National Highways Authority of India

(Ministry of Road Transport & Highways)


Government of India
G-5 & 6, Sector-10, Dwarka, New Delhi-110075

Appointment of Road Safety Auditors/ Consultant for Conducting Road


Safety Audit for Long Term Measures on Identified Blackspots on NH-44 of
Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)
Construction of LVUP Grade - II at Km. 447+890 under MORTH Identified Black-Spots
TG(02)- 229 for the year 2015-2018 with slip roads of 7.5m width on Nagpur-Hyderabad
National Highway No.44, in the state of Telangana.”

DETAILED PROJECT REPORT

DETAILED DRAWINGS

SEPTEMBER 2021

FeedbackInfraPvt.Ltd.
F DBAC INFRA No.14,LangfordGarden,1stFol or,
Making Infrastructure Happen LangfordAvenue,Lab l aghRoad,
(NearRcihmondCrice l)
Bangao l re-560025,INDIA
Te+
:l91-80-42840500
Fax+:91-80-41320989
1 2 3 4 5 6 7 8

A A

B B

C C

TABLE OF CONTENTS

Sl.No DRAWINGS No. SHEETS TITLE REVISION


D
1 FIPL/1350/NH-44/N-H/TC-01 1 OF 1 TABLE OF CONTENTS R1
2 FIPL/1350/NH-44/N-H/TCS-01 1 OF 1 TYPICAL CROSS SECTIONS TYPE - 1 & 2 R1
3 FIPL/1350/NH-44/N-H/P&P-01 1 OF 1 PLAN AND PROFILE FROM CH : 447+300 TO 448+400 R1
4 FIPL/1350/NH-44/N-H/DP&P_LHS-01 1 TO 1 DRAINAGE PLAN AND PROFILE FROM CH : 447+300 TO 448+400 R1
5 FIPL/1350/NH-44/N-H/DP&P_RHS-01 1 TO 1 DRAINAGE PLAN AND PROFILE FROM CH : 447+300 TO 448+400 R1
E E

6 FIPL/1350/NH-44/N-H/JI-1 TO 2 2 TO 2 JUNCTION IMPROVEMENT R1

F F

G G

LEGENDS:- NOTES: CLIENT: CONSULTANT: Drawn by: BAB STATUS: AUDIT REPORT
Feedback Infra Pvt. Ltd.
1. All dimensions are in millimeters or meters unless otherwise specified. No.14, Langford Garden,

H 2. Dimensions are not to be scaled and only written dimensions to be followed. F DBAC INFRA 1st Floor,Langford Avenue,
Opp.HDFC Bank
Designed by: KPG
PROJECT:
Appointment of Road Safety Auditors/ Consultant for Conducting Road
Safety Audit for Long Term Measures on Identified Blackspots on NH-44 H
Making frastructure Happen (near Richmond Circle)
Bangalore - 560 025
Checked by: SM of Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)
Tel:+91-80-42840500 Fax:+91-80-41320989
Approved By: PK
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. TITLE: TABLE OF CONTENTS
(Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Date : Scale
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET
G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt. Ltd. Sep. 2021 N.T.S DRG NO.: FIPL/1350/NH-44/N-H/TC-01
REV DATE DESCRIPTION OF REVISIONS BY 01 1 OF 1
1 2 3 4 5 6 7 8
Size: A3
TYPICAL CROSS SECTION
1 2 3 4 5 6 7 8

A 60000 A

250 5000 250 EARTHEN


2000 SPACE LEFT FOR FUTURE WIDENING . 2000 1500 7000 4500 7000 1500 2000 DRAIN SPACE LEFT FOR FUTURE WIDENING 2000

B B

C C

TYPE: 1 - TYPICAL CROSS SECTION OF FOUR LANE DIVIDED CARRIAGEWAYS WITH PAVED SHOULDER FOR OVERLAY IN RURAL AREA

D
60000

14000 14000

500 500 500 500


550 550

2500 10500 10500 2500


4000 13501

E E
100 100

500 500
F F
500 1500 7500 7500 1500 500

G TYPE: 2 - TYPICAL CROSS SECTION OF LVUP APPROACH WITH SLIP ROAD IN RURAL AREA G

LEGENDS:- NOTES: CLIENT: CONSULTANT: Drawn by: BAB STATUS: AUDIT REPORT
Feedback Infra Pvt. Ltd.
1. All dimensions are in millimeters or meters unless otherwise specified. No.14, Langford Garden,
ABBREVATION :
H 2. Dimensions are not to be scaled and only written dimensions to be followed. F DBAC INFRA 1st Floor,Langford Avenue,
Opp.HDFC Bank
Designed by: KPG
PROJECT:
Appointment of Road Safety Auditors/ Consultant for Conducting Road
Safety Audit for Long Term Measures on Identified Blackspots on NH-44 H
Making frastructure Happen (near Richmond Circle)
Bangalore - 560 025
Checked by: SM of Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)
Tel:+91-80-42840500 Fax:+91-80-41320989
Approved By: PK
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. TITLE: TYPICAL CROSS SECTION - TYPE 1 & 2
(Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Date : Scale
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET
G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt. Ltd. Sep. 2021 N.T.S DRG NO.: FIPL/1350/NH-44/N-H/TCS-01
REV DATE DESCRIPTION OF REVISIONS BY 01 1 OF 1
1 2 3 4 5 6 7 8
Size: A3
PLAN AND PROFILE
E
C
B

G
D
A

Culvert
LEGENDS:-

Proposed Drain
Level Below PCL

Existing Center Line


DATUM = 552.000

H Proposed Center line

Proposed Right of way


Proposed Carriageway
SUPERELEVATION (%)

PROPOSED CHAINAGE

1
1

FRL @ Median Edge (LHS)

FRL-SR LHS INNER EDGE


FRL @ Median Edge (RHS)

FRL-SR RHS INNER EDGE

Proposed Earthen Shoulder


PLAN
HORIZONTAL ALIGNMENT
VERTICAL ALIGNMENT (LHS)

VERTICAL ALIGNMENT (RHS)


NAGPUR

552
554
556
558
560
562

EX. GROUND AT SR INNER-LHS

F EX. GROUND AT SR INNER-RHS


447+300 555.695 555.695 554.588 554.084 555.697 555.693 555.693
447+310 555.869 555.869 555.228 554.325 555.848 555.867 555.867

EROW
447+300
Ch.=447319.851
447+320 556.045 556.045 555.398 554.584 556.048 556.043 556.043 L=556.030

K=1220.086
K=1220.086

L=100.000m
L=100.000m
447+330 556.221 556.221 555.588 554.608 556.218 556.219 556.219 GPS PILLAR
DETAILS
CHAINAGE
(Km/m)
447+340 556.398 556.398 555.752 555.031 556.404 556.396 556.396 NO. 447+360
GPS-2B

R=-600.00
Lc=136.94
EASTING (X)

LHS=5.00%
RHS=5.00%
231831.209
447+350 556.576 556.576 556.084 555.412 556.592 556.574 556.574 NORTHING
(Y) 1971524.13
ELEVATION
(Z) 6
557.208
447+360 556.754 556.754 556.273 555.751 556.769 556.753 556.753
447+370 447+370 447+370 556.933 556.933 556.265 555.470 556.937 556.933 556.933
447+380 557.113 557.113 556.450 555.599 557.112 557.113 557.113
447+390 557.293 557.293 556.816 555.736 557.295 557.293 557.293
447+400 557.473 557.473 557.030 555.965 557.471 557.473 557.473
447+

