Electric EN
Electric EN
manuel formation
training manual
CABLE
REEL EARTH 1 3 5
QG1
2 4 6
1 3
QT1
2 4
1 3 5
0 440
QM3 QM4
2 4 6
X2 5 20 0 0 24
1 3 5 1 3 5 1 3 5 1 3 5 1
KM1 KMD1 KMY1 KM3 KM4
2 4 6 2 4 6 2 4 6 2 4 6 2
1 3 5
U1 V1 W1 F1 U V W U
2 4 6
M1 IPS1 M3
+
3 3
+
V1 U2 V2 W2
C1 -
-
61 161 R1 53 153
1
KA0
62 162 R2 2 54 154
1 1 1 1
Q1 Q2 Q3 Q4
2 2 2 2
24V DC
24V DC
24V AC
X2 1 X2 2 X2 3 X2 4
1) GENERAL SYMBOLS
1/1) MAIN BREAKERS
Name starts by letter Q
Example: QG1 ---> Main breaker 1.
1 3 5
QG1
Those breakers can include:
- overload tripping device, set to the amps consumed by the
magnetic
Overload 2 4 6 receptor (motor, transformer, lights .....) named Ir
2 4
Basic low for setting:
- overload ---> Amps stamp on the motor plate. NOTE: some
motors are suitable for several voltage and frequencies, that
could increase the setting by 10% of the nominal Amps.
1/2) CONTACTORS
Name starts by letter KM
Example: KM1, KMD1 (D for delta), KMY1 (for star).
1 3 5 In the drawing beside the triangle at the end of the control,
KM means a mechanical inter-link between two contactors for star/
delta starter. This inter-link disable the two contactors to be
2 4 6 activated at the same time.
CONTACTOR
1 3 5 1/3) OVERLOAD
Name starts by letter F.
F1
This device controls the maximum Amps directed to the motor
2 4 6 as well as the correct balance in Amps between the 3 phases.
It will trip out if there is an overload or if the voltage of the 3
OVERLOAD phases are uneven.
TORQUE AVAILABLE
SPEED
This pictures shows the resistances when they are
connected: top, in STAR mode; bottom, in DELTA
mode.
STAR
Connecting box
DELTA
1 3 5
U1 V1 W1 F1
2 4 6
M1 IPS1
3
U2 V2 W2
NOTE: Due to the physical location of the overload relay, THE SETTING OF THE OVERLOAD RELAY
SHOULD BE:THE NOMINAL AMPS (stamp on the motor plate) DIVIDE BY THE SQUARE ROOT
OF3
SETTING = ( Ir ) ⁄ ( 3 )
3
K.P.H
1/6) TRANSFORMER
380 / 440
500 / 550 Inlet power: from 380 up to
660 Volt. Adjustment can be
+ - 20Volt 0 660 made from nominal voltage
using the connecting pin plus
or minus 20 Volt.
pin ECR
There is two secondaries: first
one delivers 300VA at 20 Volt,
the second one 1000 VA at
24Volt.
300 VA 1000 VA The first one is used together
with a rectifier to supply 24V
20 0 0 24 DC.
The second one supply 24 V
AC to the motor controls and
the flood lights.
S11 pin Nb
30
12
Wire Nb
X2 6
connecting
terminal x2
R3 pin 6
KA0
R4
1 2 3
S9: Push button
S9 Contact symbols:
contact 1&3: low Amps normally open
contact 2: low Amps normally closed
OFF delay
OFF RELAY: When the coil is energized, the contacts shift
immediately. When the coil is no longer energized, the
KM1
contacts move back to neutral when the delay is exhausted.
contact coil
PRESSURE SWITCH
13 Name starts by letter E.
The symbol shows a pressure switch using a contact normally
E70 P
open. 13 and 14 are the wiring pins.
2b 14
The pressure setting is 2 bar.
T TEMPERATURE SWITCH
The symbol shows a temperature switch using a contact normally
120°c open.
The temperature which activates the switch is 120° Celsius.
A1
SOLENOID
B85 Name starts by letter B.
H HOURMETER
Name starts by letter P.
P1
PAGE
Electric diagram for single boom machine.
