CSI is an engineering company that provides commissioning services globally. It started in 2004 in Istanbul and has since expanded to multiple countries in MENA, Europe, and Central Asia. CSI aims to fill the gap between construction teams and owners by leading the commissioning process as partners rather than witnesses. In 2018, CSI established its first sister company, CSI Advanced Technical Service, to expand its facilities management services.

Uploaded by

Osama Hammam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
502 views102 pages

Company Profile

CSI is an engineering company that provides commissioning services globally. It started in 2004 in Istanbul and has since expanded to multiple countries in MENA, Europe, and Central Asia. CSI aims to fill the gap between construction teams and owners by leading the commissioning process as partners rather than witnesses. In 2018, CSI established its first sister company, CSI Advanced Technical Service, to expand its facilities management services.

Uploaded by

Osama Hammam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 102

Commissioning

K SA
Services Initiative

Company Profile

www.csicx.com
www.videntium.com
CSI CONTACTS, WHERE TO FIND CSI

CSI is targeting the global markets in MENA and GCC Areas, Turkey, Eastern Europe
and Central Asia. With current active prestigious projects in these areas, CSI is rapidly
building its reputation as the future benchmark for commissioning and engineering
standards as extend of their client trust and continued support.

CSI UAE CSI Turkey CSI Europe


DIP CEO BUILDING Rasimpasa Mah. Yavuzturk Sok. Sp. Z.o.o UI. Jagiellonska 88/51L p.210
OFFICE 215 Dubai, UAE Ari Business Center No: 14 Kat 00-992 Warsaw, Poland
P.O. Box: 414055 Dubai, UAE Kadikoy, Istanbul, Turkey [email protected]
Tel: +97148886446 Tel +90 216 338 57 57 Emil Zsewczyk
Fax : +90 216 338 57 59 Tel: +48 604 468 723

CSI KSA CSI Qatar CSI Egypt


Mohammed Alaghawani Mohammed Bin Thani Street Mahmoud Saleh

King Abdulaziz Road, Unit No. 31, [email protected] El-Nozha, Cairo, Egypt
Building No. 7076, Tel : +974 4480 5902 Tel: +20 100 6018168
Al Riyadh 13321-4904, KSA
Tel: +966 53 744 5711
Tel: +966 11 235 7522

CSI Jordan CSI Bahrain CSI Kazakhstan

Zaid al Jabari Moataz Kamal Nasser Al Jundi


Tel: +962 796 35 47 85 Tel: +973 3937 8600 Tel : +7 778 159 32 3

1
ABOUT CSI, WHO WE ARE

INTRODUCTION
Strong and long-lasting organizations are built when extensive professional experience merges with the
ambition of active professional youth. That is when Commissioning Services International Company, CSI
became the real manifestation of its motto “Converting Energy to Synergy”.
Since its start in 2004 in Istanbul, CSI name became the vision of its founders to be the extension of their
successful MEP construction business by handling many prestigious projects in both MENA and Central
Asia after its planned breakthrough in 2015.
CSI new partners and founders have been owners, managers and directors of long-lasting successful
companies in the field of MEP Contracting and Commissioning in Turkey and GCC before unifying their
vision in CSI developed venture.
Aided by their experiences in managing many large projects and representing the commissioning teams
of their previous esteemed companies, CSI managers and key staff developed the optimum solutions to
provide the engineering support and high standard commissioning services to CSI clients.

BOARD OF DIRECTORS MESSAGE


It is always the target of the board members of CSI to be of a big value in all the projects CSI is participating
in. CSI was built to brand an excellent engineering service and to deliver the highest standard outcome. CSI
will be always a partner of value, not only a team member, in all the projects dealing with its prestigious and
professional business partners and clients. We believe in partnership to deliver, we are target-oriented, we
trust our abilities and professionalism, we know Commissioning Management.

2
ABOUT CSI, WHO WE ARE

THE IDEA, HOW CSI STARTED


With an active Commissioning Management Department of CSI
mother company, MEGA MEP, and successful commissioning
handling of prestigious projects since the 1990s, CSI first came to
light in 2004 on a small-scale basis to serve as its mother company’s
projects MEP Commissioning Management team.
CSI Founders and partners were friends and Co-workers in their own CSI OPERATION STARTED IN
different companies and positions since 2000 and through 2010. It ISTANBUL TO HANDLE ITS
was in 2010 when another breakthrough happened when a new MOTHER COMPANY WORKS
generation of ambitious staff and coworkers met working together IN 2004
in New Doha International Airport project that the ambitious
idea and dream of an engineering company dedicated to MEP CSI INTERNATIONAL
Commissioning Management with high caliber staff emerged. With OPERATION IS AN
their dedicated and intensive experience in Construction Field, INTEGRATED RESULT OF ITS
Testing and Balancing (TAB) and Commissioning Management, they
FOUNDERS’ AND AMBITIOUS
knew what it takes to make a brand of an excellent organization
PARTNERS DIVERSIFIED
EXPERIENCES SINCE 2015
For the following years, different approaches, merges with other companies and trials were made to initiate
this goal. During their previous experiences ranged, by then, from 10 to 35 years of diversified experiences,
they built an integrated approach for a company that covers the market, clients and contractors’ needs.
The idea of Commissioning Management has been always that of a third party certifying the works carried
out by the Contractor. That created a big gap in the needs, quality and outcome of the process that
resulted in having the Commissioning Specialist/Agency with no added value and becoming only a witness
to the process.
The idea of CSI Board of Directors was always to fill the gap between the construction team and owners’
representatives and cover the handing over process needs. This idea of the approach is applied by leading
the Commissioning Management process and team members as partners not witnesses, to deliver the
systems following the standard template and using the software(s) created by long experienced staff
tailored to the needs of each project and to represent and become the focal point of contact of the
Commissioning Team(s) in each level CSI is involved in.
In order to apply the vision, integrated trust with esteemed clients and business partners in the
construction field would have been established. This trust is based on the proven successful experience
and the excellent services CSI is providing.

3
ABOUT CSI, WHO WE ARE

VISION APPLIED, CSI EARLY DEVELOPING JOURNEY


In September 2015, starting with a core team staff of well-selected 10 members, CSI got its first chance
to apply its vision and to build its independent global name and reputation. Starting in 2 different markets
at the same time in Qatar and Turkey, CSI was successful to leave a positive impact in the projects its staff
managed. The recommendations that followed from the projects’ clients were encouraging to proceed
with the positive approach established.
In February 2016, CSI Commissioning Services International came officially to the light in its first registered
branch office in Dubai, UAE after some preludes and attempts in 2015. It was always the main target to
recruit high caliber staff and create the core-trained staff in all levels following the founders’ vision of the
Commissioning Management approach.
By July 2017, with staff of 60, CSI reached to new horizons and became active in MENA starting with
Jordan and Egypt markets and in Central Asia starting in Astana, Kazakhstan. Always recruiting high caliber
staff that know the gap and believe in the idea and applying continuous trainings and development to the
whole staff and managers, CSI became a trustworthy technical service provider to its early professional
clients. That proven short history of the new configuration and name gave CSI a kudos to its booming
getting awarded its biggest project to date, Abu Dhabi International Midfield Terminal Building Complex
in August 2017.
During late 2017 till June 2018, CSI operations were active in 8 different countries with a total staff of
company employed work force staff of over 180 staff members in managerial, technical and field levels.
New cadres in all levels started to be the lead in the different operations CSI “to- Deliver” mentality was
quickly implemented in its staff approaches and became a trademark of CSI.

In June 2018, CSI established its first sister company for facilities CSI ATS IS THE FIRST
management services, CSI Advanced Technical Service (CSI ATS), SISTER COMPANY OF CSI
in Dubai, UAE. With a potential work force of 260 staff, CSI ATS is
INTERNATIONAL GROUP OF
an extended integrated vision of the original CSI Commissioning
Management Services to add engineering approach and solutions COMPANIES
to the facilities management scope of work. CSI ATS started
creating its portfolio being awarded the prestigious project Abu
Dhabi International Airport Midfield Terminal Building Complex
assessment works to the facilities management team of the main
contractor

4
ABOUT CSI, WHO WE ARE

With the vast area covered and the growing potential, CSI established
its second branch office in Egypt to serve as its centralized technical

EGYPT
office and penetrate the African market in August 2018. Currently
with a work force of 30 engineers in the office, the technical
documents are prepared and developed in the standard formats to
serve all CSI global operations.
Engineering Services
The standard high quality of the documents produced led to high
confidence in CSI ability to handle the projects documentations
required in most prestigious projects.
In October 2018, the official registration of a Qatari branch office
was made under the name CSI Commissioning Services. The high
demand potential of the Qatari market and the growing staff of
CSI stationed in Qatar with a current number of 40 engineers and
technicians secured a robust start and approach to the Qatari market.

With the growing ambition and with more confidence gained from
proven successes, CSI started to penetrate the European market
through its registered office established in Warsaw, Poland in February
2019. Not only covering the commissioning scope of services,
CSI Europe provide special systems installation and construction
management with high standard quality to the market.

In March 2019, CSI realized the high potential market in Saudi market
for the high quality services. That led to established its registered
office in Riyadh under the name Commissioning Services Initiative.
with a team and work force of initial 20 engineers & technicians, CSI
is targeting high profile & prestigious projects in Saudi Arabia.
CSI is always open to business partnerships with its esteemed clients
and agents in other countries outside its registered offices stations
as mentioned in contacts section.

5
CSI VISION & MISSION

CSI VISION
To be the company that best understands and satisfies project needs, service and self-fulfillment
requirement of the commissioning business - globally.
The CSI team is committed to achieve new standards of excellence by providing superior commissioning
management services.

CSI MISSION
To supply outstanding service and solutions through dedication and excellence in the commissioning field,
and to provide comprehensive commissioning solutions that bring success to our client’s projects.
We will realize this mission by setting the highest standards in service, reliability, dedication and cost
containment in our service by:
Responsibility and Dedication:
Having a responsible commissioning team will enable achieving greater efficiency within the project
deadlines during the construction, commissioning & handing over stages.
• All commissioning strategies are reviewed, managed and executed.
• Construction team concentrating only in construction related items.
• More realistic, effective and accurate programming.
• Avoidance of abortive work during construction & commissioning.
• Subcontractors & vendor’s management.
• Achieving local authorities & stakeholder’s requirements.
One Focal Point:
• Simplicity of communication.
• CSI commissioning management team assigned to the project will be the focal point for all
commissioning related communication.
• CSI commissioning team representing the client in all communication related to
commissioning work as an integrated team with the client.
Simplify the Commissioning Process:
CSI’s team is specialized in commissioning and have vast experience in complex systems and projects.
Considering the size of the projects and the number of interfaces included, a qualified commissioning
team is a must to achieve a smooth handover of the project.
CSI will develop the testing & commissioning plan which will outlines the procedure, equipment and
documentation requirements in order to complete commissioning and perform the handover of the
various structures and components of MEP work in project

6
CSI JOURNEY

CSI MILESTONES

E st a b l i s h m e n t o f Fo u r t h
Re g i ste re d O ffi c e i n Po l a n d
fo r E u ro p e O p e ra � o n s
Mar
Dec 2019
2018
E st a b l i s h m e n t o f F i � h
Re g i ste re d o ffi c e i n K SA

E st a b l i s h m e n t o f T h i rd
Re g i ste re d O ffi c e i n Q a t a r
Oct
2018 E st a b l i s h m e n t o f S e c o n d
Aug Re g i ste re d O ffi c e i n E g y p t
2018

Re a c h i n g 1 8 0 S t a ff
M e m b e rs i n 8
Jan D i ffe re n t C o u n t r i e s Jun
2018 2018 E st a b l i s h m e n t o f F i rst S i ste r C o m p a ny
fo r Fa c i l i � e s M a n a g m e n t S e r v i c e s ,
C S I A d va n c e d Te c h n i c a l S e r v i c e
( C S I AT S )

I n te r n a � o n a l E x p a n s i o n
to MENA, Egypt and
C e n t ra l A s i a
Jul F i rst Re g i ste re d O u t s i d e
Tu r ke y o ffi c e i n D u b a i / UA E
2017 Fe b
2016

Launching CSI
i n I st a n b u l / Tu r ke y
Sep
2015 Business Development Plan
Jun A p p l i e d w i t h N e w Pa r t n e rs
2004

7
CSI BOARD OF DIRECTOR

Mr. Tuncer Selim


Over 40 years of experience in the MEP construction field, with wide experience in
Mega prestigious projects in MENA and Europe.
Mr. Tuncer Selim is the Founder and Chairman of MEGA MEP, one of the leading MEP
companies in Turkey and the backbone co-founder of CSI.

Mr. Yuksel Caglar


CSI Managing Director and Co-founder, Yuksel Caglar has over 25 years of MEP
construction experience working for Mega projects in MENA and Europe.
Mr. Yuksel has an extensive experience in managing MEP works and is leading CSI
management team with a base in Warsaw, Poland.

Mr. Ahmed Magdy


CSI General Manager and Co-founder with more than 15 years of dedicated experience
in the TAB and Commissioning field.
Holding Project Management Diploma from American University in Cairo when at 25,
gaining strategic planning for new markets experience, Ahmed Magdy is managing the
executive part of CSI business planning and operation.

Mr. Mustafa Hammodeh


CSI Operations Manager and Co-founder, with more than 15 years of experience in the
field of testing and commissioning in mega projects in GCC and Turkey.
Mustafa Hammodeh is the dynamic heart of the company with his experience in
leading the growing number of staff and client and applying the recent updates of CSI
developed softwares.