FINISHED ROAD LEVEL


400
447+410 447+408 557.653 557.653 557.360 556.218 557.646 557.653 557.653

FRL-SR LHS INNER EDGE


FRL-SR RHS INNER EDGE
447+420 557.833 557.833

PROFILE
557.584 556.446 557.845 557.833 557.833

GROUND LEVEL BELOW PCL

2
2

447+430 558.013 558.013 557.816 556.751 558.017 558.013 558.013

EX. GROUND AT SR INNER-LHS


EX. GROUND AT SR INNER-RHS
447+440 558.193 558.193 558.048 556.982 558.200 558.193 558.193
447+450 558.373 558.373 558.355 557.055 558.369 558.373 558.373
447+460 558.554 558.554 558.763 557.311 558.573 558.553 558.553

Ls=105.00
447+470 558.734 558.734 559.153 557.575 558.728 558.733 558.733
447+480 558.914 558.914 559.185 557.831 558.879 558.913 558.913
447+490 559.094 559.094 559.068 558.094 559.013 559.093 559.093
447

REV
+50
447+500 559.274 559.274 559.148 558.276 559.152 559.273 559.273
0

NOTES:
447+510 559.454 559.454 559.219 558.348 559.365 559.453 559.453
ERO

447+513

LHS=2.50%
W

447+520 559.634 559.634 559.304 558.488 559.561 559.633 559.633

DATE
447+530 559.814 559.814 559.681 558.724 559.778 559.813 559.813

L=330m
L=330m
447+540 559.994 559.994 559.869 558.939 559.952 559.993 559.993

G=1.800%
G=1.800%
ERO

447+550 560.174 560.174 559.577 559.102 560.133 560.173 560.173


W

447+560 560.354 560.354 559.721 559.250 560.325 560.353 560.353

Straight L=94.95
447+570 560.534 560.534 559.942 559.345 560.489 560.533 560.533

3
3

447+580 560.714 560.714


ERO

560.529 559.573 560.698 560.713 560.713


W

447
447+590 560.894 560.894 560.697 559.884 560.893 560.893 560.893
+60
0
BM PILLAR
447+600 561.074 561.074 DETAILS
560.869 560.679 561.054 561.073 561.073 CHAINAGE
(Km/m)
NO. 447+680
447+610 447+608 561.246 561.246 -999.000 560.931 561.229 561.253 561.253 BMP1B
TF
EASTING (X)
ERO

NORTHING 231945.301
447+620 561.392 561.392 561.017 561.210 561.353 561.433 561.433 (Y) T
W

1971227.56
ELEVATION
(Z) 9
560.792

RHS=2.50%
447+630 561.510 561.510 561.111 561.605 561.552 561.613 561.613
G=1.800
%

TF
TF
TF
447+640 561.602 561.602 561.181 561.964 561.670 561.793 561.793
TF
447+650 561.668 561.668
ERO

-999.000 562.055 561.823 561.973 561.973 TF


T

DESCRIPTION OF REVISIONS
W

447+660 561.707 561.707 -999.000 562.330 562.006 562.153 562.153

Ls=105.00

1. All dimensions are in millimeters or meters unless otherwise specified.


447+670 561.719 561.719 561.407 562.257 562.126 562.333 562.333

2. Dimensions are not to be scaled and only written dimensions to be followed.


447+680 561.704 561.704 561.293 562.199 562.220 562.513 562.513
ERO

447+
447+690 561.663 561.663 561.175 562.201 562.364 562.693 562.693
W

700
447+700 561.595 561.595 561.273 562.243 562.404 562.873 562.873
447+700 447+700
447+710 561.501 561.501 561.356 562.165 562.549 563.049 563.049

BY
447+713
447+720 561.379 561.379 -999.000 562.318 562.574 563.218 563.218
EROW

447+730 561.240 561.240 -999.000 562.111 562.716 563.380 563.380

4
4

447+740 561.100 561.100 -999.000 562.563 562.753 563.534 563.534

CLIENT:
447+750 560.960 560.960 -999.000 562.739 562.854 563.681 563.681
447+760 560.820 560.820 -999.000 562.600 562.940 563.820 563.820
EROW

447+770 560.680 560.680 559.421 562.701 562.965 563.952 563.952


LHS SERV
ICE ROA

447+780 560.540 560.540


D

559.341 563.087 563.020 564.077 564.077


447+790 560.400 560.400 559.394 563.004 563.027 564.194 564.194
447+800
TYPE

EROW
SPAN

447+800 560.260 560.260 560.096 563.132 563.033 564.304 564.304


CHAINAGE

447+810 560.120 560.120 560.091 563.202 563.012 564.407 564.407 BM PILLAR


CHAINAGE
DETAILS
(Km/m)

Government of India
NO. 447+910
IMPROVEMENT

447+820 559.980 559.980 559.301 563.124 563.041 564.502 564.502


DESCRIPTION

BMP2B
PAVER BLOCK

EASTING

G-5 & 6, Sector-10, Dwarka, New Delhi-110075


(X)
-
STRUCTURE NO. -
-
-

447+830 559.841 559.841 559.374 563.426 563.010 564.590 564.590 NORTHING 232017.507
(Y)
LHS MCW

RHS MCW

1971015.09
EROW

1
RHS SERVICE ROAD

ELEVATION
447+840 559.718 559.718 (Z)

National Highways Authority of India


559.429 563.465 563.018 564.671 564.671 562.894

(Ministry of Road Transport & Highways)


EXISTING

447+850 559.619 559.619 559.430 563.555 562.915 564.744 564.744

Lc=270.82
R=620.00

LHS=5.00%

RHS=5.00%
447+860 559.543 559.543
New Construction

559.445 563.532 562.924 564.810 564.810


1

LANDSCAPE
LANDSCAPE
LVUP

447+870 559.490 559.490 559.507 563.414 562.850 564.868 564.868


EROW

F
447+890

1x12.0x4.0

447+880 559.460 559.460 559.566 563.464 562.800 564.919 564.919


PROPOSED

5
5

LVUP
447+890 559.453 559.453 559.729 563.316 562.734 564.963 564.963 447+890
K=-135.714
K=-135.714

L=380.000m
L=380.000m

447+900 559.470 559.470 559.517 563.174 562.671 564.999 564.999


447+900
LANDSCAPE

447+910 559.510 559.510


EROW

559.981 563.140 562.581 565.028 565.028


LANDSCAPE

CONSULTANT:
L=566.293

447+920 559.573 559.573 560.091 563.054 562.490 565.050 565.050

DBAC
447+930 559.659 559.659 559.960 562.976 562.423 565.064 565.064
Ch.=447890.000
RHS MCW

PAVER BLOCK
LHS MCW
LHS SERV

447+940 559.768 559.768 560.116 562.915 562.348 565.071 565.071


ICE ROAD
EROW

447+950 559.901 559.901 560.209 562.890 562.228 565.070 565.070

Writing from Feedback Infra Pvt. Ltd.


447+960 560.050 560.050 560.149 562.897 562.140 565.062 565.062
447+970 560.200 560.200
TYPE

560.122 562.844 562.025 565.047 565.047


SPAN

KM-448
447+980 560.350 560.350 560.065 562.658 561.943 565.024 565.024
CHAINAGE

EROW

Making frastructure Happen 447+984 Box Culvert KM


448
447+990 560.500 560.500 560.129 562.383 561.954 564.994 564.994
IMPROVEMENT

INFRA
RHS SERV

447+990
DESCRIPTION

ICE ROA
D
-
STRUCTURE NO. -

448+000 560.650 560.650 560.388 562.100 561.928 564.957 564.957 00


448+010 560.800 560.800
Buried

560.599 561.710 561.859 564.912 564.912


448+0
447.991

EROW
EXISTING

448+020 560.950 560.950 560.594 561.782 561.943 564.860 564.860


Reconstruction

448+030 561.100 561.100 560.568 561.358 562.056 564.801 564.801


Opp.HDFC Bank
2

Bangalore - 560 025

6
6

448+040 561.250 561.250 560.739 561.385 562.088 564.734 564.734


Ls=105.00

(near Richmond Circle)


Feedback Infra Pvt. Ltd.
No.14, Langford Garden,
447+990

ERO

G=-1.000%
1x2.0x2.0

1st Floor,Langford Avenue,

448+050 561.400 561.400 560.720 561.447 562.147 564.660 564.660


Box Culvert

W
PROPOSED

448+060 561.550 561.550 560.827 561.560 562.264 564.578 564.578


Tel:+91-80-42840500 Fax:+91-80-41320989

thereof shall be Copied or Communicated to a Third Party without Authorisation in


The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd.