8
CABLE
REEL EARTH 1 3 5
QG1
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
27/08/1999
2 4 6
MAIN BREAKER
1 3
QT1
2 4
POWER PACK
1 3 5 1 3 5
0 440
QM3 QM4
2 4 6 2 4 6
X2 5 20 0 0 24
1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
24V DC FROM
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6
1 3 5
U1 V1 W1 F1 U V W U V W
2 4 6
M1 IPS1 M3 M4
+ L1 L2 L3
3 3 3
+
V1 U2 V2 W2 3
C1 - K.P.H
-
61 161 R1 53 153
1
KA0
WATER PUMP
COMPRESSOR
62 162 R2 2 54 154
1 1 1 1
Q1 Q2 Q3 Q4
2 2 2 2
24V DC
24V DC
24V AC
X2 1 X2 2 X2 3 X2 4
From the mine electric box, power is directed to the main electric box through the cable reel.
The power is control by the main breaker QG1.
This breaker includes an overload and a magnetic tripping devices.
The overload is set according to the total Amps consumed by the machine all electric components working.
The magnetic device is set to 10 times the level of the overload value. Irm = 10 x Ir
The main Voltage is then directed to:
- The phase control relay KPH
- All of the electric motors: M1 hydraulic power pack, M3 Water pump and M4 compressor
- Two phases are directed to the transformer through the breaker QT1
This breaker includes overload and magnetic tripping devices.
¤ Overload set from 6 to 10 Amps according to voltage.
¤ Magnetic set to 14 times of the overload value due to the working properties of the transformers.
Transformers: Irm = 14 x Ir
27/08/1999
2/1) 24 V DC
From the 300 VA outlet the 20Volt AC power is directed to the rectifier/capacitor.
Caution: the rectifier should always be installed on a radiator to prevent over-heating.
At the outlet of the rectifier/capacitor 24 V DC is available for the safety and warning devices.
As some of the safety devices are working either on batteries or when the main power is connected, the relay KA0 makes the selection so as to
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
Breaker Q1: 24V DC to the safety devices i.e., horn, buzzer, warning light ....; as well as the drilling control box.
Breaker Q2: 24V AC is directed to the tramming lights when using main power
24V DC is directed to the tramming lights when using batteries.
2/2) 24V AC
From the outlet 1000Va, 24V AC is directed to breaker Q3 & Q4, to Q2 through two contacts of the selector relay KAO.
PAGE 9
3) MOTOR CONTROL DIAGRAM
PAGE
24VAC FROM X2 3 X2 45 X2 20 X2 21 X1 4
BREAKER “Q3”
10
KA0 S1
11 67
X1 1 S2 IPS1 T KMD1
12 120 3s 68
16
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
QG1 X2 22 X1 7 X1 11
27/08/1999
15
X1 2 X1 5 X2 26
28 13 13
KPH S3 KM1
25 14 14
13
13 12
E70 P
X1 3 X2 23
KA1 2b 14
KMY1
X2 17 X2 18 X1 6 14 11
0 1 13 55 67
S6 KM1 KM1 X2 27
14 3s 56 3s 68
21 95 21
X2 19 X1 12
KMD1 F1 KMY1
MOTOR CONTROL PANEL
22 96 22
X1 A1 X1 A1 A1 A1 A1 A1 A1
0 X2 A2 X2 X1 20 0 A2 A2 A2 A2 A2 A2
” IC R AY O
L
N TR O
K TE EL O
L TR
“O C
AR
R N
LY EL
E LY I T I H TR O
PP L/ PP R IS
R
IT
C N C
U TO TO O R
SU SE S C C
K C W C SO
N IE AI
N
TA PA TA -S M
P
ES
AI :D N AL
M O
N
T:
M O
N
ER C
O M PU PR
T: TI H C R ER
M
H G AR
W TA E O
LI
G EC LI PO EL TH AT C
L ST D 1 W
SE M
From the breaker Q3, 24 Volt AC is supplied to the electric motor control panel which includes the emergency stop button S1, the start button S3,
the stop button S2.
3/1) INITIAL POSITION
If the main breaker QG1 is activated, the green light H1 is energized. If the phases are correctly connected, the relay KPH closes, the orange light
H2 is energized.
By turning the selector switch S6 in the drilling position, the relay KA0 is energized, 24V AC is directed to the control panel through one of the
contact of the relay KA0.
