This document provides a job safety analysis for civil work at a substation extension project. It identifies potential hazards for various job activities including excavation, concreting, breaking work, and scaffolding. Recommended actions are provided to control each hazard. Key hazards addressed are falls, electrocution, being struck by falling objects, dust inhalation, and injuries from hand tools or moving equipment. Proper use of PPE, barricades, fall protection, and following safety procedures are emphasized to minimize risks during the work.
This document provides a job safety analysis for civil work at a substation extension project. It identifies potential hazards for various job activities including excavation, concreting, breaking work, and scaffolding. Recommended actions are provided to control each hazard. Key hazards addressed are falls, electrocution, being struck by falling objects, dust inhalation, and injuries from hand tools or moving equipment. Proper use of PPE, barricades, fall protection, and following safety procedures are emphasized to minimize risks during the work.
This document provides a job safety analysis for civil work at a substation extension project. It identifies potential hazards for various job activities including excavation, concreting, breaking work, and scaffolding. Recommended actions are provided to control each hazard. Key hazards addressed are falls, electrocution, being struck by falling objects, dust inhalation, and injuries from hand tools or moving equipment. Proper use of PPE, barricades, fall protection, and following safety procedures are emphasized to minimize risks during the work.
This document provides a job safety analysis for civil work at a substation extension project. It identifies potential hazards for various job activities including excavation, concreting, breaking work, and scaffolding. Recommended actions are provided to control each hazard. Key hazards addressed are falls, electrocution, being struck by falling objects, dust inhalation, and injuries from hand tools or moving equipment. Proper use of PPE, barricades, fall protection, and following safety procedures are emphasized to minimize risks during the work.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1/ 4
KUTCH CHEMICALS INDUSTRIES LIMITED
VARSANA, GANDHIDHAM
CS SUB STATION EXTENSION PROJECT
JOB SAFETY ANALYSIS
FOR CIVIL WORK: EXCAVATION, SHUTTERING, CONCRETING, BREAKING & BACKFILLING WORK IN SUB STATION AREA Sr. JOB POTENTIAL HAZARD RECOMMENDED ACTION No. Improper access of work Entry pathway should be clear from debris and project area materials Trained & skilled staff to be authorized for working Involvement of unskilled Deliver daily Tool Box Talk personnel Use of appropriate PPE’s Mobilization of equipment Unauthorized/uninspected Only inspected Equipment/Tools must be allowed at work site 1 equipment/tools at site & Materials Ensure safe transportation of equipment/materials at work site Personnel injury / property Ensure use of proper PPE’s, avoid throwing of materials damage All of materials to be secured while its transportation to work site Safety round of all concerned persons Unauthorized work cause Take work permit from Electrical Department before 2 Inspection of Work activity injury/incident. performing work in Sub Station area. Only Trained and authorize workers are allowed to handle and Hit by breaker operate breaker. Electrical must be provided by KCIL electrician. Before starting of job, check for cable insulation. Electrocution Loose joint should be properly fix by flame proof insulation. Proper electrical connection should be provided with 3 Breaking Activity earthing/grounding. Use safety belt and Life line while working at edge of building. Fall from height Proper working platform required for stable job operation. Barricade below area to avoid movement of manpower. Hit by debris Require Net/Sheet to catch falling debris on electrical Transformer situated below the working area. 4 Steel fixing, Form work & Personal hand injury Involve skill worker while handling with steel Ensure use of Job specific PPEs & form work material Ensure use of inspected tools & tackles. Manual Handling Careful handling of steel & other materials concreting work Sharp edge Ensure proper stacking of materials Slip, Trip & Fall Maintain good housekeeping all the time. Slip trip due to debris Remove debris from the pathways and working area. Noncompliance of PPEs Use Safety Helmet, Safety Goggles, Dust Mask, Ear Plug, Hand cause injury. Gloves & Safety shoe. Ensure use of Dust Mask Dust Water sprinkling to be carried out on regular biases to avoid dust 3 Mechanical Excavation Excavated area should be properly barricaded Keep access/walk ways always clear from any obstruction Earth excavated to be stored 2 meters away from excavation Slip, Trip & fall site. Earth excavated in “V “shape. Vehicle to be kept 2 meters from the edge of excavation. Ensure Hand tools are inspected. Personnel hit by hand hand Workers should keep a reasonable distance during manual tools. excavation Ensure Close supervision Manual Excavation for Civil 4 Ensure use of appropriate PPE’s (dust mask) works Dust Ensure dust suppression on site Excavated area should be properly barricaded Slip, Trip & fall Keep access/walk ways always clear from any obstruction Ensure proper housekeeping of workplace all the time 5 Unloading the ready mix Machine works too close to Make sure all operators know the safe limitations of their concrete. persons within the same equipment. working area. Assign a competent supervisor when equipment is moving at the working area. Machine strikes another Ensure strict control measure to separate mechanical plant vehicle or person in the and enforce swing radius area as no go area for any person or vicinity vehicle in order to avoid collisions. Struck by concrete causing Ensure brackets are positioned close together to minimize injuries or falls excessive movement Sharp edges cause of cuts Secure exposed reinforcement bars from reinforcement bar Turn tie wires into reinforcement cages ends or tie wire Falling Object cause Stack Materials away from edge. injury to personal & Cover transformer with Green net/Sheets to catch falling property damage. objects. Fall From Height Erect scaffolding on a firm ground with sole plate & base Scaffold Collapse plate. 6 Brick Masonry Work Scaffolding should erect in such a way that it cannot come in contact with transformer or other live electrical equipment. Scaffolding working Platform should have two planks width. Toe guard, Mid rail and top rail should be provided to working platform for the safety of personals and materials