448+070 561.700 561.700 561.371 561.555 562.250 564.489 564.489


448+080 561.850 561.850 561.053 561.518 562.342 564.393 564.393
ERO

448+080 448+080
W

Sep.
and not for Publication. The Information is Issued on the Understanding that no part Date :

2021

448+090 448+089 562.000 562.000 561.189 561.457 562.471 564.293 564.293 BM PILLAR
DETAILS
CHAINAGE
(Km/m)
NO. 448+120
448+100 562.148 562.148 561.402 561.481 562.602 564.193 564.193
Drawn by:

BMP3B
100
EASTING (X)
Checked by:
L=51m
L=51m

448+110 562.291 562.291


Designed by:

561.605 561.183 562.648 564.093 564.093 232001.041


V
H

448+
G=-1.000%
G=-1.000%

Approved By:

NORTHING
(Y)
Scale

1970810.29
4
ERO

ELEVATION
448+120 562.430 562.430 561.508 561.846 562.764 563.993 563.993 (Z)
563.005
W

448+130 562.564 562.564 561.772 561.029 562.764 563.893 563.893


448+131 448+131
448+140 562.692 562.692 561.461 560.037 562.850 563.799 563.799
PK
SM
KPG
BAB

448+150 562.817 562.817 561.873 561.795 562.882 563.722 563.722


ERO

RHS=2.50%

A3
W

448+160 562.936 562.936 561.936 561.532 563.007 563.661 563.661


1:300
1:3000

448+170 563.050 563.050 561.956 562.085 563.054 563.615 563.615


448+180 563.160 563.160 561.931 561.677 563.185 563.586 563.586
Ch.=448190.876
ERO

448+190 563.265 563.265 562.078 562.086 563.280 563.573 563.573


7
7

L=563.284
W

K=62.397
K=62.397

L=120.000m
L=120.000m

448+200 563.365 563.365 562.051 561.916 563.382 563.576 563.576


200
448+
TITLE:
LHS=2.50%

448+210 563.460 563.460 561.961 562.467 563.462 563.594 563.594


STATUS:

DRG NO.:
PROJECT:

448+220 563.553 563.553 561.892 562.250 563.554 563.629 563.629


ERO
W

448+230 563.645 563.645 561.878 562.245 563.637 563.680 563.680


448+240 563.737 563.737 561.851 562.411 563.710 563.747 563.747
448+250 563.829 563.829 561.938 562.536 563.826 563.830 563.830
448+251 448+251
ERO

448+260 563.922 563.922 562.955 562.814 563.913 563.922 563.922


W

Straight L=341.65

448+270 564.014 564.014 563.501 563.000 563.998 564.014 564.014


448+280 564.106 564.106 563.545 562.879 564.082 564.107 564.107
448+290 564.199 564.199 563.358 563.759 564.180 564.199 564.199
ERO

300
448+300 564.291 564.291
W

563.449 563.823 564.270 564.291 564.291 448+


448+310 564.383 564.383 563.935 563.905 564.360 564.384 564.384
FIPL/1350/NH-44/N-H/P&P-01

448+320 564.476 564.476 564.052 564.008 564.461 564.476 564.476


GPS PILLAR
DETAILS
448+330 564.568 564.568
ERO

564.153 564.133 564.547 564.568 564.568 CHAINAGE


(Km/m)
NO. 448+395
W

448+340 564.660 564.660 564.259 564.266 564.656 564.661 564.661 EASTING (X) GPS-3B
NORTHING 231972.226
8
8

(Y)
448+350 564.753 564.753 1970538.07
AUDIT REPORT

564.407 564.350 564.721 564.753 564.753 ELEVATION


(Z) 6
565.234
448+360 564.845 564.845 564.503 564.333 564.809 564.845 564.845
ERO

448+370 564.937 564.937 564.598 564.316 564.888 564.938 564.938


W

LHS=2.50% RHS=2.50%

448+380 565.030 565.030


01

564.691 564.554 565.002 565.030 565.030


REV.

448+390 565.122 565.122


L=269m
L=269m

564.794 564.739 565.061 565.122 565.122


G=0.923%
G=0.923%

400
HYDERABAD

448+400 565.214 565.214


448+
564.908 564.839 565.123 565.215 565.215
G=0.923%

1 OF 1
SHEET
Appointment of Road Safety Auditors/ Consultant for Conducting Road

of Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)

PLAN & PROFILE OF LINGAREDDIPET JUNCTION FROM CH:447+300 TO 448+400

Size: A3
F
E
C
B

Safety Audit for Long Term Measures on Identified Blackspots on NH-44 H


G
A
DRAINAGE PLAN AND PROFILE
F
E
C
B

G
D
A

Culvert
RCC Drain
LEGENDS:-

Existing Center Line


DATUM = 558.000

H Proposed Center line

Proposed Right of way


Proposed Carriageway
PROPOSED CHAINAGE

1
1

Proposed Earthen Shoulder


PLAN
DRAIN INVERT LEVEL-LHS

VERTICAL SCHEMATIC LHS


NAGPUR

RD

EROW
RD
FRL AT SERVICE ROAD INNER EDGE-LHS

FRL AT SERVICE ROAD OUTER EDGE-LHS


447+300

OGL BELOW SERVICE ROAD INNER EDGE-LHS


558
560
562
564
566
568

FRL AT NEW CARRIAGE WAY OUTER EDGE-LHS


447+465 447+465 558.424 558.644 558.644 558.292 558.524 GPS PILLAR
DETAILS
447+470 558.514 558.728 558.734 558.397 558.610 CHAINAGE
(Km/m)
NO. 447+360
447+480 558.694 558.896 558.914 558.601 558.781 EASTING GPS-2B
(X)
NORTHING 231831.209
447+490 558.874 559.064 559.094 558.824 558.953 (Y)
1971524.13
ELEVATION
(Z) 6
557.208

OUTER EDGE-RHS
447+500 559.054 559.233 559.274 558.986 559.125
447+510 559.234 559.401 559.454 559.202 559.297

L=384m
RD

G=1.718%
447+520 559.414 559.569 559.634 559.387 559.469

DRAIN INVERT LEVEL-RHS


447+530 559.581 559.738 559.814 559.547 559.640

FRL AT NEW CARRIAGE WAY


FRL AT SR INNER EDGE-RHS
FRL AT SR OUTER EDGE-RHS
PROFILE
447+540 559.749 559.906 559.994 559.759 559.812

2
2

447+
00 4

OGL BELOW SR INNER EDGE-RHS


447+550 559.916 560.075 560.174 559.964 559.984 Ch.=447551.490
447+551 L=560.010
447+560 560.105 560.243 560.354 560.051 560.049
447+570 560.327 560.411 560.534 560.195 560.096

RD
447+580 560.554 560.580 560.714 560.321 560.143
447+590 560.785 560.748 560.894 560.488 560.189
447+600 561.022 560.916 561.074 560.805 560.236
447+610 561.263 561.076 561.246 561.085 560.283

