Orion Design Report
Orion Design Report
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1
Axis: 1 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B1 L=4000mm 1B2 L=4000mm 1B3 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-22.485
-27.763 -27.278
22.48 22.449 21.404 21.523 22.991
2.526
Moment
(Env.)
-16.179 -15.771
-23.167
Bending (Top Edge) ...
M (kN.m) 2.5 0.6 22.5 22.4 3.3 21.4 21.5 3.9 23.0
d (mm) 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5
K/K' 0.02 0.01 0.20 0.20 0.03 0.19 0.19 0.03 0.20
x (mm) 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06
As (mm2) 20.69 5.04 184.11 183.86 26.97 175.30 176.27 31.55 188.30
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.6 23.2 0.7 0.7 16.2 0.8 15.8 0.4
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 360.5 342.0
K/K' 0.09 0.20 0.01 0.01 0.14 0.01 0.14 0.00
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 40.06 38.00
As (mm2) 87.17 189.74 6.25 5.68 132.51 6.87 129.17 3.56
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 22.5 31.2 27.8 27.4 27.3 28.0
v (N/mm2) 0.28 0.38 0.34 0.34 0.34 0.34
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 87.9
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 55.31 OK 11.1 < 57.11 OK 11.1 < 57.11 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y13 2Y13 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-2
Axis: 1 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B4 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
Shear
Force
(Env.)
-31.429
23.212
2.154
Moment
(Env.)
-22.891
Bending (Top Edge) ...
M (kN.m) 23.2 0.8 2.2
d (mm) 360.5 360.5 360.5
K/K' 0.20 0.01 0.02
x (mm) 40.06 40.06 40.06
As (mm2) 190.11 6.15 17.64
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 0.1 22.9 10.8
d (mm) 342.0 360.5 360.5
K/K' 0.00 0.20 0.09
x (mm) 38.00 40.06 40.06
As (mm2) 0.67 187.48 88.36
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 31.4 22.1
v (N/mm2) 0.39 0.27
vc (N/mm2) 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00
Vnom (kN) 87.9
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 55.86 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13
Top SupBar 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-3
Axis: 1 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B1 L=4000mm 2B2 L=4000mm 2B3 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-23.361 -26.276 -27.533
19.726 19.89 21.87 22.063 20.521
3.554
Moment
(Env.)
-16.923 -16.169
-23.908
Bending (Top Edge) ...
M (kN.m) 3.6 0.3 19.7 19.9 3.2 21.9 22.1 3.7 20.5
d (mm) 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5
K/K' 0.03 0.00 0.17 0.17 0.03 0.19 0.19 0.03 0.18
x (mm) 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06
As (mm2) 29.11 2.10 161.56 162.90 26.56 179.12 180.70 30.55 168.07
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.3 23.9 3.1 2.3 16.9 0.8 16.2
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 360.5
K/K' 0.09 0.21 0.03 0.02 0.15 0.01 0.14
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 40.06
As (mm2) 84.51 195.81 26.33 19.94 138.60 7.33 132.43
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 23.4 30.3 26.3 27.8 27.5 26.6
v (N/mm2) 0.29 0.37 0.32 0.34 0.34 0.33
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 87.9
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 53.86 OK 11.1 < 57.11 OK 11.1 < 57.11 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y13 2Y13 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-4
Axis: 1 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B4 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
Shear
Force
(Env.)
-30.669
20.758
2.877
Moment
(Env.)
-23.375
Bending (Top Edge) ...
M (kN.m) 20.8 0.5 2.9
d (mm) 360.5 360.5 360.5
K/K' 0.18 0.00 0.03
x (mm) 40.06 40.06 40.06
As (mm2) 170.01 4.16 23.56
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 1.5 23.4 10.6
d (mm) 342.0 360.5 360.5
K/K' 0.01 0.20 0.09
x (mm) 38.00 40.06 40.06
As (mm2) 12.82 191.45 86.53
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 30.7 22.7
v (N/mm2) 0.38 0.28
vc (N/mm2) 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00
Vnom (kN) 87.9
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 54.9 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13
Top SupBar 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-5
Axis: 1 Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B1 L=4000mm 3B2 L=4000mm 3B3 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-23.903 -25.36 -27.681
22.758 23.007
17.966 18.301 19.178
4.077
Moment
(Env.)
-17.473 -16.472
-24.531
Bending (Top Edge) ...
M (kN.m) 4.1 0.1 18.0 18.3 3.7 22.8 23.0 4.4 19.2
d (mm) 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5
K/K' 0.04 0.00 0.16 0.16 0.03 0.20 0.20 0.04 0.17
x (mm) 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06
As (mm2) 33.39 0.55 147.14 149.89 30.59 186.39 188.43 35.83 157.07
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.3 24.5 5.3 3.3 17.5 0.3 16.5 0.7
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 360.5 342.0
K/K' 0.09 0.22 0.05 0.03 0.15 0.00 0.14 0.01
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 40.06 38.00
As (mm2) 84.03 200.91 45.75 28.69 143.10 2.37 134.90 6.13
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 23.9 29.8 25.4 28.0 27.7 25.8
v (N/mm2) 0.29 0.37 0.31 0.35 0.34 0.32
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 87.9
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 52.68 OK 11.1 < 57.11 OK 11.1 < 57.11 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y13 2Y13 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-6
Axis: 1 Storey: 3 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B4 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
Shear
Force
(Env.)
-30.25
19.361
3.196
Moment
(Env.)
-23.819
Bending (Top Edge) ...
M (kN.m) 19.4 0.4 3.2
d (mm) 360.5 360.5 360.5
K/K' 0.17 0.00 0.03
x (mm) 40.06 40.06 40.06
As (mm2) 158.57 3.26 26.18
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.9 23.8 10.6
d (mm) 342.0 360.5 360.5
K/K' 0.04 0.21 0.09
x (mm) 38.00 40.06 40.06
As (mm2) 34.04 195.08 86.72
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 30.3 23.1
v (N/mm2) 0.37 0.28
vc (N/mm2) 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00
Vnom (kN) 87.9
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 54.03 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13
Top SupBar 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-7
Axis: 1 Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B1 L=4000mm 4B2 L=4000mm 4B3 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-23.559 -25.149 -27.70
23.024 23.161
17.709 17.921 19.001
2.169
Moment
(Env.)