Mr. Efe Selim


CSI Business Development Manager and CSI FMS Co-Founder, Efe Selim is the key
person for CSI breakthrough in developing its programs and to be always up to date
with the market rapidly increasing requirements. With his 10 years of IT and Business
Development Management experience in mega projects in Qatar and UAE, Efe has
been a big added value to CSI team.

8
CSI MANAGEMENT

Mr. Mohammed Ghannam


CSI Technical Manager, Mohammed Ghannam is CEM, CMVP certified and experienced
technical engineer with over 10 years of experience in energy management and
commissioning field.
Mohamed is developing CSI internal processes among the departments to enable a
smooth company operation with his current station in UAE, Mohamed is establishing
the new energy management department in CSI.

Mr. Okan Altan


CSI Deputy General Manager with 20 years of dedicated experience in sales, financial
and contracts management.
Holding a BSc in Economics since 2000, Okan joined CSI in October 2019 to support
the financial and administrative parts of growing plans of CSI

Mr. Mahmoud Saleh


CSI Technical Office Manager and CSI Egypt Co-Founder and General Manager,
Mahmoud Saleh is NEBB Certified Proffessional Reg. No 24749, CSA Grade 4 Certified
with over 14 Years experience in TAB Service and completed over 100 project.
With his Station in Cairo Mahmoud is also devloping the training of new recruited
staff technical abilities, developing to cover the projects high quality developing
requirements.

Mr. Mohamed Saber


CSI Operation Technical and Development Manager, Mohamed is NEBB Certified
Professional Reg. No 24211 Since March 2018, CSA Grade 4 Certified with over 13
years of experience in TAB and Commissioning Services completing and managing over
150 projects.
Mohammed is providing technical support and quality control to the whole CSI
operations to ensure the standard procedures are followed through the entire
commissioning processes.

Mr. Zaid Al Jabari


CSI Projects Manager and acting as Jordan Operations Manager, Zaid has extensive 14
years of experience in contracting field running his own private business in Jordan.
Since joining CSI team in September 2016, he played a key role in helping establishing
CSI Operations in Jordan and managing the projects in Jordan, Turkey and currently in
Abu Dhabi.

9
CSI OPERATIONS MANAGERS

Mr. Mohammed Alaghawani


CSI KSA Operations Manager, Mohammed is NEBB Certified, CSA Grade 4 Certified, with
10 years of experience in TAB and Commissioning fields in GCC and Central Asia.Since
joining CSI in February 2017, Mohammed has shown great skills in managing projects,
delivering on time all the targets with the highest performance leading his teams.

Mr. Mustafa Abu Zaid


CSI KSA Area Operations Manager, Abu Zaid has extensive experience of 12 years
with NEBB TAB Certified, CSA Grade 4 Certified, Technical Operation Management,
Presentation Skills, Strong and Intensive TAB Leading Experience, Mechanical Teams
Resources Management, Technical Reports Analysis, Hands-on Testing Training and
Development.

Mr. Richard Jupp


CSI Commissioning Director, Richard Jupp is holder of CSA Grade 6 and has over 40
years of experience in the field of testing and commissioning. Richard is supervising the
technical tutoring of CSI teams. transferring his wide experience

Mr. Hany El-Banna


CSI Egypt Operations Manager, Hany is a big added value to CSI team since joining
CSI team in August 2016. CSA Grade 4 Certified with his extensive field experience in
electrical testing, Hany managed to deliver mega projects works operational to clients
and developed the hands on skills of CSI staff.

Mr. Nasser Al Jundi


CSI Projects Manager and acting as Turkey and Central Asia Operations Manager, Nasser
is NEBB Certified with 10 years of experience in the fields of TAB and Commissioning in
GCC, Central Asia and Turkey.
Nasser joined CSI in April 2016 and became one of the first pillars on which CSI build its
plans on. He had a great influence finishing the works in Emaar Square Mall in Istanbul
project and currently managing the operation in Central Asia, Kazakhstan.

Mr. Sherif Al Shakaa


CSI Qatar Operation Manager, Sherif has extensive and dedicated experience of
Commissioning Management of more than 15 years. The experience is developed
through working in big organizations in prestigious projects.
With his Qatar market experience of about 8 years, Sherif is currently working on
securing a long lasting base of CSI in Qatar through maintaining the high quality
provided to projects.

10
CSI KEY STAFF

CSI core teams and staff are the pillars on which it builds its reputation. Selection, recruiting and training
such staff and implementing the same target-orientation is a continuous non-stopping process supervised
by CSI Executive Management Board and Board of Directors. One of the biggest prides of CSI is that there
is no big gap between the field and management levels. It is always interactive and dynamic process
through work matrix, not the usual chain of command.
The team’s backgrounds and experiences are varied. It is again the motto of CSI that rules the process,
“Converting Energy to Synergy”. No matter what the experience of the staff member is, it is implemented
in an integrating process to serve the Commissioning Management needs.
CSI core team experiences vary from 3 to 28 years of experience. Core team is not only the Senior level. A
promising intern or a fresh graduate with intensive trainings is considered a core staff that CSI management
is investing and paving his/her way up.
CSI Internship programs are active in Egypt and Jordan with plans to initiate in Turkey. The program is
targeting the engineering students in prestigious universities in the mentioned countries CSI believes in
developing the practical skills of the freshmen students that helps them link the science to the life practice.

11
CSI KEY STAFF

Chris Jones +35 Years of Experience


Project Manager
Current Base: UAE
Key Skills: CSI Projects Manager. With 35 years of experience in construction field in
MENA and Europe markets in diversified positions and levels up to projects management,
Christopher Jones is a big added value to CSI staff since joining in May 2018.

Tahir Mazi +12 Years of Experience


Commissioning Manager
Current Base: UAE
Key Skills: NEBB Certified Professional Reg. No 24102, Certified with over 12 Year’s
experience in TAB Service and completed over 100 projects. He has Strong and
Intensive Commissioning Leading Experience and good in Mechanical Teams Resources
Management, Technical Reports Analysis, Hands-on Testing Training and Development.

Jovel Ortiz +29 Years of Experience


Commissioning QA/QC Manager
Current Base: Qatar
Key Skills: MEP Systems Testing and Commissioning, Technical Reports Analysis, Chasing
the Snagging Data, Leading QA/QC Teams towards Accurate Reporting, Holding and
Chairing Technical Coordination Workshops

Mohammed Aamer +16 Years of Experience


Commissioning Manager
Current Base: Egypt
Key Skills: Projects Management, MEP Construction Management, Mechanical
Commissioning, Presentation of Technical Trackers, Strong and Focused Approach to
Solutions

Serdar Kahveci +14 Years of Experience


Commissioning Manager
Current Base: UAE
Key Skills: Projects Management, Mechanical Commissioning, Technical Trackers
Analysis, Strong and Focused Approach to Solutions

12
CSI KEY STAFF

Ahmed Abdelrahman +15 Years of Experience


Mechanical Commissioning Manager
Current Base: Egypt
Key Skills: NEBB TAB Certified, CSA Grade 4 Certified, Strong TAB Leading Experience,
TAB Resources Management, Technical Reports Analysis, Hands-on Testing Training and
Development

Mostafa Rashed +13 Years of Experience


Electrical Commissioning Manager
Current Base: KSA
Key Skills: Electrical Systems Design and Testing, Electrical Teams Resources
Management, Technical Reports Analysis, Hands-on Testing Training and Development,
Focused Positive Approach towards Completion

Ahmed Mohamed Mostafa +12 Years of Experience


Projects Manager
Current Base: UAE
Key Skills: NEBB TAB Certified, CSA Grade 4 Certified, Technical Operation Management,
Presentation Skills, Strong and Intensive TAB Leading Experience, Mechanical Teams
Resources Management, Technical Reports Analysis, Hands-on Testing Training and
Development

Khalid Al Dakka +12 Years of Experience


Technical Manager
Current Base: Qatar
Key Skills: A multi-disciplined Engineer, with a BSc in Mechatronics Engineering and
over 12 years of working experience as an Electromechanical Engineer, Project Manager,
and Operations Manager in reputable Companies.

Moataz Kamal +11 Years of Experience


TAB Project Manager
Current Base: Bahrain
Key Skills: NEBB Certified, HVAC Systems Commissioning, Presentation Skills, Technical
Reports Analysis, Hands-on Testing Training and Development, Projects Management

13
CSI KEY STAFF

Ramy Fekry Almaasarawy +10 Years of Experience


Mechanical Commissioning Manager
Current Base: UAE
Key Skills: NEBB TAB Certified, LEED Green Certified, CSA Grade 4 Certified, Strong
and Intensive TAB Leading Experience, Technical Trackers Preparation and Analysis,
Mechanical Teams Resources Management, Technical Reports Analysis, Hands-on
Testing Training and Development

Ahmed Mamdouh +10 Years of Experience


Commissioning QA/QC Manager
Current Base: UAE
Key Skills: NEBB TAB Certified, CSA Grade 4 Certified, MEP Systems Testing and
Commissioning, Technical Reports Analysis, Chasing the Snagging Data, Leading QA/
QC Teams towards Accurate Reporting, Holding and Chairing Technical Coordination
Workshops

Mohamed Naguib +10 Years of Experience


Egypt Technical Office Manager
Current Base: Egypt
Key Skills: Electrical Systems Installations and Commissioning, Electrical Teams Field
Management, Technical Reports Analysis, Hands-on Testing Training and Development

Marwan M. AbuZaid +10 Years of Experience


Fire Fighting Department Head
Current Base: UAE
Key Skills: Fire Fighting Systems Design and Commissioning, Technical Reports Analysis,
Hands-on Testing Training and Development

Deya-Uddin Khalid Hammodeh +10 Years of Experience


Operation Maintenance Manager
Current Base: UAE
Key Skills: Electrical Systems Installations and Commissioning, Electrical Teams Field
Management, Technical Reports Analysis, Hands-on Testing Training and Development

14
CSI KEY STAFF

Asrar Rashid Mir +10 Years of Experience


Electrical Commissioning Manager
Current Base: UAE
Key Skills: Electrical Systems Installations and Commissioning, Electrical Teams Field
Management, Technical Reports Analysis and Tracking, Hands-on Testing Training and
Development

John Mark M. Diaz +14 Years of Experience


Senior ELV Commissioning Engineer
Current Base: UAE
Key Skills: ELV Systems Testing and Commissioning, ELV Teams Resources Management,
Recruiting High Skilled Staff, Training of New Joiners, Technical Reports Analysis, Focused
Positive Approach towards Completion

Aldrin Estoperez Entac +13 Years of Experience


Senior ELV Commissioning Engineer
Current Base: UAE
Key Skills: ELV Systems Design and Commissioning, ELV Teams Resources Management,
Recruiting High Skilled Staff, Training of New Joiners, Technical Reports Analysis, Focused
Positive Approach towards Completion

Noli Arcallana +13 Years of Experience


Senior Electrical Commissioning Engineer
Current Base: UAE
Key Skills: Electrical Systems Design and Commissioning, Electrical Teams Resources
Management, Training of New Joiners, Technical Reports Analysis, Focused Positive
Approach towards Completion

Theoderic Aleta +15 Years of Experience


Senior Electrical Commissioning Engineer
Current Base: UAE
Key Skills: Electrical Systems Design and Commissioning, Electrical Teams Resources
Management, Training of New Joiners, Technical Reports Analysis.

Ahmet Yakut Coşkun +6 Years of Experience


Technical Office Commissioning Engineer
Current Base: UAE
Key Skills: Electrical-ELV Systems Testing and Commissioning, Handing Over Documents
Preparation, Chasing Clients’ Approvals, Comments Tracking and Closing, Hands-on
Presentation Skills

15
CSI SERVICES, WHAT WE DO

CSI operates in different fields of engineering services with big focus on the commissioning service that
we provide. CSI is able to provide all the services in a high professional level of performance and result
oriented approach to get the trust of clients. CSI is using internally developed software to control, work
progress and quality (Videntium).
• Testing and Commissioning
• Hand Over and Close out Documentation
• Building Envelope Testing Service
• Energy Management
• Pharmaceutical and Medical Testing
• Facilities Management
• MEP Fit out & Contracting
• Fire & Safety Installation and Contracting

16
CSI SERVICES, WHAT WE DO

COMMISSIONING AND DOCUMENTATION SERVICES


Commissioning Management
The main objective of Commissioning Management is to manage and track individual project commissioning
activities, which is vital to the success of any project.
CSI team is able to provide a full commissioning management services from day one of the project,
starting from defining the clients Project Requirements and ending with deferred handover, close and
Documentation
LEED Commissioning
The commissioning process is a highly effective method to improve the performance of building systems
and equipment. Coincidentally, the Leadership in Energy and Environmental Design (LEED) standards have
the same goal of improving building performance. CSI as a commissioning agent have vast LEED knowledge
that will help project teams to meet the requirements of the required project LEED Certification earning
points toward an even higher LEED. CSI individuals have achieved LEED accreditation demonstrated
inclusive knowledge of green building technologies and strategies aimed at improving energy savings,
water efficiency, indoor air quality, and CO2 emissions
Commissioning Verification & Validation
Verification & validation is the combined activities of two independent steps.
Verifying that the Cx process has been completed to the best practice performance standards in the
industry, and validating the planning, design and operations of the facility to ensure it was designed and
built as planned and is fit for intended use.
CSI has the higher levels of expertise as well as the professional and technical background of engineers
who are well-versed in the type of facility and systems being designed, verified and validated.
Retro Commissioning
Retro commissioning, or “existing building commissioning,” is a systematic process for identifying and
implementing operational and maintenance improvements in a building to ensure continued good
performance over time.
Depending on the age of the building, retro commissioning can often resolve problems that occurred
during design or construction, or address problems that have developed throughout the building’s life. In
all, retro commissioning improves a building’s operations and maintenance (O&M) procedures to enhance
overall building performance.
CSI has the experienced and qualified commissioning team who can make retro commissioning for any
building addressing all kind of problems related to systems performance and design.
Close Out Documentation
The handover of a project to the client at the end of construction is a very important stage of the project
procurement process and facility operation success. A well organized, efficient and effective transfer of
information from project works to the Project is essential.