3/2) STARTING IN STAR MODE
24VAC FROM X2 3 X2 45 X2 20 X2 21 X1 4
BREAKER “Q3”
KA0 S1
11 67
X1 1 S2 IPS1 T KMD1
12 120 3s 68
16
QG1 X2 22 X1 7 X1 11
15
X1 2 X1 5 X2 26
28 13 13
KPH S3 KM1
25 14 14
13
13 12
E70 P
X1 3 X2 23
KA1 2b 14
KMY1
X2 17 X2 18 X1 6 14 11
27/08/1999
0 1 13 55 67
S6 KM1 KM1 X2 27
14 3s 56 3s 68
21 95 21
X2 19 X1 12
KMD1 F1 KMY1
22 96 22
X1 A1 X1 A1 A1 A1 A1 A1 A1
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
0 X2 A2 X2 X1 20 A2 A2 A2 A2 A2 A2
IC AY L
”
TR K ER EL L O
“O
N O RT R O TR
Y L EC LY A I H TR O
N
ST
L E P I R C N C
P / P R I IT
P L
SU TO TO O R
SU SE C C
K C W C SO
I N IE IN TA PA TA -S M
P
ES
AL
:D A N
M
A
O
N
T:
M O
N
ER C
O M PU PR
T: TI C
ER
M
H C G
H
AR
W TA ER C
O
LI
G
LE L I
ST PO
D
EL TH AT
SE 1 W
M
By depressing the start button S3 power is directed to the contactor KMY1. The STAR position is selected.
Due to the contact KMY1 (pin 13/14) power is directed to the contactor KM1. The motor starts.
Due to the contact KM1 both contactors are still energized when the push button S3 is released.
PAGE 11
3/3) DELTA POSITION
PAGE
24VAC FROM X2 3 X2 45 X2 20 X2 21 X1 4
BREAKER “Q3”
KA0 S1
12
11 67
X1 1 S2 IPS1 T KMD1
12 120 3s 68
16
QG1 X2 22 X1 7 X1 11
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
15
27/08/1999
X1 2 X1 5 X2 26
28 13 13
KPH S3 KM1
25 14 14
13
13 12
E70 P
X1 3 X2 23
KA1 2b 14
KMY1
X2 17 X2 18 X1 6 14 11
0 1 13 55 67
S6 KM1 KM1 X2 27
14 3s 56 3s 68
21 95 21
X2 19 X1 12
KMD1 F1 KMY1
22 96 22
X1 A1 X1 A1 A1 A1 A1 A1 A1
0 X2 A2 X2 X1 20 A2 A2 A2 A2 A2 A2
IC Y L
N” TR TE
R LA L RO
“O OK RE O T
LE
C Y AR TR ON
LY /E PL I
S T R
I
CH N C
PP EL
P
TO
R I TO IT CO
R
SU SU CK W SO
IE
S
IN AC AC -S P
AI
N T PA NT M ES
:D M
A N AL PU PR
T:
M I ON T: CO ER CO RM M
CT GH OW TA ER CO
LI
G H
LE LI AR EL HE AT
ST P D 1T W
SE M
After 3 seconds the two timing contacts (one normally open, the other normally closed) KM1 shift.
Contactor KMY1 is no longer energized. KMD1 is energized.
The motor is now running in delta. For safety purposes one contact of the contactor KMY1 is installed in the line to the KMD1 coil, one contact
KMD1 is installed on the line to the contactor KMY1.
Star and delta cannot be activated at the same time.
3/4) CAUTION DEVICES
24VAC FROM X2 3 X2 45 X2 20 X2 21 X1 4
BREAKER “Q3”
KA0 S1
11 67
X1 1 S2 IPS1 T KMD1
12 120 3s 68
16
QG1 X2 22 X1 7 X1 11
15
X1 2 X1 5 X2 26
28 13 13
KPH S3 KM1
25 14 14
13
13 12
E70 P
X1 3 X2 23
27/08/1999
KA1 2b 14
KMY1
X2 17 X2 18 X1 6 14 11
0 1 13 55 67
S6 KM1 KM1 X2 27
14 3s 56 3s 68
21 95 21
X2 19 X1 12
KMD1 F1 KMY1
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
22 96 22
X1 A1 X1 A1 A1 A1 A1 A1 A1
0 X2 A2 X2 X1 20 A2 A2 A2 A2 A2 A2
” IC R AY O
L
N TR O
K TE EL O
L TR
“O C
AR
R N
LY LE PL
Y
I T I
C
H TR C
O
E S R N
PP L/ P R I TO IT O R
SU
E SU TO K C O
ES N C C
TA
C SW P SS
AI
N I AI TA PA - M E
:D M N O
N AL PU PR
ER
N
T:
M O T: O C M M
H TI H C
W A ER ER O
C LI
G AR PO
LT AT C
LI
G
LE ST D
E TH W
SE 1
M
F1 is the contact of the overload relay. If the overload is activated KM1 is no longer energized the motor stops. The overload relay is set from the
factory in the AUTO position. The overload will reset automatically after some minutes.