-17.845 -16.731
-25.68
Bending (Top Edge) ...
M (kN.m) 2.2 0.0 17.7 17.9 4.1 23.0 23.2 4.7 19.0
d (mm) 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5 360.5
K/K' 0.02 0.00 0.16 0.16 0.04 0.20 0.20 0.04 0.17
x (mm) 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06 40.06
As (mm2) 17.77 0.29 145.03 146.77 33.45 188.57 189.69 38.90 155.62
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 11.8 25.7 4.8 2.8 17.8 0.4 16.7 1.1
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 360.5 342.0
K/K' 0.10 0.23 0.05 0.03 0.16 0.00 0.15 0.01
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 40.06 38.00
As (mm2) 96.96 210.32 41.28 24.33 146.15 3.16 137.03 9.51
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 23.6 30.1 25.1 28.2 27.7 25.7
v (N/mm2) 0.29 0.37 0.31 0.35 0.34 0.32
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 87.9
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 50.56 OK 11.1 < 57.11 OK 11.1 < 57.11 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y13 2Y13 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-8
Axis: 1 Storey: 4 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B4 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
Shear
Force
(Env.)
-30.516
19.089
1.724
Moment
(Env.)
-24.757
Bending (Top Edge) ...
M (kN.m) 19.1 0.4 1.7
d (mm) 360.5 360.5 360.5
K/K' 0.17 0.00 0.02
x (mm) 40.06 40.06 40.06
As (mm2) 156.34 3.05 14.12
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.7 24.8 11.8
d (mm) 342.0 360.5 360.5
K/K' 0.04 0.22 0.10
x (mm) 38.00 40.06 40.06
As (mm2) 31.98 202.76 96.77
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 30.5 22.8
v (N/mm2) 0.38 0.28
vc (N/mm2) 0.45 0.45 0.45
v-max (N/mm2) 4.00 4.00
Vnom (kN) 87.9
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 52.25 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46
Bottom Edge 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13
Top SupBar 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-9
Axis: 2 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B23 L=4000mm 1B24 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.)
-35.77
-43.952
65.358
27.781 25.86
5.168
Moment
(Env.)
-20.609
-49.796
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-10
Axis: 2 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B25 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
28.19
Shear
Force
(Env.)
-60.309
66.082
Moment
(Env.)
-27.99
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-11
Axis: 2 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B23 L=4000mm 2B24 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.) -26.77
-48.231
86.787
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-12
Axis: 2 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B25 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
25.887
Shear
Force
(Env.)
-63.113
76.238
Moment
(Env.)
-25.234
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-13
Axis: 2 Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B23 L=4000mm 3B24 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.) -20.983
-50.904
102.136
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-14
Axis: 2 Storey: 3 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B25 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
24.239
Shear
Force
(Env.)
-65.096
83.144
Moment
(Env.)
-23.636
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-15
Axis: 2 Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B23 L=4000mm 4B24 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.) -18.925
-51.173
108.61
Moment 4.574
(Env.)
-26.166
-65.015
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-16
Axis: 2 Storey: 4 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B25 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
23.656
Shear
Force
(Env.)
-65.692
86.087
Moment
(Env.)
-22.564
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-17
Axis: 3 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B26 L=4000mm 1B27 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.)
-35.83
-43.953
65.524
27.845 25.938
5.164
Moment
(Env.)
-20.607
-49.80
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-18
Axis: 3 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B28 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
28.178
Shear
Force
(Env.)
-60.308
66.083
Moment
(Env.)
-27.974
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-19
Axis: 3 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B26 L=4000mm 2B27 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.) -26.872
-48.233
86.869
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-20
Axis: 3 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B28 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
25.867
Shear
Force
(Env.)
-63.111
76.231
Moment
(Env.)
-25.209
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-21
Axis: 3 Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B26 L=4000mm 3B27 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.) -21.112
-50.907
102.258
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-22
Axis: 3 Storey: 3 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B28 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
24.212
Shear
Force
(Env.)
-65.092
83.131
Moment
(Env.)
-23.605
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-23
Axis: 3 Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B26 L=4000mm 4B27 L=4000mm WALL L=4000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=23.29 20.38
Q=5.66 5.66
Shear
Force
(Env.) -19.066
-51.177
108.73
Moment 4.57
(Env.)
-26.187
-65.024
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-24
Axis: 3 Storey: 4 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B28 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=20.38
20.38
Q=5.66
5.66
23.628
Shear
Force
(Env.)
-65.69
86.079
Moment
(Env.)
-22.525
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-25
Axis: 4 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B8 L=4000mm 1B9 L=4000mm 1B10 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
14.14 14.14
G=10.19 10.19 3.58 3.58
Q=2.83 2.83
Shear
Force
(Env.) -22.90 -25.72
-57.89
31.97 33.165 33.902
21.405 21.27
2.558
Moment
(Env.) 1.84
-13.787
-23.89
-31.06
Bending (Top Edge) ...
M (kN.m) 2.6 0.4 21.4 21.3 10.2 32.0 33.2 0.7 33.9
d (mm) 360.5 360.5 360.5 360.5 360.5 359.0 359.0 360.5 359.0
K/K' 0.02 0.00 0.19 0.19 0.09 0.28 0.29 0.01 0.30
x (mm) 40.06 40.06 40.06 40.06 40.06 41.22 42.85 40.06 43.86
As (mm2) 20.95 3.38 175.31 174.20 83.51 263.39 273.83 5.41 280.29
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.9 23.9 2.7 1.0 13.8 4.0 31.1 3.5
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 360.5 342.0
K/K' 0.10 0.21 0.03 0.01 0.12 0.04 0.27 0.03
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 40.06 38.00
As (mm2) 89.09 195.66 22.90 8.41 112.92 34.14 254.38 30.30
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 22.9 30.9 25.7 30.5 57.9 58.2
v (N/mm2) 0.28 0.38 0.32 0.38 0.72 0.72
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.51 0.51 0.45 0.51
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 87.9
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 53.9 OK 11.1 < 57.11 OK 11.1 < 41.79 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 402.12 402.12 265.46 402.12
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y16 2Y16 2Y16
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-26
Axis: 4 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B11 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
20.594
Shear
Force
(Env.)