17
CSI SERVICES, WHAT WE DO

TESTING SERVICES
HVAC Testing Adjusting Balancing
The building construction industry is experiencing a major growth in demand for experienced and certified
testing, adjusting, and balancing (TAB) contractors who can balance today’s complex HVAC systems.
The purpose of testing, adjusting, and balancing (TAB) is to assure that an HVAC system is providing
maximum occupational comfort at the lowest energy cost possible. Hands on of the Testing, Adjusting and
Balancing works for both the air and hydronic systems is the most important aspect of the overall process
of Testing & Commissioning for HVAC systems.
CSI provides a comprehensive TAB service to clients for all types of development, with highly experienced
staff and a full range of calibrated instruments.

Indoor Air Quality (IAQ)


CSI can provide an indoor air quality assessment that will instigate good environmental management of
every aspect of workplace

Sound & Vibration Test


CSI is equipped to provide advanced noise and vibration testing by blending the best of both traditional
and leading-edge technologies to identify the types and characteristics of noise & Vibration along with
identifying appropriate control measures

Electrical Testing
CSI electrical testing and inspection team understand electrical testing regulations and can perform the
tests or supervise the test carried by others and submit test report, CSI team will ensure all electrical
installation and appliances are fully compliant with the standards and regulations after successfully testing

Thermal Imaging Test


An infrared camera shows exactly where the problems are and helps focus the inspectors’ attention allowing
him or her to properly diagnose areas with energy loss. This strategy saves considerable amount of time
that would have otherwise been spent and lost in identifying the problems. Thus Infrared thermography
is the easiest and quickest method to detect energy waste, moisture and electrical issues in buildings.
Through thermal imaging CSI Engineers locate and identify electrical/mechanical equipment with
hotspots

Building Envelope (Building Tightness)


Due to the increased interest in high-performance buildings, more attention is being paid to how envelope
assemblies affect interior comfort and energy performance.
CSI is able to carry out effective commissioning of building envelope assemblies including air intrusion,
water intrusion, and thermal intrusion

18
CSI SERVICES, WHAT WE DO

Clean Room Test


The act of evaluating the performance of a cleanroom by performing a series of defined tests with prescribed
procedures and reporting requirements, CSI experience in cleanroom systems ensure these critical areas
are performing in accordance with international standards and customer quality specifications.
HEBA Filters Testing
CSI comply with international and local testing standards and regulations during HEPA filters testing.

Medical Gas and Laboratory System


CSI ensure the proper procedure and standards are used for verification of laboratory and medical gas
systems
Leak pressure testing standards and anti-confusion testing are measure requirements that need to be
demonstrated before acceptance

Safety Cabinet and Testing


CSI comply with various testing standards and regulations during safety cabinet testing
Face velocity measurement for safety cabinets with contaminate testing are the basic test required for
demonstration before acceptance

ENERGY AND SUSTAINABILITY


Energy Audit
CSI provides a turnkey job and confirms that the scope of work which it will undertake covers all components
and requirements deemed necessary to provide complete functional energy efficient systems that are
environmentally friendly and enhance the IAQ (Indoor Air Quality) of the Building. Our Aim that the Audit
achieves the following three objectives:

Energy Management
CSI Energy Management Solution provide a complete answer to your facilities and energy management
needs, for your new or existing facilities through Energy Managements, measurement and verification,
monitoring and control services
The Energy Management Solution will provide you with comprehensive energy audit and supervise the
implementing of Energy Efficiency measures
A Monitoring and control service will provide you with the needed measurement and verification to
ensure that the saving is obtained

19
CSI SERVICES, WHAT WE DO

Energy Review
The Energy Review Service to review design drawings and specifications related to Energy Efficiency to
provide recommendations that will improve the energy performance of the building.

Energy Modeling
CSI Energy modeling team well work with your team to optimize and have consistently been able to
generate substantial capital and operational cost savings and the early involvement of energy modelling
on projects allows energy efficiency strategies to be better selected so that the Client’s investment is
optimized.

LEED Consultancy
CSI will provide Assessment & Consultation for buildings approaching LEED accreditation to ensure that
it will achieve the desire rating with the optimum design, and support you through the process form the
design stage till the handover and document submission

Measurement and Verification


service is to develop the methodology of calculating the saving from the implemented EEM’s, and describe
the impact of the EEM’s under all conditions
CSI have a professional team which is CMVP certified develop a M&V plan according to the IPMVP

20
CSI SERVICES, WHAT WE DO

FACILITIES MANAGEMENT (CSI ATS)

Full MEP Facilities Management


CSI works to protect built assets by managing and executing maintenance works in a safe and efficient
manner with extensive planned preventive maintenance regimes enabling responsiveness when defects
occur and reactive when repair services are needed. We believe in carrying out our MEP services with
minimum disruption to achieve high standards of performance, quality with convenience for building
tenants and visitors.
Our specialists can manage and operate all projects with detailed knowledge of the industry and the
highest standards of professionalism
Services include
1. Consult a facility management strategy
2. Advice and support on the application of improved systems, structures and procedures
3. Integrated cost management analysis
4. Analysis of service charges
5. Control the selection of service provider and management quality
6. Risk assessment and provision of risk management systems
7. Conduct asset surveys, inventory of assets and database of the Facilities Management
System
8. Application of standard operating methodologies and procedures
9. Providing professional reports on performance management
10. Monitor work practices and prevent negative trends through surveillance Preventive
Maintenance
11. Transition and handover management
12. Asset coding in Computer Aided Facilities Management System
13. Master PPM planning
14. Specialty subcontract management
Our professional teams carry out and manage proactive maintenance, which also ensures compliance
with all regulations, requirements and manufacturer recommendations.

21
CSI SERVICES, WHAT WE DO

Trouble Shooting and Retesting


Conducting survey & trouble shooting for existing building services because they invariably lose peak
efficiency and become difficult to control due to inefficient maintenance or possibly modification
to system, fabric or occupancy since installation. CSI is able to carry out surveys of existing building
installation including.
CMMS/CMMIS:
Computerized maintenance management systems with a dedicated and fully integrated helpdesk that
maintains a computer database of information about organization’s maintenance operations. This will
help management to make informed decisions and to properly control the maintenance of a facility,
A CMMS also allows for record keeping, to track completed and assigned tasks in a timely and cost-
effective manner.
Preventive Maintenance
The purpose of preventive maintenance to help keep system up and running, preventing any
unplanned downtime and expensive costs from unanticipated system failure, this can be achieved
through implementing a planned periodic maintenance system which is built to meet with the real site
conditions and weather variables. CSI can provide planning and scheduling the preventive maintenance
through studying the project circumstances and the manufacturer’s literature as we as provide qualified
manpower to fulfill the needed site works

22
CSI SERVICES, WHAT WE DO

Reactive Corrective Maintenance:


Reactive or corrective maintenance performed to identify, isolate and rectify a fault so that the failed
equipment or system can be restored to an operational condition, and it is typically carried out after
failure detection. CSI with the presence of an integrated team of engineers and capable technicians can
lead the process of RCM to overcome the day to day challenges of maintaining operational conditions all
over the facilities being under our responsibility.
Reporting:
The importance of creating oriented and accurate maintenance reports comes from its ability to keep
the whole process of facility management enlighten and aware of all the possible problems as well as
helps in keeping a continuous timely and cost-effective manner of operation. CSI through the gained
experience in using the CMMS’s created reports as well as preparing periodic manual reports can keep
the whole process of operation and maintenance of the facility under control all the time.

Health Safety and Environment


The purpose HSE procedures is to study and implement practical aspects of environmental protection
and safety at work, CSI and due to its zero-accident culture will create organized procedures for
identifying work place hazards and will train and retrain periodically the FM team which can reduce the
possibility of accidents and harmful situations.

23
CSI CERTIFICATION & AFFILIATION

CSI CERTIFICATE
Certificate Name - Testing,
Adjusting and Balancing of
Environmental Systems
NEBB Certificate Number - 3760
Certificate Name - Whole Building
Technical Commissioning of New
Construction.
NEBB Certificate Number - 3760
Established in 1971, NEBB is the premier international certification association for firms that deliver
high performance building systems. Building owners and tenants are concerned about the cost-effective
performance of the environmental systems within their respective buildings. This “green” goal can
be best accomplished by having a building’s environmental system properly tested, balanced and/or
commissioned by a NEBB Certified Professional or Technician. NEBB’s function is to establish, promote
and maintain high quality standards through certification of Firms, Professionals and Technicians. NEBB
certification is tangible proof of their qualification to perform their work in accordance with NEBB
Procedural Standards.
CSI fullfil the requirements to get the NEBB Certificate on March 2019, 3 NEBB Certified Professional and
More than 15 NEBB Certified Technician to serve the company projects around the region.

Certificate Name - Corporate


Member of Commissioning
Specialists Association.
CSA Certificate Number - 190124

The Association was formed in 1990 by a number of the country’s leading commissioning companies.
Their prime objective was - and still is - to offer anyone who utilizes the services of commissioning
companies and engineers the guarantee of a professional service, based on trained, qualified and
experienced field personnel, backed up by a quality of service underpinned by adherence to the CSA’s
aims, objectives and code of practice. The Commissioning Specialists Association (CSA) is the only body
in the UK aimed specifically at developing and improving the commissioning function to provide building
users, consultant engineers, main contractors and installation companies with a professional, quality
service carried out by trained and experienced staff.
CSI is a member in the commissioning specialist association CSI has more than 20 CSA Certified
Professionals which includes 1 Grade-6, 12 Grade-4 and 19 Grade-3 professionals to serve the company
projects around the region.

24
CSI CERTIFICATION & AFFILIATION

CSI CERTIFICATE
Certificate Name - Member of The
Building Services Research & information
Association
BSRIA Certificate Number - OOM3052

BSRIA was formed in 1955 as the Heating and Ventilating Research Council, later to become the Heating
and Ventilating Research Association. In 1975 the ‘building services’ scope was adopted, marked by
the formation of the Building Services Research and Information Association, commonly shortened to
BSRIA. BSRIA mission is to make buildings better, and they support industry in designing and operating
buildings that perform well economically, socially, and environmentally. BSRIA do this through providing
independent testing of products and buildings throughout the construction industry; the sale,
calibration and rental of instruments; market intelligence; information; and consultancy services for
design, construction, facilities management and manufacturing.
CSI is part of the BSRIA association since 2017 and applying the codes and guideline of BSRIA on CSI
projects to meet the highest standards.

The Emirates Green Building Council (EmiratesGBC) was formed in 2006, with the goal of advancing
green building principles for protecting the environment and ensuring sustainability in the United Arab
Emirates. Since the inception of the EmiratesGBC in 2006, there has been significant change in the
attitudes and demands related to the sustainable built environment.
CSI fulfill all the requirements to become a member of Emirates Building Council and implementing all
the rules and regulations on every project of CSI.

25
CSI CERTIFICATION & AFFILIATION

Certificate Name - Quality Management System


Certificate
ISO Certificate Number - QAIS-Q-UAE-CC-10.08.004

QACS is one of the pioneer name in the system certification, product certification & training business.
QACS is providing system certification according to ISO 9001:2015, ISO ISO14001:2015, ISO 45001:2018,
ISO 22000: 2005, OHSAS 18001: 2007, ISO 27001, ISO 13485, ISO 20001, CE, Kosher, Halal and other
international standards in India & Abroad. As an experienced certification body, QACS is authorized to
assess quality standards. QACS has assisted various organizations in diverse sectors for enhancing and
developing an effective management system that serves as solid foundation, enabling them to compete
in increasingly complex business environment. Today, QACS is recognized as the global leader in the field
of certification services.
CSI fulfilled all the requirement to get QACS certificate and CSI provide quality services and check as per
rules and regulation of ISO.

The LEED Green Associate credential designates individuals who have a documented, up-to-date
understanding of the most current green building principles and practices. The LEED Green Associate is
a foundational credential and for many it is the first step before earning advanced credentials such as
the LEED AP with specialty.
In CSI, many professionals have LEED certified to provide sustainability solutions and service on every
project.

26
CSI PROJECTS, OUR GEMS

ABU DHABI INTERNATIONAL AIRPORT MIDFIELD TERMINAL


BUILDING COMPLEX

Project Name: Abu Dhabi International Airport Midfield Terminal Building Complex
Location: Abu Dhabi, United Arab Emirates
Owner/Developer: Abu Dhabi Airports Company (ADAC)
Consultant/PM: AECOM
Main Contractor: TAV Consolidated Contractors Company Arabtec JV (TCA JV)
Scope of Work: MEP Systems Commissioning Management / IT Systems Commissioning
Management / Construction Snagging Tracking, Coordination Support &
Facility Management
Value: 10.8 Billion USD
The new Midfield Terminal Building (MTB) will be the largest in the Emirate of Abu Dhabi, and one of the
region’s most architecturally impressive structures. It will have 700,000sqm of internal space, and will be
visible from more than 1.5km away. The central space of the terminal building could hold three full-sized
football pitches and features a ceiling 52m tall at its highest point, taller than the Emirates Palace. Abu
Dhabi Airports and the joint venture (JV) of TAV, CCC, and Arabtec have signed an AED 10.8 billion contract
in June 2012 for the construction of the Midfield Terminal Building (MTB) at Abu Dhabi International
Airport.
The complex will include approximately 28,000sqm of retail and F&B outlets. These are set around an
8,400sqm indoor park, another first for the region, which will host Mediterranean plants and features at
its center, and desert landscapes at its edge.
In September 2013, the Midfield Terminal Complex received an Estidama 3 Pearl Rating. The Estidama
Pearl Rating System is a framework developed by the Urban Planning Council for sustainable design,
construction and lifecycle operation for communities, buildings and villas. The MTB is now the highest
rated airport terminal in the GCC, and the largest singular building ever to be rated globally.
Passenger facilities and duty-free retail will include high-end commercial offerings across more than
18,000sqm, including internationally renowned luxury goods and designer outlets, and almost 10,000sqm
of international restaurants and cafes, offering a wide range of styles and cuisines. Passenger facilities
will also include over 27,500sqm of airline hospitality lounges, a transit hotel and a heritage and culture
museum

27
CSI PROJECTS, OUR GEMS

Following pie diagram shows growth of CSI man power on this project.

