Tool Preventive Maintenance Check Sheet
Part Number Date
S.No Tool name Cleaning Visual Damage Ready For Next Run
1 Movable Die
2 Fixed Die
3 Pusher Plate
4 Separator
5 Chute
Note:
1- While surrendering, the tools are in good condition, mention as OK.
2- If any abnormality found in the tool mention it NOT OK. In remark need to mention it properly and report to the shift
incharge immediately.
3- Before handover the tools must need to update TOOL HISTORY sheet properly.
OET Sign / OET Num Shift Incharge Sign Dept Head Sign
Sigma Forging & Forming Pvt Ltd.,
Tool Preventive Maintenance Check Sheet
Station Tool name Spacer Thickness Cleaning Visual Damage Ready For Next Run
Punch
Punch Spacer
1st Station
Punch Pin
Die
K.O Pin
Punch
Punch Spacer
2nd Station
Punch Pin
Die
K.O Pin
Punch
Punch Spacer
3rd Station
Punch Pin
Die
K.O Pin
Punch
Punch Spacer
4th Station
Punch Pin
Die
K.O Pin
Sigma Forging & Forming Pvt Ltd.,
Tool Preventive Maintenance Check Sheet
Station Tool name Spacer Thickness Cleaning Visual Damage Ready For Next Run
Punch
Punch Spacer
5th Station
Punch Pin
Die
K.O Pin
Punch
Punch Spacer
Punch Pin
6th Station
Upper Nib
Core Die
K.O Pin
Remarks ;
Note:
1- While surrendering, the tools are in good condition, mention as OK.
2- If any abnormality found in the tool mention it NOT OK. In remark need to mention it properly and report to the shift incharge
immediately.
3- Before handover the tools must need to update TOOL HISTORY sheet properly.
OET Sign / OET Num Shift Incharge Sign Dept Head Sign
Sigma Forging & Forming Pvt Ltd.,
Tool Preventive Maintenance Check Sheet
Part Number Date
Station Tool name Spacer Thickness Cleaning Visual Damage Ready For Next Run
Punch
Punch Spacer
1st Station
Punch Pin
Die
K.O Pin
Punch
Punch Spacer
Punch Pin
2nd Station
Upper Nib
Core Die
K.O Pin
Punch
3rd Station
Punch Spacer
Punch Pin
Note:
1- While surrendering, the tools are in good condition, mention as OK.
2- If any abnormality found in the tool mention it NOT OK. In remark need to mention it properly and report to the shift in charge
immediately.
3- Before handover the tools must need to update TOOL HISTORY sheet properly.
OET Sign / OET Num Shift Incharge Sign Dept Head Sign
OET Sign / OET Num Shift Incharge Sign Dept Head Sign