-33.954
33.047
1.90
Moment
(Env.)
-20.341
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-27
Axis: 4 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B8 L=4000mm 2B9 L=4000mm 2B10 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
14.14 14.14
G=10.19 10.19 3.58 3.58
Q=2.83 2.83
Shear
Force
(Env.) -23.565 -24.23
-58.136
31.774 33.319 31.041
19.847 19.979
3.545
Moment
(Env.) 1.513
-14.581
-24.307
-31.87
Bending (Top Edge) ...
M (kN.m) 3.5 0.1 19.8 20.0 10.3 31.8 33.3 0.7 31.0
d (mm) 360.5 360.5 360.5 360.5 360.5 359.0 359.0 360.5 360.5
K/K' 0.03 0.00 0.17 0.18 0.09 0.28 0.29 0.01 0.27
x (mm) 40.06 40.06 40.06 40.06 40.06 40.95 43.06 40.06 40.06
As (mm2) 29.04 1.14 162.55 163.62 84.51 261.69 275.18 5.99 254.23
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.5 24.3 4.2 1.9 14.6 4.3 31.9 5.8
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 360.5 342.0
K/K' 0.09 0.21 0.04 0.02 0.13 0.04 0.28 0.06
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 40.89 38.00
As (mm2) 85.66 199.08 36.07 16.76 119.42 37.17 261.30 50.38
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 23.6 30.3 24.2 30.5 58.1 56.9
v (N/mm2) 0.29 0.37 0.30 0.38 0.72 0.70
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.51 0.51 0.45 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 87.9
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 53.1 OK 11.1 < 57.11 OK 11.1 < 40.58 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 402.12 402.12 265.46 265.46
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46 265.46
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y16 2Y16 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-28
Axis: 4 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B11 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
21.202
Shear
Force
(Env.)
-32.996
29.946
2.713
Moment
(Env.)
-20.885
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-29
Axis: 4 Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B8 L=4000mm 3B9 L=4000mm 3B10 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
14.14 14.14
G=10.19 10.19 3.58 3.58
Q=2.83 2.83
Shear
Force
(Env.) -23.974 -23.305
-58.287
32.288 33.959 29.369
18.833 19.218
4.055
Moment
(Env.) 1.129
-15.15
-24.715
-32.494
Bending (Top Edge) ...
M (kN.m) 4.1 0.0 18.8 19.2 10.7 32.3 34.0 0.9 29.4
d (mm) 360.5 360.5 360.5 360.5 360.5 359.0 359.0 360.5 360.5
K/K' 0.04 0.00 0.17 0.17 0.09 0.29 0.30 0.01 0.26
x (mm) 40.06 40.06 40.06 40.06 40.06 41.65 43.94 40.06 40.06
As (mm2) 33.21 0.16 154.25 157.39 87.31 266.16 280.79 7.24 240.54
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.4 24.7 5.4 3.7 15.1 4.8 32.5 7.2
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 359.0 342.0
K/K' 0.09 0.22 0.05 0.04 0.13 0.05 0.29 0.07
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 41.94 38.00
As (mm2) 84.80 202.42 46.48 32.35 124.08 41.42 267.96 61.75
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 24.0 30.0 23.3 30.5 58.3 56.1
v (N/mm2) 0.30 0.37 0.29 0.38 0.72 0.69
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.51 0.51 0.51 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 93.0
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 52.33 OK 11.1 < 57.11 OK 11.14 < 50.45 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 402.12 402.12 265.46 265.46
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y16 2Y16 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-30
Axis: 4 Storey: 3 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B11 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
21.549
Shear
Force
(Env.)
-32.458
28.168
3.122
Moment
(Env.)
-21.323
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-31
Axis: 4 Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B8 L=4000mm 4B9 L=4000mm 4B10 L=4000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
14.14 14.14
G=10.19 10.19 3.58 3.58
Q=2.83 2.83
Shear
Force
(Env.) -23.606 -23.167
-58.315
32.814 33.694
28.731
18.845 19.097
2.158
Moment
(Env.) 1.392
-15.425
-25.799
-33.197
Bending (Top Edge) ...
M (kN.m) 2.2 0.0 18.8 19.1 11.2 32.8 33.7 0.9 28.7
d (mm) 360.5 360.5 360.5 360.5 360.5 359.0 359.0 360.5 360.5
K/K' 0.02 0.00 0.17 0.17 0.10 0.29 0.30 0.01 0.25
x (mm) 40.06 40.06 40.06 40.06 40.06 42.37 43.58 40.06 40.06
As (mm2) 17.67 0.03 154.34 156.40 92.09 270.76 278.46 7.66 235.31
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 11.9 25.8 5.2 3.4 15.4 5.3 33.2 8.0
d (mm) 360.5 360.5 342.0 342.0 360.5 342.0 359.0 342.0
K/K' 0.10 0.23 0.05 0.03 0.14 0.05 0.29 0.08
x (mm) 40.06 40.06 38.00 38.00 40.06 38.00 42.90 38.00
As (mm2) 97.47 211.29 45.08 29.77 126.33 45.95 274.10 68.98
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 23.6 30.4 23.2 30.7 58.3 56.0
v (N/mm2) 0.29 0.37 0.29 0.38 0.72 0.69
vc (N/mm2) 0.45 0.45 0.45 0.45 0.45 0.51 0.51 0.51 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 87.9 87.9 93.0
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 11.1 < 50.35 OK 11.1 < 57.11 OK 11.14 < 49.55 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 265.46 265.46 265.46 402.12 402.12 265.46 265.46
Bottom Edge 265.46 265.46 265.46 265.46 265.46 265.46 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y13 2Y13 2Y16 2Y16 2Y13
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-32
Axis: 4 Storey: 4 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B11 L=4000mm
BwxH (mm) 225 x 400
Flange BfxHf ---
G=10.19
Q=2.83
21.316
Shear
Force
(Env.)
-32.78
28.10
1.698
Moment
(Env.)
-22.133
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-33
Axis: A Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B12 L=5000mm 1B13 L=5000mm 1B14 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
13.1 13.1
G=10.19 10.19 2.83 2.83 10.19 10.19
Q=2.83 2.83 2.83 2.83
Shear
Force
(Env.)