REV
447+620 561.509 561.210 561.392 561.339 560.329

L=136m

NOTES:
G=0.467%
447+630 561.757 561.323 561.510 561.589 560.376
447

RD
+50
0
447+640 562.003 561.415 561.602 561.940 560.423

DATE
R
ERD

447+650 562.250 561.480 561.668 562.051 560.469


OW

447+660 562.497 561.519 561.707 562.339 560.516


RD

447+670 562.743 561.531 561.719 562.473 560.563


447+680 562.990 561.517 561.704 562.617 560.609
Ch.=447687.629
ERO

447+690 447+688 563.237 561.476 561.663 562.633 560.612 L=560.645


W

3
3

447+700 563.483 561.408 561.595 563.148 560.472


RD

447+710 563.726 561.313 561.501 563.101 560.331


ERO

447+720 563.918 561.192 561.379 563.060 560.191


RD
W

447
447+730 564.080 561.053 561.240 563.133 560.051

RD
+60
0
BM PILLAR
CHAINAGE
DETAILS
447+740 564.234 560.913 561.100 563.391 559.911 (Km/m)
NO. 447+680

447+750 564.381 560.773 560.960 563.544 559.770 BMP1B


TF
EASTING (X)
ERO

NORTHING 231945.301
(Y)
447+760 564.520 560.633 560.820 563.693 559.630 T
W

1971227.56
ELEVATION
(Z) 9
560.792
RD

DESCRIPTION OF REVISIONS
447+770 564.652 560.493 560.680 563.722 559.490
TFTF
TF

L=174m
447+780 564.777 560.353 560.540 563.810 559.350

G=-1.402%

1. All dimensions are in millimeters or meters unless otherwise specified.


TF
ERO

447+790 564.894 560.213 560.400 563.797 559.209 TF


T
W

RD

2. Dimensions are not to be scaled and only written dimensions to be followed.


447+800 565.004 560.073 560.260 563.625 559.069
447+810 565.107 559.933 560.120 563.746 558.929
447+820 565.202 559.793 559.980 563.780 558.789
ERO

447+

BY
447+830 565.290 559.653 559.841 563.787 558.648
RW D

700
447+840 565.371 559.531 559.718 563.838 558.508

4
4

447+850 565.444 559.431 559.619 563.819 558.368

RD
447+860 565.510 559.355 559.543 563.747 558.228 Ch.=447861.900
447+862 L=558.201

CLIENT:
447+870 565.568 559.302 559.490 563.707 558.217
EROWRD

447+880 565.619 559.272 559.460 563.661 558.237


LVUP
447+890 565.663 559.266 559.453 563.536 558.257 447+890
447+900 565.699 559.282 559.470 563.502 558.277
EROW

447+910 565.728 559.322 559.510 563.384 558.297


LHS SERV
ICE ROA

L=566.293
D

447+920 565.750 559.385 559.573 563.229 558.317


RD
RD

L=128m
447+930 565.764 559.471 559.659 563.165 558.337
Ch.=447890.000
ERR

G=0.200%

Government of India
447+800
TYPE

OWD
SPAN

447+940 565.771 559.581 559.768 563.033 558.357

G-5 & 6, Sector-10, Dwarka, New Delhi-110075


CHAINAGE

BM PILLAR
447+950 565.770 559.713 559.901 562.980 558.377 CHAINAGE
DETAILS
(Km/m)

National Highways Authority of India


NO. 447+910
IMPROVEMENT
DESCRIPTION

447+960 565.762 559.863 560.050 562.907 558.397

(Ministry of Road Transport & Highways)


BMP2B
PAVER BLOCK

EASTING
(X)
-
STRUCTURE NO. -
-
-

NORTHING 232017.507
447+970 565.747 560.013 560.200 562.884 558.417 (Y)
LHS MCW

RHS MCW

1971015.09
1
RHS SERVICE ROAD

ELEVATION
(Z)
447+980 565.724 560.163 560.350 562.810 558.437 562.894
RD
EXISTING

Box Culvert
EROW RD

F
447+990 447+990 565.656 560.313 560.500 562.721 558.457 447+990
New Construction

448+000 565.552 560.463 560.650 562.638 558.657


RD

5
5

LANDSCAPE
LANDSCAPE
LVUP

448+010 565.440 560.613 560.800 562.504 558.857


EROW

L=558.457
447+890

1x12.0x4.0
PROPOSED

448+020 565.322 560.763 560.950 562.372 559.057


Ch.=447990.000

CONSULTANT:
448+030 565.195 560.913 561.100 562.362 559.257
448+040 565.062 561.063 561.250 562.324 559.457
447+900
ERO

DBAC
LANDSCAPE

RD
W
LANDSCAPE

448+050 564.921 561.213 561.400 562.290 559.657


RD

448+060 564.773 561.363 561.550 562.213 559.857

Writing from Feedback Infra Pvt. Ltd.


448+070 564.617 561.513 561.700 562.038 560.057
L=154m
G=2.000%
RHS MCW

PAVER BLOCK
LHS MCW
LHS SERV

448+080 564.454 561.663 561.850 562.088 560.257


ICE ROAD
RD EROW

448+090 564.287 561.813 562.000 562.114 560.457

Making frastructure Happen 448+100 564.121 561.961 562.148 562.138 560.657


INFRA
TYPE

SPAN

448+110 563.954 562.104 562.291 562.165 560.857


RD
ERRD

KM-448
CHAINAGE

448+120 563.787 562.242 562.430 562.470 561.057


OW

KM
448
IMPROVEMENT

448+130 563.621 562.376 562.564 562.586 561.257


RHS SERV
DESCRIPTION

ICE ROA
D
-
STRUCTURE NO. -

448+140 448+144 563.461 562.505 562.692 562.585 561.457 Ch.=448144.136


00
Opp.HDFC Bank

L=561.540
Buried

448+0
448+150 563.372 562.629 562.817 562.420 561.611
447.991

Bangalore - 560 025

6
6

EROW
EXISTING

(near Richmond Circle)


Feedback Infra Pvt. Ltd.
No.14, Langford Garden,

448+160 563.311 562.748 562.936 562.616 561.731


G

1st Floor,Langford Avenue,


Reconstruction

L=36m

448+170 563.265 562.863 563.050 562.702 561.852


2

RD
RD

Ch.=448180.117
RD

563.236 562.972 563.160 562.609 561.972


ER

448+180 448+180 L=561.974


Tel:+91-80-42840500 Fax:+91-80-41320989

thereof shall be Copied or Communicated to a Third Party without Authorisation in


The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd.
447+990

1x2.0x2.0

448+190 563.223 563.077 563.265 562.646 562.068


Box Culvert

OW
PROPOSED

448+200 563.226 563.177 563.365 562.760 562.164


Sep.
and not for Publication. The Information is Issued on the Understanding that no part Date :

2021

448+210 563.244 563.273 563.460 562.856 562.260


L=70m

Drawn by:

448+220 563.279 563.365 563.553 562.755 562.355


ERO

G=0.956%

Checked by:
Designed by:

V
H
W

Approved By:

BM PILLAR
Scale

448+230 563.330 563.457 563.645 562.751 562.451 CHAINAGE


DETAILS
(Km/m)
RD
RD

NO. 448+120
RD

448+240 563.397 563.550 563.737 562.819 562.546 100 BMP3B


EASTING (X)
Ch.=448250.000 232001.041
448+
448+250 448+250 563.480 563.642 563.829 562.920 562.642 L=562.642
NORTHING
(Y)
1970810.29
4
ERO

