Project Title Evaluation report for soil treatment by adding polymer 5S-Road
Type of Material Subgrade Date of Sampling 12/2/2022
Source pit 2 A Date of Testing 16/2/2022
Location ALKOMS SITE
Procedure :
3
Volume of mould ( V ) = 984.4 cm
Moisture Content Setting 3.0% 5.0% 7% 9%
Mass of mould + base + compacted specimen, M1 g 5511.7 5686.7 5883.6 5746.2
Mass of mould + base, M2 g 3760.0 3760.0 3760.0 3760.0
Mass of compacted specimen, M = M1 - M2 g 1751.7 1926.7 2123.6 1986.2
Bulk Density, r = M / V
3
g/cm 1.779 1.957 2.157 2.018
Container No. A B C D
Mass of container, m1 g 57.6 58.3 56.4 56.2
Wet soil + container, m2 g 131.0 124.0 180.7 221.0
Dry soil + container, m3 g 128.9 120.85 172 207
Mass of moisture, m4 = m2 - m3 g 2.09 3.15 8.70 14.00
Mass of dry soil, m5 = m3 - m1 g 71.3 62.6 115.6 150.8
Moisture Content , W = m4 / m5 x 100 % 2.9 5.0 7.5 9.3
Dry Density, rd = 100r / ( 100 + w ) g/cm3 1.73 1.86 2.01 1.85
4
Corracted Dry Density g/cm
Saturation line %
Max Dry Density g/cm3 , 1.959
Optimum Moisture Content % 7.50
2
1.95
1.9
1.85
1.8
Dry density
1.75
1.7
1.65
1.6 y = -0.0162x2 + 0.2228x + 1.1988
1.55 R² = 0.8621
1.5
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
Moisture content
Remarks:
……………………………………………………………………………………………………………………………………………
PROJEK MEMBAIKPULIH DAN
QA/QC Engineer AB Group
Eng. Hamza Ennajah
Name
.............................................. ............................................