-33.235
-45.419 -44.056
44.516 44.984 44.974 44.547
13.485 13.447
Moment
(Env.)
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-34
Axis: A Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B12 L=5000mm 2B13 L=5000mm 2B14 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
13.1 13.1
G=10.19 10.19 2.83 2.83 10.19 10.19
Q=2.83 2.83 2.83 2.83
Shear
Force
(Env.)
-34.27
-44.834 -42.699
40.98 42.09 42.08 41.032
16.639 16.574
Moment
(Env.)
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-35
Axis: A Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B12 L=5000mm 3B13 L=5000mm 3B14 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
13.1 13.1
G=10.19 10.19 2.83 2.83 10.19 10.19
Q=2.83 2.83 2.83 2.83
Shear
Force
(Env.)
-34.842
-44.497 -42.012
39.149 41.029 41.015 39.218
18.225 18.14
Moment
(Env.)
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-36
Axis: A Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B12 L=5000mm 4B13 L=5000mm 4B14 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
13.1 13.1
G=10.19 10.19 2.83 2.83 10.19 10.19
Q=2.83 2.83 2.83 2.83
Shear
Force
(Env.)
-33.234
-44.924 -43.826
40.693 41.593 41.594 40.742
10.391 10.34
Moment
(Env.)
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-37
Axis: B Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B15 L=5000mm 1B16 L=5000mm 1B17 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-56.989
-74.34 -76.107
78.282 77.683 77.545 78.141
23.231 23.31
Moment
(Env.)
-51.447
-61.993 -62.006
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-38
Axis: B Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B15 L=5000mm 2B16 L=5000mm 2B17 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-58.399
-73.519 -74.088
73.102 73.36 73.143 72.952
27.993 28.112
Moment
(Env.)
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-39
Axis: B Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B15 L=5000mm 3B16 L=5000mm 3B17 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-59.087
-73.08 -73.225
70.947 71.272 71.067 70.759
29.82 29.967
Moment
(Env.)
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-40
Axis: B Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B15 L=5000mm 4B16 L=5000mm 4B17 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-56.535
-73.834 -76.111
73.011 72.926 72.71 72.815
17.005 17.111
Moment
(Env.)
-55.893
-67.187 -67.252
Bending (Top Edge) ...
M (kN.m) 17.0 1.8 73.0 72.9 7.0 72.7 72.8 1.7 17.1
d (mm) 360.5 360.5 342.5 342.5 360.5 342.5 342.5 360.5 360.5
K/K' 0.15 0.02 0.71 0.71 0.06 0.71 0.71 0.02 0.15
x (mm) 40.06 40.06 109.26 109.10 40.06 108.72 108.90 40.06 40.06
As (mm2) 139.27 14.44 698.14 697.15 57.06 694.68 695.88 14.25 140.14
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 26.9 67.2 2.3 55.9 2.4 67.3 26.9
d (mm) 359.0 359.0 342.0 359.0 342.0 359.0 359.0
K/K' 0.24 0.59 0.02 0.49 0.02 0.59 0.24
x (mm) 39.89 92.99 38.00 75.48 38.00 93.09 39.89
As (mm2) 221.49 594.20 19.84 482.33 20.98 594.86 221.04
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 56.5 76.1 73.8 73.7 76.1 56.6
v (N/mm2) 0.70 0.99 0.96 0.96 0.99 0.70
vc (N/mm2) 0.51 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.51
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 103.8 103.8 103.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 13.93 < 36.07 OK 13.93 < 42.07 OK 13.93 < 36.04 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 760.27 760.27 265.46 760.27 760.27 265.46 265.46
Bottom Edge 402.12 804.25 402.12 402.12 804.25 402.12 402.12 804.25 402.12
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 3Y16 3Y16 3Y16 3Y16
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-41
Axis: C Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B18 L=5000mm 1B19 L=5000mm 1B20 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
16.155 6.97
Moment
(Env.)
-31.156
-42.036
-57.581
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-42
Axis: C Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B18 L=5000mm 2B19 L=5000mm 2B20 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
16.613 5.948
Moment
(Env.)
-30.037
-41.151
-55.889
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-43
Axis: C Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B18 L=5000mm 3B19 L=5000mm 3B20 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
15.377 4.659
Moment
(Env.)
-40.53 -29.723
-55.398
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-44
Axis: C Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B18 L=5000mm 4B19 L=5000mm 4B20 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
8.482
Moment
(Env.)
-40.922 -32.086
-60.616
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-45
Axis: D Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B21 L=5000mm WALL L=5000mm 1B22 L=5000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=20.39 20.39
20.38
Q=5.66 5.66
10.19 10.19
2.83 2.83
27.129
Shear
Force
(Env.)
-47.996 -48.855
98.875
61.073
13.597 6.162
Moment
(Env.)
-28.544
-51.83
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-46
Axis: D Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B21 L=5000mm WALL L=5000mm 2B22 L=5000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=20.39 20.39
20.38
Q=5.66 5.66
10.19 10.19
2.83 2.83
25.868
Shear
Force
(Env.)
-47.09 -50.606
104.26
67.884
13.587 4.986
Moment
(Env.)
-27.179
-49.95
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-47
Axis: D Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B21 L=5000mm WALL L=5000mm 3B22 L=5000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=20.39 20.39
20.38
Q=5.66 5.66
10.19 10.19
2.83 2.83
24.73
Shear
Force
(Env.)
-46.01 -52.088
108.628
72.926
11.961 3.188
Moment
(Env.)
-26.744
-49.348
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-48
Axis: D Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B21 L=5000mm WALL L=5000mm 4B22 L=5000mm
BwxH (mm) 225 x 400 225 x 400
Flange BfxHf --- ---
G=20.39 20.39
20.38
Q=5.66 5.66
10.19 10.19
2.83 2.83
23.869
Shear
Force
(Env.) -43.974 -52.759
112.957
75.325
6.124
Moment
(Env.)
-26.976
-51.061
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-49
Axis: E Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B5 L=5000mm 1B6 L=5000mm 1B7 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-33.339
-39.674 -43.738
42.882 41.698 41.608 42.751
13.028 13.095
Moment
(Env.)
