.12 days
E.15 days
Question 2: Arun can do a certain work in the same time in
which Bipasha and Rahul together can do it. If Arun and
Bipasha together could do it in 10 days and Rahul alone in
50 days, then Bipasha alone could do it in:
A.15 days
B.20 days
C.25 days
D.30 days
E.35 days
Question 3: Sekar, Pradeep and Sandeep can do a piece of
work in 15 days. After all the three worked for 2 days, sekar
left. Pradeep and Sandeep worked for 10 more days and
Pradeep left. Sandeep worked for another 40 days and
completed the work. In how many days can sekar alone
complete the work if sandeep can complete it in 75 days?
A.25 days
B.20 days
C.30 days
D.35 days
E.15 days
Question 4: Dinesh does 80% of a work in 20 days. He then
calls in Gokul and they together finish the remaining work in
3 days. How long Gokul alone would take to do the whole
work?
A.39 days
B.37 days
C.37 ½ days

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 2
ambitiousbaba.com Online Test Series

D.40 days
E.39 ½ days
Question 5: Hari and Vijay can together finish a work in 30
days. They worked together for 20 days and then Vijay left.
After another 20 days, hari finished the remaining work. In
how many days hari alone can finish the work?
A.45
B.60
C.35
D.50
E.65
Question 6: Madhavan can finish a work in 5 hours. He
invites Manohar and Manjima who can work 3/4th as fast as
he can to join him. He also invites Mani and Mohan who can
work only 1/5th as fast as he can to join him. If the five
person team works the same job and they start together, how
long will it take for them to finish the job?
A.50/97 days
B.87 days
C.50/29 days
D.78 days
E.62 days
Question 7: A typing work is done by three person P, Q and
R. P alone takes 10 hours to type a single booklet but B and
C working together takes 4 hours, for the completion of the
same booklet. If all of them worked together and completed
14 booklets, then how many hours have they worked?
A.30hrs
B.40hrs
C.25hrs
D.45hrs
E.50hrs
Question 8: Nakul and Ram are working on aproduction
company. Nakul takes 6 hours to make 32 products, while
Ram takes 5 hours to make 40 products. How much time will
they take, working together to make 110 products?
A.8 hours
B.8 hours 15 minutes
C.9 hours
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 3
ambitiousbaba.com Online Test Series

D.8 hours 25 minutes


E.9 hours 15 minutes
Question 9: Gopal does a work in 90 days, Vikash in 40 days
and Santhosh in 12 days. They work one after another for a
day each, starting with Gopal followed by Vikash and then by
Santhosh. If the total wages received are Rs 360 and Gopal,
Vikash, Santhosh share them in the ratio of the work done,
find their respective individual wages.
A.Rs 44, Rs 80 and Rs 264
B.Rs 40, Rs 87 and Rs 276
C.Rs 36, Rs 81 and Rs 243
D.Rs 42, Rs 86 and Rs 232
E.Rs 37, Rs 89 and Rs 284
Question 10: When Ashok and Karthik are working alone,
they can complete a piece of work in 25 days and 30 days
respectively. On day 1, Karthik started the work and Ashok
joined B from day 3 on-wards. Find approximately after how
many days will the work be completed?
A.20 days
B.10 days
C.15 days
D.25 days
E.30 days
Question 11: P can do 2/5 of the work in 10 days and Q can
do 4/5 of the work in 16 days. If both of them start working
together then the time in which the work can be done?
a) 12.1/9 days
b) 11.1/9 days
c) 11.2/9 days
d) 12.4/9 days
e) None of these
Question 12: A does half as much work as B does in one sixth
of the time. If together they take 20 days to complete the
work, then what is the time taken by B to complete the work
independently.
a) 80 days
b) 100 days
c) 120 days

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 4
ambitiousbaba.com Online Test Series

d) 140 days
e) None of these
Question 13: A contractor undertakes to make a mall in 60
days and he employs 30 men. After 30 days it is found that
only one- third of the work is completed. How many extra
men should he employ so that the work is completed on
time?
a) 20men
b) 25men
c) 30men
d) 40men
e) None of these
Question 14: 50 men could complete a work in 200 days.
They worked together for 150 days, after that due to bad
weather the work is stopped for 25 days. How many more
workers should be employed so as to complete the work in
time?
a) 25
b) 35
c) 50
d) 60
e) None of these
Question 15: P and Q were assigned to do a work for an
amount of 1200. P alone can do it in 15 days while Q can do
it in 12 days. With the help of R they finish the work in 6
days. Find the share if C.
a) 100
b) 120
c) 140
d) 160
e) None of these
Question 16: A can do a work in 32 days. P who is 60 percent
more efficient than A. Find how much time they will take
together to do the same work?
a) 150/13 days
b) 160/13 days
c) 170/3 days
d) 190/3 days
e) None of these
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 5
ambitiousbaba.com Online Test Series

Question 17: P does half as much work as Q in three-fourth


of the time. If together they take 24 days to complete the
work, how much time shall P take to complete the work?
a) 50 days
b) 60 days
c) 70 days
d) 80 days
e) None of these
Question 18: X and Y can do a piece of work in 12 and 15
days respectively. They began their work but before 3 days of
its completion Y left. In how many days the work will be
completed.
a) 6 days
b) 8 days
c) 10 days
d) 12 days
e) None of these
Question 19: Neha takes 5 hours to type 40 pages while sunil
takes 6 hours to type 60 pages. How much time will they
take working together on different computer to type an
assignment of 180 pages.
a) 5hr
b) 7hr
c) 9hr
d) 11hr
e) none of these
Question 20: P and Q together can complete a job in 90days,
Q and R takes 60 days to complete the same work and P and
R will take 45 days to complete the same work. How much
time will P, Q and R will take to complete the work together.
a) 40 days
b) 42 days
c) 36 days
d) 44 days
e) None of these
Question 21: The work done by a woman in 8 hours is equal to
the work done by a man in 6 hours and by a boy in 12 hours.
If working 6 hours per day 9 men can complete a work in 6

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 6
ambitiousbaba.com Online Test Series

days then in how many days can 12 men, 12 women and 12


boys together finish the same work working 8 hours per day?
(a) 4/3 days
(b) 11/3 days
(c) 3 days
(d) 3/2 days
(e) None of these
Question 22: A is thrice as good a workman as B and takes
10 days less to do a piece of work than B takes. B alone can
do the whole work in
a) 15 days
b) 10 days
c) 9 days
d) 8 days
Question 23: A does half as much work as B in three-fourth
of the time. If together they take 18 days to complete the
work, how much time shall B take to do it
a) 40 days
b) 35 days
c) 30 days
d) 25 days
Question 24: Worker A takes 8 hours to do a job. Worker B
takes 10 hours to do a job. How long should it take both A
and B, working together to do same job.
a) 49
b) 249
c) 349
d) 449

Question 25: 5 men and 2 boys working together can do four


times as much work as a man and a boy. Working capacity of
man and boy is in the ratio
a) 1:2
b) 1:3
c) 2:1
d) 2:3
Question 26: A piece of work can be done by 6 men and 5
women in 6 days or 3 men and 4 women in 10 days. It can be
done by 9 men and 15 women in how many days ?
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 7
ambitiousbaba.com Online Test Series

a) 3 days
b) 4 days
c) 5 days
d) 6 days

Question 27: A can do a piece of work in 15 days and B alone


can do it in 10 days. B works at it for 5 days and then leaves.
A alone can finish the remaining work in
a)5 days
b) 6 days
c) 7.5 days
d) 8.5 days
Question 28: To complete a work A and B takes 8 days, B and
C takes 12 days, A,B and C takes 6 days. How much time A
and C will take
a) 24 days
b) 16 days
c) 12 days
d) 8 days
Question 29: A and B can together complete a piece of work
in 4 days. If A alone can complete the same work in 12 days,
in how many days can B alone complete that work ?
a) 4 days
b) 5 days
c) 6 days
d) 7 days
Question 30: A can do a certain job in 25 days which B alone
can do in 20 days. A started the work and was joined by B
after 10 days. The number of days taken in completing the
work were ?
a) 1423kmph1423kmph
b) 1523kmph1523kmph
c) 1623kmph1623kmph
d) 1723kmph
Question 31:
A takes three times as long as B and C together to do a job. B
takes four times as long as A and C together to do the same
work, If all three, working together can complete the job in