ELEVATION
(Z)
PK
SM
KPG
BAB

448+260 563.585 563.746 563.922 563.158 562.747 563.005


W

448+270 563.689 563.850 564.014 563.674 562.852


A3

1:300
1:3000

448+280 563.794 563.954 564.106 563.540 562.957


448+290 563.899 564.058 564.199 563.786 563.061
ERO
W
RD

RD

448+300 564.004 564.162 564.291 563.930 563.166


RD

7
7

448+310 564.109 564.266 564.383 564.023 563.271


448+320 564.214 564.370 564.476 564.133 563.376
TITLE:
ERO

L=151m

STATUS:

448+330 564.318 564.474 564.568 564.289 563.481


G=1.049%

DRG NO.:
W

PROJECT:

00 2
448+340 564.423 564.578 564.660 564.488 563.586 448+
448+350 564.528 564.682 564.753 564.600 563.691
E

448+360 564.627 564.786 564.845 564.597 563.795


RD

RD
RRDOW

448+370 564.719 564.891 564.937 564.659 563.900


448+380 564.811 564.995 565.030 564.762 564.005
448+390 564.903 565.099 565.122 564.907 564.110
ERO

448+400 448+401 564.996 565.203 565.214 564.970 564.215 Ch.=448400.884


L
G

L=564.224
W

448+410 448+410 565.088


565.088 565.307 565.307 565.066 564.432
RD

RD
ERO

300
W

448+
FIPL/1350/NH-44/N-H/DP&P_LHS-01

8
8

GPS PILLAR
AUDIT REPORT

DETAILS
ERO

CHAINAGE
(Km/m)
NO. 448+395
W

DRAINAGE PLAN & PROFILE


RD

EASTING GPS-3B
(X)
NORTHING 231972.226
(Y)
RD

1970538.07
ELEVATION
(Z) 6
565.234
01
REV.
ERO
W
HYDERABAD

OF LINGAREDDIPET JUNCTION FROM CH:447+300 TO 448+400

1 OF 1
SHEET

400
Appointment of Road Safety Auditors/ Consultant for Conducting Road

of Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)

448+
Size: A3
F
E
C
B

Safety Audit for Long Term Measures on Identified Blackspots on NH-44 H


G
A
F
E
C
B

G
D
A

Culvert
RCC Drain
LEGENDS:-

Existing Center Line


DATUM = 558.000

H Proposed Center line

Proposed Right of way


Proposed Carriageway
PROPOSED CHAINAGE

1
1

Proposed Earthen Shoulder


PLAN
DRAIN INVERT LEVEL-RHS

VERTICAL SCHEMATIC RHS


NAGPUR

RD

EROW
RD
FRL AT SERVICE ROAD INNER EDGE-RHS

FRL AT SERVICE ROAD OUTER EDGE-RHS


447+300

OGL BELOW SERVICE ROAD INNER EDGE-RHS


558
560
562
564
566
568

FRL AT NEW CARRIAGE WAY OUTER EDGE-RHS


447+465 447+465 558.845 558.644 558.644 558.873 558.524 GPS PILLAR
DETAILS
447+470 558.914 558.728 558.734 558.927 558.610 CHAINAGE
(Km/m)
NO. 447+360
447+480 559.052 558.896 558.914 559.050 558.781 EASTING GPS-2B
(X)
NORTHING 231831.209
447+490 559.190 559.064 559.094 559.170 558.953 (Y)
1971524.13
ELEVATION
(Z) 6
557.208

OUTER EDGE-RHS
447+500 559.329 559.233 559.274 559.290 559.125
447+510 559.467 559.401 559.454 559.399 559.297

L=384m
G=1.718%
447+520 559.605 559.569 559.634 559.520 559.469

DRAIN INVERT LEVEL-RHS


RD
447+530 559.740 559.738 559.814 559.615 559.640

FRL AT NEW CARRIAGE WAY


FRL AT SR INNER EDGE-RHS
FRL AT SR OUTER EDGE-RHS
PROFILE
447+540 559.869 559.906 559.994 559.597 559.812

2
2

447+
00 4

OGL BELOW SR INNER EDGE-RHS


447+550 447+551 559.994 560.075 560.174 559.756 559.984 Ch.=447551.490
L=560.010
447+560 560.114 560.243 560.354 559.825 560.049
447+570 560.251 560.411 560.534 559.996 560.096
447+580 560.419 560.580 560.714 560.179 560.143

RD
447+590 560.586 560.748 560.894 560.289 560.189
447+600 560.754 560.916 561.074 559.716 560.236
447+610 560.921 561.076 561.246 560.540 560.283

REV
447+620 561.089 561.210 561.392 560.780 560.329

L=136m

NOTES:
G=0.467%
447+630 561.263 561.323 561.510 560.814 560.376
447
+50
0
447+640 561.443 561.415 561.602 560.722 560.423

DATE
R
ERD

447+650 561.623 561.480 561.668 560.653 560.469

RD
OW

447+660 561.803 561.519 561.707 561.084 560.516


RD

447+670 561.922 561.531 561.719 561.441 560.563


447+680 562.035 561.517 561.704 560.827 560.609
Ch.=447687.629
ERO

447+688
447+690 562.149 561.476 561.663 561.205 560.612 L=560.645
W

3
3

447+700 562.262 561.408 561.595 560.968 560.472


RD

447+710 562.372 561.313 561.501 561.434 560.331

RD
ERO

447+720 562.518 561.192 561.379 -999.000 560.191


RD
W

447
447+730 562.680 561.053 561.240 -999.000 560.051
+60
0
BM PILLAR
CHAINAGE
DETAILS
447+740 562.834 560.913 561.100 -999.000 559.911 (Km/m)
NO. 447+680

447+750 562.981 560.773 560.960 -999.000 559.770 BMP1B


TF
EASTING (X)
ERO

NORTHING 231945.301
(Y)
447+760 563.120 560.633 560.820 -999.000 559.630 T
W

1971227.56
ELEVATION
(Z) 9
560.792
RD

DESCRIPTION OF REVISIONS
447+770 563.252 560.493 560.680 560.181 559.490
TFTF
TF

RD

L=174m
447+780 563.377 560.353 560.540 560.175 559.350

G=-1.402%

1. All dimensions are in millimeters or meters unless otherwise specified.


TF
ERO

447+790 563.494 560.213 560.400 560.222 559.209 TF


T
W

2. Dimensions are not to be scaled and only written dimensions to be followed.


447+800 563.604 560.073 560.260 560.430 559.069
447+810 563.707 559.933 560.120 560.425 558.929
447+820 563.802 559.793 559.980 560.195 558.789
ERO

447+

BY
447+830 563.890 559.653 559.841 560.154 558.648
RW D

700
447+840 563.971 559.531 559.718 560.237 558.508

RD

4
4

447+850 564.044 559.431 559.619 560.225 558.368


447+860 447+862 564.110 559.355 559.543 560.219 558.228 Ch.=447861.900
L=558.201

CLIENT:
447+870 564.168 559.302 559.490 560.287 558.217
EROWRD

447+880 564.219 559.272 559.460 560.347 558.237


LVUP
447+890 564.263 559.266 559.453 560.093 558.257 447+890
447+900 564.299 559.282 559.470 560.158 558.277
EROW

RD

447+910 564.328 559.322 559.510 560.742 558.297


LHS SERV
ICE ROA

L=566.293
D

447+920 564.350 559.385 559.573 560.909 558.317


RD

L=128m
447+930 564.364 559.471 559.659 560.538 558.337
Ch.=447890.000
ERR

G=0.200%

Government of India
447+800
TYPE

OWD
SPAN

447+940 564.371 559.581 559.768 560.661 558.357

G-5 & 6, Sector-10, Dwarka, New Delhi-110075


CHAINAGE

BM PILLAR
447+950 564.370 559.713 559.901 560.977 558.377 CHAINAGE
DETAILS
(Km/m)