-25.303
-35.158 -35.17
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-50
Axis: E Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B5 L=5000mm 2B6 L=5000mm 2B7 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-34.043 -39.192 -42.629
40.136 39.286 39.139 39.953
15.561 15.662
Moment
(Env.)
-26.283
-34.253 -34.284
Bending (Top Edge) ...
M (kN.m) 15.6 0.9 40.1 39.3 3.9 39.1 40.0 0.9 15.7
d (mm) 360.5 360.5 359.0 359.0 360.5 359.0 359.0 360.5 360.5
K/K' 0.14 0.01 0.35 0.35 0.03 0.35 0.35 0.01 0.14
x (mm) 40.06 40.06 52.54 51.34 40.06 51.13 52.28 40.06 40.06
As (mm2) 127.44 7.15 335.69 328.05 31.92 326.74 334.05 6.98 128.27
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.7 34.3 1.1 0.7 26.3 0.7 1.3 34.3 10.7
d (mm) 359.0 359.0 342.0 342.0 360.5 342.0 342.0 359.0 359.0
K/K' 0.09 0.30 0.01 0.01 0.23 0.01 0.01 0.30 0.09
x (mm) 39.89 44.35 38.00 38.00 40.06 38.00 38.00 44.39 39.89
As (mm2) 88.28 283.37 9.66 6.11 215.26 5.99 10.82 283.64 88.21
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 34.0 42.7 39.2 39.1 42.6 34.1
v (N/mm2) 0.42 0.53 0.49 0.48 0.53 0.42
vc (N/mm2) 0.45 0.51 0.51 0.51 0.45 0.51 0.51 0.51 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 93.0 87.9 93.0
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 13.93 < 48.24 OK 13.87 < 49.49 OK 13.93 < 48.2 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 402.12 402.12 265.46 402.12 402.12 265.46 265.46
Bottom Edge 402.12 402.12 402.12 265.46 265.46 265.46 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y16 2Y16 2Y16 2Y16
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-51
Axis: E Storey: 3 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
3B5 L=5000mm 3B6 L=5000mm 3B7 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-34.376 -38.927 -42.153
38.987 38.132 37.914 38.757
16.668 16.862
Moment
(Env.)
-26.956
-34.133 -34.175
Bending (Top Edge) ...
M (kN.m) 16.7 0.8 39.0 38.1 3.3 37.9 38.8 0.8 16.9
d (mm) 360.5 360.5 359.0 359.0 360.5 359.0 359.0 360.5 360.5
K/K' 0.15 0.01 0.34 0.34 0.03 0.34 0.34 0.01 0.15
x (mm) 40.06 40.06 50.92 49.72 40.06 49.42 50.60 40.06 40.06
As (mm2) 136.52 6.54 325.37 317.73 27.39 315.78 323.31 6.36 138.10
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 9.8 34.1 1.6 1.0 27.0 1.0 1.7 34.2 10.1
d (mm) 359.0 359.0 342.0 342.0 360.5 342.0 342.0 359.0 359.0
K/K' 0.09 0.30 0.02 0.01 0.24 0.01 0.02 0.30 0.09
x (mm) 39.89 44.18 38.00 38.00 40.06 38.00 38.00 44.24 39.89
As (mm2) 80.58 282.31 13.46 8.68 220.77 8.54 15.01 282.69 83.10
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 34.4 42.2 38.9 38.8 42.2 34.4
v (N/mm2) 0.42 0.52 0.48 0.48 0.52 0.42
vc (N/mm2) 0.45 0.51 0.51 0.51 0.45 0.51 0.51 0.51 0.45
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 93.0 87.9 93.0
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 13.93 < 48.39 OK 13.87 < 48.32 OK 13.93 < 48.34 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 402.12 402.12 265.46 402.12 402.12 265.46 265.46
Bottom Edge 402.12 402.12 402.12 265.46 265.46 265.46 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y16 2Y16 2Y16 2Y16
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-52
Axis: E Storey: 4 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
4B5 L=5000mm 4B6 L=5000mm 4B7 L=5000mm
BwxH (mm) 225 x 400 225 x 400 225 x 400
Flange BfxHf --- --- ---
Shear
Force
(Env.)
-33.009
-39.329 -43.74
39.89 39.271 39.042 39.654
9.474 9.605
Moment
(Env.)
-27.386
-38.055 -38.111
Bending (Top Edge) ...
M (kN.m) 9.5 0.9 39.9 39.3 5.5 39.0 39.7 0.8 9.6
d (mm) 360.5 360.5 359.0 359.0 360.5 359.0 359.0 360.5 360.5
K/K' 0.08 0.01 0.35 0.35 0.05 0.35 0.35 0.01 0.08
x (mm) 40.06 40.06 52.19 51.32 40.06 51.00 51.86 40.06 40.06
As (mm2) 77.60 7.04 333.48 327.92 44.84 325.87 331.35 6.84 78.67
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 15.8 38.1 0.2 1.1 27.4 1.1 0.4 38.1 15.7
d (mm) 359.0 359.0 342.0 342.0 360.5 342.0 342.0 359.0 359.0
K/K' 0.14 0.34 0.00 0.01 0.24 0.01 0.00 0.34 0.14
x (mm) 39.89 49.62 38.00 38.00 40.06 38.00 38.00 49.69 39.89
As (mm2) 129.63 317.04 1.48 9.88 224.29 9.84 3.11 317.54 129.27
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 33.0 43.8 39.3 39.2 43.7 33.1
v (N/mm2) 0.41 0.54 0.49 0.49 0.54 0.41
vc (N/mm2) 0.51 0.51 0.51 0.51 0.45 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 93.0 87.9 93.0
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250 Y8-250
Deflection Check ...