The systems entrusted to CSI teams to manage their Commissioning Activities and processes are as the
following
HVAC Systems
The HVAC system covers the main terminal and 4 piers using 370 AHU, 1000 FCU, 1100
BCU and over 300 fans
Fire Fighting Systems
The airport is protected with 225 Pre-Action FSS, 12 Fame FSS, 84 Gas FSS and 290 WFFS
fire-fighting systems.
Plumbing Systems
The plumbing systems which connect over 500 submersible pumps with the plumbing
fixture and supply the airport with the needed clean water.
Emergency Systems
Emergency systems with 12 generators and more than 35 UPS and up to 90 battery sets.
Electrical Systems
80 transformers feed the 150 MOB to over 3000 FOB that will power all the airport
systems.
ELV Systems
ELV systems connect the airport using 120 SCADA system, 600 fire alarm and PAVA
systems, VESDA, ... etc.)

28
CSI PROJECTS, OUR GEMS

KING SALMAN SPECIALIZED HOSPITAL

Project Name: King Salman Specialized Hospital


Location: Al Taif – Kingdome of Saudi Arabia
Client: National Guard Health Affairs
Consultant: Dar Al-Handasah
Main Contractor: Nesma And Partners
MEP Sub-Contractor: Sasel Saudi LLC
Scope of Work: HVAC Testing, Adjusting and Balancing Works
Value: 137 Million USD
As part of National Guard Health Affairs plan of new hospitals, the hospital project is a 6-storey hospital
building located in Al Taif. The hospital, with a capacity of 500 beds, will provide healthcare to some
700,000 residents of the city. The hospital has additional space for future expansion; the main building has
an area of 34,230 square meters.
The project works commencement date was in Q2 2019. Currently, CSI technical office team is preparing all
the technical preliminary reports, design review reports and test packs and teams started the mobilization
for an expected handover date by Q1 2020
CSI was approved to provide the scope of work of HVAC TAB Works Consultancy under NEBB Certification
requirements. The sophisticated HVAC systems consists of the following

• 93 AHU’s,
• 232 FCU,
• 420 different types of Fans,
• About 1800 VAV and CAV terminals
• 16 Chilled Water Pumps
• 9 Chillers
• About 850 Static and Dynamic Balancing Valves
• About 6500 Air Terminals

29
CSI PROJECTS, OUR GEMS

JABAL OMAR DEVELOPMENT PROJECT – PHASE III

Project Name: Jabal Omar Development


Location: Makkah, Saudi Arabia
Owner/Developer: Jabal Omar Development
PM: Hill International
Consultant: Engineering Consultants Group
Main Contractor: Arabian Construction Company – Drake and Scull (ACC-DSE JV)
Scope of Work: MEP Systems Commissioning Management
Value: 2.7 Billion USD
Jabal Omar project lives up to the sacredness of place and spirituality of time. It is where pilgrims and
visitors to The Grand Mosque find peace, harmony, and content. The project is a blend of tradition and
innovation that is achieved through preserving the Islamic - particularly Makkah’s - architectural style and
infusing it with a touch of modernity.
The project will offer a distinctive design, luxurious atmosphere, and a superb service that lives up to the
holiness of the place. The project is composed of 40 towers situated on top of 16 structural bases with
a total built-up area of approximately two million square meters. The project houses an array of hotels,
apartments, residential units, and malls. Upon completion, Jabal Omar project will include a variety of
five- and four-star hotels with the capacity to host up to 36,000 guests annually and in excess of 100,000
visitors during Hajj season. The specific project of Phase Three consists of four towers, including a twin-
towered five-star Hilton hotel the third phase of the Jabal Omar scheme will involve the construction of
four hotel towers with a total built up area of 400,000 square meters. The towers will also include a 5 star
and a 3-star hotel.

30
CSI PROJECTS, OUR GEMS

Volume of the MEP systems under CSI Commissioning Management team is as following:
HVAC Systems
This system covers the JODP using 35 AHUs, 2220 FCUs, 30 Fans, 9 CHWPs.
Fire Fighting Systems
The project is protected with 25 firefighting systems and other Fire Reel Hose and
extinguishers.
Plumbing Systems
A system that connects over 40 pumps & with the plumbing fixtures and supplies the
complex with the needed clean water.
Emergency Systems
Emergency system with more than 20 UPS and more than 50 emergency panels.
Electrical Systems
8 transformers feed more than 150 panels that will power all the JODP systems.
ELV Systems
ELV systems serve the project using fire alarm system with more than 70 FAP, 10 PAVA
systems and BMS system.

31
CSI PROJECTS, OUR GEMS

KING ABDULLAH FINANCIAL DISTRICT AREA 1 BUILDING

Project Name: King Abdullah Financial District Area 1 Building


Location: Riyadh, KSA
Owner/Developer: Public Investment Fund of Saudi Arabia
Consultant/PM: JLL & Atkin
Main Contractor: Salini
Scope of Work: Site Survey for MEP Work
Value: 7.8 Billion USD

King Abdullah Financial District (KAFD) is a master plan development positioned to become Riyadh’s new
Central Business District (CBD). Combining a real estate development of circa; 850,000 sqm NLA of office
space, 115,000 GLA of retail, 1,200 residential units and 2000 hospitality keys, KAFD it is set to be a
key enabler of the KSA 2030 vision. The area identified for completion and provision of the SAPL/PMCM
services consists of 29 plots in various stages of completion (Area 1).

CSI is working Under Core Emirates as a Joint Venture.

32
CSI PROJECTS, OUR GEMS

KAP 4 FOR THE DEVELOPMENT

Project Name: KAP 4 Directorate of Passport City (4th Stage)


Location: Riyadh, KSA
Owner/Developer: Ministry of Interior (MOI)
Consultant: Proger
Main Contractor: RTCC
Scope of Work: Testing Adjusting and Balancing Supervision

KAP-4 is a project that will lead to the construction of 24 building complexes to be used by the
Ministry of Interior for institutional purposes in 9 different locations around the Kingdom of Saudi
Arabia. The complexes will be of three different kinds according to their uses and to their main buildings,
that’s to say offices (General Directorates and Administration Buildings of various kind), sports training
centers, and dormitories (including a total of 200 units).
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems.
• 57 AHU’s,
• 128 FCU’s
• 12 Fans
• 6 CRAHU
• 191 PICV’s
• 2 PACV
• More than 1000 Air Terminals

33
CSI PROJECTS, OUR GEMS

Project Name: KAP 4 Training Center


Location: Najran, Abha and Jazan, KSA
Owner/Developer: Ministry of Interior (MOI)
Consultant: Proger
Main Contractor: RTCC
Scope of Work: Testing Adjusting and Balancing Supervision

KAP-4 is a project that will lead to the construction of 24 building complexes to be used by the
Ministry of Interior for institutional purposes in 9 different locations around the Kingdom of Saudi
Arabia. The complexes will be of three different kinds according to their uses and to their main buildings,
that’s to say offices (General Directorates and Administration Buildings of various kind), sports training
centers, and dormitories (including a total of 200 units).
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems.
• 14 AHU’s,
• 3 FCU’s
• 35 Fans
• 62 VAV
• 3 CWP
• 3 Chiller
• Around 400 Air Terminals

34
CSI PROJECTS, OUR GEMS

Project Name: KAP 4 Directorate of Admin Center


Location: Riyadh, Saudi Arabi
Owner/Developer: Ministry of Interior (MOI)
Consultant: Proger
Main Contractor: RTCC
Scope of Work: Testing Adjusting and Balancing Supervision
The King Abdullah Bin Abdulaziz’s Project is the development of security facilities in Saudi Arabia in order
to upgrade military standards across the country.
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems.
• 22 AHU’s,
• 100 FCU’s
• 60 Fans
• 8 Pumps
• 100 PICV
• 4 Chiller
• 304 Air Terminals

35
CSI PROJECTS, OUR GEMS

DR. SULAIMAN AL HABIB HOSPITAL

Project Name: Dr. Sulaiman Al Habib Hospital


Location: Al Khobar, KSA
Owner/Developer: Dr. Sulaiman Al-Habib Medical Group (HMG)
Consultant: Al Shaker Office
Main Contractor: Saudi Aircon
Scope of Work: Testing Adjusting and Balancing Works
Value: 150 Million USD

Dr. Sulaiman AL-Habib Hospital in AL Khobar is the first fully integrated digital health project with Digital
Hospital system in the region, with the capacity of 400 beds and 290 clinics on 290.000 m2. The hospital
will work on applying virtual healthcare system (Cyber Care) so as to provide diagnostic and therapeutic
services for multiple categories of patients depending on the remote healthcare (VCare) via advanced
digital and technological systems. Digital Hospital system will enable patients to have an access to
medical consultations at work or home around the clock via visual communication services. The patient
and the doctor communicate together continuously on medical consultations and dosages. This helps
the patient not to go to the hospital in non-emergency situations. The hospital will include 100 beds for
intensive care, 50 beds for emergencies, 16 birthing room, 2 equipped cardiac catheterization rooms,
and 10 operation rooms.
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems.
• 120 AHU’s,
• 200 FCU’s
• 250 Fans
• 5000 Air Terminals
• 200 PICV
• 450 VAV & CAV
• 10 CWP

36
CSI PROJECTS, OUR GEMS

RIYADH METRO LINE 2 (6 SURFACE STATIONS)

Project Name: Riyadh Metro Line 2 (6 Surface Stations)


Location: Riyadh, Saudi Arabia
Owner/Developer: Arriyadh Development Authority (ADA)
Consultant: Riyadh Metro Transit Consultants
Main Contractor: BACS JV
MEP Sub Contractor HAPCO Co.
Scope of Work: Testing Adjusting and Balancing Works
Value: 2.8 Billion USD
Metro Line-2 is 25.3 km (15.7 mi) 13 stations 3 stations runs in the east-west direction along King Abdullah
Road, between King Saud University and the eastern sub-center, mostly on a raised strip in the median of
a planned freeway.
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems
• 38 AHU’s,
• 150 Fans
• 993 Air Terminals

37
CSI PROJECTS, OUR GEMS

RIYADH METRO LINE 3 (9 ELEVATED STATIONS)

Project Name: Riyadh Metro Line 3 (9 Elevated Stations)


Location: Riyadh, Saudi Arabia
Owner/Developer: Arriyadh Development Authority (ADA)
Consultant: Riyadh Metro Transit Consultants
Main Contractor: Arriyadh New Mobility JV
MEP Sub Contractor HAPCO Co.
Scope of Work: Testing Adjusting and Balancing Works
Value: 2.8 Billion USD
Riyadh Metro Line3 is 40.7 km (25.3 mi) 20 stations. 2 stations run in the east-west direction along Al–
Madinah Al Munawwarah and Prince Saad Bin Abdulrahman Al Awal Roads, starting at the west near
Jeddah Expressway and ending at the east near the National Guard camp of Khashm El Aan. The metro
will be mostly elevated along the western part of Al–Madinah Al Munawwarah Road, then underground in
tunnels in the central section of the line, and generally at grade along Prince Saad Ibn Abdulrahman Road.
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems
• 52 AHU’s,
• 170 Fans
• 4176 Air Terminals

38
CSI PROJECTS, OUR GEMS

RIYADH METRO WEST, EAST & SOUTH DEPOTS

Project Name: Riyadh Metro West, East & South Depots


Location: Riyadh, Saudi Arabia
Owner/Developer: Arriyadh Development Authority (ADA)
Consultant: Riyadh Metro Transit Consultants
Main Contractor: ANM & BACS JV
MEP Sub Contractor HAPCO Co.
Scope of Work: Testing Adjusting and Balancing Works
Value: 2.8 Billion USD
Metro Network will provide 6 Mainlines in the city Riyadh to form the backbone of the future Riyadh
Public Transport Network. The six-line metro system that will run for a total length of 176 kilometers
across the city and includes 85 stations. The Project is divided into 3 Packages. The Package-1 comprises
of the Lines-1 & 2. The Line-1 is a North-South Line along Olaya – King Faisal – Batha Corridor. The Line-
2 is a East-West line along King Abdullah Road. South, East and West Depot are used to perform internal
cleaning, inspections, maintenance, repairs and painting of the trains. The structures made of structural
steel and concrete mix.
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems
• 70 AHU’s,
• 270 FCU’s,
• 13 Chillers,
• 60 Pumps,
• 280 Fans
• 3353 Air Terminals

39
CSI PROJECTS, OUR GEMS

EMAAR SQUARE DEVELOPMENT

Project Name: Emaar Square Mall and Development – Package II and III
Location: Çamlıca, Istanbul, Turkey
Client: Emaar Properties Turkey
Consultant/PM: Turner (TIME) Turkey
Main Contractor: TAV SERA Construction JV
MEP Sub-Contractor: SONMEZ METAL (Package III)
Scope of Work: MEP Systems Commissioning Management / HVAC Systems
TAB Works Consultancy
Value: 2.35 Billion USD

Emaar Square is a stunning new lifestyle development in Turkey. Taking inspiration from the rich cultural
heritage and spirit of the city, the development is set to become a landmark attraction in the region.
The Emaar Square Shopping Mall, a trophy asset within the development, offers city dwellers an unrivalled
shopping and leisure destination that employs around 5,000 people. At a later stage, Emaar Square will
comprise over 1,000 luxury homes, a 180-room five-star Address hotel.
With over 150,000 sq m of total rentable space, the mall in Emaar Square also features a wide range of
leisure facilities including a family entertainment center, an ice rink and an underwater zoo. Emaar Square
Shopping Mall is also a home to a 2,400-seat movie theatre complex and a 4,500-vehicle parking lot.
Once completely finished with all packages, Emaar Square will offer 40,000 sq m of office space,
accommodating around 4,000 professionals.