National Highways Authority of India


NO. 447+910
IMPROVEMENT
DESCRIPTION

447+960 564.362 559.863 560.050 560.850 558.397

(Ministry of Road Transport & Highways)


BMP2B
PAVER BLOCK

EASTING
(X)
-
STRUCTURE NO. -
-
-

RD

NORTHING 232017.507
447+970 564.347 560.013 560.200 560.862 558.417 (Y)
LHS MCW

RHS MCW

1971015.09
1
RHS SERVICE ROAD

ELEVATION
(Z)
447+980 564.324 560.163 560.350 560.793 558.437 562.894
EXISTING

Box Culvert
EROW RD

F
447+990 447+990 564.333 560.313 560.500 560.927 558.457 447+990
New Construction

448+000 564.362 560.463 560.650 561.059 558.657


RD

5
5

LANDSCAPE
LANDSCAPE
LVUP

448+010 564.384 560.613 560.800 561.191 558.857


EROW

L=558.457
447+890

1x12.0x4.0
PROPOSED

448+020 564.399 560.763 560.950 561.343 559.057


Ch.=447990.000

CONSULTANT:
448+030 564.406 560.913 561.100 561.203 559.257
RD

448+040 564.384 561.063 561.250 561.127 559.457


447+900
ERO

DBAC
LANDSCAPE

W
LANDSCAPE

448+050 564.310 561.213 561.400 561.255 559.657


RD

448+060 564.228 561.363 561.550 561.361 559.857

Writing from Feedback Infra Pvt. Ltd.


448+070 564.139 561.513 561.700 561.474 560.057
L=154m
G=2.000%
RHS MCW

PAVER BLOCK
LHS MCW
LHS SERV

448+080 564.043 561.663 561.850 561.574 560.257


ICE ROAD
RD EROW

448+090 563.943 561.813 562.000 561.670 560.457


RD

Making frastructure Happen 448+100 563.843 561.961 562.148 562.015 560.657


INFRA
TYPE

SPAN

448+110 563.743 562.104 562.291 561.908 560.857


ERRD

KM-448
CHAINAGE

448+120 563.643 562.242 562.430 562.155 561.057


OW

KM
448
IMPROVEMENT

448+130 563.543 562.376 562.564 561.980 561.257


RHS SERV
DESCRIPTION

ICE ROA
D
-
STRUCTURE NO. -

448+140 563.449 562.505 562.692 562.001 561.457 Ch.=448144.136


448+144
00
Opp.HDFC Bank

L=561.540
Buried

448+0
448+150 563.372 562.629 562.817 562.086 561.611
447.991

Bangalore - 560 025

6
6

EROW

RD
EXISTING

(near Richmond Circle)


Feedback Infra Pvt. Ltd.
No.14, Langford Garden,

448+160 563.311 562.748 562.936 562.636 561.731


G

1st Floor,Langford Avenue,


Reconstruction

L=36m

448+170 563.265 562.863 563.050 562.487 561.852


2

RD

Ch.=448180.117
RD

448+180 448+180 563.236 562.972 563.160 562.459 561.972


ER

L=561.974
Tel:+91-80-42840500 Fax:+91-80-41320989

thereof shall be Copied or Communicated to a Third Party without Authorisation in


The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd.
447+990

1x2.0x2.0

448+190 563.223 563.077 563.265 562.489 562.068


Box Culvert

OW
PROPOSED

448+200 563.226 563.177 563.365 562.704 562.164


Sep.
and not for Publication. The Information is Issued on the Understanding that no part Date :

2021

448+210 563.244 563.273 563.460 562.642 562.260


L=70m

Drawn by:
RD

448+220 563.279 563.365 563.553 562.540 562.355


ERO

G=0.956%

Checked by:
Designed by:

V
H
W

Approved By:

BM PILLAR
Scale

448+230 563.330 563.457 563.645 562.486 562.451 CHAINAGE


DETAILS
(Km/m)
RD

NO. 448+120
RD

448+240 563.397 563.550 563.737 562.523 562.546 100 BMP3B


EASTING (X)
Ch.=448250.000 232001.041
448+
448+250 448+250 563.480 563.642 563.829 562.544 562.642 L=562.642
NORTHING
(Y)
1970810.29
4
ERO

ELEVATION
(Z)
PK
SM
KPG
BAB

448+260 563.585 563.746 563.922 563.077 562.747 563.005


W

448+270 563.689 563.850 564.014 563.602 562.852


A3

1:300
1:3000

448+280 563.794 563.954 564.106 563.679 562.957


RD

448+290 563.899 564.058 564.199 563.872 563.061


ERO
W
RD

448+300 564.004 564.162 564.291 563.955 563.166


RD

7
7

448+310 564.109 564.266 564.383 564.062 563.271


448+320 564.214 564.370 564.476 564.192 563.376
TITLE:
ERO

L=151m

STATUS:

448+330 564.318 564.474 564.568 564.313 563.481


G=1.049%

DRG NO.:
W

PROJECT:

00 2
448+340 564.423 564.578 564.660 564.463 563.586 448+
RD

448+350 564.528 564.682 564.753 564.596 563.691


E

448+360 564.627 564.786 564.845 564.681 563.795


RD
RRDOW

448+370 564.719 564.891 564.937 564.732 563.900


448+380 564.811 564.995 565.030 564.837 564.005
448+390 564.903 565.099 565.122 564.950 564.110
ERO

448+400 448+401 564.996 565.203 565.214 565.073 564.215 Ch.=448400.884


L=564.224
W

L
G

448+410 448+410 565.088 565.307 565.307 565.205 564.432


RD

RD
ERO

300
W

448+
FIPL/1350/NH-44/N-H/DP&P_RHS-01

8
8

GPS PILLAR
AUDIT REPORT

DETAILS
ERO

CHAINAGE
(Km/m)
NO. 448+395
W

DRAINAGE PLAN & PROFILE


RD

EASTING GPS-3B
(X)
NORTHING 231972.226
(Y)
RD

1970538.07
ELEVATION
(Z) 6
565.234
01
REV.
ERO
W
HYDERABAD

OF LINGAREDDIPET JUNCTION FROM CH:447+300 TO 448+400

1 OF 1
SHEET

400
Appointment of Road Safety Auditors/ Consultant for Conducting Road

of Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)

448+
Size: A3
F
E
C
B

Safety Audit for Long Term Measures on Identified Blackspots on NH-44 H


G
A
JUNCTION IMPROVEMENT
1 2 3 4 5 6 7 8

NAGPUR HYDERABAD
GOLDEN DABHA JUNCTION
A A

TOOPRAN

TF
B W-21(b) B

1.5 W-28
7.5

IN MALAYALA
NAME
IN MA
1.5

NAME
HZ
-1B
7.5

LA
I1 - 0R
447+700

YA
I5-0

S-61 (d
Truck Lay

C C

447+800
1.5

LA
I5-0
TRUCK

M
LAYBYE

IN ENGLIS
INTELUGU ENGLISH
0.0
I1-7

447+600
R30 R3

W-28
R1-2

S-61 (d

W-28
.0

)
Bye

I1 - 1

IN ENGLIS
IN

INTELUGU
INTELUGU
IN ENG

WAY
IN TEL

447+500

5
GIVE
120.0

447+
5.
I5-0 5.5 I5-0

)
90.0
R2-15
IN ENGLISH
IN TELUGU

14.0
UGU

4.5
LISH

3.0
I1 - 0L

1.0
7.0
I1-4L

7.5
1.5
IN ENG
IN TEL

HZ-1B

TF
LHS SERVICE ROAD PAVER BL

9
STOP
OCK

00
UGU
LISH

TFTF
TF
D
LAND
SC APE

4.5
LHS M
.0

T
CW

R5 4.5
R5

T
LAN
DSC

.0
12.0 APE

RHS M
CW
9.0
1.5
1.5

5.0
4.5 R
14.0
.0
LAND

3.0

W-23 4.0
RHS SE

1.0
7.5
SCAP

R5

1.5
RVICE
ROAD E
E E
90.0

4.5
I5-0 120.0

HZ-1L

W-32l
W-47
HZ-1L

TF
I5-0
PAV
ER B
LOC
K
I5-0
HZ-1L
I5-0 90.0

8
910

07
91
S

W-2
17.5
2B
TAIL

0
447+
F F

015.
BMP
680

1
569

2320

894

(d)
S

R DE

1971
45.3
1B
TAIL
447+

227.