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 8
ambitiousbaba.com Online Test Series

24 days, then the number of days, A alone will take to finish


the job is:
a) 100
b) 96
c) 95
d) 90
e) None of these
Question 32: 4 boys and 3 women can do a piece of work in 6
days while 2 boys and 4 women can do the same piece of work
in 9 days. How much time will be taken by 7 boys and 9 women
to do the same piece of work?
a) 3 days
b) 7 days
c) 8 days
d) 12 days
e) None of these
Question 33: Working alone, Typewriters A, B, C can do a
certain typing job, consisting of a large number of pages, in
12, 15 and 18 hours, respectively. What is the ratio of the time
it takes Typewriter A to do the job, working alone at its rate,
to the time it takes Type writer B and C to do the job, working
together at their individual rate?

4
11

1
2

15
22

22
15
Question 34: A, B and C can do a piece of work in 4, 7 and 8
days respectively. They undertook to finish the work together
for Rs. 53650. Find the difference (in Rs.) between the share
of A and that of B.
a) 10100
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 9
ambitiousbaba.com Online Test Series

b) 11100
c) 11650
d) 12560
e) None of these
Question 35:
A takes twice as much time as B or thrice as much time as C
to finish a piece of work. Working together, they can finish
the work in 2 days. B can do the work alone in:
A. 4 days
B. 6 days
C. 8 days
D. 12 days
Question 36:
A and B can complete a work in 15 days and 10 days
respectively. They started doing the work together but after
2 days B had to leave and A alone completed the remaining
work. The whole work was completed in :
A. 8 days
B. 10 days
C. 12 days

D. 15 days
Question 37:

A and B can do a piece of work in 30 days, while B and C can


do the same work in 24 days and C and A in 20 days. They all
work together for 10 days when B and C leave. How many
days more will A take to finish the work?
A. 18 days
B. 24 days
C. 30 days
D. 36 days

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 10
ambitiousbaba.com Online Test Series

Question 38:
A works twice as fast as B. If B can complete a work in 12
days independently, the number of days in which A and B
can together finish the work in :
A. 4 days
B. 6 days
C. 8 days
D. 18 days
Question 39:
Twenty women can do a work in sixteen days. Sixteen men
can complete the same work in fifteen days. What is the ratio
between the capacity of a man and a woman?
A. 3 : 4
B. 4 : 3
C. 5 : 3
D. Data inadequate
Question 40: A can do a piece of work in 10 days, B in 15
days. They work together for 5 days, the rest of the work is
finished by C in two more days. If they get Rs. 3000 as wages
for the whole work, what are the daily wages of A, B and C
respectively (in Rs):
a) 200, 250, 300
b) 300, 200, 250
c) 200, 300, 400
d) None of these
Question 41: A, B and C can do a piece of work in 24 days, 30
days and 40 days respectively. They began the work together
but C left 4 days before the completion of the work. In how
many days was the work completed?
a) 11days
b) 12days
c) 13days
d) 14days
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 11
ambitiousbaba.com Online Test Series

Question 42: 12 men can complete a work in 8 days. 16


women can complete the same work in 12 days. 8 men and 8
women started working and worked for 6 days. How many
more men are to be added to complete the remaining work in
1 day?
a) 8
b) 12
c) 16
d) 24
Question 43: P can complete a work in 12 days working 8
hours a day. Q can complete the same work in 8 days
working 10 hours a day. If both p and Q work together,
working 8 hours a day, in how many days can they complete
the work?
a) 60/11
b) 61/11
c) 71/11
d) 72/11
Question 44: A and B can do a piece of work in 30 days ,
while B and C can do the same work in 24 days and C and A
in 20 days . They all work together for 10 days when B and C
leave. How many days more will A take to finish the work?
a) 18
b) 24
c) 30
d) 36
Question 45: A works twice as fast as B .If B can complete a
work in 18 days independently, the number of days in which
A and B can together finish the work is:
a) 4
b) 6
c) 8
d) 10
Question 46: A can do a certain work in the same time in
which B and C together can do it. If A and B together could
do it in 20 days and C alone in 60 days , then B alone could
do it in:
a) 20
b) 40
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 12
ambitiousbaba.com Online Test Series

c) 50
d) 60
Question 47: A Contractor employed a certain number of
workers to finish constructing a road in a certain scheduled
time. Sometime later, when a part of work had been
completed, he realised that the work would get delayed by
three-fourth of the scheduled time, so he at once doubled
the no of workers and thus he managed to finish the road on
the scheduled time. How much work he had been completed,
before increasing the number of workers?
a) 10%
b) 14(2/7%)
c) 20%
d) 30%
Question 48: A is thrice efficient as B and C is twice as
efficient as B. what is the ratio of number of days taken by
A,B and C, when they work individually?
a) 2:6:3
b) 2:3:6
c) 1:2:3
d) 3:1:2
Question 49: The ratio of efficiency of A is to C is 5:3. The
ratio of number of days taken by B is to C is 2:3. A takes 6
days less than C, when A and C completes the work
individually. B and C started the work and left after 2 days.
The number of days taken by A to finish the remaining work
is:
a) 4
b) 5
c) 6
d) 9
Question 50: (x-2) men can do a piece of work in x days and
(x+7) men can do 75% of the same work in (x-10)days. Then
in how many days can (x+10) men finish the work?
a) 27
b) 12
c) 25
d) 18

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 13
ambitiousbaba.com Online Test Series

Question 51: A is twice efficient as B and together they do


the same work in as much time as C and D together. If C and
D can complete the work in 20 and 30 days respectively,
working alone ,then in how many days A can complete the
work individually:
a) 12
b) 18
c) 24
d) 30
Question 52: An air conditioner can cool the hall in 40
minutes while another takes 45 minutes to cool under
similar conditions. If both air conditioners are switched on at
same instance then how long will it take to cool the room
approximately ?
a) 18
b) 19
c) 22
d) 24
Question 53: A group of workers was put on a job. From the
second day onwards, one worker was withdrawn each day.
The job was finished when the last worker was withdrawn.
Had no worker been withdrawn at any stage, the group would
have finished the job in 55% of the time. How many workers
were there in the group?
a) 50
b) 40
c) 45
d) 10
Question 54: Ram starts working on a job and works on it
for 12 days and completes 40% of the work. To help him
complete the work, he employs Ravi and together they work
for another 12 days and the work gets completed. How much
more efficient is Ram than Ravi?
a) 50%
b) 200%
c) 60%
d) 100%
Question 55: If A and B work together, they will complete a
job in 7.5 days. However, if A works alone and completes half
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 14
ambitiousbaba.com Online Test Series