L/d 13.93 < 43.85 OK 13.87 < 47.59 OK 13.93 < 43.79 OK
Provided Steel Areas (mm2)
Top Edge 265.46 265.46 402.12 402.12 265.46 402.12 402.12 265.46 265.46
Bottom Edge 402.12 402.12 402.12 265.46 265.46 265.46 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y13 2Y13 2Y13
Top SupBar 2Y16 2Y16 2Y16 2Y16
Top SupBar
Side Bars
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-53
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-21
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-22
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-23
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-24
1W1 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 2047.8 -777.2 2.3 1943.0 -777.7 -4.9
2 1833.6 -649.2 5.1 1728.8 -649.4 -10.6
3 1885.2 -707.9 2.3 1780.4 -708.7 -4.8
4 1787.9 -679.8 -1.3 1683.1 -680.3 2.6
5 1956.5 -727.6 2.2 1851.7 -727.8 -4.8
6 2076.4 -780.8 2.1 1971.6 -776.8 -4.4
7 1946.9 -717.6 2.2 1842.1 -718.4 -4.8
8 1759.2 -676.3 -1.0 1654.4 -681.2 2.1
9 2048.0 -895.7 2.3 1943.2 -896.5 -4.9
10 1833.6 -649.2 5.1 1728.8 -649.4 -10.6
11 1894.5 -599.3 2.3 1789.7 -599.3 -4.8
12 1702.6 -1107.2 6.6 1612.8 -879.5 -4.9
13 1729.1 -188.5 -2.7 1639.2 -417.0 -3.3
14 1634.0 -403.3 2.0 1544.1 -571.7 -4.1
15 1797.7 -892.3 1.9 1707.9 -724.8 -4.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 2047.8 - 2047.8
M1 (kN.m) -777.7 -41.0 -1240.2
M2 (kN.m) -4.9 -23.0 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.086 Le1/b1 = 0.7 < 15.0
Beta = 0.90 Le2/b2 = 12.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.2 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.42 / 0.55 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
2W1 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1557.3 -604.3 7.3 1452.5 -606.1 -7.4
2 1394.2 -506.4 15.2 1289.3 -507.4 -14.8
3 1433.7 -551.1 7.0 1328.9 -553.3 -7.1
4 1359.8 -529.1 -3.3 1255.0 -530.7 2.6
5 1486.4 -563.2 6.9 1381.6 -564.7 -7.0
6 1579.1 -608.1 6.6 1474.3 -603.0 -6.7
7 1481.9 -559.0 6.9 1377.1 -561.6 -7.0
8 1338.0 -525.3 -2.5 1233.2 -533.8 2.0
9 1554.8 -689.8 7.3 1450.0 -692.2 -7.4
10 1394.2 -506.4 15.2 1289.3 -507.4 -14.8
11 1440.8 -469.8 7.0 1336.0 -470.3 -7.1
12 1292.0 -740.4 8.1 1202.2 -593.7 -7.4
13 1317.7 -267.1 4.0 1227.8 -416.8 -4.9
14 1259.5 -352.3 6.1 1169.6 -480.1 -6.2
15 1350.2 -655.2 6.0 1260.4 -530.4 -6.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 1557.3 - 1557.3
M1 (kN.m) -606.1 -31.1 -967.5
M2 (kN.m) -7.4 -17.5 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.066 Le1/b1 = 0.7 < 15.0
Beta = 0.92 Le2/b2 = 14.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 2.8 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.42 / 0.63 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-25
3W1 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1049.3 -411.6 7.3 944.5 -414.8 -7.3
2 939.2 -345.3 14.0 834.4 -347.5 -13.8
3 966.2 -375.8 6.9 861.4 -379.0 -6.9
4 915.8 -360.7 -1.8 811.0 -363.4 1.6
5 1001.0 -382.4 6.8 896.2 -385.9 -6.8
6 1064.2 -412.7 6.7 959.4 -412.1 -6.8
7 999.2 -381.1 6.8 894.4 -385.6 -6.8
8 901.0 -359.7 -1.2 796.2 -366.2 1.1
9 1046.5 -467.3 7.3 941.7 -471.2 -7.3
10 939.2 -345.3 14.0 834.4 -347.5 -13.8
11 970.9 -321.5 6.9 866.1 -323.0 -6.9
12 870.0 -433.1 8.2 780.1 -358.3 -7.9
13 888.3 -253.1 4.0 798.5 -333.3 -4.2
14 859.7 -263.2 6.1 769.8 -349.9 -6.1
15 898.6 -423.0 6.0 808.8 -341.8 -6.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 1049.3 - 1049.3
M1 (kN.m) -414.8 -21.0 -665.2
M2 (kN.m) 7.3 11.8 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.044 Le1/b1 = 0.7 < 15.0
Beta = 0.95 Le2/b2 = 14.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 8.8 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.42 / 0.61 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.01 N/mm2
H.Steel=Y8-170
4W1 Storey: 4 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 529.1 -206.9 9.5 424.3 -211.9 -11.9
2 473.6 -173.0 17.3 368.7 -176.7 -21.3
3 487.4 -189.0 8.9 382.6 -193.6 -11.2
4 461.2 -181.7 -1.4 356.4 -185.5 1.5
5 504.8 -192.3 8.8 400.0 -197.9 -11.1
6 537.1 -207.9 8.7 432.3 -209.3 -10.8
7 504.1 -191.8 8.8 399.3 -198.3 -11.1
8 453.3 -180.6 -0.7 348.5 -188.2 0.4
9 527.6 -234.7 9.5 422.8 -240.4 -11.9
10 473.6 -173.0 17.3 368.7 -176.7 -21.3
11 489.7 -161.7 9.0 384.9 -164.7 -11.3
12 439.6 -183.6 9.5 349.8 -175.5 -11.7
13 447.0 -161.4 6.3 357.2 -177.8 -8.0
14 438.9 -142.9 8.0 349.0 -188.9 -10.0
15 447.7 -202.0 7.8 357.9 -164.4 -9.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 529.1 - 529.1
M1 (kN.m) -211.9 -10.6 0.0
M2 (kN.m) -11.9 -6.0 -21.1 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.022 Le1/b1 = 0.7 < 15.0
Beta = 0.97 Le2/b2 = 13.1 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 12.3 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.42 / 0.57 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.02 N/mm2