40
CSI PROJECTS, OUR GEMS

CSI services extended till February 2018 for the cause and effect tests and compilation of handing over
documentation with Authorities Having Jurisdiction with only 2 engineers
Scope of work included Commissioning of the following systems

HVAC Systems
The system Cover the Project using 144 AHU,
170 FCU and Over 850 Fan
Fire Fighting Systems
the project is protected with 225 Pre-
Action FSS, 12 Foam FSS, 84 Gas FSS and 290
WFFS firefighting systems
Plumbing Systems
A system that connect over 100 Submersible
pumps with the plumbing fixture and supply
the project with the needed clean Water
Emergency Systems
An Emergency system with 26 Generator and
more than 17 UPS
Electrical Systems
A 78 Transformer feeding 35 MOB to over
499 FOB that will power all the project
systems.
ELV Systems
complicated system that connect the
project using 46 Fire Alarm system, 70
Emergency Announcement & Background
Music System, 683 CCTV, 118 ACS ,158
lighting control system, and BMS system

41
CSI PROJECTS, OUR GEMS

ABU DHABI PLAZA COMPLEX

Project Name: Abu Dhabi Plaza Complex


Location: Astana, Kazakhstan
Owner/Developer: Abu Dhabi Government / ALDAR Properties PJSC
Consultant/PM: AECOM
Main Contractor: Arabtec Consolidated Contractors Company JV
MEP Sub-Contractor: Arabtec, Consolidated Contractors Company
Scope of Work: MEP Systems Commissioning Management / Electrical Testing / HVAC Systems
TAB Works
Value: 2.5 Billion USD
Abu Dhabi Plaza is a major mixed-use development located in Astana, Kazakhstan, comprising of a retail
podium, residential apartments, international grade office space, and leisure facilities. Upon completion,
it will be the largest tower block in Central Asia with highest tower with a height of 382 m of 78 floors.
This prestigious and modern mixed integrated complex will include 568 apartments, 190 hotel rooms,
and 100 serviced apartments as well as the Mall and Offices; the operator of the hotel is Starwood Group
under its Sheraton Brand. Volume of MEP systems under CSI scope of work is
HVAC Systems
This system covers the project using 46 AHU, 2125 FCU, 305 BCU and over 460 fans
Fire Fighting Systems
The project is protected with 256 clean agent fire system, 1 foam system and 523 fire hose
real.
Plumbing Systems
Plumbing systems connect 5 submersible pumps with the plumbing fixture and supply the
project with the needed clean water
Emergency Systems
Emergency systems with 15 generators and more than 12 UPS
Electrical Systems
40 transformers feed the 45 MOB to over 1750 FOB that will power all the systems of
project.
ELV Systems
ELV systems connect the project using 45 fire alarm panel, 630 cameras and over 1000 access
doors ... etc)

42
CSI PROJECTS, OUR GEMS

ALMAZAH CITY CENTER MALL

Project Name: Almazah City Center Mall


Location: Heliopolis, Cairo, Egypt
Client: Majid Al Futtaim Group
Consultant/PM: Shaker Consultancy Group
Main Contractor: Hassan Allam Consolidated Contractors Company JV
MEP Sub-Contractor: Hassan Allam Technology (HAT)
Scope of Work: MEP Systems Commissioning Management
Value: 228 Million USD

Located in Cairo’s high-end suburb of Heliopolis on the north eastern quadrant of the junction between
the Cairo-Suez Road and Nasr Road in Heliopolis, Almazah City Center will feature 103,455 square meters
of retail space offering over 300 of the best international and local brands, and as well as 23 restaurants,
18 food court outlets and nine cafes. In addition to housing a unique retail mix of the leading international
and local brands, Almazah City Center will include a 13,040 square meter Carrefour, 16 state-of-the-art
VOX cinema screens, a 1,800 square meter Magic Planet family entertainment center and 4,000 parking
space.

43
CSI PROJECTS, OUR GEMS

As an extension of the successful experience and cooperation with CSI in Abu Dhabi Airport Midfield
Terminal Building and Abu Dhabi Plaza in Astana projects, CCC nominated and recommended getting CSI
specialized staff on board to provide the MEP Systems Commissioning Management scope of work on
behalf of HAC/CCC JV.

Volume of MEP systems under CSI scope of work is


HVAC Systems
This system covers the mall area using 57 AHU, 605 FCU and Over 331 Fan
Fire Fighting Systems
The project is protected with a full firefighting system and over 25 FM200 System
Plumbing Systems
Plumbing system connects over 41 submersible pumps with the plumbing fixture and
supply the mall with the needed clean water
Emergency Systems
An Emergency system with 8 Generator and more than 13 UPS and up to 112 Battery
sets.
Electrical Systems
64 Transformers feed 80 MOB to over 800 FOB that will power all the project systems
ELV Systems
ELV systems connect the project using 27 Fire alarm system, 14 PAVA System, 43 Access
Control System, CCTV and BMS

44
CSI PROJECTS, OUR GEMS

BAHRAIN INTERNATIONAL AIRPORT MODERIZATION

Project Name: Bahrain International Airport Modernization


Location: Manamah, Kingdom of Bahrain
Owner/Developer: Bahrain International Airport
Consultant/PM: Hill International
Main Contractor: TAV Arabtec JV
MEP Sub-Contractor: SONMEZ
Scope of Work: MEP Systems Commissioning Verification / HVAC Systems TAB Works
Supervision
Value: 1.1 Billion USD
The Bahrain Airport Company (BAC) is developing a new passenger terminal building at Bahrain International
Airport (BIA). The project is a part of the Airport Modernization Program (AMP), a comprehensive
development plan designed to improve the infrastructure and services at the airport to cater to future
aviation needs. The modernization program includes a new 20-year airport master plan, which includes the
construction of a new passenger terminal, in addition to the expansion and refurbishment of the existing
terminal. The first stage of the project was officially launched with the start of enabling works in March
2015. Construction on the terminal building began in February 2016 and is planned to be completed by
2020.
HVAC Systems and Supervision scope of work under CSI is as the following:
• 170 AHUs, Supervision for following Systems
• 520 FCU, • Fire Fighting
• 165 different types of Fans, • Reverse Osmics
• 12 Chilled Water Pumps • 130 Electric Water Heaters
• 6 Chillers • 75 UV Filters
• 6 Cooling Towers • 68 Clean Agent
• 580 VAV and CAV Terminals • 11 Booster Pumps
• 800 DRVs/ PICVs
• About 9000 Air Terminals

45
CSI PROJECTS, OUR GEMS

FAIRMONT MARINA ABUDHABI HOTEL AND SERVICED


APARTMENTS

Project Name: Fairmont Marina Abu Dhabi Hotel and Serviced Apartments
Location: Marina Abu Dhabi, UAE
Client: Fairmont Hotels and Residences
Consultant/PM: Khatib and Alami
Main Contractor: Arabtec Construction
MEP Sub-Contractor: Drake and Scull Abu Dhabi
Scope of Work: HVAC Systems Testing, Adjusting and Balancing, Commissioning Management
Value: 372 Million USD
The Fairmont Marina Resort and Residences is located in a prime precinct of Abu Dhabi Breakwater
occupying an overall area of approximately 155,000 sq.m. with extensive water frontage. The project will
be a self- integrated 5-star development encompassing the Fairmont Marina Resort, with 563 guestrooms
and suites, and the Fairmont Marina Residences, with 249 serviced residences.
The design of the resort is based on the development of a stunning, state of the art high-rise building with
regal status. The facade will be an interoperation between the classic and post-modern styles, enriched
with various elements of the traditional Arabian ornaments all in a contemporary concept, in harmony
with Fairmont Hotels and Resorts tradition and offering the guests a look and feel of the Arabic world.
Project specifics include: 563 Hotel keys with a golden lounge, 249 serviced residences in addition to a
business center & banqueting, a lobby lounge & lobby bar, all day dining restaurant, high end steak house
restaurant, Spectrum restaurant, SPA, recreational outdoor area, late departure lounge and a Children’s
and young adult’s area, in house laundry, tennis court and supporting back of house facilities.
CSI was approved to provide the scope of work of HVAC TAB Works Consultancy under NEBB Certification
requirements. The sophisticated HVAC systems consists of the following
• 51 AHU’s,
• 2227 FCU,
• 137 different types of Fans,
• 20 Chilled Water Pumps
• 71 Heat Exchanger
• About 2600 Static and DBV
• About 8600 Air Terminals

46
CSI PROJECTS, OUR GEMS

ST. REGIS AMMAN HOTEL AND SERVICED APARTMENT

Project Name: St. Regis Amman Hotel and Serviced Apartments


Location: Abdoun, Amman, Jordan
Client: Eagle Hills
Consultant/PM: Turner (TIME)
Main Contractor: Arabtec Jordan
MEP Sub-Contractor: Drake and Scull Jordan
Scope of Work: HVAC Systems Testing, Adjusting and Balancing
Value: 300 Million USD
Owned by Eagle Hills, the new luxurious St. Regis is located in the most vibrant area in Amman, Abdoun.
The hotel complex consists of sixteen floors hotel building, second to sixteenth, and seventeen floor
branded apartments building. Both buildings are open-winged/flanged-shaped. Attached to the hotel in
lower levels, ground to fourth, podium building with the entrance and the retails areas and restaurants
and back of house.
The hotel building contains two hundred and sixty high class and luxurious guest rooms with facilities, bars
and restaurants located at the podium levels.
The branded apartments’ building contains different types of one to five bedrooms’ apartments. The
building also contains business center and world-calls amenities with indoor and outdoor pools.
CSI was approved to provide the scope of work of HVAC TAB Works Consultancy under NEBB
Certification requirements. The sophisticated HVAC systems consists of the following

• 27 AHU’s,
• 1314 FCU,
• 75 different types of Fans,
• 31 Chilled Water Pumps
• 21 Chillers
• About 2700 Static and Dynamic Balancing Valves
• About 7000 Air Terminals

47
CSI PROJECTS, OUR GEMS

THE MUSEUM OF THE FUTURE

Project Name: Museum of The Future


Location: Trade Center 2, Dubai, UAE
Owner/Developer: Meraas
Consultant/PM: Burohappold Engineering
Main Contractor: Bam Higgs & Hill LLC
MEP Sub-Contractor: Trans Gulf Electro Mechanical
Scope of Work: HVAC Testing, Adjusting and Balancing Works
Value: 200 Million USD
The Museum of the Future is a unique incubator for futuristic innovation and design, currently under
construction in Dubai, UAE.
Planned for opening in 2019, the Museum of the Future builds on over 5 years of temporary immersive
exhibitions held at the World Government Summit. These pop-ups led to the conception of the Dubai
Future Foundation and the permanent Museum of the Future, set to become the world’s largest and most
exciting home to tomorrow’s trends and opportunities.