the job and then B takes over and completes the remaining
half alone, they will be able to complete the job in 20 days.
How long will B alone take to do the job if A is more efficient
than B?
a) 20 days
b) 40 days
c) 30 days
d) 24 days
Question 56: A tank is fitted with 8 pipes, some of them that
fill the tank and others that are waste pipe meant to empty
the tank. Each of the pipes that fill the tank can fill it in 8
hours, while each of those that empty the tank can empty it
in 6 hours. If all the pipes are kept open when the tank is
full, it will take exactly 6 hours for the tank to empty. How
many of these are filling pipes?
a) 2
b) 4
c) 6
d) 4. 5
Question 57: A can finish a work in 12 days while B can
finish the same work in 15 days. If both work together, then
calculate the Time taken to complete the work.
a) 6 2/3 days
b) 6 days
c) 8 days
d) 4 days
Question 58: As a worker, Ajit is thrice as good as Dev. If
both working together can finish the work in 5 days, then
determine the Time taken by Ajit to complete the work
alone.
a) 10/3 days
b) 5 days
c) 4 days
d) 20/3 days
Question 59: A and B can do a work in 12 days, B and C can
do the same work in 15 days and A and C can complete the
work in 20 days. In how many days A, B and C working
together can complete the whole work?
a) 10 days
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 15
ambitiousbaba.com Online Test Series

b) 12 days
c) 8 days
d) 14 days
Question 60: A can finish the work in 16 days while B can
finish the work in 8 days. After A started the work alone, B
joined him after 4 days. Find out the total Time taken to
finish the work.
a) 4 days
b) 8 days
c) 6 days
d) 14 days
Question 61: Amit takes 20 days to complete a certain work.
Amit started the work and Suraj joined him 4 days before the
work was completed. Find out the number of days for which
Amit worked alone if Suraj’s efficiency is 25% more than
that of Amit’s.
a) 10 days
b) 8 days
c) 12 days
d) 11 days
Question 62: The ratio of number of days taken by B is to C
is 2: 3. The ratio of efficiency of A is to C is 5: 3. A takes 4
days less than C, when A and C complete the work
individually. A, B and C started the work and B & C left after
2 days. The number of days taken by A to complete the
remaining work is:
a) 1 day
b) 2 days
c) 3 days
d) 5 days
Question 63: A takes 4 days less than B and 2 days more
than C to do a job. A and B together can do the job in the
same Time as C. Determine the ratio of number of days taken
by A and B to complete the job individually.
a) 2: 3
b) (1 + v3): (3 + v3)
c) 1: v2
d) (1 + v3): (2 + v6)

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 16
ambitiousbaba.com Online Test Series

Question 64: Two companies GIL and NCC are working


together to build a flyover in Delhi. GIL working on its own
would have finished the project in 5 months but working
with NCC it is able to finish the project in 4 months. NCC has
two teams, one headed by Ramesh and other headed by
Sanjeev working on this project. They are doing the same
kind of work but efficiency of Sanjeev’s team is 75% of the
efficiency of Ramesh’s team. If the total value of the
contract for building this flyover is Rs. 35, 00, 000 then
determine the money obtained by Sanjeev’s team.
a) Rs. 4, 00, 000
b) Rs. 3, 50, 000
c) Rs 2,50, 000
d) Rs. 3, 00, 000
Question 65: 15 workers working 4 hours a day for 25 days
can build a platform of width 120 meters, length 10 meter
and height 14 meters. How many days will 12 workers
working 5 hours a day will take if they have to build a
platform of width 600 meters, length 14 metres and height
12 metres?
a) 150
b) 130
c) 125
d) 120
Question 66: 12 Men can complete a project in 15 days and
10 women can complete the same project in 24 days. 9 men
start working and after 6 days they are replaced by 12
women. In how many days will 12 women complete the
remaining work?
(a) 20
(b) 10
(c) 16
(d) 18
(e) 14
Question 67: Arjun and Suman together can complete an
assignment of data entry in 6 days. Suman’s speed is 60% of
Arjun’s speed and the total key are 5,76,000. What is Arjun’s
speed in key depressions per hour if they work for 12 hours a
day?
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 17
ambitiousbaba.com Online Test Series

(a) 4800
(b) 6400
(c) 5000
(d) 7200
(e) 8400
Question 68: There are two taps to fill a tank and a third to
empty it. When the third tap is closed, they can fill the tank
in 10 min and 12 min, respectively. If all the three taps be
opened, the tank is filled in 15 min. If the first two taps are
closed, in approximately what time can the third tap empty
the when it is full?
(a) 8 min and 34 second
(b) 9 min and 32 second
(c) 7 min
(d) 6 min
(e)12 min
Question 69: A is twice as efficient as C. B takes thrice as
many days as A. C takes 12 days to finish the work alone. If
they work in pairs (i.e., BC, AB, CA) starting with BC on the
first day, AB on the second day and AC on the third day and
so on, then how many days are required to finish the work?
(a) 31/5 days
(b) 4.5 days
(c) 46/9 days
(d) 8 days
(e) 4 days
Question 70: There are two auto closed pipes X and Y which
get closed if there is any disturbance can fill a tank in 10 and
15 hrs. respectively. Both the pipes are opened to fill the
tank but when the tank is 1/3 rd full, a leak develops in the
tank which results in closing of both pipes. Through the leak
one-third water supplied by both the pipes goes out & after it
the leak was get closed by some means and both filling pipes
again start filling the tank. The total time taken to fill the
tank is
(a) 12 hr
(b) 8 hr
(c) 4 hr

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 18
ambitiousbaba.com Online Test Series

(d) 6 hr
(e) 10 hr.
Question 71: A certain number of people were supposed to
complete a work in 20 days. The work, however, took 28
days, since 8 people were absent throughout. How many
people were supposed to be working originally?
(a) 32
(b) 27
(c) 36
(d) 30
(e) 28
Question 72: X and Y start from the same point and run
around a circular stadium, whose circumference is 2800 m,
at the rate of 250 m and 350 m per minute respectively in
the opposite direction. They will meet each other in
(a) 14/3 min
(b) 16/3 min
(c) 12/5 min
(d) 18/5 min
(e) 11/3 min
Question 73: If 300 men dig a 5.5 m wide, 4 m deep and 405
m long canal in an hour, then how long a canal will 2000
men working for 6 hrs, dig if it is 20 m wide and 16 m deep?
(a) 6452 m
(b) 6682.5 m
(c) 2694.5 m
(d) 4082 m
(e) None of these
Question 74: In an army camp there was sufficient food for
250 soldiers for 30 days. After 20 days 125 soldiers left the
camp. For how many extra days will the rest of the food last
for the remaining soldiers?
(a) 12 days
(b) 10 days
(c) 8 days
(d) 6 days
(e) 14 days
Question 75: Arun can do a piece of work in 40 days, but Bala
can do the same work in 5 days less, than Arun, when
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 19
ambitiousbaba.com Online Test Series

working alone. Arun and Bala both started the work together
but Bala left after some days and Arun finished the
remaining work in 30 days with half of his efficiency but he
did the work with Bala with his complete efficiency. For how
many days they had worked together?
A. 25/3 days
B. 31/3 days
C. 35/3 days
D. 38/3 days
E. None of these
Question 76: Kiran can do a work in 20 days, while Karan
can do the same work in 25 days. They started the work
jointly. Few days later Suman also joined them and thus all
of them completed the whole work in 10 days. All of them
were paid total Rs.1000. What is the share of Suman?
A. 200
B. 400
C. 100
D. 300
E. 500
Question 77: 7 Indian and 4 American finish a job in 6 days.
7 African and 3 American finish the same job in 8 days. The
efficiency of each person of a particular nationality is same
but different from others. One Indian One American and One
African will complete the work in:
A. 10 days
B. 12 days
C. 24 days
D. 36 days
E. None of these
Question 78: Chitra is twice efficient as Arun. Bala takes
thrice as many days as Chitra. Arun takes 12 days to finish
the work alone. If they work in pairs(i.e Arun-Bala, Bala-
Chitra, Chitra-Arun) starting with Arun – Bala on the first
day, Bala – Chitra on the second day and Chitra – Arun on
the third day and so on, then how many days are required to
finish the work?
A. 26/9 days
B. 46/9 days
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 20
ambitiousbaba.com Online Test Series