Thermal switch IPS1. This switch is located inside the motor housing. If the temperature reaches 120°C, the contact IPS1 closes, the relay KA1 is
energized.
PAGE 13
The normally closed contact KA1 opens. KM1 is no longer energized, the motor stops. After cooling down of the housing, the thermal switch
opens, relay KA1 is reset to neutral, motor can be start again.
3/5) WATER PUMP, COMPRESSOR
PAGE
24VAC FROM X2 3 X2 45 X2 20 X2 21 X1 4
BREAKER “Q3”
KA0
14
S1
11 67
X1 1 S2 IPS1 T KMD1
12 120 3s 68
16
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
QG1 X2 22 X1 7 X1 11
27/08/1999
15
X1 2 X1 5 X2 26
28 13 13
KPH S3 KM1
25 14 14
13
13 12
E70 P
X1 3 X2 23
KA1 2b 14
KMY1
X2 17 X2 18 X1 6 14 11
0 1 13 55 67
S6 KM1 KM1 X2 27
14 3s 56 3s 68
21 95 21
X2 19 X1 12
KMD1 F1 KMY1
22 96 22
X1 A1 X1 A1 A1 A1 A1 A1 A1
0 X2 A2 X2 X1 20 A2 A2 A2 A2 A2 A2
” IC R AY O
L
N TR O
K TE EL O
L TR
“O EC AR
R N
LY L LY I T I H TR O
PP
/E PP R I S R
IT
C N C
L
SU TO TO O R
SU SE C C
K C SW P
C SO
N IE AI
N
TA PA TA - M ES
AI :D N AL
M N
T:
M O
N
ER C
O M PU PR
T: IO C R M
H T G
H
AR
W TA ER E O
IG EC LI PO EL TH AT C
L L ST D 1 W
SE M
Both motors can only be started around 3 seconds after the main motor shifts to DELTA POSITION, due to the N/O delay contact KMD1.
Compressor:
The compressor starts automatically, 3 seconds after the main motor shifts to DELTA POSITION, KM4 energized.
Water pump:
the motor starts automatically when the operator opens the water flushing valve. If the mine water supply pressure is correct, the water strainer is
clean, the pressure switch E70, set at 2bar, closes, KM3 is then energized, the water pump starts.
4) GENERAL FUNCTIONS
24VDC FROM
BREAKER “Q1” X2 1 X1 18
X2 2 13 13 13 13
24V AC/DC FROM
BREAKER “Q2” KM4 KMD1
S9 KA5
14 14
14 14
X2 4
24VAC FROM
BREAKER “Q4” X2 33 X2 41
X1 19 X1 14
13 11 13 21 23
0 1 1 3 1 0 2
S7 KA4 S8 X2 37 X2 35
14 2 4 12 14 22 24
27/08/1999
X2 28 X2 29 X2 30 X2 31 X2 32
A1 X1 X1
H
0 A2 0 X2 X2
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
PAGE 15
Those lights are working from 24V DC from batteries or 24 V AC from the transformer through the breaker Q2, according to the position of the
relay KA0.
