SATIP-B-006-01 Fireproofing Concrete

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SAUDI ARAMCO ID/PID - REV 1 - 18-May-05 (Standards Cutoff - August 2004)

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fireproofing Concrete SATIP-B-006-01 18-May-05 CIVIL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW


SAIC-Q-
1.1 Concrete Mix Design Approval SAIC-Q-1006
1006
RH1 RH1 If Plant-batched concrete is specified.

Intumescent Material Application Refer to SATIP-B-006-02 for Proprietary Fireproofing


1.2
Procedure with QC Procedure materials
RECEIVING
2.0
INSPECTION
Proprietary Fireproofing Materials Refer to SATIP-B-006-02 for Proprietary Fireproofing
2.1
Receiving Inspection materials

Cast-in-Place Ready Mix Concrete SAIC-Q- S. ARAMCO - Witness first two days delivery of concrete
2.2
Receiving Inspection
SAIC-Q-1009
1009
W1 W2 and the final delivery.

3.0 INSTALLATION

Pre-placement/Site Preparation SAIC-B- S. ARAMCO - Witness first two occurrences of surface


3.1
Inspection
SAIC-B-1001
1001
W1 W2 preparation and once every three occurrences thereafter.

S. ARAMCO - Witness first two occurrences of


Fireproofing Concrete Application SAIC-B-
3.2
Inspection
SAIC-B-1002
1002
W1 W2 application/placement and once every three occurrences
thereafter.

Contractor QC - Witness first day of curing activities on


the first two occurrences and the first day of one in three
SAIC-B-
3.3 Fireproofing Concrete Curing Inspection SAIC-B-1003
1003
W2 S occurrences thereafter. S. ARAMCO - surveillance of
first day of curing activities on the first two occurrences,
and the first day of one in three occurrences thereafter.

SAIC-B- S. ARAMCO - Witness first two occurrences and once


3.4 Concrete Fireproofing Final Inspection SAIC-B-1004
1004
W1 W2 every three occurrences thereafter.

4.0 PRE-COMMISSIONING

4.1 Not Applicable

Page 1 of 2
SAUDI ARAMCO ID/PID - REV 1 - 18-May-05 (Standards Cutoff - August 2004)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fireproofing Concrete SATIP-B-006-01 18-May-05 CIVIL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
1 the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 sample Review of Documents S Surveillance

Page 2 of 2