Inspection: 2Az-Fe Emission Control - Canister

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

2AZ-FE EMISSION CONTROL CANISTER

EC11

(b) Remove the 4 bolts, clip and canister.

A127739

INSPECTION
1. INSPECT CANISTER (a) Visually check the canister for cracks or damage. If cracks or damage is found, replace the canister.

A105940

Purge Port

(b) Check the canister operation. (1) While holding the purge port closed, blow air 0.39 kPa (4.0 kgf/cm2, 3 mmHg) into the vent port, and check that air flows from the air inlet port. If the result is not as specified, replace the canister.

EC

Vent Port

Air

Air Inlet Port


A105941E04

Purge Port Air Inlet Port

(2) While holding the air inlet port closed, blow air 0.39 kPa (4.0 kgf/cm2, 3 mmHg) into the vent port, and check that air flows from the purge port. If the result is not as specified, replace the canister.

Vent Port

Air
A123647E01

Purge Port

Air Inlet Port

(3) While holding the air inlet port closed, apply vacuum 3.43 kPa (35.0 kgf/cm2, 25.7 mmHg) to the vent port, and check that air is sucked into the purge port. If the result is not as specified, replace the canister.

Vent Port

Vacuum
A123648E01

EC12
Purge Port

2AZ-FE EMISSION CONTROL CANISTER


Air Inlet Port

(c) Check the air tightness. (1) While holding the vent and air inlet ports closed, apply vacuum 3.43 kPa (35.0 kgf/cm2, 25.7 mmHg) to the purge port, and check that the vacuum is maintained for 1 minute. If the result is not as specified, replace the canister.

Vent Port

Vacuum
A123649E01

Purge Port A

Air Inlet Port

(d) Check the diaphragm. (1) Remove the air hose between ports A and B. (2) While holding the vent, purge and air inlet ports closed, apply vacuum 1.42 kPa (14.5 kgf/cm2, 10.6 mmHg) to port A, and check that air is not sucked into port B.

Vent Port

Vacuum
A123650E01

EC

Purge Port A

Air Inlet Port

Vent Port

(3) While holding the vent, purge and air inlet ports closed, apply vacuum 1.42 kPa (14.5 kgf/cm2, 10.6 mmHg) to port A, and measure how long it takes for the vacuum to drop. Vacuum drop time: 10 seconds or more If the result is not as specified, replace the canister.

Vacuum
A123651E01

(e) Check the leak detection pump. (1) Check that air flows from port A to port B and C. If the result is not as specified, replace the canister.

A Air B
A105944E01

Valve

Closed

(2) Connect the positive (+) lead of the battery to terminal 7 and the negative (-) lead to terminal 6. (3) Check that the valve is closed. If the result is not as specified, replace the canister. (4) Install the canister pump module.

A105945E01

You might also like