1. SHIP PARTICULAR
REMARKS AND COMMENTS
1.1. Name of vessel
1.2. Previous Name(s)
1.3. Flag
1.4. IMO number
1.5. Classification Society and details
1.6. Certificate and Class No.
1.7. Issued and valid date of certificate
1.8. Port of Registry
1.9. Vessel operator
1.10. Name
1.11. Address
1.12. Tel
1.13. E-mail
1.14. Number of crew and nationality
1.15. Vessel builder
1.16. Date of launch
1.17. Date of delivery
1.18. Type of hull
1.19. Deadweight Tonnage
1.20. Gross tonnage
1.21. Net tonnage
1.22. Length overall
1.23. Length between Perpendicular
1.24. Depth
1.25. Draft (max)
1.26. Breadth
1.27. Number of cargo tanks and type
1.28. Connection size and standard
1.29. Number of ship's header and manifold
1.30. Cargo tank capacity
1.31. Cargo pump capacity & rate/hour
1.32. Fresh water capacity
1.33. Last dry dock place and date
1.34. Additional remarks and comments (including
additional special equipment vessel has
onboard)
2. General Barge/Vessel Condition
General comments must be made on the following areas and, if appropriate, photographs should be
taken.
COMMENTS/OBSERVATION/NA
2.1. General Safety Management
2.2. Hull (Is the hull free from obvious
defects? etc.)
2.3. Accommodation sleeping area
2.4. Bridge (gangway)
2.5. Mess room
2.6. Galley
2.7. Main deck
2.8. Machinery space (e.g. is the space
free of oil leaks, clean, good
ventilation, etc)
2.9. Electrical equipment
2.10. Is all permanent wiring adequately
supported and secure? Is there
any evidence of bare electrical
wires? etc.)
2.11. Storage areas (general)
2.12. Additional
comments/observations
Inspection date:
Inspector:
3. Certification & documentation
3.15. P&I
4.9. Is the max flow rate and max pressure for Max flow receive:
every header clearly documented? Specify Max pressure:
under comment.
4.10. Is there a fixed and valid gauging point?
4.86. SART
4.87. AIS