C. 16/9 days
D. 56/9 days
E. None of these
Question 79: A work is done by 30 workers not all of them
have the same capacity to work. Every day exactly 2
workers, do the work with no pair of workers working
together twice. Even after all possible pairs have worked
once, all the workers together works for six more days to
finish the work. Find the number of days in which all the
workers together will finish the work?
A. 22 days
B. 20 days
C. 24 days
D. 35 days
E. 32 days
Question 80: Arun can do a piece of work in 10 days, Bala in
15 days. They work together for 5 days, the rest of the work
is finished by Chitra in two more days. If they get Rs. 5000
as wages for the whole work, what are the daily wages of
Arun, Bala and Chitra respectively (in Rs)?
A. 600, 400, 500
B. 200, 300, 400
C. 500, 300, 400
D. 600, 500, 300
E. 400, 300, 200
Question 81: A Contractor employed a certain number of
workers to finish constructing a building in a certain
scheduled time. Some time later, when a part of work had
been completed, he realized that the work would get delayed
by half of the scheduled time, so he at once doubled the no
of workers and thus he managed to finish the building on the
scheduled time. How much work he had been completed,
before increasing the number of workers?
A. 200/3 %
B. 100/3 %
C. 300/3 %
D. Can’t be determined
E. None of these

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 21
ambitiousbaba.com Online Test Series

Question 82: (x-2) person can do a work in x days and (x+7)


person can do 75% of the same work in (x-10)days. Then in
how many days can (x+10) person finish the work?
A. 27 days
B. 12 days
C. 25 days
D. 18 days
E. None of these
Question 83: The ratio of efficiency of Arun is to Chitra is
5:3. The ratio of number of days taken by Bala is to Chitra is
2:3. Arun takes 6 days less than Chitra, when Arun and
Chitra complete the work individually. Bala and Chitra
started the work and left after 2 days. The number of days
taken by Arun to finish the remaining work is?
A. 4 days
B. 5 days
C. 6 days
D. 9 days
E. None of these
Question 84: Arun is twice efficient as Bala and together
they do the same work in as much time as Chitra and David
together. If Chitra and David can complete the work in 20
and 30 days respectively, working alone, then in how many
days A can complete the work individually?
A. 12 days
B. 18 days
C. 24 days
D. 30 days
E. None of these
Question 85: A is twice efficient as B. A and B together do
the same work in as much time as C and D can do together.
If the ratio of the number of alone working days of C to D is
2:3 and if B worked 16 days more than C then no of days
which A worked alone?
A. 18 Days
B. 20 Days
C. 30 Days
D. 36 Days
E. Cannot be determined
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 22
ambitiousbaba.com Online Test Series

Question 86: A can do a piece of work in 40 days B can do


the same piece of work in 60 days. A and B started the work
together in the first 15 days A worked with 50% of his
efficiency, in the next 15days B worked with 50% of his
efficiency. Now in how many days does the remaining work
will be completed if both of them work with their full
efficiencies?
A. 1 Day
B. 1.5 Days
C. 2 Days
D. 2.5 Days
E. None
Question 87: A can do a piece of work in 30 days, B can do in
45 days and C can do same work alone in 60 days. If on
the first day A worked alone and on the second day A and B
worked together and on the third day A and C worked
together. If they repeat the cycle as follows then in how
many days total work can be completed?
A. 21 Days
B. 21 7/8 Days
C. 21 5/6 Days
D. 21 4/9 Days
E. None
Question 88: Ramu completes 30% of work in 7.5 days. Raju
is 50% as efficient as Ramu, Venu is 50% as efficient as Raju.
Now Raju and Venu joined with Ramu for the rest of the work
then in how many days will take to complete the work?
A. 9 Days
B. 10 Days
C. 12 Days
D. 15 Days
E. None of these
Question 89: A can do a piece of work in 21days. B is 50%
more efficient than A. C is twice efficient than B. A started
the work alone and worked for some days and left the work
then B and C joined together and completed the work in 2
days. Then how many days does A worked alone?
A. 7 Days
B. 12 Days
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 23
ambitiousbaba.com Online Test Series

C. 14 Days
D. 21 Days
E. None
Question 90: A can do a piece of work in 60days working 14
hours. B has the same efficiency as of A. A and B started
working together. A works 5,6,7 and 8 hours respectively on
first four days and repeats the cycle again. Then B has to
work how many hours daily if they together completed the
work in 80 days?
A. 1 Hour
B. 2 Hours
C. 3 Hours
D. 4 Hours
E. None of these
Question 91: Sruthi, Swetha and Swati together can cut 216
Apples of the same size in 3 hours. Number of Apples cut by
Sruthi in 9 hours is same as the number of Apples cut by
Swati in 7 hours. In one hour, Swati can cut as many Apples
more than Swetha as Swetha can cut more than Sruthi.Then
the number of Apples cut by Swetha in one hour?
A. 21
B. 24
C. 27
D. 29
E. None
Question 92: A can type 100 letters in 5 minutes. B and C
typing together can type 50 letters in 2 minutes. If all of
them working together then can type 90 letters in how many
minutes?
A. 2 minutes
B. 4 minutes
C. 5 minutes
D. 10 minutes
E. None
Question 93: If A and B work together can complete a work
in 8/5 days. A started the work alone and completed. 50% of
the work and left the work then B started the work alone and
finished the rest of work. They took total 5 days to complete
the work. Then in how many days B can complete the work if
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 24
ambitiousbaba.com Online Test Series

A is more efficient than A?


A. 1 Day
B. 2 Days
C. 3 Days
D. 4 Days
E. None
Question 94: A piece of work is to be completed in 100days,
11 Men are employed to do the work it is found that after 50
days only 1/3 rd work is completed. Now additionally how
many more Men are to be employed to work to finish the
work in time?
A. 5
B. 6
C. 7
D. 11
E. None
1. C
Explanation :
Total days Mohan worked = 3+3 = 6
6/15 = 2/5
So 3/5 = 3/x
x=5
2. C
Explanation :
Arun, Bipasha and rahul’s 1 day work = 1/10 + 1/50 =
6/50 = 3/25
Arun’s 1 day work = Bipasha + Rahul ‘s 1 day work
2*( Arun’s 1 day work) = 3/25
Arun’s 1 day work = 3/50
Bipasha’s 1 day work = 1/10 – 3/50 = 2/50 = 1/25
3. C
Explanation :
Assume the total work to be 600 units. (LCM of all the
numbers)
Then Sandeep’s 1 day work = 8 units.
All three’s 1 day work = 40 units.All work together in the
first 2 days

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 25
ambitiousbaba.com Online Test Series

Work done in the first 2 days = 40 × 2 = 80 units


Sandeep alone works during the last 40 days
Work done in the last 40 days = 40 × 8 = 320 units
Remaining work = 600 – (320 + 80) = 200 units
This work is done by pradeep and sandeep in 10 days.
Pradeep and Sandeep together’s 1 day work = 20 units
Sekar’s 1 day work = All three 1 day work – Pradeep and
Sandeep together’s 1 day work = 40 units – 20 units = 20
units
Sekar can do the work of 600 units in 30 days.
4. C
Explanation :
Dinesh work done = 20*5/4 = 25 days
1/5 workdone by Dinesh and gokul in 3days.
Whole work done = 15 days
Dinesh 1 days work = 1/25
Dinesh and gokul’s 1 day work = 1/15
Gokul’s 1 day work = 1/15 – 1/25 = 2/75
Gokul alone in 75/2 days or 37 ½ days.
5. B
Explanation :
Hari + vijay 20 days work = 1/30 *20 = 2/3
Remaining work = 1/3
1/3 work in 20 days so whole work in 60 days.
6. C
Explanation :
Let the work be 100 units.
Madhavan’s 1 hour work = 100/5 = 20 units
Manohar and Manjima’s 1 day work = 3/4 × 20 = 15 units.
Mohan and Mani’s 1 day work = 1/5 × 20 = 4 units.
In one day all five of them can do = 20 + 15 + 15 + 4 + 4 =
58 units of work. Hence they can complete the work in
100/58 days.
7. B
Explanation :
1/P = 1/10
1/P + 1/Q + 1/R = 1/10 + ¼ = 7/20
In 20 hours, working together, they will complete 7