562.
BMP

S-61
2319

792
R DE

ILLA
1971

/m)
560.

(Km
BM P
ILLA
)
m/m

AGE

(Y)
(X)
BM P

(Z)
E (K

IN

G
TING

ION
THIN
CHA
)
INAG

(X)
G (Y

NO.
N (Z

VAT
EAS
TING

NOR
THIN
CHA

ATIO

ELE
G G
NO.
EAS
NOR

V
ELE

LEGENDS:- NOTES: CLIENT: CONSULTANT: Drawn by: BAB STATUS: AUDIT REPORT
Feedback Infra Pvt. Ltd.
1. All dimensions are in millimeters or meters unless otherwise specified. No.14, Langford Garden,

H
Proposed Center line
Proposed Carriageway
2. Dimensions are not to be scaled and only written dimensions to be followed. F DBAC INFRA 1st Floor,Langford Avenue,
Opp.HDFC Bank
Designed by: KPG
PROJECT:
Appointment of Road Safety Auditors/ Consultant for Conducting Road
Safety Audit for Long Term Measures on Identified Blackspots on NH-44 H
Proposed Earthen Shoulder Making frastructure Happen (near Richmond Circle)
Bangalore - 560 025
Checked by: SM of Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)
Tel:+91-80-42840500 Fax:+91-80-41320989
Proposed Drain Approved By: PK
Existing Right of way EROW National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. TITLE: GOLDEN DABHA JUNCTION IMPROVEMENT @ CH : 447+645
(Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Date : Scale
Existing Center Line
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET
G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt. Ltd. Sep. 2021 N.T.S DRG NO.: FIPL/1350/NH-44/N-H/JI-01
REV DATE DESCRIPTION OF REVISIONS BY 01 1 OF 2
1 2 3 4 5 6 7 8
Size: A3
1 2 3 4 5 6 7 8

NAGPUR HYDERABAD

LINGAREDDYPET JUNCTION

4
1970810.29
232001.041
A A

563.005
448+120
BMP3B
S
R DETAIL

6
1970538.07
231972.226
(Km/m)
BM PILLA

N (Z)

4
G (Y)

565.23
395
GPS-3B
(X)

IO

8+
IN

S
E

T
EASTING

R DETAIL
44
CHAINAG

ELEV A
NOR T
B B

NO.

E (Km/m)

N (Z)
G (Y)
GPS PILLA

(X)

ELEVATIO
NORTHIN
Truck Lay Bye

EASTING
CHAINAG
TRUCK
LAYBYE
I1-7

NO.
448+100
448+000

448+200

448+300
HZ-1L

448+400
W-23
I5-0

W-32l
W-47

LAY BYE
TRUCK
I1-4R
14.0
3.0
4.0

7.5
1.0

1.5

C C
KM-448

448
KM

ROAD
RHS SERVICE

STOP

.0 5
14.0
4.0
1.5

.0
7.5
1.0
3.0

R1
5
R1
I5-0
120.0 11.0

)
S-61 (d
HZ-1B
W-47

IN ENGLISH
IN TELUGU
E
I5-0 E
HZ-1L

IN ENGLISH
IN MALAYALAM

IN MALAYALAM

IN TELUGU
I1 - 0R

I1-4L
R1-1

I1 - 0L
IN ENGLISH
IN TELUGU
NAME

NAME

IN ENGLISH
IN TELUGU

LINGAREDDYP
IN ENGLISH
IN TELUGU
I1 - 0 (a)

W-47
F F

ET
W-21(b)

G G

LEGENDS:- NOTES: CLIENT: CONSULTANT: Drawn by: BAB STATUS: AUDIT REPORT
Feedback Infra Pvt. Ltd.
1. All dimensions are in millimeters or meters unless otherwise specified. No.14, Langford Garden,

H
Proposed Center line
Proposed Carriageway
2. Dimensions are not to be scaled and only written dimensions to be followed. F DBAC INFRA 1st Floor,Langford Avenue,
Opp.HDFC Bank
Designed by: KPG
PROJECT:
Appointment of Road Safety Auditors/ Consultant for Conducting Road
Safety Audit for Long Term Measures on Identified Blackspots on NH-44 H
Proposed Earthen Shoulder Making frastructure Happen (near Richmond Circle)
Bangalore - 560 025
Checked by: SM of Nagpur-Hyderabad Section from km 175.000 to km 474.000 (BS 229)
Tel:+91-80-42840500 Fax:+91-80-41320989
Proposed Drain Approved By: PK
Existing Right of way EROW National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. TITLE: LINGAREDDYPET JUNCTION IMPROVEMENT @ CH : 448+275
(Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Date : Scale
Existing Center Line
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET
G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt. Ltd. Sep. 2021 N.T.S DRG NO.: FIPL/1350/NH-44/N-H/JI-02
REV DATE DESCRIPTION OF REVISIONS BY 01 2 OF 2
1 2 3 4 5 6 7 8
Size: A3
STRUCTURE DRAWINGS
BOX CULVERT
1 2 3 4 5 6 7 8

A A

B B

'3'

U/S
D/S EXISTING STRUCTURE
TO BE DISMANTLED

C C

'1'

SECTIONAL ELEVATION

D D

TO HYDERABAD
A
E B E
HALF TOP

D/S U/S

EXISTING STRUCTURE
TO BE DISMANTLED
HALF BOTTOM

TO NAGPUR
F F

A
B

PLAN
G G

CLIENT: CONSULTANT: F
dL
e
.tePad .rbnvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1a
o4nG
.od,gorF
fo,ad
1
lre
stn,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
LanA
odgrfven L
bu aelgR,hoad,
F DBAC INFRA N
(Re
cham ri e o)ncC
ldri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a60
nN -2g
oeI5a
rD,lA I
(Package-I)
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a GENERAL ARRANGEMENT DRAWING OF
Approved By: AT TITLE: SINGLE CELL BOX CULVERT FOR RECONSTRUCTION
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra AT DESIGN CH:447+990
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-BC-REC-447+990-GA-01
R1 01 OF 02
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

NOTES:-

A A

'2'
B DETAIL-'1' B

C SECTION A-A C

DETAILS OF
CONSTRUCTION JOINT

D D

E LEGEND: E

F F

SECTION B-B
DETAIL-'2'

DETAIL-'3'

G G

CLIENT: CONSULTANT: F
dL
e
.tePad .rbnvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1a
o4nG
.od,gorF
fo,ad
1
lre
stn,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
LanA
odgrfven L
bu aelgR,hoad,
F DBAC INFRA N
(Re
cham ri e o)ncC
ldri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a60
nN -2g
oeI5a
rD,lA I
(Package-I)
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a GENERAL ARRANGEMENT DRAWING OF
Approved By: AT TITLE: SINGLE CELL BOX CULVERT FOR RECONSTRUCTION
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra AT DESIGN CH:447+990
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-BC-REC-447+990-GA-01
R1 02 OF 02
1 2 3 4 5 6 7 8
Size: A2
BOX CULVERT REINFORCEMENT
1 2 3 4 5 6 7 8

