Ahw 10 Pdfeed MP 2343 00001 0091 01 PDF
Ahw 10 Pdfeed MP 2343 00001 0091 01 PDF
Ahw 10 Pdfeed MP 2343 00001 0091 01 PDF
1 2 3 4 5 6 7 8 9 10 11 12
FABRICATION MATERIALS
N
PT COMPONENT DESCRIPTION SIZE ITEM CODE QTY
NO (Inch)
PIPE
A A
1 PIPE Sch X GRE 4 74.79.39.006.9 86.4m
FITTINGS
1 ERECTION MATERIALS
4"NS CONTINUED ON
www.pdo.co.om
B AHWR-1010-2"-D-1012103-11440M6-01 PT COMPONENT DESCRIPTION SIZE ITEM CODE QTY B
1209
GR.EL.100000 NO (Inch)
AHW-10-PDFEED-MP-2343-00001-0068
E 197893 FLANGES
N 178200
CL. EL +100242 7 BLIND FLANGE 150# GRE 4 76.A9.30.90G.9 1
1431
4
F5 G8 B11 GASKETS
21 0
4
45o
21 0
E 191849
4"NS 8 Gasket flat ring (r/f face) X 150# Nitrile Butadiene 4 85.46.80.006.9 2
N 190524
1490
Rubber (NBR for H2S<100 ppm) hardness 70+/-5 shore A
CL. EL +98791 1 9 GASKET flat ring (r/f face) 600# Nitrile Butadiene Rubber 4 85.45.81.206.9 1
V (NBR for H2S<100 ppm) hardness 70+/-5 shore A
1
335
4 SLOPE 1:200 BOLTS
0
89.71 o 1 49
SLOPE 1:200 GR.EL.100000 10 150 STUDBOLT WITH NUTS ASTM A193-B7M/A194-2HM 7/8 81.38.66.406.1 8
C CL. EL +98791 1 23 11 80 STUDBOLT WITH NUTS ASTM A193-B7M/A194-2HM 5/8 81.38.66.269.1 8 C
24 1 12 70 STUDBOLT WITH NUTS ASTM A193-B7M/A194-2HM 5/8 81.38.66.267.1 8
SLOPE 1:200
3
2 5
455 44.71 o
4"x4"NS CL. EL +98752
CL. EL +98705
1
SLOPE 1:200 2
9
2 484 4"x4"NS
4"x4"NS CL. EL +98730
CL. EL +98696 115
1
SLOPE 1:200 0
D 0 1 90 CONTINUED ON D
1 41 0 AHWR-1010-3"-D-1012106-17011M6-01
PIPE SLEEVE SLOPE 1:200
1 F5 AHW-10-PDFEED-MP-2343-00001-0092
ROAD CROSSING E 187000
1 69 E 185100 N 178315
7 N 176476
G8 B12 CL. EL +98706
0 CL. EL +98705
800
7
PIPE SLEEVE FOR FUTURE CONN.
ROAD CROSSING
4
155
89.71 o
CL. EL +98399
01
E 559 E
E 129200 1
264
N 181649 9
CL. EL +98399 1
PIT
TO DRAIN PIT
344 SLOPE 1:200
SCDP-10001 9
E 129200
N 181649
CL. EL +98245
E 129200
N 178200
CL. EL +98416 4
CL. EL +98416
F F
www.pdo.co.om
FEED OFFICE
bsi. ISO
9001:2015
Quality
Management
G G
FM546425
NOTES: MATERIAL PIPING CLASS LINE CONDITIONS PROJECT TITLE
1. ALL DIMENSIONS, ELEVATIONS & CO-ORDINATES ARE IN MM GRE 17011M6 DESIGN TEST
GREATER AL HUWAISAH AREA DEVELOPMENT PHASE-1
2. THIS ISOMETRIC SHALL BE READ IN CONJUNCTION WITH GENERAL NOTES.
INSULATION TYPE STRESS ANALYSIS AREA PLANT WBS No.
NIL GRE VENDOR PAINTING SYSTEM N/A PRESS kPa (g) 700/- GRE VENDOR
3. THIS ISOMETRIC IS PRELIMINARY & TO BE USED ONLY FOR
DIMENSIONS/ROUTING PURPOSE. GRE VENDOR IS RESPONSIBLE FOR INSULATION THICKNESS N/A INSPECTION CLASS N/A COLOUR N/A TEMP ( C)
o
100/0 RMS-1 REMOTE MANIFOLD STATION-1 C.AB.GHW.DF.01.ED2
CARRYING OUT FURTHER DETAILING WITH RESPECT TO GRE FITTING HEAT TRACING N/A TEST TYPE HYDRO TEST MODEL AREA LINE No. PROJECT ID
STRESS CALC NO - 01 14.07.21 APPROVED FOR CONSTRUCTION PMC MH/RG SSP DRAWING NO SHEET REV
STRESS CLIENT
GA AHW-10-PDFEED-MP-4033-00002-0006/0008 REV DATE DESCRIPTION DRN. CHKD. APPD. APP. APP. AHW-10-PDFEED-MP-2343-00001-0091 1 OF 1 01
REFERENCE DRAWINGS & DOCUMENTS REVISION DETAILS
1 2 3 4 5 6 7 8 9 10 11 12
This drawing and all information theron is the property of PetroleumDevelopment Oman and shall be returned on demand. It is issued on the condition that except with our written permission it must not be reproduced, copied or communicated to any other party nor be used for any purpose other than that stated in the particular enquiry, order or contract with which it is issued.
DATE: 15-7-2021-11:20 PROJ: YRP 12.1.SP4.40 ZONE: AHWR-1010-CU-PI-01-D USER: PRITAM.CHAVAN
PIPE: AHWR-1010-4"-D-1012104-17011M6-01
Responsible Engineer : DO NOT SCALE Closed dateASK.
IF IN DOUBT : 07/28/2021