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 26
ambitiousbaba.com Online Test Series

booklets.
Thus, in 40 hours they will complete 14 booklets.
8. B
Explanation :
Number of products made by Nakul in 1 hour = 32/6 =
16/3
Number of products made by Ram in 1 hour = 40/5 = 8
Number of products made by both in 1 hour = 16/3 + 8 =
40/3
Time taken by both to make 110 products = 110* 3/40 = 8
¼ hrs
9. C
Explanation :
Assume there are 360 units of work (LCM of 90, 40 and 12).
Hence, they can do 4,9 and 30 units per day or together 43
units every 3 days.
So In 24 days, 43×8=344 units of work is completed.
In the next 2 days, 13 unitsare completed and on 27th day,
Santhosh takes 1/10 thof a day to finish the rest.
So, gopal and vikash worked for 9 days each and have
hence put in 36 and 81 units respectively, and the rest of
the 243 units is put in by santhosh.
The wages shall also be distributed in the same ratio as: Rs
36, Rs 81 and Rs 243.
10. C
Explanation :
Fraction of work completed by Karthik on day 1 and day 2 =
2* 1/30 = 1/15
Fraction of work left after 2 days = 14/15
Fraction of work completed by Both = 1/25 + 1/30 =
11/150
Number of days after day 2 to complete work =
14*150/15*11 = 13 days
So after 2+13 = 15 days works will be completed
11. B
Explanation :
P can complete the work in 25 days and Q can complete the
work in 20 days. So both will complete the work in
(20*25)/45 = 100/9 days
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 27
ambitiousbaba.com Online Test Series

12. A
Explanation :
Let B take X days to complete the work then in one –sixth of
the time i.e. x/6 days. Now A do half work as done by B so A
will take twice the time i.e. 2*x/6 = x/3 to complete the job
alone
So 1/x + 3/x = 1/20, x = 80 days
13. C
Explanation :
Let total work is w and it is given that one-third of the work
is completed after 30 days. Means
M*D = 30*30 = w/3, so total work = 30*30*3
2700 = 30*30 + (30+p)*30, so we get P = 30 (p = additional
men)
14. C
Explanation :
Let additional workers be P,
(50*150)/(50*200) = 3/4 of the work is already completed
and now only 1/4 of the work is to be done. So,
1/4 = ((50 + P) * 25)/50*200, solve for p, we get P = 50
15. B
Explanation :
1/15 + 1/12 + 1/c = 1/6, we got C = 60 (it means C will
take 60 days to complete the work alone)
so ratio of work done by P:Q:R = 4:5:1
so c share = (1/10)*1200 = 120
16. B
Explanation :
A’s one day work = 1/32 so P one day work =
(160/100)*1/32 = 1/20, so P will take 20 days to complete
the work.
So Both A and P will take = (32*20)/52 = 160/13 days
17. B
Explanation :
Let Q take x days to complete the work, so P will take 2*3/4
of X day to complete the work i.e. 3x/2 days
1/x + 2/3x = 1/24, we get x = 40 days, so P will take = 3/2
of 40 = 60 days
18. B
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 28
ambitiousbaba.com Online Test Series

Explanation :
(1/12 + 1/15)*(T – 3) + 3/12 = 1
19. E
Explanation :
In one hour number of pages type by neha = 40/5 = 8 and
similarly for sunil it is 60/6 = 10.
Now to type 180 pages they will take, (8 + 10)*T = 180, T =
10 hours
20. A
Explanation :
( 1/90 + 1/60 + 1/45)*1/2 = (1/P +1/Q + 1/R) = 1/40
so 40 days
21. D
22. A
Explanation:
Ratio of times taken by A and B = 1:3
Means B will take 3 times which A will do in 1 time

If difference of time is 2 days, B takes 3 days


If difference of time is 10 days, B takes (3/2) * 10 =15 days
23. C
Explanation:
Suppose B takes x dáys to do the work.
As per question A will take
2∗34∗x=3x2days

(A+B)s 1 days work= 1/18


1/x + 2/3x = 1/18 or x = 30 days

24. D
Explanation:
In this type of questions, first we need to calculate 1 hours
work, then their collective work as,

A's 1 hour work is 1/8


B's 1 hour work is 1/10

(A+B)'s 1 hour work = 1/8 + 1/10


IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 29
ambitiousbaba.com Online Test Series

= 9/40

So both will finish the work in 40/9 hours


=449
25. C
Explanation:
Let 1 man 1 day work = x
1 boy 1 day work = y

then 5x + 2y = 4(x+y)
=> x = 2y
=> x/y = 2/1
=> x:y = 2:1
26. A
Explanation:
To calculate the answer we need to get 1 man per day work
and 1 woman per day work.

Let 1 man 1 day work =x


and 1 woman 1 days work = y.
=> 6x+5y = 1/6
and 3x+4y = 1/10
On solving, we get x = 1/54 and y = 1/90

(9 men + 15 women)'s 1 days work =


(9/54) + (15/90) = 1/3

9 men and 15 women will finish the work in 3 days


27. C
Explanation:
B's 5 days work =
110∗5=12Remaining work =1−12=12A can finish work
=15∗12=7.5days
28. D
Explanation:
A+B 1 day work = 1/8
B+C 1 day work = 1/12
A+B+C 1 day work = 1/6

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 30
ambitiousbaba.com Online Test Series

We can get A work by (A+B+C)-(B+C)


And C by (A+B+C)-(A+B)

So A 1 day work =
16−112=112

Similarly C 1 day work =


16−18=4−324=124

So A and C 1 day work =

112+124=324=18

So A and C can together do this work in 8 days


29. C
Explanation:
(A+B)'s 1 day work = 1/4

A's 1 day work = 1/12

B's 1 day work =


(14−112)=3−112=16(14−112)=3−112=16

So B alone can complete the work in 6 days

30. D
Explanation:
Work done by A in l0 days = (1/25) *10 = 2/5
Remaining work = 1 - (2/5) = 3/5
(A+B)s 1 days work = (1/25) + (1/20) = 9/100

9/100 work is done by them in 1 day.


hence 3/5 work will be done by them in (3/5)*(100/9)
= 20/3days.

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 31
ambitiousbaba.com Online Test Series

Total time taken = (10 + 20/3) = 16*(2/3) days


31. B
Let 1 day's efficiency of each of the individuals is A, B and C
respectively.

As per the given information, we get the efficiency equations


as follows

3A = (B + C) ...(i)

A + B + C = 24 .....(ii)

Putting 3A in place of (B + C) in eqnation (ii), we get

A + 3A = 24

4A = 24

Now, 4A do the whole work in 24 days.

Therefore, A alone will do the whole work in 24 × 4 = 96


days.

Hence, option B is correct.


32. A
As per the given information, work done by 4 boys and 3
women in 6 days must be equal to work done by 2 boys and
4 women in 9 days.

Therefore, we get

(4B + 3W) × 6 = (2B + 4W) × 9

⇒ 24B + 18W = 18B + 36W

⇒ 6B = 18W ⇒ 1B = 3W

Now, 2B + 4W= (2 × 3)W + 4W = 10W


IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 32
ambitiousbaba.com Online Test Series

⇒ 10 women do a piece of work in 9 days.