48
CSI PROJECTS, OUR GEMS

The Museum of the Future is a unique initiative by HH Sheikh Mohammed bin Rashid Al Maktoum that
explores the future of science, technology and innovation and will be located near the Burj Khalifa. In
addition to becoming a major tourist destination, the Museum will offer advanced courses and specialized
workshops, as well as public talks and events. It is intended to offer a platform to demonstrate and test
the latest inventions and prototypes from up and coming start-ups and the world’s technology giants. It
will also host innovation facilities and design studios with universities, companies and research partners.
Upon receiving the approval from the prestigious client, Meraas, CSI started with the technical studies
of the design revision and the commissioning-ability reports of the HVAC systems. Works are planned to
commence within Q1 2019 for a planned opening within Q3 of 2019.
The sophisticated HVAC systems consists of the following
• 27 AHU’s,
• 1314 FCU,
• 75 different types of Fans,
• 31 Chilled Water Pumps
• 21 Chillers
• About 2700 Static and Dynamic Balancing Valves
• About 7000 Air Terminals

49
CSI PROJECTS, OUR GEMS

JUMEIRAH GATE

Project Name: Jumeirah Gate


Location: JBR, Dubai
Owner/Developer: Al Ain Properties
Consultant/PM: WSP
Operator: Emaar Hospitability Group
Main Contractor: Multiplex Construction L.L.C
MEP Sub-Contractor: Bilt Middle East L.L.C
Scope of Work: HVAC Systems TAB Works
Value: 500 Million USD

The towers have a total height of 290m occupies a prime location at the end of JBR beach. The building
comprises three podium levels which make up the front and back of house. The western holds 14 floors
dedicated to hotel and 54 floors of service apartments. The tower’s pure form is an ellipse in plan with a
void in the center that serves to increase daylight penetration and views to the Palm, JBR beach and the
horizon. The building functions as two towers with separate cores that are connected at the base for the
lobby and at the top for the penthouses and sky lofts.
CSI was approved to provide the scope of work of HVAC TAB works & systems consists of the following
• 11 AHU’s,
• 3,168 FCU’s
• 149 Fans
• 16 Heat Exchanger
• 22 CHW Pumps
• 26 FAHU
• 13 MAHU
• 3,231 PICV’s
• 21,232 Air Terminals

50
CSI PROJECTS, OUR GEMS

FLY DUBAI NEW HEADQUARTER

Project Name: Fly Dubai New Headquarter


Location: Sharjah, UAE
Owner/Developer: Dubai Aviation City Corporation
Consultant/PM: Dewan Architects + Engineers
Main Contractor: Al Nahoodah Contracting
MEP Sub-Contractor: Trans gulf Electromechanical Engineers & Contractors
Scope of Work: Commissioning Authority, Thermal Imaging, HVAC Systems TAB Works
Value: 40 Million USD
The project consists of a 9-storey office building located in Al Warsan 3, Dubai. The project will house the
headquarters of Fly Dubai. The new headquarters located on the Emirates Road, will provide a new home
for its office-based colleagues and the 100,000 square meters’ site will incorporate training facilities for fly
Dubai employees. Fly Dubai employees will enjoy a modern comfortable working environment as well as
have access to a range of sports facilities, a medical clinic and a choice of eateries. An expansion consisting
of a city check-in and 3-star dry business hotel will be added in the final stages. The architectural design
itself is technologically advanced, with cutting edge features that highlight the energetic tone of Fly Dubai.
CSI was approved to provide the scope of work of Testing & Commissioning, HVAC TAB works consultancy.
The sophisticated HVAC systems consists of the following

• 4 AHU’s,
• 932 FCU’s
• 40 Fans
• 360 VAV/CAV
• 13 CHW Pumps
• 5 FAHU
• 2 MAHU
• Around 2500 Air Terminals

51
CSI PROJECTS, OUR GEMS

SECOND LINE OF WARSAW METRO EAST EXTENSION

Project Name: Second Line of Warsaw Metro East Extension


Location: Poland
Client: Astaldi & Gulermak
Scope of Work: Testing and Commissioning of Station C16 - C18
Value: 225 million EUR
In March 11, 2016, a 1 billion zł (€225 million) contract was awarded to the Italian company Astaldi to
build the first phase of the North-East second subway line extension with 3.2 kilometers (2.0 mi) of track
and 3 stations: Szwedzka, Targówek and Trocka.

CSI was the Testing and Commissioning Agency on behalf of Astaldi. The responsibility included the
integration of the MEP Systems, Execution of the Smoke Tests with ITB, Testing and Operation of All Fire
Scenarios with ITB and Warsaw Fire Brigade to obtain a positive opinion for the operation permit.

52
CSI PROJECTS, OUR GEMS

EXPO 2020 SOUTH STATIONS

Project Name: Expo 2020 South Stations


Location: Dubai
Owner/Developer: RTA
Consultant/PM: Systra & Persons
Main Contractor: Multiplex Construction L.L.C
MEP Contractor: Berksan
Scope of Work: Electrical Testing, TAB Works, Duct Leakage testing, Close Out
Documentation, Tunnel Ventilation
Value: 2.9 Billion USD
Route 2020 is a five-stage extension of the Dubai Metro Red Line up to the World Exposition 2020 (Expo
2020) exhibition site in Dubai, UAE. Estimated to cost $2.9bn, the project represents the first major
expansion of the Red Line. The Roads and Transport Authority of Dubai (RTA) is undertaking the project
in 2015.
The Route 2020 comprises a 15km-long line, of which 11.8km will be an elevated section and the remaining
3.2km underground which will have depth ranging between 12.5m and 36m. The route will have seven
LEED Gold-certified stations including three interchange and two underground stations. The plan also
includes the creation of an iconic station at the exhibition site and an interchange station on the Red Line
at the Nakheel Harbor and Tower
CSI was approved to provide the scope of work of Electrical Testing, MV, LV, BMS Cable Pulling and
termination, TAB Works, Duct Leakage testing, Close Out Documentation, Tunnel Ventilation
The sophisticated HVAC systems consists of the following

• 47 AHU’s, • 166 DRV


• 318 FCU’s • 24 VRF
• 129 Fans • 410 PICV’s
• 4 Heat Exchanger • 2500 Air Terminals
• 6 CHW Pumps
• 31 FAHU

53
CSI PROJECTS, OUR GEMS

S52 THE SOUTHERN BYPASS

Project Name: S52 The Southern Bypass


Location: Poland
Client: Gulermak
Scope of Work: Verification of Documentation to Zrid in Accordance with the Contract Requirements
For the MEP Installation in Tunnels
Expressway S52 is an expressway under construction in Poland, which is located in the Silesian and
Lesser Poland voivodeships. Upon completion it will connect the border of the Czech Republic in
Cieszyn-Boguszowice along with the Expressway R48 in the Czech Republic with Kraków.
CSI was approved to provide the scope of work of Verification of Documentation to Zrid in Accordance
with the Contract Requirements for the MEP Installation in Tunnels

54
CSI PROJECTS, OUR GEMS

ADVANCED MILITARY MAINTENANCE, REPAIR AND


OVERHUAL CENTER

Project Name: Advanced Military Maintenance, Repair and Overhaul Center (AMMROC)
Location: Al Ain, UAE
Owner/Developer: Advanced Military Maintenance, Repair and Overhaul Center (AMMROC)
Consultant & PM: ECG & AECOM Middle East
Main Contractor: ESCO - JV
MEP Contractor: ESCO - JV
Scope of Work: Commissioning Management, Close out Documentation
Advanced Military Maintenance, Repair and Overhaul Center (AMMROC) LLC plans to build a maintenance
repair overhaul center in Al Ain Aerospace Park, Abu Dhabi. The project aims at offering innovative
maintenance solutions, performance-based reliability, all life cycle management, and affordability from
one centralized location. The project covers the maintenance repair overhaul center with a built-up area
of 1,000,000 sq.m, spreading over a land area of 1,000,000 sq.m including hangars, helicopter depot, paint
and strip hangar, engine and components workshop and an engine test facility. The facility will support
more than 40 different types of military aircraft.
Advanced Military Maintenance, Repair and Overhaul Center (AMMROC) is a dedicated military
Maintenance, Repair and Overhaul (MRO) center of excellence formed to deliver a wide range of aircraft
maintenance and support services to the United Arab Emirates (UAE) Armed Forces and other military
operators throughout the South Asia, Middle East and North Africa region.

55
CSI PROJECTS, OUR GEMS

THE MIDTOWN AFNAN ZONE 2 & DANIA ZONE 3

Project Name: The Midtown Afnan Zone 2 & Dania Zone 3


Location: UAE
Owner/Developer: Deyaar Development
Consultant: Ramboll Middle East
Main Contractor: Menasco Mechanical Contracting
Scope of Work: Testing Adjusting and Balancing Works

Dubai-based Deyaar Development has revealed that construction of Afnan and Dania districts in its
Midtown development have reached the halfway point. Afnan was launched in 2015 as the first phase of
the 5.5 million sq ft, Midtown development in Dubai Production City. The overall Midtown development
comprises 27 buildings across six districts, that will share a single-level podium covering retail, parking and
essential services.
The HVAC systems under CSI scope of works consists of the following
• 2058 FCU’s
• 228 Fans
• 8 CHW Pumps
• 26 FAHU
• 178 DRV
• 4395 Air Terminals

56
CSI PROJECTS, OUR GEMS

ZAYED NATIONAL MUSEUM

Project Name: Zayed National Museum


Location: Abu Dhabi, UAE
Owner/Developer: Department of Culture and Tourism
Consultant: WSP
Main Contractor: Arabtec
MEP Sub Contractor EFECO
Scope of Work: Commissioning Management and TAB Work
Conceived as a monument and memorial to the late Sheikh Zayed bin Sultan Al Nahyan, the founding
president of the UAE, the Zayed National Museum will be the centrepiece of the Saadiyat Island Cultural
District and will showcase the history, culture, more recently the social and economic transformation of
the Emirates. Architecturally, the aim has been to combine a highly efficient, contemporary form with
elements of traditional Arabic design and hospitality to create a museum that is sustainable, welcoming
and culturally of its place.
CSI was approved to provide the scope of work of HVAC TAB work consist of following systems
• 80 AHU’s,
• 415 FCU’s,
• 11 Pumps,
• 111 Fans
• 2682 Air Terminals
• 63 VAV & CAV

57
CSI PROJECTS, OUR GEMS

DOHA METRO QATAR RAIL – PHASE 1 PROJECTS

The Doha Metro is a rapid transit system currently under construction in Doha, Qatar’s capital city, that
is scheduled to become operational by the end of 2019. With an estimated overall budget of 17.8 Billion
USD, it will have four lines with an approximate overall length of 300 km and 100 stations. It will be an
integral component of the larger Qatar Rail network, which will include a long-distance rail for passengers
and freight, linking Qatar to the GCC, and the Lusail LRT. Capable of reaching 100km/hr. Doha Metro will
be one of the fastest driverless trains in the world.
Doha Metro will be operated and maintained for a duration of 20 years by RKH Qitarat, a joint venture
formed by Hamad Group (51 %) and French transit operators Keolis and RATP Dev (49 %), on behalf of
system owner Qatar Rail.
The Doha Metro will ultimately consist of four lines opening in phases beginning in 2011 with an eventual
completion date of 2026. The Red, Green and Gold Lines will radiate out from a central interchange at
Msheireb in Downtown Doha with the Blue Line providing a semi-orbital service.
Doha Metro Phase 1 is implemented by multiple joint ventures involving local and international contractors.
Qatar Rail has previously specified that consortiums looking to build different parts of the network should
partner with a Qatari firm, which has led to companies such as Qatar Building Company, Galfar-Misnad
Engineering, Darwish and HBK Contracting picking up work alongside international bidders

58
CSI PROJECTS, OUR GEMS

Project Name: Doha Metro Qatar Rail – Red Line South Depot
Location: Wakrah Road, Doha, Qatar
Client: Qatar Rail
Consultant/PM: MHI (Mitsubishi Led Consortium Design and Build)
Main Contractor: Fujita Corporation
MEP Sub-Contractor: Drake and Scull
Scope of Work: MEP Systems Commissioning Management
Value: 800 Million USD
As an extension of the long proven and successful cooperation between CSI Managers and DSI in previous
works even before establishing CSI in February 2016, CSI experience and staff was entrusted again by
DSI to provide the Commissioning Management team in the project to act as and represent DSI in all
Commissioning Meetings and activities, preparation of Commissioning documents, trackers, schedules
and procedures.
Volume of MEP systems under CSI scope of work is
HVAC Systems
This system covers the project using 17 chillers station serving 166 AHU, 200 FCU, and
Over 320 Fan
Fire Fighting Systems
The project is protected with 16 sprinkler system with 156 FHC, 77 FM200 and 4 fame
firefighting systems
Plumbing Systems
Plumbing systems cover over 30 Submersible pumps with the plumbing fixture and
supply the project with the needed clean Water
Emergency Systems
An Emergency system with 200 Emergency panel feeding the critical systems in the project
Electrical Systems
500 panels feed the project and power all the project systems
ELV Systems
ELV systems that covers more than 30 FAP, 100 PAVA and so on.

59
CSI PROJECTS, OUR GEMS

Project Name: Doha Metro Qatar Rail – Red Line South Elevated Stations
Location: Wakrah Road, Doha, Qatar
Client: Qatar Rail
Consultant/PM: FYAP (FCC-YUKSEL-Archirodon-PETROSERV Consortium Design and Build)
Main Contractor: FYAP (FCC-YUKSEL-Archirodon-PETROSERV Consortium)
MEP Sub-Contractor: ANEL Group Qatar
Scope of Work: MEP Systems Commissioning Management
Value: 600 Million USD

The project is the construction of 7.2-kilometer upper ground metro line including 3 elevated stations at
Barwa Village, Al Wakrah and Qatar Economic Zone in Qatar.
CSI was asked to provide assistance to ANEL Group Commissioning team assigned to the project by
providing 1 senior engineer and 3 field engineers for a period of 5 months starting from March 2018.
CSI scope of work was mainly for the HVAC systems pre-commissioning and enabling the systems to be
ready for the TAB Works for the third party assigned to the project TAB Works.
The works were concluded successfully by July 2018.

60
CSI PROJECTS, OUR GEMS

Project Name: Doha Metro Qatar Rail – Msheireb Central Station


Location: Msheireb, Doha, Qatar
Client: Qatar Rail
Consultant/PM: Consolidated Construction Company MIDMAC JV (Design and Build Contract)
Main Contractor: Consolidated Construction Company MIDMAC JV (Design and Build Contract)
Scope of Work: MEP Systems Commissioning Close Out Management
Value: 1.2 Billion USD

Msheireb station is the largest station in Doha and is situated at the corner of the Msheireb
development where Wadi Msheireb and Al Diwan Street meet. Msheireb Station marks the crossing of
three metro lines with the Red and Green Lines running parallel and the Gold Line situated underneath.
The station features an extravagant entrance shelter as a landmark way finding for locals and tourists
alike. A strong visual connection between entrance and concourse enables a smooth passenger
experience and clear direction throughout the station.
In July 2018, CSI was asked to provide assistance to MIDMAC Commissioning team assigned to
the project by providing engineers capable of closing the progress of Commissioning Works done
documentation. The scope of work was extended in later stage to assisting the site teams with the
supervisor’s level for the hands on testing for electrical and mechanical systems. Works were completed
by December 2018.