H.Steel=Y8-170
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-26
1W2 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1191.1 -42.7 -2.8 1061.5 -45.1 -2.5
2 1138.5 -42.7 -2.4 1008.9 -45.1 -2.1
3 1104.9 -42.7 -2.6 975.3 -45.1 -2.3
4 1106.0 24.1 -2.5 976.4 22.2 -2.2
5 1111.8 -88.1 -2.6 982.2 -89.8 -2.3
6 1161.7 -97.6 -2.7 1032.1 -104.6 -2.4
7 1116.1 -88.1 -2.6 986.5 -89.8 -2.3
8 1135.5 79.0 -2.6 1005.9 81.7 -2.3
9 994.7 -42.7 -3.3 865.0 -45.1 -2.9
10 1138.5 -42.7 -2.4 1008.9 -45.1 -2.1
11 1297.1 -42.7 -2.2 1167.5 -45.1 -1.9
12 1004.3 662.5 -2.4 893.2 339.8 -2.1
13 1004.3 -732.9 -2.4 893.2 -414.2 -2.1
14 1170.2 -33.4 -0.5 1059.1 -35.3 -2.2
15 838.4 -37.0 -4.2 727.3 -39.1 -2.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 1191.1 - 1191.1
M1 (kN.m) -45.1 -23.8 0.0
M2 (kN.m) -2.8 -13.4 -14.9 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
5225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.041 Le1/b1 = 0.6 < 15.0
Beta = 0.95 Le2/b2 = 12.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 0.1 kN As (Required): %0.40 (min) 4702.50 mm2 52Y13
vc'(1/2)= 0.44 / 0.55 N/mm2 As (Provided): %0.59 6902.06 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
2W2 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 886.1 -27.6 -2.4 756.5 -33.9 -1.8
2 847.7 -27.6 -2.0 718.1 -33.9 -1.5
3 821.4 -27.6 -2.2 691.8 -33.9 -1.7
4 822.5 22.4 -2.2 692.9 17.2 -1.6
5 828.5 -63.4 -2.3 698.9 -68.0 -1.7
6 864.3 -67.2 -2.3 734.7 -81.8 -1.7
7 829.1 -63.4 -2.2 699.5 -68.0 -1.7
8 844.4 62.1 -2.3 714.8 65.1 -1.7
9 740.3 -27.6 -2.8 610.7 -33.9 -2.1
10 847.7 -27.6 -2.0 718.1 -33.9 -1.5
11 966.7 -27.6 -1.9 837.1 -33.9 -1.4
12 747.2 354.6 -2.0 636.1 115.7 -1.5
13 747.2 -400.0 -2.0 636.1 -171.6 -1.5
14 839.4 -21.9 -1.8 728.3 -27.1 -1.4
15 655.0 -23.5 -2.3 543.9 -28.9 -1.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 886.1 - 886.1
M1 (kN.m) -33.9 -17.7 0.0
M2 (kN.m) -2.4 -10.0 -11.1 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
5225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.030 Le1/b1 = 0.6 < 15.0
Beta = 0.96 Le2/b2 = 14.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.9 / 0.1 kN As (Required): %0.40 (min) 4702.50 mm2 52Y13
vc'(1/2)= 0.45 / 0.55 N/mm2 As (Provided): %0.59 6902.06 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-27
3W2 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 587.5 -16.9 -1.7 457.9 -25.4 -1.2
2 562.5 -16.9 -1.4 432.8 -25.4 -1.0
3 544.2 -16.9 -1.6 414.6 -25.4 -1.1
4 545.1 16.7 -1.5 415.5 9.5 -1.1
5 550.0 -41.7 -1.6 420.4 -47.8 -1.1
6 573.0 -44.8 -1.6 443.4 -59.9 -1.2
7 549.2 -41.7 -1.6 419.6 -47.8 -1.1
8 559.6 44.6 -1.6 430.0 44.0 -1.1
9 490.8 -16.9 -2.0 361.2 -25.4 -1.4
10 562.5 -16.9 -1.4 432.8 -25.4 -1.0
11 641.8 -16.9 -1.3 512.2 -25.4 -0.9
12 495.4 146.6 -1.4 384.3 -5.6 -1.0
13 495.4 -174.4 -1.4 384.3 -36.4 -1.0
14 535.2 -13.7 -1.2 424.1 -20.7 -1.1
15 455.6 -14.1 -1.7 344.5 -21.3 -0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 587.5 - 587.5
M1 (kN.m) -25.4 -11.7 0.0
M2 (kN.m) -1.7 -6.6 -7.5 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
5225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 0.6 < 15.0
Beta = 0.98 Le2/b2 = 14.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.0 kN As (Required): %0.40 (min) 4702.50 mm2 52Y13
vc'(1/2)= 0.43 / 0.54 N/mm2 As (Provided): %0.59 6902.06 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
4W2 Storey: 4 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 292.2 -8.7 -1.2 162.6 -16.9 -0.1
2 280.0 -8.7 -1.0 150.3 -16.9 -0.1
3 270.5 -8.7 -1.0 140.9 -16.9 -0.1
4 271.1 8.6 -1.0 141.5 0.8 -0.1
5 274.0 -21.4 -1.1 144.4 -26.5 -0.1
6 285.1 -22.7 -1.1 155.5 -36.9 -0.1
7 273.3 -21.4 -1.1 143.7 -26.5 -0.1
8 278.3 22.5 -1.1 148.7 20.7 -0.1
9 243.9 -8.7 -1.3 114.3 -16.9 -0.1
10 280.0 -8.7 -1.0 150.3 -16.9 -0.1
11 319.6 -8.7 -0.9 189.9 -16.9 -0.1
12 246.4 34.7 -1.0 135.4 -32.3 -0.1
13 246.4 -49.0 -1.0 135.4 4.3 -0.1
14 255.7 -7.2 -0.9 144.6 -13.9 -0.1
15 237.2 -7.1 -1.0 126.1 -14.1 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 292.2 - 292.2
M1 (kN.m) -16.9 -5.8 0.0
M2 (kN.m) -1.2 -3.3 -3.9 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
5225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.010 Le1/b1 = 0.6 < 15.0
Beta = 0.99 Le2/b2 = 13.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 0.4 kN As (Required): %0.40 (min) 4702.50 mm2 52Y13
vc'(1/2)= 0.43 / 0.55 N/mm2 As (Provided): %0.59 6902.06 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-28
1W3 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1977.2 -781.3 0.1 1872.4 -784.7 -0.5
2 1763.1 -653.3 -2.7 1658.3 -656.5 5.2