A A

B B

C C

REINFORCEMENT DETAILS OF TOP SLAB

D D

2
REINFORCEMENT DETAILS OF RCC BOX
SECTION A-A
A
NOTES:
E E

F F

DETAIL - 2 REINFORCEMENT DETAILS OF BOTTOM SLAB

G G

CLIENT: CONSULTANT: F
dL
e
.tePad .rbnvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1a
o4nG
.od,gorF
fo,ad
1
lre
stn,
LanA
odgrfven L
bu aelgR,hoad,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
F DBAC INFRA N
(Re
cham ri e o)ncC
ldri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H LEGEND: NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a60
nN -2g
oeI5a
rD,lA I
(Package-I)
·
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a
·
TYPICAL REINFORCEMENT DETAIL
Approved By: AT TITLE:
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra OF RCC BOX CULVERT (WITH FILL)
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-BC-RC-01(WITH FILL)
R1 01 OF 01
1 2 3 4 5 6 7 8
Size: A2
LIGHT VEHICULAR UNDERPASS
1 2 3 4 5 6 7 8
TO NAGPUR TO HYDERABAD

A A

PROW

PROW
PROW

PROW

447800.000

447900.0
GL GL

44770
SECTION A-A

00
0.0

4480
00
B B

00.0
00
PROW

PROW
KEY-PLAN
TO HYDERABAD

C C
PROW

PROW
NOTES:-
PROW

PROW
C

HALF TOP PLAN


D D
B

PROW
PROW
PROW

PROW
2
E E
A A

PROW
PROW

2
1 1

PROW
PROW

HALF BOTTOM PLAN


F F

PROW
B
LEGEND:
PROW

TO NAGPUR

PROW
PROW

PROW
G G

PLAN

CLIENT: CONSULTANT: Fd
L
e.tePad .rb
nvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1ao4nG
.od
,gorF
fo
,a d
1
lre
stn,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
LanAodgrfven Lbu aelgR,hoad,
F DBAC INFRA N
(Re
ch am ri e o)ncC
ldri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a 60
nN -2
g
oeI5a
rD,lA I
(Package-I)
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a GENERAL ARRANGEMENT DRAWING OF
Approved By: AT TITLE: LIGHT VEHICULAR UNDERPASS
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra
AT DESIGN CH:447+890 (NEW CONSTRUCTION)
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-LVUP-447+890-GA-01
R1 01 OF 02
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

A A

B 1 B

C SECTION B-B VIEW C-C C

D D

E E
VIEW-1-1 VIEW-2-2

DETAIL - 1
DETAILS OF
CONSTRUCTION JOINT

F F

G G

CLIENT: CONSULTANT: F
dL
e
.tePad .rbnvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1a
o4nG
.od,gorF
fo,ad
1
lre
stn,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
LanA
odgrfven L
bu aelgR,hoad,
F DBAC INFRA N
(Re
cham ri e o)ncC
ldri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a60
nN -2g
oeI5a
rD,lA I
(Package-I)
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a GENERAL ARRANGEMENT DRAWING OF
Approved By: AT TITLE: LIGHT VEHICULAR UNDERPASS
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra
AT DESIGN CH:447+890 (NEW CONSTRUCTION)
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-LVUP-447+890-GA-01
R1 02 OF 02
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

A SCHEDULE OF REINFORCEMENT:
SPAN 1 x 12.0 (a) x 4.0 (h)
BAR SHAPE OF BARS SPACING
A BAR DIA A
MARK (NOT TO SCALE) OR
(MM)
NO. OF BAR

'1'
B B

C C

DETAIL-2
A REINFORCEMENT DETAIL
'2' SECTION A-A

D D

E E

REINFORCEMENT DETAILS OF TOP SLAB

NOTES:
F F

DETAIL-1

G G

REINFORCEMENT DETAILS OF BOTTOM SLAB LEGEND:

CLIENT: CONSULTANT: Fd
L
e.tePad .rb
nvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1ao4nG
.od
,gorF
fo
,a d
1
lre
stn,
LanAodgrfven Lbu aelgR,hoad,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
F DBAC INFRA N
(Re
ch am ri e o)ncC
ldri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a 60
nN -2
g
oeI5a
rD,lA I
(Package-I)
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a REINFORCEMENT DETAILS OF
Approved By: AT TITLE: LIGHT VEHICULAR UNDERPASS
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra AT DESIGN CH:447+890 (NEW CONSTRUCTION)
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-LVUP-447+890-RC-01
R1 01 OF 02
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

SCHEDULE OF REINFORCEMENT
SPACING
BAR SHAPE OF BARS BAR DIA OR
A MARK (NOT TO SCALE) (MM) NO. OF A
BAR
B

B B

B SECTION B-B
REINFORCEMENT DETAIL
C C

D D

E E

F F

G G

REINFORCEMENT DETAILS OF TOP SLAB

CLIENT: CONSULTANT: F
dL
e
.teP
ad.rbnvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1a
o4
nG
.od
,gorF
fo,ad
1
lre
stn,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
LanA
od
grfven L
bu aelgR,hoad,
F DBAC INFRA N
(Re
ch
amri e o)n
cC ld
ri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a60
n
N -2
g
oeI5a
rD,lA I
(Package-I)
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a REINFORCEMENT DETAILS OF
Approved By: AT TITLE: LIGHT VEHICULAR UNDERPASS
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra AT DESIGN CH:447+890 (NEW CONSTRUCTION)
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-LVUP-447+890-RC-01
R1 02 OF 02
1 2 3 4 5 6 7 8
Size: A2
RETAINING WALL
1 2 3 4 5 6 7 8

@ c/c @ c/c
@ c/c
A A

B B

C C
**

D RETAINING WALL REINFORCEMENT DETAIL D

DETAIL OF RETAINING WALL

**

E E
NOTES:-

F F

G G

CLIENT: CONSULTANT: F
dL
e
.teP
ad.rbnvta
fIck
Drawn by: VKS STATUS: AUDIT REPORT
NL1a
o4
nG
.od
,gorF
fo,ad
1
lre
stn,
Appointment of Road Safety Auditors/ Consultant for Conducting Road
LanA
od
grfven L
bu aelgR,hoad,
F DBAC INFRA N
(Re
ch
amri e o)n
cC ld
ri Designed by: RV PROJECT: Safety Audit for Long Term Measures on Identified Blackspots on
H NH-44 of Nagpur-Hyderabad Section from km 175.000 to km 474.000 H
Making Infrastructure Happen B5a60
n
N -2
g
oeI5a
rD,lA I
(Package-I)
05
0
4
8
2
4-0
8-1
9
+: lT
e Checked by: KAL
9
80
2
3
1
4-0
8-1
9
+:xF
a DETAILS OF RCC RETAINING WALL UP TO
Approved By: AT TITLE: HEIGHT 10.0m FOR SBC 20 T/m2 WITH OUT
National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra
SURCHARGE
(Ministry of Road Transport & Highways) Pvt. Ltd. and not for Publication. The Information is Issued on the Understanding
that no part thereof shall be Copied or Communicated to a Third Party without SCALE Date: REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY Government of India Authorisation in Writing from Feedback Infra Pvt.Ltd. AS SHOWN September-2021 DRG NO.: FIPL-HD-N-H-NH44-1350-RET-GA-01
R0
R1 04 OF 04
1 2 3 4 5 6 7 8
Size: A2