61
CSI PROJECTS, OUR GEMS

HAMAD NEW DOHA PORT – NPP0032

Project Name: Hamad New Doha Port – NPP0032


Location: Um Al Houl Area, Doha, Qatar
Client: Hamad Port
Consultant/PM: AECOM
Main Contractor: Hamad Bin Khalid Contracting (HBK)
MEP Sub-Contractor: Transgulf Electromechanical
Scope of Work: MEP Systems Commissioning Management
Value: 7.4 Billion USD
Strategically located south of Doha. The mega project includes a new port, a new base for the Qatar Emir
Naval Forces and the Qatar Economic Zone 3. When fully completed and operational by 2020, the new
project will span across 26.5 square kilometer area. Capable of handling up to 7.8 million tons of products
annually, the bulk of trade, which passes through the port, consists of food and building materials as part
of self-sufficiency and sustainability Qatar National Vision 2030 plan.
Volume of MEP systems under CSI scope of work was
HVAC Systems
This system covers the port using 16 PAHU, 21 SAC and Over 53 Fans.
Fire Fighting Systems
The Port is protected with 21 Deluge System and 28 FM200 and other Fire Reel Hose
and extinguishers.
Plumbing Systems
A system that connects over 40 pumps with the plumbing fixture and supply the port
with the needed clean water.
Emergency Systems
The Emergency system with 7 generators and more than 25 UPS.
Electrical Systems
29 Transformers feed 100 panels that will power all the port systems.
ELV Systems
ELV systems that connect the project with 20 FAP and BMS systems.

62
CSI PROJECTS, OUR GEMS

NORTH GATE MALL AND OFFICE BUILDINGS – PHASE I

Project Name: North Gate Mall and Office Buildings – Phase I


Location: Doha, Qatar
Client: Bawabat Al Shamal
Consultant/PM: Hill International
Main Contractor: Habtoor Leighton Group (HLG)
MEP Sub-Contractor: VOLTAS Limited Qatar
Scope of Work: MEP Systems Commissioning Authority
Value: 290 Million USD
The project represents the first phase of the North Gate mixed-use development in a growing neighborhood
on one of Doha’s strategically important arterial roadways, Al Shamal Road (North Road), north of Doha’s
West Bay central business district.
Phase 1 comprises a total built-up area of around 375,000 square meters, with a podium comprising two
levels of carpark, a three-level mall and six, five-level office buildings.
The North Gate Mall is positioned as a mid- to premium-development with targeted luxury attracting
leading fashion, home, dining, leisure and entertainment brands and outlets along with superior office
accommodation. Designed by Callison, the property comprises a number of unique spaces including the
Crystal Garden, Market Street indoor/outdoor dining precinct, and Shamal Hall with its unique architectural
features. The development will be serviced by 4,000 underground car parks.

63
CSI PROJECTS, OUR GEMS

Volume of the MEP systems under CSI Commissioning Management team is as the following:

HVAC Systems
This system covers the project with using 60 AHUs, 600 FCUs and over 100 fans.
Fire Fighting Systems
The project is protected by 110 fire-fighting systems and other fire reel hose and
extinguishers.
Plumbing Systems
The plumbing system that connects over 18 pumps with the plumbing fixture and
supplies the project with the needed clean water
Emergency Systems
The emergency system with more than 45 UPS and more than 81 emergency panels.
Electrical Systems
29 transformers feed 377 panel that will power all the systems of project.
ELV Systems
ELV systems connect the port using fire alarm system ,15 PAVA systems and BMS system)

64
CSI PROJECTS, OUR GEMS

MSHERIB DOWNTOWN DOHA – PHASE 1C, PHASE 3

Project Name: Msherib Downtown Doha – Phase 1C, 3


Location: Msherib, Doha, Qatar
Owner/Developer: Msherib Properties
Consultant/PM: Turner (TIME) Qatar
Main Contractor: Brookfield Multiplex
MEP Sub-Contractor: Drake and Scull Qatar
Scope of Work: Handing Over Documents Preparation and Compilation
Value: 412 Million USD
Phase 1C is an early part of the prestigious mega project of Msherib Downtown Doha development. The
project is a mixed-use development located at Doha, Qatar. This project involves a total constructed area
of 2.21 million square feet, more than half of which (1.31 million) will be in three-level underground
facility housing logistic operations like a 1,200-car parking garage, a 66KVA electric substation and a
cooling facility. Above ground, Phase 1C will incorporate four office buildings with 30 street-level retail
outlets, five residential towers, 51 apartments and a primary school with a day-care center. Phase 1C will
also include a mobile telecommunication node and an automated waste collection center.
CSI scope of work was awarded in January 2017. CSI technical teams were entrusted to prepare the
prestigious project’s handing over documents in line with the project strict specifications requirements.
The work includes over 150 operation and Maintenance manual, 80 training manual, and asset registers
for all the project equipment’s.

65
CSI PROJECTS, OUR GEMS

HGH TRAUMA AND EMERGENCY EXPANSION PROJECT

Project Name: HGH TRAUMA AND EMERGENCY EXPANSION PROJECT


Location: Doha, Qatar
Client: Hamad Medical Corporation
Consultant KEO International
Main Contractor: MIDMAC
Scope of Work: HVAC Testing, Adjusting and Balancing (TAB)
Value: 70 Million USD
HGH Trauma and Emergency Expansion Project mainly is built in two phases, the new Trauma and
Emergency Department and a three-fold expansion of the existing Emergency Department, will cater for
the widest range of illnesses and injuries, with a focus on patients presenting with life-threatening medical
needs.
One special facility, incorporated within the new building will be a state-of-the-art, multi-place hyperbaric
chamber which will provide emergency medical treatment to those involved in diving accidents.
This chamber will also offer improved access to oxygen therapy for patients with a variety of medical
conditions. Located in front of the existing Emergency Department at Hamad General Hospital, the
new trauma and emergency facility will be arranged over four floors and will accommodate 226 patient
stations. A full range of diagnostic and treatment facilities will be provided, with enhanced operational
links to adjoining buildings for efficient transfer of patients, including a direct link to the new operating
theater facility and the Trauma Intensive Care Unit at Hamad General Hospital. The overall built up area of
the development is circa 29,000 sq.m, making this one of the largest dedicated emergency care facilities
in the region.
The HVAC systems under CSI scope of works consists of the following
• 16 AHU’s,
• 7 FCU,
• 4 exhaust fans,
• About 370 VAV and CAV terminals
• 553 Air Terminals
• 16 Vibration tests for AHUs
• 1 lot Environment, Performance and Sound levels tests

66
CSI PROJECTS, OUR GEMS

Project Name: Turkish School Primary Turkish School Project in Doha, With
Location: Ain Khaled, Doha, Qatar the increase in the number of Turks who work
Client: Turkish Embassy in Doha in Qatar, the embassy opened a formal Turkish
Consultant: Al Noor Consultants school. It is under the supervision of the embassy
Main Contractor: TAV Construction Qatar and follows the Turkish curriculum. It provides
MEP Sub-Contractor: Al Fajr Mechanical and a formal education for the Turkish community
Electrical in Qatar whose members work mainly in the
CSI Scope of Work: MEP Systems Commissioning construction and service sectors.
Management
Project Value: 5 Million USD
Status: Completed in April 2016

Project Name: Qatar Academy Qatar Academy Al Khor has been located to a new,
Location: Al Khor City, Qatar state of the art complex of 150, 000-meter sq. in
Client: Qatar Foundation Al Khor, state of Qatar. This outstanding campus
Consultant: Turner (TIME) Qatar is spread over 9 buildings with 137 classrooms,
Main Contractor: HBK Contracting 21 laboratories for the disciplines of Physics,
MEP Sub-Contractor: HBK Engineering Services Chemistry, Biology and Design Technology. In
CSI Scope of Work: MEP Systems Commissioning addition, there are 7 Art studios and 14 Music
Management classrooms. Currently, the school serves the
Project Value: 150 Million USD educational needs.
Status: Completed in September 2016

67
CSI PROJECTS, OUR GEMS

Project Name: Habtoor Polo Resort and Club A luxury equestrian development located in
Location: Dubailand, Dubai, UAE DubaiLand, the Al Habtoor Polo Resort & Club
Client: Habtoor Group comprises of 126 Hotel keys, 162 Andalusian-
Consultant: WS Atkins style villas and branded villas, polo club, state-
Main Contractor: Parkway International of-the-art polo academy, riding school and
Contracting exceptional equestrian facilities, including 520
MEP Sub-Contractor: Commodore MEP Abu Dhabi stables.
CSI Scope of Work: HVAC Testing, Adjusting and
Balancing
Value: 270 Million USD
Project Status: Completed in July 2017

Project Name: Mavibahçe Shopping Mall Mavi Bahçe comprises a leasable area of approx.
Location: Izmir, Turkey 60,000 m² on four levels. The shopping center
Client: Mavibahçe Development accommodates more than 200 specialist stores, 47
MEP Sub-Contractor: ANEL Group Turkey cafés and restaurants, the largest floor designed for
CSI Scope of Work: HVAC Testing, Adjusting and kids in Izmir, various entertainment facilities and
Balancing the first IMAX theatre in the city with 11 halls. In
Project Value: 210 Million USD addition, 2.000 parking spaces will be available to
Status Completed in November 2017 the visitors

68
CSI PROJECTS, OUR GEMS

Project Name: The Louvre Museum The Louvre Abu Dhabi is an art and civilization
Location: Saadiyat Island, Abu Dhabi, UAE museum, located in Abu Dhabi, UAE. The museum
Client: Abu Dhabi Tourism and Culture was established on 8 November 2017.[3] It is
Authority part of a thirty-year agreement between the city
Consultant: BuroHappold Engineering of Abu Dhabi and the French government. The
Main Contractor: Arabtec, Constructora San Jose museum is located on the Saadiyat Island Cultural
and Oger JV District. It is approximately 24,000 square meters
Sub-Contractor: Habtoor Leighton Specon/Drake (260,000 sq ft) in size, with 8,000 square metres
& Scull JV (86,000 sq ft) of galleries [4], making it the largest
Scope of Work: Ventilation Systems TAB Works art museum in the Arabian Peninsula.
Project Value: 1.2 Billion USD
Status Completed in October 2017

Project Name: Saraya Aqaba Hotel Zone W Lighthouse Hotel and the annexed Clubhouse
Location: Aqaba, Jordan and Villas, operated by Starwood, is one hotel
Client: Eagle Hills of six luxurious hotels consisting Saraya Aqaba
Consultant: Turner (TIME) Jordan Resort located in Aqaba City in Jordan. The hotel
Main Contractor: CCC is located in construction Zone W of the project
MEP Sub-Contractor: Drake and Scull Jordan
CSI Scope of Work: HVAC TAB Works
Project Value: 150 Million USD
Status Ongoing

69
CSI PROJECTS, OUR GEMS

Project Name: Al Bathaa Residential Tower Al Batha Tower is a residential tower in Sheikh
Location: Business Bay, Dubai, UAE Zayed Road in Business Bay Area The tower
Main Contractor: Dubai Civil Engineering spans 47 floors and will have a built up area
MEP Sub-Contractor: GECO of 47,000 square meters. A separate 9 story
CSI Scope of Work: HVAC Testing, Adjusting and parking building behind the tower will feature
Balancing a swimming pool and health club on the roof
Project Value: 77 Million USD and will be connected to the main tower via a
Status Completed walkway bridge on the 7th floor.

Project Name: MovenPick Hotel A global firm with Swiss roots and a restaurant
Location: Riyadh, KSA and hospitality heritage that dates back to the
Client: MovenPick 1940s, our approach to service has remained
Main Contractor: Earth Foundation Company consistent; warm, intuitive, personal and uniquely
CSI Scope of Work: Testing, Adjusting and Balancing ‘Mövenpick’. We also embrace innovation to
Works meet ever-changing guest needs and continue
Value: 135 Million USD to celebrate our rich culinary legacy, setting
Project Status: Ongoing trends but never compromising on quality and
authenticity.

70
CSI PROJECTS, OUR GEMS

Project Name: HBK – Headquarter Building Project calls for the construction of the new HBK
Location: Doha, Qatar HQ Building in Doha Jadeed, at the end of Grand
Client: HBK Real Estate Company Hamad Avenue in New Doha. The building will
Consultant 1: M Z and Partners comprise of 5 Basements+ Ground + Mezzanine
Consultant 2: UNii Engineering Consultancy + 10 Floors + Roof.
Main Contractor: HBK Contracting
MEP Sub-Contractor: HBK Engineering
CSI Scope of Work: Testing, Adjusting and
Balancing Works
Value: 42 Million USD
Project Status: Ongoing

Project Name: ISF CPC 08A CSI is awarded for Testing and Commissioning
Location: Doha - Qatar Management for CPC 08A. The ISF project
Consultants KEO features more than 330 individual building units
Client ISF (Internal Security Force) made up of several different types of purpose-
Main Contractor: KG Group built facilities. The camp is planned to have an
CSI Scope of Work: Commissioning Management ultimate resident population of more than 17
Status Ongoing 000 and it is expected overall completion date
is in 2025. Besides residential buildings, the area
will include post office, unit force offices, unit
guardhouses, check points, a five-star hotel and
a 10,000-spectator stadium.