Similary, 7B + 9W = (7 × 3)w + 9W = 30W

Now, when 10 women do a piece of work in 9 days,

30 women (thrice of 10) will do the same piece of work in 3


days (∵ Time ∝ 1/Efficiency ).

Hence, option A is correct.


33. D
Since Typewriter B can do the job in 15 hours,

1
it can do of the job in 1 hour.
15

Since Typewriter C can do the job in 18 hours


1
it can do of the job in 1 hour.
18

Together Typerwriters B and C can do


1 1 6 5 11
( + )=( + )= of the job in 1 hour
15 18 90 90 90

90
Which means that it takes them = hours
11

to complete the job. Since Typewriter A completes the job in


12 hours, the ratio of the time required for A to do the job to
the time required for B and C working together to do the job
is

12 12(11) 2(11) 22
= = =
90 90 15 15
11

Hence, option (D) is correct.

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 33
ambitiousbaba.com Online Test Series

34. B
We know that

The ratio of shares of A, B and C = The ratio of their


efficiencies

1 1 1
= : :
4 7 8

14 8 7
= : : = 14 : 8 : 7
56 56 56

6
Difference between the shares of A and B in ratio
29

6
∴ Actual difference in value = × 53650 = 11,100/-
29

Hence, option B is correct.


35. B
Explanation:
Suppose A, B and C x x days respectively to finish the
and
take x, 2 3 work.
1 2 3 1
Then, + + =
x x x 2
6 1
=
x 2
x = 12.
So, B takes (12/2) = 6 days to finish the work
36. C
Explanation:
1 1 1
(A + B)'s 1 day's work = + = .
15 10 6
1 1
Work done by A and B in 2 days = x2 = .
6 3
1 2
Remaining work = 1- = .
3 3

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 34
ambitiousbaba.com Online Test Series

1
Now, work is done by A in 1 day.
15
2 2
work will be done by a in 15 x = 10 days.
3 3
Hence, the total time taken = (10 + 2) = 12 days.
37.A
Explanation:
1 1 1 15 1
2(A + B + C)'s 1 day's work = + + = = .
30 24 20 120 8
1 1
Therefore, (A + B + C)'s 1 day's work = = .
2 x 8 16
10 5
Work done by A, B, C in 10 days = = .
16 8
5 3
Remaining work = 1- = .
8 8
1 1 1
A's 1 day's work = - = .
16 24 48
1
Now, work is done by A in 1 day.
48
3 3
So, work will be done by A in 48 x = 18 days.
8 8
1. A
Explanation:
Ratio of rates of working of A and B = 2 : 1.
So, ratio of times taken = 1 : 2.
1
B's 1 day's work = .
12
1
A's 1 day's work = ; (2 times of B's work)
6
1 1 3 1
(A + B)'s 1 day's work = + = = .
6 12 12 4
So, A and B together can finish the work in 4 days.
39. B
Explanation:
(20 x 16) women can complete the work in 1 day.
1 woman's 1 day's work = 1 .
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 35
ambitiousbaba.com Online Test Series

320
(16 x 15) men can complete the work in 1 day.
1
1 man's 1 day's work =
240
1 1
So, required ratio = :
240 320

1 1
= :
3 4

= 4 : 3 (cross
multiplied)

40.B
Explanation:

A's 5 days work = 50%


B's 5 days work = 33.33%
C's 2 days work = 16.66% [100- (50+33.33)]
Ratio of contribution of work of A, B and C
= 50 : 3313 : 162350 : 3313 : 1623 = 3 : 2 : 1
A's total share = Rs. 1500
B's total share = Rs. 1000
C's total share = Rs. 500

A's one day's earning = Rs.300


B's one day's earning = Rs.200
C's one day's earning = Rs.250
4. A
Explanation:

One day's work of A, B and C = (1/24 + 1/30 +


1/40) = 1/10.
C leaves 4 days before completion of the work,
which means only A and B work during the last 4
days.
Work done by A and B together in the last 4 days
= 4 (1/24 + 1/30) = 3/10.

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 36
ambitiousbaba.com Online Test Series

Remaining Work = 7/10, which was done by A,B


and C in the initial number of days.
Number of days required for this initial work = 7
days.
Thus, the total numbers of days required = 4 + 7
= 11 days.

42.B
Explanation:

1 man's 1 day work =1/96 ; 1 woman's 1 day work = 1/192


Work done in 6
days=6(896+8192)=6×18 =346896+8192=6×18 =34
Remaining work = 1/4
(8 men +8 women)'s 1 day work = 1(896+8192)1896+8192 =1/8
Remaining work =1/4 - 1/8 = 1/8

1/96 work is done in 1 day by 1 man

Therefore, 1/8 work will be done in 1 day by 96 x (1/8) =12 men


43.A
Explanation:

P can complete the work in (12 x 8) hrs = 96 hrs


Q can complete the work in (8 x 10) hrs=80 hrs
Therefore, P's 1 hour work=1/96 and Q's 1 hour work= 1/80
(P+Q)'s 1 hour's work =(1/96) + (1/80) = 11/480. So both P and
Q will finish the work in 480/11 hrs
Therefore, Number of days of 8 hours each = (480/11) x (1/8) =
60/11
44. A
Explanation:

2(A+B+C)'s 1 day work = 1/30 + 1/24 + 1/20 = 1/8


=>(A+B+C)'s 1 day's work= 1/16
work done by A,B and C in 10 days=10/16 = 5/8

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 37
ambitiousbaba.com Online Test Series

Remaining work= 3/8


A's 1 day's work= (116−124)=148116-124=148
Now, 1/48 work is done by A in 1 day.
So, 3/8 work wil be done by A in =48 x (3/8) = 18 days
45. B
Explanation:

Ratio of rates of working of A and B =2:1. So, ratio of times taken


=1:2
Therefore, A's 1 day's work=1/9
B's 1 day's work=1/18
(A+B)'s 1 day's work= 1/9 + 1/18 = 1/6
so, A and B together can finish the work in 6 days

46. D
Explanation:

(A+B)'s 1 day's work=1/20


C's 1 day work=1/60
(A+B+C)'s 1 day's work= 1/20 + 1/60 = 1/15

Also A's 1 day's work =(B+C)'s 1 day's work


Therefore, we get: 2 x (A's 1 day 's work)=1/15
=>A's 1 day's work=1/30

Therefore, B's 1 day's work= 1/20 - 1/30 = 1/60


So, B alone could do the work in 60 days.
47. B
Explanation:

Let he initially employed x workers which works for D days and


he estimated 100 days for the whole work and then he doubled
the worker for (100-D) days.
D * x +(100- D) * 2x= 175x
=> D= 25 days
Now , the work done in 25 days = 25x
Total work = 175x
Therefore, workdone before increasing the no of workers
= 25x175x×10025x175x×100 % = 1427%
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 38
ambitiousbaba.com Online Test Series

48. A

Explanation:

A : B : C
Ratio of efficiency 3 : 1 : 2
Ratio of No.of days 1/3 : 1/1 : 1/2
or 2 : 6 : 3
Hence A is correct.
49. C
Explanation:

A : C

Efficiency 5 : 3

No of days 3x : 5x

Given that, 5x-6 =3x => x = 3

Number of days taken by A = 9

Number of days taken by C = 15

B : C

Days 2 : 3

Therefore, Number of days taken by B = 10

Work done by B and C in initial 2 days = 2[110+115]2110+115=


1/3

Thus, Rest work =2/3

Number of days required by A to finish 2/3 work = (2/3) x 9 = 6


days
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 39
ambitiousbaba.com Online Test Series

50. B
Explanation:

34×(x−2)x=(x+7)(x−10)34×(x-2)x=(x+7)(x-10)
⇒x2−6x−280 =0⇒x2-6x-280 =0
=> x= 20 and x=-14
so, the acceptable values is x=20
Therefore, Total work =(x-2)x = 18 x 20 =360 unit
Now 360 = 30 x k
=> k=12 days
51. B
Explanation:

A + B = C + D
| | | |
Ratio of efficiency 10x + 5x 9x + 6x
|________| |_________|
15x 15x
Therefore , ratio of efficiency of A:C =10:9
Therefore, ratio of days taken by A:C = 9:10
Therefore, number of days taken by A = 18 days
52. C
Explanation:

Let the two conditioners be A and B

'A' cools at 40min

'B' at 45min

Together = (a x b)/(a + b)
= (45 x 40)/(45 + 40)
= 45 x 40/85
= 21.1764
= 22 min (approx).
53. D
Explanation:

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 40
ambitiousbaba.com Online Test Series

Let the number of workers be x.