3 1814.7 -711.9 0.2 1709.9 -715.7 -0.6
4 1853.6 -696.9 2.7 1748.8 -699.8 -5.3
5 1786.1 -717.4 0.2 1681.3 -719.8 -0.8
6 1803.5 -705.6 2.1 1698.7 -713.2 -4.4
7 1776.5 -707.4 0.2 1671.7 -710.4 -0.8
8 2027.4 -772.5 0.7 1922.6 -771.3 -1.4
9 1977.5 -899.8 0.1 1872.7 -903.6 -0.5
10 1763.1 -653.3 -2.7 1658.3 -656.5 5.2
11 1824.0 -603.4 0.2 1719.2 -606.4 -0.6
12 1671.0 -192.0 4.8 1581.2 -423.0 -1.2
13 1644.6 -1110.7 -4.5 1554.8 -885.4 0.4
14 1575.1 -402.2 0.1 1485.2 -576.0 -0.3
15 1740.6 -900.4 0.1 1650.7 -732.4 -0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 1977.2 - 1977.2
M1 (kN.m) -784.7 -39.5 -1233.0
M2 (kN.m) -0.5 -22.2 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.083 Le1/b1 = 0.7 < 15.0
Beta = 0.90 Le2/b2 = 12.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 1.6 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.42 / 0.61 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
2W3 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1505.1 -602.5 -0.1 1400.3 -611.3 0.6
2 1341.9 -504.6 -8.0 1237.1 -512.7 8.0
3 1381.5 -549.3 0.2 1276.7 -558.5 0.3
4 1410.2 -537.4 7.0 1305.4 -544.9 -5.9
5 1358.6 -552.5 0.5 1253.8 -559.0 -0.1
6 1372.0 -542.6 5.5 1267.2 -557.6 -4.7
7 1354.1 -548.3 0.5 1249.3 -555.9 -0.1
8 1543.2 -597.4 1.4 1438.4 -598.7 -0.6
9 1502.5 -688.0 -0.1 1397.7 -697.5 0.6
10 1341.9 -504.6 -8.0 1237.1 -512.7 8.0
11 1388.5 -468.0 0.2 1283.7 -475.5 0.3
12 1274.7 -265.7 2.0 1184.8 -421.3 -0.7
13 1249.0 -738.9 -2.2 1159.2 -598.1 1.8
14 1216.1 -348.4 -0.1 1126.2 -484.1 0.6
15 1307.7 -656.3 0.0 1217.8 -535.2 0.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 1505.1 - 1505.1
M1 (kN.m) -611.3 -30.1 -961.7
M2 (kN.m) 0.6 16.9 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.063 Le1/b1 = 0.7 < 15.0
Beta = 0.92 Le2/b2 = 14.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.0 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.42 / 0.56 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-29
3W3 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1013.4 -408.6 -1.4 908.6 -420.4 1.5
2 903.3 -342.3 -8.1 798.5 -353.0 8.0
3 930.3 -372.8 -1.0 825.5 -384.5 1.1
4 949.1 -364.4 4.6 844.3 -374.6 -4.2
5 914.4 -374.3 -0.6 809.6 -383.6 0.5
6 923.0 -369.3 3.4 818.2 -383.8 -3.3
7 912.6 -373.0 -0.6 807.8 -383.2 0.5
8 1039.5 -403.8 -0.3 934.7 -411.1 0.6
9 1010.6 -464.3 -1.4 905.8 -476.7 1.5
10 903.3 -342.3 -8.1 798.5 -353.0 8.0
11 934.9 -318.4 -1.1 830.1 -328.5 1.1
12 858.8 -250.7 0.9 769.0 -338.0 -0.6
13 840.4 -430.7 -3.3 750.6 -363.0 3.1
14 830.0 -259.7 -1.3 740.1 -354.6 1.3
15 869.3 -421.6 -1.1 779.4 -346.3 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 1013.4 - 1013.4
M1 (kN.m) -420.4 -20.3 -662.6
M2 (kN.m) 1.5 11.4 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.043 Le1/b1 = 0.7 < 15.0
Beta = 0.95 Le2/b2 = 14.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.3 / 0.3 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.44 / 0.60 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.00 N/mm2
H.Steel=Y8-170
4W3 Storey: 4 (Con.:C20/25 / Steel:Grade 410 (Type 2) - Web:Grade 410 (Type 2))
Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 508.8 -204.4 -2.8 404.0 -218.1 3.9
2 453.3 -170.6 -10.7 348.5 -182.9 13.4
3 467.1 -186.5 -2.3 362.3 -199.8 3.3
4 476.6 -182.7 4.5 371.7 -194.8 -5.2
5 459.3 -187.6 -1.6 354.5 -198.4 2.6
6 462.6 -184.4 3.0 357.7 -200.4 -3.1
7 458.6 -187.0 -1.6 353.8 -198.8 2.5
8 522.8 -202.7 -1.3 418.0 -212.4 1.8
9 507.3 -232.2 -2.8 402.5 -246.6 3.9
10 453.3 -170.6 -10.7 348.5 -182.9 13.4
11 469.4 -159.3 -2.3 364.6 -170.9 3.3
12 430.3 -159.3 -0.7 340.5 -182.9 1.5
13 422.9 -181.5 -4.0 333.1 -180.7 5.1
14 422.1 -140.6 -2.4 332.3 -194.2 3.4
15 431.0 -200.2 -2.3 341.2 -169.4 3.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 508.8 - 508.8
M1 (kN.m) -218.1 -10.2 -342.9
M2 (kN.m) 3.9 5.7 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
4225
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 0.7 < 15.0
Beta = 0.97 Le2/b2 = 13.1 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 7.6 kN As (Required): %0.40 (min) 3802.50 mm2 42Y13
vc'(1/2)= 0.42 / 0.57 N/mm2 As (Provided): %0.59 5574.74 mm2
v (1/2)= 0.00 / 0.01 N/mm2
H.Steel=Y8-170
Project: different_floors
INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1
Project: different_floors
Project: different_floors - INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1
NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)
Project: different_floors
Project: different_floors - INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2
Project: different_floors
Project: different_floors - INITIATIVE_CONSTRUCTION_COMPANY (*1ZB-QPQ9-WNXC-BMCE)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3
Project: different_floors