71
CSI PROJECTS, OUR GEMS

Project Name: ISF CPC 07D CSI is awarded for Testing and Commissioning
Location: Doha - Qatar Management for CPC 07D. The ISF camp is
Client: The Internal Security Force (ISF) a 409-hectare development located north
Consultant: KEO of Doha that is planned to have an ultimate
Main Contractor: Bojamhoor resident population of 17,608. The works consist
CSI Scope of Work: Commissioning Management of an external boundary wall and associated
Project Status: Ongoing structures, post office, unit force offices, unit
guardhouses, check points and the design &
build of infrastructure including road works,
landscaping and all utilities

Project Name: Monte Galala Hotel The Resort is located on an area of 520 acres. The
Location: Ain Sokhna, Ataqah, Egypt construction of the project is at different heights
Client: Engineering Authority by (terraces). A collection of more than 5 different
Ministry of Defence heights and designed with diverse communities
Consultant: EMG in mind, Each of Il Monte Galala El Sokhna
Main Contractor: Hassan Allam Construction areas is distinguished by its unique character
CSI Scope of Work: Commissioning Management and environment, the project introduces the
Status Ongoing world’s first and largest mountain-top lagoon
built in partnership with world-renowned Crystal
Lagoons

72
CSI PROJECTS, OUR GEMS

Project Name: Alder Head quarter The Aldar Headquarters building is the first
Location: Abu Dhabi, UAE circular building of its kind in the Middle East. It
Client: Alder Properties is located in Abu Dhabi, United Arab Emirates.
CSI Scope of Work: Energy Audit The shape of this building is achieved through the
Project Status: Completed use of structural diagrid, a diagonal grid of steel.
This iconic commercial building of height 121m
& project was developed following the principles
of the American system of classification of U.S.
Green Building Council LEED, and offers 62,000
m2 of office space over 23 floors.

Project Name: Optimum Mall Optimum Istanbul Shopping Mall offers


Location:  Istanbul, Turkey convenient value shopping together with a
Client: Ronesans Holding wide array of dining and entertainment options.
Scope of Work: Energy Audit Optimum Outlet has most of the major brands
Project Status: Completed available in Turkey
The center includes 5 floors of retail, featuring
both outlet and full-price stores of well-known
brands together with a food court and leisure
facilities, which include an entertainment center,
a 541 sqm ice skating rink and an 11-screen
movie theatre

73
CSI PROJECTS, OUR GEMS

Project Name: Fewa 2 Substation The Federal Electricity & Water Authority
Location: Dubai, UAE (FEWA) plans to build a substation in Ajman,
Client: FEWA UAE. The project aims at serving Muweihat,
Consultant: KENNEDYB & DONKIN CONS. ENG. Zahra, Hamediya, Jarf and Hleio areas. The
Contractor: GECO M & E LTD. project covers the extension of 132/33 kV Rifaa
Scope of Work: Testing, Adjusting and Balancing station to add a third 90 MVA transformer, in
Works addition to three 33/11 kV transformers of 3 X
Project Status: Completed 20/25 MVA capacity to serve H.H. Sheikh Khalifa
housing initiatives in Samar, Hamraniya and
Union University in RAK

Project Name: Steigenberger Hotel The Steigenberger Hotels & Resorts brand is
Location: Domyat, Egypt continuing to build upon the strong degree
Client: Travco of commitment traditionally shown to Egypt
Consultant: KAF by opening a total of three new hotels in the
Main Contractor: Al Hegazy Construction Company country this year. The hotel has 158 rooms and
Sub-Contractor: Advance Technology Services suites, two restaurants, a lobby bar, a swimming
CSI Scope of Work: TAB pool with a separate children’s section, a health
Status Completed and beauty spa, a gym facility and two large
ballrooms

74
CSI PROJECTS, OUR GEMS

Project Name: Saadiyat Rotana Hotel & Resort The project includes floor area of 39,500 meters
Location:  Abu Dhabi, UAE square, the 340-key property features 291
Contractor:  Ali & Sons Contracting Company standard guestrooms, 33 standard suites, one
Scope of Work: Thermal Imaging & Data Logging royal suite, two ambassador suites, 11 one-
Assessment bedroom villas, and two two-bedroom villas.
Value:  160 Million USD
Project Status: Completed The project also boasts seven dining facilities,
including a gastropub and the first Italian
restaurant on Saadiyat Island, as well as a kids
club.

Project Name: Oceana Hotel Additional Floors in Ocean is a Luxury residential complex on the
Palm Jumeirah trunk of Palm Jumeirah consisting of 7 buildings
Location:  Dubai, UAE and some 644units. The design of the project
Client: Seven tides Limited closely mirrors the tiara development on the
Consultants: PJSI Consultants DMCC opposite side of the trunk of the palm, i.e. both
Contractor:  ASTECO Contracting L.L.C consist of 7 building and are ytiangular shaped.
MEP Contractor: DRC International Electromechanical
Scope of Work: Chilled Water System Testing &
Balancing
Project Status: Completed

75
CSI PROJECTS, OUR GEMS

Project Name: Al Olaya Tower - Honeywell The Olaya Towers are a pair of skyscrapers on
offices. Olaya Street in Riyadh, Saudi Arabia. The towers
Location: Riyadh, KSA are connected at ground floor level by a large
podium. The 36-storey tower A is the highest
Owner/Developer: Al Olaya Tower Group of the two towers at 203.4 meters including its
Consultant: JLL antenna. The 34-storey tower B is 166.3 meters
Main Contractor: C&P Contractor high. CSI was approved to provide the scope of
Scope of Work: Testing Adjusting and Balancing work of TAB
Works

Project Name: Al Faisaliah Tower Group Faisaliah is a commercial skyscraper located in


Location:  Riyadh, KSA the business district of Riyadh, Saudi Arabia.
Client: Al Faisaliah Tower Group Designed by Foster + Partners, it was the first
Consultants: JLL skyscraper built in Saudi Arabia, and is presently
Contractor:  C&P Contractor the fourth tallest building in Saudi Arabia after
Scope of Work: Testing Adjusting and Balancing the Kingdom Centre.
Works
Project Status: Completed

76
CSI PROJECTS, OUR GEMS

LIST OF PROJECTS

Sr No Name of Project Scope of Work Location Status


1 HRH Al Waleed Bin Technical Shooting & Trouble KSA Completed
Talal Office, Kingdom Shooting
Tower
2 Commercial & Testing Adjusting & Balancing UAE Ongoing
Residential - Bin Lahej Work
3 Sharm Expo TAB & Commissioning Egypt Completed
Management
4 Kayaan 110 (Bldg-4) MEP Systems Commissioning Egypt Ongoing
Management
5 Eitat TAB & Commissioning Egypt Ongoing
Management

77
CSI CLIENTS

78
CSI COMMISSIONING ACTIVITY
TRACKER

CSI Commissioning Activity Tracker


CSI Commissioning Activity Tracker (CAT) is built to follow up, schedule and report the Commissioning
Activities as per the site condition and progress from the pre-commissioning stage till the client hand over.
CSI CAT main objective is to have a clear status about the site condition and the activity progress to focus
and solve the issues delaying the commissioning process as per the following steps.
1. Follow up and report the pre-requests for each system and equipment
2. Follow up and report the testing and commissioning process.
3. Follow up the client handover an

79
INTRODUCTION:
VIDENTIUM is an online application with mobile support. Developed by CSI Software team with the
technical input and enhancements of CSI Technical experiences. Videntium has supportive tools for
construction, commissioning, facility management, HR & admin, finance teams to record, follow, report
and manage all project financial records, and projects management activities. VIDENTIUM has also built-in
project check list template matching with international standard requirements & project needs.

VIDENTIUM SOFTWARE PRODUCTS


Videntium software platform has different modules. These modules can be settled to work & communicate
each other according to customer needs. also all modules under videntium software suite has multi
language support.

80
OUR SOLUTIONS HELPS YOU:

• Entering data by using EXCEL is faster and easier for all users.
• Exporting latest updated data to EXCEL can help all users to create different kind of reports or sharing
data with other users platforms.
• VIDENTIUM helps users to track all work flow in a single platform which can be updated via
web application and mobile applications.
• VIDENTIUM provides all required data to develop future project plans.

81
WITH EXCEL:
All VIDENTIUM modules are compatible to work with EXCEL; VIDENTIUM allows importing data from
EXCEL files, then converting them to SQL database information or can convert data from SQL to EXCEL and
export it.

ANDROID & IOS:


All activities i.e. online or offline can be updated via VIDENTIUM to Android and IOS application. Users
can access VIDENTIUM through phone, Ipad and Tablet at any location with even offline mode and they
can update information after getting connectivity.

82
VIDENTIUM allows to download reports in HTML format with compression. Reports can be converted to
pdf or word documents easily if needed. With compression of reports, it takes just seconds to download
thousands of reports.

83
TESTING AND COMMISSIONING
VIDENTIUM TESTING, COMMISSIONING, TRACKING AND MANAGEMENT
• Main features such as project creation, adding equipment with all description and details and
modifying can be done in amplitude.
• Project data base development and updating can be done swiftly.
• VIDENTIUM can be used during any project stage.
• Flexible in checklist creation and updates.
• Able to follow planning schedules and milestone requirements.
VIDENTIUM T&C Module enables T&C team to create platform with project requirements. Such as,
project stages, system checklist, equipment & project references.
Project equipment reference data, check list & filled data can be prepared on EXCEL and then uploaded
to VIDENTIUM T&C application directly. Even if project is ongoing, VIDENTIUM can adopt project very
rapidly.

84
85
Using VIDENTIUM, It simplifies the creation of equipment data base with all equipment and their sub
category via web interface.

86
VIDENTIUM provides user-friendly web base tracking tool with tracking interface, users are able to filter
data, export to EXCEL, download and send an email with the detailed information.

Videntium can allow filter every single data for user’s reference.

87
All equipment information and commissioning stage progress with checklist details can be shown on web
base or can be downloaded as a pdf file.

88
Dashboard has many options to create reports to show required systems and equipment progress with
their status.

All progresses are calculated as per work completion and equipment weight.

89
Listing Equipment as per type with stage completion percentage.

Equipment charts are available as per quantity or weightage.

90
VIDENTIUM can monitor all type of equipment completion Report; all stages should be completed to
shown in this report.

VIDENTIUM is available for android/ IOS phone, Ipad and tablet for users to monitor, report, record all
site activities.

91
VIDENTIUM has option to download all project data to use offline while users are on site with implemented
QR Code scanner. Users are able to access equipment information, check list with electronic signature and
they are able to sign checklists if it is required.

Users are able to update checklists, take site notes with pictures and upload to system at any time when
they have internet connection. (Application also supports real time online operations)

92
BENEFITS:
• Obstructions of work completion on site can be shared more easily.
• Missing materials, wrong installation, clashes etc. can be highlighted.
• Online platform can generate all type of reports to see.
• Created reports can be signed through all gadgets and also they can be used for claims.

VIDENTIUM SITE OBSERVATION, TESTING & COMMISSIONING


Along with standard Testing & Commissioning module, all international standards module provides user to
preloaded category and checklist question pool. While creating project, user can select multiple questions
from this pool (with simple drag & drop option) also, they can add new checklist questions.
VIDENTIUM site observation application is helping site teams to prepare detailed reports from tablets and
address the issues to respond personnel’s to take an action.

93
TAB – TESTING, ADJUSTING & BALANCING
• VIDENTIUM is able to create test sheets with equipment components.
• In VIDENTIUM, test sheets can be filled and signed via web application or mobile application.
• All test reports of TAB can be generated at once.
• VIDENTIUM has Privacy option that it shows test reports to authorized personnel’s only.
• Users can view TAB progress from the web application even as per equipment basis.

VIDENTIUM TAB is a reporting tool with auto creation feature for all equipment in project. This will save a
lot time, effort and office resources.

BENEFITS:
• Due to using VIDENTIUM application it saves time, effort and office resources.
• TAB work can be allotted into different employees from the system.
• All reports are generated in same format so there won’t be any data conflict.

94
FACILITIES MANAGEMENT
• VIDENTIUM can able to track all equipment which requires periodic maintenance.
• Users can create maintenance calendar for projects and equipment groups.
• Site employees can share equipment & maintenance data even from mobile application.
• Web view maintenance reports from the web application with based on their access level.

COMPUTER MAINTENANCE MANAGEMENT SYSTEM


Maintenance scheduling can be done manually and automatically according to NP algorithms.

In VIDENTIUM, users are able to view upcoming maintenance & from those which are not necessary to be
done can be postpone or cancel.

95
SERVICE HISTORY TRACKING
Users can track all service records of the equipment and able to download from newest to oldest
maintenance reports.

REPORTING
Users are able to view or download a bunch or any single maintenance report through web application.

96
MOBILE APPLICATION
Maintenance teams, can follow up their routes with mobile application (which date, which equipment
needs maintenance, maintenance history etc.) Maintenance teams, can fill maintenance report from
the site using mobile application with photograph support. (photos will be attached automatically which
created reports)

BENEFITS
• In VIDENTIUM, mobile application users can track equipments which require maintenance.
• Higher authority can allot manpower for equipment maintenance.
• Users can collect facility management reports, analyze and report back easily.
• Mobile application will improve efficiency of the maintenance operation teams.

97
ASSET MANAGEMENT
• Asset Management is developed to track company assets around the world.
• It shows location, expiration date, assigned person, assign history, documents related to
equipment.
• Depreciation calculation.
• Renewal warning system of all equipment’s certificates, rentals, registrations.
• Warning system for handing over and taking back.
• Approval system for handing over and taking back.
• Transfer order and approval system.
• QR codes can be generated per equipment and these codes can help users to access equipment data
without hassling.

98
99
BENEFITS
• You can control company assets from all around the world.
• Assets can be grouped as per locations and employees. These groupings can be used to
determine company budgets or project cost controls.
• Out of stock alerts can be sett and it will trigger when product stock counts become
low.

100
CSI, Commissioning Services Ini a ve
CSI Company Registra on No. 1010575176 Chamber of Commerce Registra on No. 499201
Tajreed office Building – 7076 King Abdulaziz Road – Al Sahafa District Unit 31 Al Riyadh 13321-4904 – K. S. A.
Land Line (+966) 11 235 7522 Mob: (+966) 53 744 5711 Website: www.csicx.com Email: [email protected]

You might also like