Now, Using work equivalence method,
X + (X-1) + (X-2)+ . . . . + 1 = X *55% of X

=> [X * (X+1)] / 2 = X * (55X/100) [because, Series is in AP.


Sum of AP = {No. of terms (first term+ last term)/2} ]
Therefore, X = 10
54. D
After the first 12 days, in the next 12 days Ram will again do 40%
of the work. Hence, Ravi will do 20% of the work.
Therefore ram is twice as efficient as ravi. Or 100% more efficient.
(since, (2-1)/1 x100 = 100%).
55. C
Let’s solve this using answer options. We can see that if B takes
40 days to complete the entire work then he’ll take 20 days to do
half of it. But the sum of A and B is 20.. Let’s try option c. B will
do half the work in 15 days. Now using equation
(1/a)+(1/b)=2/15, We see that a = 10. Hence half the job is done
in 5 days. It’s the correct option.
56. D
Method 1- Using variables
Let the number of filling pipes be x and the number of empty
pipes be y. Then y/6 – x/8 = 1/6.. 4(y-1)=3x Now go from answer
options
We see that for x= y=4, the relation is getting satisfied. Hence the
answer is 4.
Method 2- Using Percentage
Inlet- 8 hours => 12.5% per hour Outlet= 6 hours => 16.66% per
hour The difference = 4.16% As the tank is full, the difference
should account for 100% of the tank, as it takes 6 hours to
empty 4.16 x 6 = 25% i.e. 25% work is done by one outlet pipe;
therefore there has to be 4 outlet pipes therefore the number of
inlet pipes = 8-4 = 4. Answer is option (b).
57. A
A can finish the work in 12 days. He can finish 100% of the work
in 12 days. In 1 day he can finish (100/12) % = 8.33% of the
work. Similarly, B can finish (100/15) % = 6.67% of the work in 1
day. When they both work together, they can finish (8.33 + 6.67)

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 41
ambitiousbaba.com Online Test Series

% = 15% of the work in 1 day So, to complete 100% of the work,


they will take 100/15 = 6 2/3 days.
58. D
Suppose Ajit can finish the work in ‘x’ days. In one day he can do
(100/x) % of the work.
As Ajit is thrice as good as Dev, Dev will do 1/3rd of what Ajit
can do in a day.
So, Dev can do (100/3x)% of work in a day.
Now they complete the work in 5 days, so in 1 day they must be
doing 100/5 = 20% of the work.
So, (100/x) + (100/3x) = 20 ? x = 20/3.
So, Ajit can complete the work alone in 20/3 days.
59. A
Let a, b and c be the % of the work done by A, B, and C in one
day respectively.
A & B can complete the work in 12 days ? a + b = 100/12% =
8.33% … (i)
B & C can complete the work in 15 days ? b + c = 100/15% =
6.67% … (ii)
A & C can complete the work in 20 days ? a + c = 100/20% = 5%
… (iii)
Adding (i), (ii) and (iii) 2(a + b + c) = 20% ? (a + b + c) = 10%.
So, working together they finish 10% of work in a day. So, they
can complete the work in 10 days.
60. B
A can finish the work in 16 days. In one day he can finish
(100/16) %= 6.25% of the work.
In 4 days, working alone he will finish [(100/16)*4] = 25% of the
work.
Now B joins him. Amount of work left = 100 – 25 = 75%. B can do
(100/8)% = 12.33% of the work.
A and B together can do 12.33+ 6.25 = 18.75 % of the work in
one day. Work left after A has finished 25% of the work in 4 days
= 75%. Hence Time taken = [75/18.75] = 4 days. So, total Time
taken = 4 + 4 = 8 days.
61. D
Amit takes 20 days to complete the work. So, in 1 day Amit
completes 100/20 = 5% of the work.

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 42
ambitiousbaba.com Online Test Series

Suraj is 25% more efficient than Amit. So, Suraj will do [5 + (5


*.25)] = 6.25% of the work in 1 day.
Suraj joined Amit 4 days before the work was completed. This
means Suraj worked for 4 days.
In four days Amit and Suraj together complete [(5 + 6.25)*4] =
45% of the work.
This means rest 55% of the work is done by Amit alone. This 55%
of work will be completed in (55/5) = 11 days
So, Amit worked alone for 11 days.
62. A
The ratio of efficiency is inversely proportional to the amount of
Time taken. Hence A and C will take Time in ratio 3: 5 to
complete the same work.
So, in term of numbers, days have taken to complete the work:
B: C = 2: 3 A: C = 3: 5
A: B: C = 9: 10: 15
If A is taking 9x days, B takes 10x days and C takes 15x days.
A takes 4 days less than C ? 9x = 15x – 4 ? x = 2/3.
A takes 6 days, B takes 20/3 days and C takes 10 days.
In one day A does (100/6)%, B does 15% and C does 10% of the
work.
If A, B and C work for two days together. So, in 2 days, amount of
work done = 2(100/6+ 15 + 10)=250/3 % Amount of work left =
100 – 250/3=50/3%. This can be completed by “A” in 1 day.
63. B
Suppose A takes x days to complete the job. Then B will take x +
4 days and C will take x – 2 days to do the same job.In one day, A
does (1/x)%, B does [1/(x+4)]% and C does [1/(x-2)]%.
A & B will do [1/x]+ [1/(x+4)]% of the work in a day.
So, Time taken by A & B to complete the work when
working together = x(x+ 4)/(2x+4)
Time taken by C = (x – 2)
Now as given, x – 2 = x(x + 4)/(2x+4)
Solving we get x = 2(1 ± v3), we neglect 2(1 ± v3) because, number
of days cannot be negative
So, days taken by A = 2(1 + v3) days taken by B = 2(3 + v3)
Ratio = (1 + v3): (3 + v3).
64. D

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 43
ambitiousbaba.com Online Test Series

In one month GIL can do 100/5= 20% of the work. Along with
NCC, it is able to do 100/4 = 25% of the work in one month. So,
amount of work done by NCC = 5% in a month. So, in the 4
months NCC has done 5*4 = 20% of the work. So, share of NCC =
20% of Rs. 35, 00, 000 = Rs. 7, 00, 000.Out of these as Sanjeev’s
team is only 75% as efficient as Ramesh’s team, the money will
be divided in the ratio of efficiency: Sanjeev’s team efficiency:
Ramesh’s Team Efficiency = 75: 100 = 3: 4.
So, money earned by Sanjeev’s team = (3/7)× Rs.7,00,000 =
Rs.3,00,000.
65. A
Equate the amount of work in terms of man – hours and volume
of the platform.
15 workers, 4 hours a day, 25 days == 120 * 10 * 14
12 workers, 5 hours a day, N days = = 600 * 14 * 12 Taking the
ratio,
(15*4*25)/( 12 *5*N)=(120 *10 * 14)/(600 *14 * 12)? N = 150.
They will take 150 days.
66. E

