KUTCH CHEMICALS INDUSTRIES LIMITED

VARSANA, GANDHIDHAM

CS SUB STATION EXTENSION PROJECT

JOB SAFETY ANALYSIS


FOR
CIVIL WORK: EXCAVATION, SHUTTERING, CONCRETING, BREAKING &
BACKFILLING WORK IN SUB STATION AREA
Sr.
JOB POTENTIAL HAZARD RECOMMENDED ACTION
No.
Improper access of work  Entry pathway should be clear from debris and project
area materials
 Trained & skilled staff to be authorized for working
Involvement of unskilled
 Deliver daily Tool Box Talk
personnel
 Use of appropriate PPE’s
Mobilization of equipment Unauthorized/uninspected  Only inspected Equipment/Tools must be allowed at work site
1 equipment/tools at site
& Materials
 Ensure safe transportation of equipment/materials at work
site
Personnel injury / property  Ensure use of proper PPE’s, avoid throwing of materials
damage  All of materials to be secured while its transportation to work
site
 Safety round of all concerned persons
Unauthorized work cause  Take work permit from Electrical Department before
2 Inspection of Work activity
injury/incident. performing work in Sub Station area.
 Only Trained and authorize workers are allowed to handle and
Hit by breaker
operate breaker.
 Electrical must be provided by KCIL electrician.
 Before starting of job, check for cable insulation.
Electrocution  Loose joint should be properly fix by flame proof insulation.
 Proper electrical connection should be provided with
3 Breaking Activity
earthing/grounding.
 Use safety belt and Life line while working at edge of building.
Fall from height
 Proper working platform required for stable job operation.
 Barricade below area to avoid movement of manpower.
Hit by debris  Require Net/Sheet to catch falling debris on electrical
Transformer situated below the working area.
4 Steel fixing, Form work &  Personal hand injury  Involve skill worker
while handling with steel  Ensure use of Job specific PPEs
& form work material  Ensure use of inspected tools & tackles.
 Manual Handling  Careful handling of steel & other materials
concreting work
 Sharp edge
 Ensure proper stacking of materials
 Slip, Trip & Fall
 Maintain good housekeeping all the time.
Slip trip due to debris  Remove debris from the pathways and working area.
Noncompliance of PPEs  Use Safety Helmet, Safety Goggles, Dust Mask, Ear Plug, Hand
cause injury. Gloves & Safety shoe.
 Ensure use of Dust Mask
Dust  Water sprinkling to be carried out on regular biases to avoid
dust
3 Mechanical Excavation
 Excavated area should be properly barricaded
 Keep access/walk ways always clear from any obstruction
 Earth excavated to be stored 2 meters away from excavation
Slip, Trip & fall
site.
 Earth excavated in “V “shape.
 Vehicle to be kept 2 meters from the edge of excavation.
 Ensure Hand tools are inspected.
Personnel hit by hand hand  Workers should keep a reasonable distance during manual
tools. excavation
 Ensure Close supervision
Manual Excavation for Civil
4  Ensure use of appropriate PPE’s (dust mask)
works Dust
 Ensure dust suppression on site
 Excavated area should be properly barricaded
Slip, Trip & fall  Keep access/walk ways always clear from any obstruction
 Ensure proper housekeeping of workplace all the time
5 Unloading the ready mix Machine works too close to  Make sure all operators know the safe limitations of their
concrete. persons within the same equipment.
working area.  Assign a competent supervisor when equipment is moving at
the working area.
Machine strikes another  Ensure strict control measure to separate mechanical plant
vehicle or person in the and enforce swing radius area as no go area for any person or
vicinity vehicle in order to avoid collisions.
Struck by concrete causing  Ensure brackets are positioned close together to minimize
injuries or falls excessive movement
Sharp edges cause of cuts  Secure exposed reinforcement bars
from reinforcement bar  Turn tie wires into reinforcement cages
ends or tie wire
 Falling Object cause  Stack Materials away from edge.
injury to personal &  Cover transformer with Green net/Sheets to catch falling
property damage. objects.
 Fall From Height  Erect scaffolding on a firm ground with sole plate & base
 Scaffold Collapse plate.
6 Brick Masonry Work
 Scaffolding should erect in such a way that it cannot come in
contact with transformer or other live electrical equipment.
 Scaffolding working Platform should have two planks width.
 Toe guard, Mid rail and top rail should be provided to working
platform for the safety of personals and materials