SUBMITTAL COVER SHEET

Circo Noche Restaurant Submittal No: ATS-50869-CN-SD-KT-029


Project No. 50869 Revision No: 00
Client: M/s. Atlantis The Palm Submittal Date: 4-Oct-22
Design Consultant M/s. Bishop Design Title: SHOP DRAWING
LEED Consultant LXA
Project Manager: M/s. Turner & Townsend Drawing No: ATS-DXB-CN-50869-KE-SD- 22-128
FIRST SUBMITTAL OF THIS ITEM OR RESUBMITTAL

TYPE OF SUBMITTAL
Shop Drawings & Schedules Method Statement Preliminary As Built Drawings
Samples Programme As Built Drawings
Materials & Product Data Mock-up & QC panel O & M Manuals

Certification & Verification of Inspection & Test Reports Other -


Performance

DESCRIPTION
SUB CONTRACTOR / MANUFACTURER

CO2 FIRE FIGHTING AND FIRE DETECTION


SYSTEM FOR FIRE BOX M/s. Royal Middle East Int'l LLC

Specification & BOQ Ref: Location / Use:

FIRE BOX AT ENTRANCE

DESIGN CONSULTANT'S COMMENTS

CONTRACTOR'S REVIEW SUBMITTAL REVIEW STATUS

The contractor has reviewed this submission prior to A Approved


submission to the Consultant B Approved with Comments
C Rejected
Signature D Not Reviewed

DATE RECEIVED DATE RETURNED

DESIGN CONSULTANT'S SIGNATURE

For and on behalf of Consultant Date:

PROJECT MANAGER'S APPROVAL

For and on behalf of Project Manager Date:

Distribution: Original to Al Tayer Stocks


Copies to: Subcontractors

QR.C-06/R-02/Jan2015
GENERAL NOTES:-
THIS DRAWING NOT TO BE SCALED.
ALL DIMENSIONS SHOWN ARE IN MILLIMETERS. U O N

LEGEND:-

DPS

EA

A A

GYPSUM
WALL

DETAIL A

PLAN LAYOUT
SCALE:1:25

00 FOR APPROVAL 30-SEPT-2022


REV. DESCRIPTION DATE

PROJECT:-

Circo Noche
Atlantis The Palm
Dubai, U A E
CLIENT:-

EA
EXHAUST DUCT TO BE
CONNECTED TO FAN
(TO BE SPECIDIED) LEAD CONSULTANT:-
GD

GD

OPERATOR:-
HD

HD
EXHAUST DUCT TO BE

EXHAUST DUCT TO BE
CLADDED AS PER ID

LOV
CLADDED AS PER ID

PROJECT MANAGER:-

DPS

EA

GD

GD Suite 111 & 112, Pinnacle Bldg., Al Barsha, P.O. Box: 29422 Dubai
T: +971.4.399.0271 F: +971.4.399.0273
E: [email protected] W: www.wearebishopdesign.com

220V/50Hz FROM MAIN SUPPLY HD SUB CONTRACTOR:-

220V/50Hz FROM UPS


HD

ROYAL MIDDLE EAST Int'l., LLC


DUBAI INVESTMENT PARK (D.I.P.) - Phase 2, PLOT no> 597-775
LOV behind Abu Dhabi Pipe Factory (ADPF)
P.O. Box 24381 - Dubai, U. A. E.
Tel. no. (04) 885 8977-78 - Fax no. (04) 885 6353
E-mail Address: [email protected]
Website Address: www.royalmiddleeast.ae

DPS
DPS MAIN FITOUT CONTRACTOR:
DPS
Al-Tayer Stocks LLC.
Interior & Building Contractors
P.O.BOX. 2623, DUBAI, UAE.
CO2 CYLINDER
CO2 CYLINDER

30th and 31st Floor, API Trio Office Tower. Al Barsha 1


Phone #: 04 5034 888, Fax #: 04 3994 115
Web Site : www.altayerstocks.com
E-mail : [email protected]

DRAWING TITLE
600

CO2 FIRE FIGHTING AND


FIRE DETECTION SYSTEM
100

FOR FIRE BOX


GAS SHOT OFF CONSULTANT DRAWING REFERENCE SCALE
VALVE BY OTHERS 1332-FB-SD-00-501 AS SHOWN
FLOW SWITCH
DRAWING NUMBER SHEET #
BY OTHERS
ATS-DXB-CN-50869-KE-SD- 22-128 01

SECTION LAYOUT "AA" DRAWN


YBN
CHECK
AV
APPROVED
-
DATE
21-07-2022
SCALE:1:25 DRAWING STATUS REVISION #
FOR APPROVAL 00