67. C

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 44
ambitiousbaba.com Online Test Series

68. A

69. C

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 45
ambitiousbaba.com Online Test Series

70. B

71. E

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 46
ambitiousbaba.com Online Test Series

72. A

73. B

74. B

75. C
Explanation :
1 day work of Arun and Bala = 1/40 + 1/35 = 15/280
Arun finished the remaining work in 30 days = 30 * 1/40 * 2 =
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 47
ambitiousbaba.com Online Test Series

3/8
Remaining work done by Arun and Bala = 5/8
Worked together = (5/8)/(15/280) = 35/3 days.
76. C
Explanation :
Efficiency of Kiran = 5%
Efficiency of Karan = 4%
They will complete only 90% of the work = [(5+4)*10] =90
Remaining work done by Suman = 10%.
Share of Suman = 10/100 * 1000 = 100
77. C
Explanation :
Explanation:
7I + 4Am = 1/6
7Af + 4Am = 1/8
7I + 7Af + 7Am = 7/24
1I + 1Af + 1Am = 1/24
One Indian One American and One African will complete the
work in – 24 days.
78. B
Explanation :
No of days taken by Arun = 12 days
No of days(Arun:Bala:Chitra) = 2:3:1
1 day work of (Arun+Bala) = 5/36
1 day work of (Bala+Chitra) = 8/36
1 day work of (Chitra+Arun) = 9/36
5 days total work – 35/36
1/36 is done by Arun-Chitra
Number of days taken by Arun-Chitra for the rest of the work =
(1/36)/(9/36) = 1/9
Total time taken to complete the work = 5 + 1/9 = 46/9 days
79. D
Explanation :
30 workers work in pairs, with no same pair of workers working
together twice
29[1/w1 + 1/w2 ….. + 1/w30] + 6[1/w1 + 1/w2 ….. + 1/w30] = 1
[1/w1 + 1/w2 ….. + 1/w30] = 1/35
35 days.
80. A
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 48
ambitiousbaba.com Online Test Series

Explanation :
A’s 5 days work = 50%
B’s 5 days work = 33.33%
C’s 2 days work = 16.66%[100- (50+33.33)] Ratio of contribution
of work of Arun, Bala and Chitra = 3 : 2 : 1
Arun’s total share = Rs. 3000
Bala’s total share = Rs. 2000
Chitra’s total share = Rs. 1000
Arun’s one day’s earning = Rs.600
Bala’s one day’s earning = Rs.400
Chitra’s one day’s earning = Rs.500
81. B
Explanation :
Explanation:
D * x +(100- D) * 2x= 150x
=> D= 50 days
work done in 50 days = 50x
Total work = 150x
50x/150x * 100 = 100/3
82. B
Explanation :
3/4 * (x-2)x = (x+7)(x-10)
x – 6x – 280 = 0
x = 20; x = -14
(x-2)x = 18 * 20 = 360
360 = 30 * y
y = 12 days
83. C
Explanation :
Ratio of number of days = 9:10:15
Work done By B and C in first two days = 2*1/6 = 1/3
Rest of the work = 2/3
Number of days = (2/3)/(1/9) = 6 days
84. B
Explanation :
1/x + 1/2x = 1/20 + 1/30
3/2x = 1/12
Number of days taken by Arun = 18 days
85. A
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 49
ambitiousbaba.com Online Test Series

Explanation :
Assume working days
A = x, B = 2x, C = 2y, D = 3y
1/x+1/2x = 1/2y+1/3y
And 2x-2y = 16
Solving we get x = 18 days.
86. B
Explanation :
15*(1/80+1/60) + 15*(1/120+1/40) + x*(1/40+1/60) = 1
X= 3/2 = 1.5
87. C
Explanation :
First day = 1/30
Second day = 1/30+1/45
Third day = 1/30+1/60
3 days work = 3/30+1/45+1/60 = 25/180
3*7 = 21 days work = 175/180
Now 1/36 work is left which can be completed by A alone
1/36*30 = 5/6
21+5/6 = 21 5/6 Days
88. B
Explanation :
Ramu takes 25 days to complete work.
Raju = 50 days Venu = 100 days
Now 70% work is left
They can complete whole work in = 1/ 1/25+1/50+1/100
100/7 days then 70% in 10 days
89. B
Explanation :
A = 21 B = 14 C =7
x/21+2*(1/14+1/7) = 1
x = 12.
90. D
Explanation :
20*(5+6+7+8+4x)/840 = 1
x= 4 hours
91. B
Explanation :
U+v+W = 72
IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 50
ambitiousbaba.com Online Test Series

9U = 7W
W-V = V-U
V = 24
92. A
Explanation :
(1/5+1/4)
20/9*90/100 = 2
93. D
Explanation :
1/A+1/B = 5/8
x/A+y/B = 1
x+y = 5
y=4
94. D
Explanation :
11*50/1/3 = (11+x)*50/2/3
X = 11

• Click here to Join Telegram Group


• Click here to Join Whatsapp Group

Click here to Buy Online Test Series

Attempt Quantitative Aptitude Topic Wise Online Test Series

RBI Assistant Prelims Online Test Series 2022

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 51
ambitiousbaba.com Online Test Series

2022 Preparation Kit PDF

Most important PDF’s for Bank, SSC, Railway and Other Government
Exam : Download PDF Now
AATMA-NIRBHAR Series- Static GK/Awareness Practice Get PDF here
Ebook PDF
The Banking Awareness 500 MCQs E-book| Bilingual (Hindi Get PDF here
+ English)
AATMA-NIRBHAR Series- Banking Awareness Practice Get PDF here
Ebook PDF
Computer Awareness Capsule 2.O Get PDF here
AATMA-NIRBHAR Series Quantitative Aptitude Topic-Wise Get PDF here
PDF 2020
Memory Based Puzzle E-book | 2016-19 Exams Covered Get PDF here
Caselet Data Interpretation 200 Questions Get PDF here
Puzzle & Seating Arrangement E-Book for BANK PO MAINS Get PDF here
(Vol-1)
ARITHMETIC DATA INTERPRETATION 2.O E-book Get PDF here

Click here to Subscribe Bank & Insurance MahaCombo Online Test


Series

Complete list of Test Series covered in the “All Banking Exams Test
Series for” is given below:
Exam Covered Number of Mock Tests

SBI PO Prelims 15

SBI PO Mains 10

SBI Clerk Prelims 15

SBI Clerk Mains 10

IBPS RRB PO Prelims 15

IBPS RRB PO Mains 10

IBPS RRB Clerk Prelims 15

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 52
ambitiousbaba.com Online Test Series

IBPS RRB Clerk Mains 10

IBPS PO Prelims 15

IBPS PO Mains 10

IBPS Clerk Prelims 15

IBPS Clerk Mains 10

RBI Assistant Prelims 15

RBI Assistant Mains 10

LIC AAO Prelims 15

LIC AAO Mains 10

LIC Assistant Prelims 15

LIC Assistant Mains 10

SBI Apprentice 10

NIACL AO Prelims 15

NIACL AO Mains 10

Reasoning Section-Wise 30

Quantitative Aptitude Section-Wise 30

English Section-Wise 30

Topic-Wise (Quantitative Aptitude) 15

Arithmetic Data Interpretation 10

Caselet DI 10

Memory Based Mock (Prelims) 10

Banking Awareness 15

Static Awareness (GK) 15

Hindi Language for RRB 20

Computer Awareness 20

Current Affairs (Weekly Tests) 50

Topic Wise General Awareness Capsule Tests (Mains exam only) 15 (for Each Exam)

Other Banking Exams (Excepts SO)

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 53
ambitiousbaba.com Online Test Series

IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 54

You might also like