4/2) CAUTION DEVICES
PAGE
24VDC FROM
BREAKER “Q1” X2 1 X1 18
X2 2 13 13 13 13
16
24V AC/DC FROM
BREAKER “Q2” KM4 KMD1
S9 KA5
14 14
14 14
X2 4
24VAC FROM
BREAKER “Q4” X2 33 X2 41
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
X1 19 X1 14
27/08/1999
13 11 13 21 23
0 1 1 3 1 0 2
S7 KA4 S8 X2 37 X2 35
14 2 4 12 14 22 24
X2 28 X2 29 X2 30 X2 31 X2 32
A1 X1 X1
H
0 A2 0 X2 X2
PERSONNAL NOTES/
PAGE
X2 7
18
15
0 1 15
11
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
S11 S12
27/08/1999
30 S1
50a 17 19
0 1 2 12
X2 6 X2 8
X2 38
R3 12
KA0 KA3
H10
R4 11 X2 10 X2 39
Q0
1 2 X2 5
X2 9
D00
B+ + +
H4
BATTERIES
2 3 STOP
5
4
ALTERNATOR STARTER
X2 34 D+
W(12V) M - DIESEL
A1
3 4 A2
KA3
5/1) 24V DC SUPPLY
24V DC from the batteries is directed to the master switch Q0.
Power supply to:
- alternator charge light H4
- selector relay KA0
- alternator pin B+
- starter pin +
- contact of relay KA0 pin R4 R3
5/2) CONTROL DIAGRAM
The selector switch drilling/tramming in tramming position the relay KA0 is not energized.
24V DC is directed from the master switch, the contact KA0 to the contact key S11.
27/08/1999
When the contact key is closed power is directed through the emergency stop button S1 to the engine STOP DEVICE. This device includes two
solenoids. The first one which is now energized will hold the injection pump lever in running position.
NOTE: the first solenoid do not deliver enough force to move the injection pump lever.
Starting switch:
In first position, contact 19, power is directed to the glow plugs and to the glow plug indicator. By rotating to the second position 24VDC is directed
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
to the starter as well as the second solenoid of the injection stop device through the contact of the relay KA3. the starter is running, the injection
pump lever moves.
The glow plugs are still energized.
Relay KA3:
When the engine is running the alternator starts to deliver power. The charge light is no longer energized.
From the alternator special pin W, 12V DC is supplied to the relay KA3.
NOTE: relay KA3 is the only 12V DC relay installed on the machine.
The purpose of this relay is to open automatically the line to the starter and to enable the engine oil pressure safety device. Therefore if the lever
S12 is still engaged this relay will disconnect automatically the engine starter and the second solenoid or the injection pump.
PAGE 19
6) GENERAL CAUTION LIGHTS
PAGE
20
P T 27 P 27
V2.4 V2.4
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
B.P. 46 - 69881 MEYZIEU Cedex
19 avenue De Lattre-de-Tassigny - ZI
SANDVIK-TAMROCK SECOMA S.A
T
18 28 4 18 4
27/08/1999
28
24 1
V2.1
V2.5 24 1 V2.1 V2.5
5 5
KA3 KA3
21
2
V2.2
21
2 V2.2
X2 40 X2 40
3
V2.3
6 3 V2.3 6
X2 X2 X2 A2 X2 X2 X2 A2
24 V DC H H
from breaker Q1
X2 1 X1 X1 X1 A1 X2 1 X1 X1 X1 A1
P5 H5 H6 H7 KA5 P5 H5 H6 H7 KA5
ER E N ER E N
ET U
R
P. O
W AY ET U
R
P. O
W AY
R
M SS M D EL R
M SS M D EL
K R K R
U E TE EA Y U E TE EA Y
H
O PR E IT H
O PR E IT
E IL G
IN BR U
R E IL G
IN BR U
R
IN O N LT C IN O N LT C
G
IN
E E BE SE G
IN
E E BE SE
EN G N EL EN G N EL
EN FA IE
S EN FA IE
S
D D
MANU
11 13
X2 45 22 1
S13
12 14
X2 20 41 2
30
KX1 E65 X4 8 X4 9
87a 87
V5
X1 11 X2 26 56 8 X4 2
X4 12 X4 3 X4 6
13
13 11 V4
20 1 E70 P
2b 14 S14 E71 F E66 P
14 12 70b
X1 12 X2 27 57 9 X4 10
X4 4 X4 7
13
E67 P E65 P
2b 14 70b
X1 8 X2 42 F16 5 X4 5 E67
13
KM3
14
X1 9 X2 36 F12 7 B1 X4 13
X2 43 B1 6 TO DRIFTER HOURMETER B1
86
10
H T (NOT USED)
0 X4 11 85
P3 B1 KX1 B2 B5
D .
U
AR SE R
C
R
MAIN ELECTRIC BOX RW VE PE
E AL
FO R U
ED ED AN
FE FE M
Pressure switch E70: when the water valve is opened, mine water pressure should be at a minimum of
2 bar to activate this pressure switch. The water pump starts (see motor control).
By using the feed lever in forward direction the micro-switch S9 - 1 closes. 24 V DC is directed to the
manual/auto selector switch S13.
Three conditions are needed to energize the feed forward solenoid B1 and the drilling hourmeter P3.
- a correct water flow monitors by the switch E71.
- an air pressure at a minimum of 2 bar monitors by the switch E67.
- the water pump should run, contactor MK3 energized.
NOTE: when needed to move the rockdrill for maintenance purposes, the water and air electric
switches can be by-passed by depressing the push button S14. The solenoid B1 is directly energized.
AUTO
11 13
X2 45 22 1
S13
12 14
X2 20 41 2
30
KX1 E65 X4 8 X4 9
87a 87
V5
X1 11 X2 26 56 8 X4 2
X4 12 X4 3 X4 6
13
13 11 V4
20 1 E70 P
2b 14 S14 E71 F E66 P
14 12 70b
X1 12 X2 27 57 9 X4 10
X4 4 X4 7
13
E67 P E65 P
2b 14 70b
X1 8 X2 42 F16 5 X4 5 E67
13
KM3
14
X1 9 X2 36 F12 7 B1 X4 13
X2 43 B1 6 TO DRIFTER HOURMETER B1
86
10
H T (NOT USED)
0 X4 11 85
P3 B1 KX1 B2 B5
D .
U
AR SE R
C
R
MAIN ELECTRIC BOX RW VE PE
E AL
FO R U
D D
E E AN
FE FE M
24 V DC is directed to the pressure switches E71 and E67 through the contact KX1 and the diode V4.
The solenoid B1 is energized.
NOTE: one line supplies power to both pressure switches E66 and E65.
AUTO
11 13
X2 45 22 1
S13
12 14
X2 20 41 2
30
KX1 E65
87a 87
V5
X1 11 X2 26 56 8 X4 2
X4 12 X4 3 X4 6
13
V4
E65
13 11
20 1 E70 P
2b 14 S14 E71 F Feed E66 P
14 12 70b
X1 12 X2 27 57 9 X4 10
X4 4
13
E67 P Perc. E65 P
2b 14 70b
X1 8 X2 42 F16 5 X4 5 E67
13
KM3
14
X1 9 X2 36 F12 7 B1 X4 13
X2 43 B1 6 TO DRIFTER HOURMETER B1
86
10
H T (NOT USED)
0 X4 11 85
P3 B1 KX1 B2 B5
D .
U
AR SE R
C
R
MAIN ELECTRIC BOX RW VE PE
E AL
FO R U
D D
E E AN
FE FE M
The feed lever stays in forward position. At the end of the feed travel the percussion by-pass valve
drops the pressure to the return line.
Two pressure switches are located at the BCI block underneath the directional control valves:
E66 normally open on the feed forward line and E65 normally closed on the percussion line.
When the rock drill reaches the end of the travel the feed forward pressure is at its maximum the switch
E66 is closed. The percussion pressure drops due to the by-pass valve, the pressure switch E65
moves back to neutral. Power is directed to the relay coil KX1.
KX1 energized, its contact shifts over, feed forward is no longer activated (B1 not energized), feed
reverse is activated (B2 energized).
As soon as feed reverse is activated, oil is directed to the rod end chamber of the feed cylinder, the
large chamber is connected to tank by the directional feed control valve. Therefore the feed forward
pressure switch is reset to its neutral position (open).
To be able to maintain the relay coil KX1 energized during all the reverse motion, a line out of the
contact KX1 (pin 87, wire E65) keeps the coil KX1 energized.
To reset the feed circuit back to neutral, the operator should move the feed lever to neutral (micro
switch S9.1 open).
NOTE: both pressure switches should be adjusted at 70 bar, to ensure that during collaring process or
when the anti-jamming is activated, this relay will not be energized.
NOTE: diode V5 prevents the relay KX1 to be energized when feed reverse is activated manually by
using the feed lever (micro switch S9.2 closed).